J1_Material Submittal.pdf

PDF 82 KB Posted

Attached to
Hangar 3211 Fire Suppression Repair
Solicitation number
FA448426R0002
Issued by

About this file

This Schedule of Material Submittals details requirements for a Fire Suppression System project at Hangar 3211, with project number PTFL 17-2008. The document outlines 70 specific submittal items that must be provided by the contractor, with most submissions required within 30 days after Notice to Proceed (NTP), and some specialized submittals like programming due 75 days after NTP or training-related documents prior to project completion.

The submittals cover a comprehensive range of technical documentation and materials, including environmental management systems, safety plans, construction schedules, technical drawings, equipment specifications, and detailed documentation for various fire suppression and alarm system components. These include pipes, fittings, valves, sprinklers, alarm switches, detectors, panels, cables, sensors, and associated documentation such as as-built drawings, operation manuals, training plans, and testing documentation. Each submittal requires multiple copies and must be reviewed and approved by the contracting administration before final acceptance.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVED DISAPPROVED

1 Conformance with Enviromental Management Systems 3 As Required

2 Health and Safety Plan - in accordance with OSHA 3 As Required

3 As-Built Drawings 3 30 Days After Completion

4 Construction Schedule 3 30 Days After

NTP

Contract Work Plan - Preconstruction and Construction Phase Plans

3 3 30 Days After

NTP

6 Base Civil Engineering Work Clearence Request, AF Form 103 3 3 30 Days After

NTP

7 Accident Prevention Plan 3 30 Days After

NTP

8 Fire Protection Plan 3 30 Days After

NTP

9 Utility Outage Request 3 3 3 30 Days After

NTP

10 Utility Connection Request 3 3 3 30 Days After

NTP

11 Construction Quality Control Plan 3 3 30 Days After

NTP

12 Indoor Air Quality Management Plan 3 30 Days After

NTP

13 NICET Cert 3 3 30 Days After

NTP

14 Sprinkler System Designer 3 3 30 Days After

NTP

15 Sprinkler System Installer 3 3 30 Days After

NTP

16 Fire Protection Specialist Resume 3 3 30 Days After

NTP

17 List of Contact Personnel 3 30 Days After

NTP

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N

PR

O

FE

SI

O N

AL

E

N G

IN

EE

R L

IC

EN

SE

SC

H

ED

U

LE

FI

N

AL

A

PP

R

O

VA

L

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

REMARKS

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

AS

-B

U

IL

T D

R

AW

IN

G

S

W O

R K

PL

AN

EQ

U

IP

M

EN

T

LI

ST

PROJECT TITLE

Fire Suppression System, Hangar 3211

DATE CONTRACTOR

NOTIFIED

PROJECT NUMBER

PTFL 17-2008

(To be completed by Contract Administrator)

SOLICITATION / CONTRACT NO.

SU

BM

IT

TA

L N

U M

BE

R

S

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

SA

M

PL

E

O R

T

ES

TI

N

G

TE

C

H N

IC

AL

D

AT

A

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

M

AN

U

FA

C

TU

R

ER

'S C

AT

AL

O G

C U

TS

/D

A T

O

PE

R

AT

IO

N

/M

AI

N

TE

N

AN

C E

M

AN

U

AL

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

PE

R

M

IT

R

EQ

U

ES

T

FO

R M

FI

N

AL

A

C C

EP

TA

N C

E

TE

ST

(P

AT

) P

LA

N

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

FI

EL

D R

EP

O

R

TS

APPROVED DISAPPROVEDSA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N

PR

O

FE

SI

O N

AL

E

N G

IN

EE

R L

IC

EN

SE

SC

H

ED

U

LE

FI

N

AL

A

PP

R

O

VA

L

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

REMARKS

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

AS

-B

U

IL

T D

R

AW

IN

G

S

W O

R K

PL

AN

EQ

U

IP

M

EN

T

LI

ST

PROJECT TITLE

Fire Suppression System, Hangar 3211

DATE CONTRACTOR

NOTIFIED

PROJECT NUMBER

PTFL 17-2008

(To be completed by Contract Administrator)

SOLICITATION / CONTRACT NO.

SU

BM

IT

TA

L N

U M

BE

R

S

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

SA

M

PL

E

O R

T

ES

TI

N

G

TE

C

H N

IC

AL

D

AT

A

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

M

AN

U

FA

C

TU

R

ER

'S C

AT

AL

O G

C U

TS

/D

A T

O

PE

R

AT

IO

N

/M

AI

N

TE

N

AN

C E

M

AN

U

AL

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

PE

R

M

IT

R

EQ

U

ES

T

FO

R M

FI

N

AL

A

C C

EP

TA

N C

E

TE

ST

(P

AT

) P

LA

N

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

FI

EL

D R

EP

O

R

TS

18 Personnel List 3 30 Days After

NTP

19 Warranty Management Plan 3 3 30 Days After

NTP

20 Health and Safety Plan 3 3 30 Days After

NTP

Welding, Burning, Cutting Permit - Air Force Occupational Safety and Health (AFOSH) Standard 91-5

