J2f Requirements Document (DWH RD).pdf
PDF 1 MB Posted
- Attached to
- David Wayne Hooks (DWH) ATCT Replacement Federal contract opportunity
- Solicitation number
- 697DCK-25-R-00189
About this file
This Requirements Document details the Federal Aviation Administration's (FAA) project for replacing the Airport Traffic Control Tower (ATCT) at David Wayne Hooks Memorial Airport in Tomball, Texas. The existing non-standard design ATCT, constructed in the late 1970s, will be replaced with a new facility at Site 5, located approximately 600 feet south of the current tower. The new tower will maintain the current operational configuration of three control positions (Local Control East, Local Control West, and Ground Control) and three support positions, with a total staffing of 18 personnel.
The project requirements include a 530 sq. ft. eight-sided cab with a floor elevation of 90.5 feet above ground level, comprehensive facility specifications, and specific design considerations. Funding will be provided by the Infrastructure Investment and Jobs Act (IIJA)/Bipartisan Infrastructure Law (BIL). The facility will include various specialized spaces such as a lactation room, wellness area, and technical operations rooms. Key design requirements involve sustainability principles, security measures, electrical and communication systems, and adherence to the Terminal Facilities Design Standard. The project involves a comprehensive implementation strategy covering deployment planning, personnel transition, training, and facility integration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ - RFI Set 1.pdf | ||
| 697DCK-25-R-00189.pdf | ||
| J2b DWH ATCT_Initial Geotechnical Report April 2024.pdf | ||
| J2m FOTS-STD-061A.pdf | ||
| 697DCK-25-R-00189.pdf | ||
| J2d DWH_AppF_OEAAA.pdf | ||
| J2e DWH_V2.0_Siting_Report_Final.pdf | ||
| J2i FAA-C-1217H Chg 2 Electrical.pdf | ||
| J2n FSL 2 CI Baseline Requirements Job Aid.pdf | ||
| J2p Div 1 DWH SPECS.pdf | ||
| J1 DWH Phase I RFQ - Final.pdf | ||
| J2 SOW_ DWH_ATCT.pdf | ||
| J2h FAA_Order_1053_1C Energy-Water Manage.pdf | ||
| J2j FAA-C-1391F - ELD 2023.pdf | ||
| J2l FAA-STD-019G - LPGBS 2024.pdf | ||
| J2o TFDS_V2.3 Terminal ATCT.pdf | ||
| J5 Past Performance Questionnaire.pdf | ||
| J2a DWH Standard Design.pdf | ||
| J2c DWH FINAL Topo-Utility Survey (markup).pdf | ||
| J2g FAA BIM Execution Plan_v1.2 CAEG.pdf | ||
| J2k FAA-STD-002h Drawing Prep - Sup.pdf | ||
| J3 WD TX20250253.pdf | ||
| J4 DB Quals - SF330-21.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
David Wayne Hooks Memorial Airport (DWH) Tomball, Texas
Airport Traffic Control Tower (ATCT)
REQUIREMENTS DOCUMENT
Prepared By:
Air Traffic Organization
Technical Operations Facilities & Engineering Services (AJW-2)
Terminal Facilities Planning and Controls (AJW-2444)
April 2024
U.S. Department of Transportation Federal Aviation Administration 800 Independence Avenue, SW
Washington, D.C. 20591
David Wayne Hooks Memorial Airport (DWH), TX ATCT, Requirements Document April 2024
Background:
The Business Case for the David Wayne Hooks Memorial Airport (DWH) Airport Traffic Control Tower (ATCT) was approved on April 13, 2023, by the Air Traffic Organization (ATO) Vice Presidents of Air Traffic and Technical Operations. This document defines the facility requirements for the DWH ATCT Replacement Project. These requirements are the baseline for subsequent design and implementation and, as such, cannot be changed without prior approval.
Cost and schedule information will be updated as the design is completed. This document indicates that Terminal Facilities Planning and Controls (TFPC) has deemed the program ready for execution. Terminal Program Operations agrees to accept the program and begin implementation.
Recommendation: Approve Requirements Document for the replacement of DWH ATCT.
