JA-103 Monthly UP KPI Report.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Utilities Privatization - Privatization of the Electric Utility System at Norfolk Naval Shipyard, VA
Solicitation number
SP060025R0800
Issued by

About this file

This document is a Monthly UP KPI (Key Performance Indicator) Report for the Electric Utility System at Norfolk Naval Shipyard, tracking performance metrics for a utilities privatization contract. The report outlines six critical performance criteria, including system availability (minimum 99.9772%), service interruption duration and frequency limits, and service request response times. These metrics cover emergency, urgent, and routine service orders, with specific requirements such as 90% of emergency service requests being responded to within 1 hour and 100% resolved within 24 hours.

The report provides a template for documenting monthly performance, with sections for outages, service requests, and additional information. While specific performance data is not filled in, the document serves as a standardized reporting mechanism for the utility system contractor to demonstrate compliance with contractual performance standards. This aligns with the related federal contract opportunity for Utilities Privatization at Norfolk Naval Shipyard, which involves transferring ownership and operational responsibility of the electric utility system to a private contractor under DLA Energy and U.S. Navy oversight.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. Cover Sheet

Monthly UP KPI Report
Installation Name:Norfolk Naval Shipyard
Utility System:Electric
Contract No.:
Contract Award Date:
Contract Start Date:
Total Customer Service Connections:
KPI Reporting Year:
Report Submittal Date:
NameEmailPhone
System Owner POC:
Contract Administering Officer:
Contracting Officer Representative:

B. Monthly Performance Summary

Electric System
No.CriteriaPerformance Requirement[Annual] PerformancePerformance meets Navy requirement? (Y/N)Corrective Action Plan if not meeting Navy requirementOther Notes
1Unplanned System OutagesSystem availability no less than 99.9772%
2System Average Interruption Duration Index (SAIDI)Not to exceed 60 minutes
3System Average Interruption Frequency Index (SAIFI)Not to exceed 1 event per year
4Emergency Service Order90% of Emergency service requests are responded to within 1 hour and 100% of Emergency service requests are resolved within 24 hours
5Urgent Service Order90% of Urgent service requests are resolved within 5 working days
6Routine Service Order90% of Routine service requests are resolved within 30 calendar days

C. Outages

Outage No. Date Time Quantity Estimate (gal) Type/Product (Ex: jp5, dfm, gas, min oil, hyd oil, lube oil) Responsible Party Cause Location Water/Land Weather Collection (No. drums turned in) Collection (Gallons in vac truck) Labor hours Sample Collected? (Y/N) [RESERVED] [RESERVED] [RESERVED] [RESERVED] Comments

D. Service Requests

SO request receivedSO on-scene arrivalDeficiency mitigation/arrestService restoration
Service Order No.PriorityDateTimeDateTimeDateTimeDateTimeResponse Time (minutes)Resolve Time (minutes)Service outage duration (minutes)Total No. of customers with service interruptionNo. of critical facilities with service interruptionResponsible PartyCauseLocation[RESERVED][RESERVED][RESERVED][RESERVED]Comments

F. Additional Information

[RESERVED]

File details come from the government source that posted it. Updated .