3 3 3 30 Days After Completion

22 Airfield Acces 3 20 Days After

NTP

23 Quality Assurance Plan 3 30 Days After

NTP

24 Construction Waste Management Plan 3 30 Days After

NTP

25 Demolition Plan 3 30 Days After

NTP

26 Product Subsitution Submittal 3 3 3 3 3 3 3 30 Days After

NTP

27 Submittals - Shop Drawings, Cut Sheet, Product Data 3 3 3 3 3 3 3

30 Days After

NTP

28 Pipe 3 3 3 3 3 3 30 Days After

NTP

29 Fittings 3 3 3 3 3 3 30 Days After

NTP

30 Valves 3 3 3 3 3 3 30 Days After

NTP

31 Alarm Valves 3 3 3 3 3 3 30 Days After

NTP

32 Relief Valves 3 3 3 3 3 3 30 Days After

NTP

33 Sprinklers 3 3 3 3 3 3 30 Days After

NTP

34 Pipe Hangers 3 3 3 3 3 3 30 Days After

NTP

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N

PR

O

FE

SI

O N

AL

E

N G

IN

EE

R L

IC

EN

SE

SC

H

ED

U

LE

FI

N

AL

A

PP

R

O

VA

L

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

REMARKS

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

AS

-B

U

IL

T D

R

AW

IN

G

S

W O

R K

PL

AN

EQ

U

IP

M

EN

T

LI

ST

PROJECT TITLE

Fire Suppression System, Hangar 3211

DATE CONTRACTOR

NOTIFIED

PROJECT NUMBER

PTFL 17-2008

(To be completed by Contract Administrator)

SOLICITATION / CONTRACT NO.

SU

BM

IT

TA

L N

U M

BE

R

S

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

SA

M

PL

E

O R

T

ES

TI

N

G

TE

C

H N

IC

AL

D

AT

A

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

M

AN

U

FA

C

TU

R

ER

'S C

AT

AL

O G

C U

TS

/D

A T

O

PE

R

AT

IO

N

/M

AI

N

TE

N

AN

C E

M

AN

U

AL

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

PE

R

M

IT

R

EQ

U

ES

T

FO

R M

FI

N

AL

A

C C

EP

TA

N C

E

TE

ST

(P

AT

) P

LA

N

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

FI

EL

D R

EP

O

R

TS

35 Sprinkler Alarm Switch 3 3 3 3 3 3 30 Days After

NTP

36 Valve Tamper Switch 3 3 3 3 3 3 30 Days After

NTP

37 Cable Installation Plan 3 3 30 Days After

NTP

38 Wire and Cable 3 3 3 3 3 3 30 Days After

NTP

39 Conductors 3 3 3 3 3 3 30 Days After

NTP

40 Conduit 3 3 3 3 3 3 30 Days After

NTP

41 Local Operating Console/RDU 3 3 3 3 3 3 30 Days After

NTP

42 Addressable Pull Stations 3 3 3 3 3 3 30 Days After

NTP

43 Alarm combination speaker/strobes 3 3 3 3 3 3 30 Days After

NTP

44 Alarm Strobes 3 3 3 3 3 3 30 Days After

NTP

45 Alarm CO Blue Strobe 3 3 3 3 3 3 30 Days After

NTP

46 Addressable Speakers 3 3 3 3 3 3 30 Days After

NTP

47 Text Display Unit 3 3 3 3 3 3 30 Days After

NTP

48 Fire/Evacuation Lighted Signs 3 3 3 3 3 3 30 Days After

NTP

49 LT Graphic Annunciator 3 3 3 3 3 3 30 Days After

NTP

50 Addressable Modules 3 3 3 3 3 3 30 Days After

NTP

51 Batteries 3 3 3 3 3 3 30 Days After

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N

PR

O

FE

SI

O N

AL

E

N G

IN

EE

R L

IC

EN

SE

SC

H

ED

U

LE

FI

N

AL

A

PP

R

O

VA

L

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

REMARKS

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

AS

-B

U

IL

T D

R

AW

IN

G

S

W O

R K

PL

AN

EQ

U

IP

M

EN

T

LI

ST

PROJECT TITLE

Fire Suppression System, Hangar 3211

DATE CONTRACTOR

NOTIFIED

PROJECT NUMBER

PTFL 17-2008

(To be completed by Contract Administrator)

SOLICITATION / CONTRACT NO.

SU

BM

IT

TA

L N

U M

BE

R

S

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

SA

M

PL

E

O R

T

ES

TI

N

G

TE

C

H N

IC

AL

D

AT

A

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

M

AN

U

FA

C

TU

R

ER

'S C

AT

AL

O G

C U

TS

/D

A T

O

PE

R

AT

IO

N

/M

AI

N

TE

N

AN

C E

M

AN

U

AL

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

PE

R

M

IT

R

EQ

U

ES

T

FO

R M

FI

N

AL

A

C C

EP

TA

N C

E

TE

ST

(P

AT

) P

LA

N

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

FI

EL

D R

EP

O

R

TS

52 Duct Smoke Detector 3 3 3 3 3 3 30 Days After

NTP

53 Programming 3 3 3 3 3 3 3 75 Days After

NTP

54 Antenna 3 3 3 3 3 3 30 Days After

NTP

55 LT Sensors 3 3 3 3 3 3 30 Days After

NTP

56 Nac Panel 3 3 3 3 3 3 30 Days After

NTP

57 Ventalation Control Panel 3 3 3 3 3 3 30 Days After

NTP

58 Firemans Panel 3 3 3 3 3 3 30 Days After

NTP

59 Circuir Breakers 3 3 3 3 3 3 30 Days After

NTP

60 As-Built Drawings 3 30 Days After Completion

61 As-Built Records of Equipment and Materials 3 3 30 Days After Completion

62 Operation and Maintenance Manuals 3 30 Prior to Completion

63 O&M Database 3 3 3 3 3 30 Prior to Completion

64 Training Plan 3 30 Prior to Completion

65 Training Outlline 3 30 Prior to Completion

66 Training Content 3 30 Prior to Completion

67 Testing plans 3 3 3 3 3 3 3 3 3 180 Days After

NTP

68 Closet out Submittals 3 3 3 3 3 3 3 3 3 3 3 30 Days After

NTP

69 Products 3 3 3 3 30 Days After

NTP

70 3 60 Days After

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

File details come from the government source that posted it. Updated .