Digitally signed by JAMES F
Submitted By: JAMES F PASTO PASTO
Manager, Terminal Facilities (ADJaWte-:224042)4.04.30 15:11:08 -04'0D0a' te
Signed By: Date: Decision:
Digitally signed by Mark A Brandewie
'Date: 2024.05.22 09:35:14 -04'00 Approved Disapproved
Group Manager, Facilities and Security Services (AJW-24)
HONEY A NATALE Digitally signed by HONEY A NATALE Date: 2024.06.24 08:01:41 -05'00'
�Approved �Disapproved
Group Manager, Planning and Requirements Group, Central Service Center (AJV- C3)
CHARLES V MAURO Digitally signed by CHARLES V MAURO Date: 2024.05.30 15:06:11 -04'00'
Approved Disapproved
Director, Financial Services (AJG-R) Digitally signed by DOUGLAS E LOCKWOOD
DOUGLAS E LOCKWOOD II II
Date: 2024.06.20 06:47:28 -05'00'
Approved Disapproved
Director, Technical Operations, Central Service Area (AJW-C)
JOSEPH FIGLIUOLO III Digitally signed by JOSEPH FIGLIUOLO III Date: 2024.06.18 17:08:56 -04'00'
Approved Disapproved
Director, Air Traffic Operations, Central Service Area (AJT- C) Approved Disapproved
Director, Air Traffic Operations, Headquarters (AJT-2/3) Approved Disapproved
Director, Facilities & Engineering Services (AJW-2) Approved Disapproved
Vice President, Air Traffic Services (AJT-0) Approved Disapproved
Vice President, Technical Operations (AJW-0)
ROLANDO S CAPARAS Digitally signed by ROLANDO S CAPARAS Date: 2024.08.01 10:16:18 -04'00'
1.0 Executive Summary
The DWH Airport Traffic Control Tower (ATCT) is a Tier 2, Level 6 facility located in Tomball, TX (Figure 1). The city of Tomball is in Harris County, a suburb of Houston. This airport is approximately 31 miles northwest of downtown Houston and 21 miles northwest of the George Bush Intercontinental Airport (IAH).
Figure 1. Location of DWH Airport in Tomball, Texas
The existing non-standard design ATCT is located on the west side of the airport (Figure 2). The DWH ATCT operates from 0700 to 2200 local / central time. The ATCT is a Hunt-Avco design (Figure 3). The Cab size is approximately 225 sq. ft. The Cab floor level is 44 feet above ground level (AGL). The ATCT was constructed in the late 1970s and commissioned in 1979. The ATCT is a functional shaft of approximately 1,600 gross sq. ft. The base building and link were constructed between 1987 and 1988. A one-story equipment room addition to the base building was added to the south of the base building in 2005. The gross area for the base building, including the 90 sq. ft. link, is 1,850 sq. ft., for a total combined facility square footage of approximately 3,450 sq. ft.
Figure 2. DWH Airport, Tomball, TX
Figure 3. DWH ATCT
A Quick Look (QL) evaluation1 was conducted at the Airport Facilities Terminal Integration Laboratory (AFTIL). The evaluation confirmed several Line-of-Sight (LOS) blockages.
A Facility Condition Assessment (CA) conducted by Jacobs Engineering identified numerous architectural, fire life safety, electrical, and mechanical deficiencies.2
The LOS and facility deficiencies regarding visibility, condition and necessary space will be corrected by the replacement of this ATCT.
2.0 Operational and Functional Requirements
The DWH ATCT has three operational positions: Local Control East (LC-E), Local Control West (LC-W), and Ground Control (GC). DWH ATCT has three support positions: Cab Coordinator (CC), Clearance Delivery (CD)/Flight Data (FD), Controller-in-Charge (CIC) / Supervisor Cab/Front Line Manager (FLM).3
1 Source: FAA/AFTIL/DWH Quick Look evaluation dated August 30, 2018 2 Source: FAA/Task Order AE-0015 Condition Assessment and 6480.17 Facility Evaluation Report DWH ATCT and Base Building, Tomball, TX, August 2016 3 Source: FAA/Technical Requirements & Forecasting Group, AJG-P2, September 2022
DWH airspace underlies the Houston Terminal Radar Approach Control (TRACON) (I90). I90 provides approach control services into DWH, which underlies the Houston Air Route Traffic Control Center (ARTCC) (ZHU) (Figure 4).
Figure 4. DWH ATCT Airspace Underlying Houston TRACON Airspace
Facility Specifications for DWH ATCT
Facility Type: ATCT Current Facility Status: (owned or leased) Owned Planned Realignment (804): None Attached functions: None ATC Level: 6 (Tier 2) Hours of operation: 0700-2200 Local
Current positions:
3 -Operations; 3 - Support
Airspace/Procedure Changes: None FY Operations for 2023: 170,192 Facility Type: ATCT Automation: STARS G4 (I90) Siting: 2/29/2024 Method of Implementation: AFTIL I
Airspace/Procedure Changes (Planning) None Overlying ARTCC: ZHU Controlling TRACON I90
2.1 Airspace Changes
No airspace changes to DWH are anticipated.
