This document is a federal contract solicitation for a fire suppression system replacement project at Hangar 3211. The contract requires demolition of an existing high expansion foam fire suppression system and installation of a new alarm system, with multiple components including addressable pull stations, speaker strobes, speakers, a fireman's panel, signage, tamper switches, flow switches, ventilation control panel, NAC panel, low temperature sensors, addressable modules, RF with antenna, and associated programming and testing. The performance period is 365 days, and the contract includes specific provisions about unit pricing, quantity variations, and bid responsiveness, such as a requirement that failure to provide a bid on all items will render the bid non-responsive.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor: Date:
UNIT
ITEM SUPPLIES/SERVICES (Base Bid) QUANTIT UNIT PRICE AMOUNT
Demolition 1 LS
LOC/RDU 1 LS
Addresable Pull Stations 1 LS
Addresable Speaker Strobes 1 LS
Addresable Speakers 1 LS
Firemans Panel 1 LS
Signage 1 LS
Addresable Tamper Switch 1 LS
Addressable Flow Switch 1 LS
Ventilation Control Panel 1 LS
NAC Panel 1 LS
Low Temperature Sensors 1 LS
Low Temperature Annunciator 1 LS
Addresable Modules 1 LS
RF with Antenna 1 LS
Programming 1 LS
PART 1 - THE SCHEDULE
SECTION B (PTFL172008; Fire Suppression System, Hangar 3211 )
SUPPLIES OR SERVICE AND PRICES/COSTS
Provide all labor, equipment, appliances, and materials, and furnish and perform all work in strict accordance with the specifications, schedules, and drawings forming parts thereof, subject to the terms and conditions of the contract to demolish the existing high expansion foam fire suppression system and install a new alarm system at Hangar 3211, and all related work necessary and described or indicated in the contract document to include but not limited to:
Contractor: Date:
UNIT
ITEM SUPPLIES/SERVICES (Base Bid) QUANTIT UNIT PRICE AMOUNT
PART 1 - THE SCHEDULE
SECTION B (PTFL172008; Fire Suppression System, Hangar 3211 )
SUPPLIES OR SERVICE AND PRICES/COSTS
Testing 1 LS
Conduit and Wire 1 LS
Miscellaneous 1 LS
General Site Safety 1 LS
Performance Period: 365 Days
Overhead Profit
TOTAL (Base Bid)
NOTE 1: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.
NOTE 2: If a modification to a bid based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro-rata basis to every unit price in the bid schedule.
NOTE 3: If the actual quantities should be less than 85% or more than the 115% of the estimated quantities, the unit prices of those items falling outside the parameters of 85%/115% will be subject to negotiation; however, if the actual quantities installed/removed fall within the 85% and 115% range of the estimated quantities, the unit prices bid will be used for payment purposes. In either event, the contractor shall only be paid for actual quantities installed/removed (as applicable to bid schedule). In no case shall the contractor exceed the amount of the contract without consent of the Contracting Officer.
NOTE 4: Failure to provide a bid on all items will render your bid non-responsive.