2.2 Facility Siting Requirements
The AFTIL 1 siting was signed on November 17, 2022. There were 11 sites assessed, with 3 sites deemed as recommended: Site 1, Site 5 (preferred) and Site 9. A Safety Management System (SMS) Comparative Safety Analysis4 (CSA) panel was conducted at the AFTIL to identify, analyze, review, and mitigate hazards associated with siting the new DWH ATCT. Site 5 was accepted (Figure 5.). An AFTIL 1 & 2 re-siting occurred on February 29, 2024 and confirmed the following elevations:
Site 1:
Located approximately 300 ft. South Southeast of the existing ATCT Lat.: 30° 03'58.26"N Long.: 95°33'20.69"W Eye level height: 95.6 ft. AGL.
Site 5 (Recommended):
Located approximately 600 ft., almost due south of the current ATCT Lat.: 30°03'55.36"N Long.: 95°33'19.72"W Eye level height: 95.6 ft. AGL.
4 David Wayne Hooks Memorial Airport (DWH) Replacement Airport Traffic Control Tower AFTIL-2 – With Hazards November 2022
Site 9:
Located approximately 600 ft. due south of the current ATCT Lat.: 30°03'55.1738"N Long.: 95°33'21.3964"W Eye level height: 124.6 ft. AGL.
Figure 5. DWH Preferred Sites for ATCT Replacement / Site 5 Recommended
2.3 AJT Operational Positions
The following table details the operational Air Traffic Services (AJT) positions for the DWH
ATCT:
AJT Operational Positions
OPERATIONAL POSITIONS
Tomball, TX David Wayne Hooks Tower (DWH), Type Tower, Hrs. of Op 0700-200 LCL, Technical Requirements
& Forecasting, AJG-P2, 10/27/2023
Current Positions
Future Positions
Tower Control Positions
LOCAL CONTROL WEST 1 1
LOCAL CONTROL EAST 1 1
GROUND CONTROL 1 1
Total Control Positions 3 3 Tower Support Positions
CLEARANCE DELIVERY 1 1
FLIGHT DATA
CAB COORDINATOR 1 1
OPERATIONAL
SUPERVISOR/CONTROLLER-IN-
CHARGE
Total Support Positions 3 3
Total Tower Positions 6 6
Clearance delivery and flight data are one certification at this location and are considered one position.
2.4 AJT Staffing
The following table details the staffing levels for AJT for the DWH ATCT:
AJT Authorized Staffing Numbers
David Wayne Hooks, Houston, TX ATCT (DWH), Ops Hours 0700-2200LCL, Technical Requirements Analysis Team, AJG- P24, 10/27/2023
Authorized AT Staffing
Estimated Future Staffing
AIR TRAFFIC PERSONNEL
Air Traffic Manager 1 1 Staff Manager 0 0 Support Manager 0 0 Operations Manager 0 0
Operational Supervisor 2 2 Support Specialist 1 1 Air Traffic Control Specialist 13 13 ATCS Staffing Range (Min/Max) 10/13 10/13
Administrative Officer 0 0 Personnel Specialist 0 0 T&A Clerk 0 0 Administrative Support 1 1
Traffic Management Officer 0 0 Supervisory Traffic Management Coordinator 0 0 Traffic Management Coordinator 0 0 Traffic Management Analyst 0 0 Traffic Management Specialist 0 0
Total Air Traffic Personnel 18 18
CONTRACT PERSONNEL
Contract Weather Observers 0 0 US Customs Staff 0 0 Contractor Training manager 0 0 Contractors for Training 0 0 Contractor Administrative 0 0
Total Contract Personnel 0 0 Total Facility Personnel 18 18
2.5 AJR Staffing
Staffing for AJR does not exist at DWH.
2.6 AJW Staffing
The following table displays the Technical Operations Services (AJW) staffing levels for the
DWH ATCT:
DWH Tech Ops Staffing (David Wayne Hooks Airport)
FUNCTION Current On-
Site Staffing
Verified by (AJV-C62, 01/4/2023)
Hours of Ops = 5-day week
(Admin) District Manager 0 District Facility Manager 0 Facility Manager 0 SSC Manager* 0 SSC Coordinator 0
Support Specialist 0 Air Traffic System Specialist (ATSS) 0 General Maintenance Mechanic (GMM) 0 Engineering Technician 0 Electronic Technician 0 Administrative Support Personnel 0 Tech Ops Total 0
* SSC is System Support Center
Three System Support Center (SSC) Units from I90 provide day-to-day operational support services for preventative maintenance and restoration at DWH (NAV/Comm, ENV, and Automation).
2.7 System Functional Requirements
For a complete listing of all facility equipment functionality, refer to the equipment list tab of the DWH Requirements Document Workbook (RDWB). There is no difference in equipment functionality between the existing facility and the new facility.
2.8 Facility Requirements
2.8.1 Space Allocation
ROOM FUNCTION Space per Staff Final Validated Staff Allowable Space NOTES
TERMINAL PERSONNEL
Air Traffic Manager 150 1 150
Operations / Front Line Manager 50 2 100 Single Shared Office Admin Assistant 64 1 64
Support Specialist 64 1 64
Air Traffic Control Specialists 0 13 0
Subtotal 378
TECHNICAL OPERATIONS PERSONNEL
ATSS Desk Space and Tech Library 32 0
Workspace for visitng ATSSs, and Tech Ops document storage
Subtotal 160
AIR TRAFFIC SPACES
AT Space 150 1 150 Multi purpose room, Site adapt this room to meet facility needs Quiet Room 100 1 100 FAA Controlled ATCTs only
Subtotal 250
TECHNICAL OPERATIONS REQUIREMENTS
Electronics Equipment Space 536 1 536
Electronics / Tech Ops Room
Multi purpose room, Site adapt this room to meet facility needs. Space must not be site adapted for high occupancy use such as lounge, breakroom, conference, collaboration, wellness.
TELCO 64 1 64
Subtotal 973
ENVIRONMENTAL SUPPORT - MECH/ELEC SPACE
Electrical Equipment Space 912 1 912
Fire Pump Room 130 1 130
Fire Life Safety Electrical Room 160 1 160
Mechanical Equipment Space 1,244 1 1,244
Storage 300 1 300
Subtotal 2,746
JOINT USE & MISC. SUPPORT AREAS
Wellness and Locker Room 225 1 225
Lactation Room (with sink) 84 1 84
Smoking Room 0 0 0 Exterior shelter Collaboration Room 15 15 225
Janitor Closet 100 1 100
Storage 240 1 240
Womans Restroom 64 1 64
Mens Restroom 64 1 64
Lounge 15 15 225
Training Room 150 1 150
Subtotal 1,377
Lobbies / Restrooms / Corridors, etc. shown on PAU design 2,010
TOTAL ATCT SPACE 7,894
2.8.2 Special Considerations
The Terminal Facilities Design Standard (TFDS) establishes design standardization where possible/practical to facilities and facility systems for new buildings and modernizations within FAA Terminal Facilities. The TFDS is a mandatory document containing policy and technical criteria to be used in the programming, design, construction, measurement and verification, and documentation of FAA ATCT facilities. Please contact the Terminal Facilities Design, Engineering, and Innovation group to obtain the latest version of the document to be incorporated into the design contract.
2.8.2.1 Special Design Considerations
The Practice for Architecture and Urbanism (PAU) Standard Design must be followed for the design of this project. A list of TFDS exceptions for PAU tower replacement projects will be provided.
Please contact Zane Edwards or Ryan Cummings of Design, Engineering, Innovation (DEI) prior to the commencement of design for the most recent TFDS and PAU Standard Design Drawings.
Every effort must be made to contain all facility needs in the ATCT while maintaining a calculated occupancy load of 90 or less. If facility requirements are such that the total calculated occupancy load exceeds 90 and a base building may be required, a justification must be submitted to DEI for review and approval.
Email: Zane.Edwards@FAA.GOV – Cell Phone: 202-374-5570 Email: Ryan.Cummings@FAA.GOV – Cell Phone 617-968-5583
2.8.2.2 Whole Building Commissioning
A third-party commissioning authority will be retained to perform enhanced whole-building commissioning. This effort starts prior to the commencement of design.
2.8.2.3 Siting
The siting report identified the recommended site as Site 5 with a Cab floor elevation of 90.5' AGL. Review the Final DWH Siting Report and Comparative Safety Analysis (Safety Risk Management Document) and incorporate any required mitigations into the project.
Cab 530 sq. ft. with eight-sided Cab.
Lat.: 30° 03'55.36"N Long.: 95°33'19.72"W
2.8.2.4 Parking
Provide the following parking spaces:
19 Employee (Max Shift) 1 Accessible 20 Spaces total
No AJW staffing report to DWH as their duty station, however 3 ATSS from the IAH SSC perform significant preventative maintenance and restoration activities regularly at DWH ATCT.
Spaces included for these employees are counted in the visitor parking allocation.
2.8.2.5 Electric Vehicles
Please contact the FAA Fleet Program Manager prior to the 10 percent design submission to verify conduit infrastructure for charging stations from separate power service to planned parking lot station location.
FAA Electric Vehicle (EV) Fleet Manager POC: tim.morris@faa.gov
2.8.2.6 Power Systems
Power requirements for this project are a radial system Uninterruptible Power Supply (UPS). The actual room sizes are to be determined once the power system is sized. All Electric Generators (E/G) will be exterior to the building.
The design engineer must utilize the new Electrical System Load Calculator. The tool can be found on the Terminal Facilities Standard Design Knowledge Services Network (KSN) site at the following link:
https://ksn2.faa.gov/AJW/AJW244C/dei/_layouts/15/WopiFrame.aspx?sourcedoc=/AJW/AJW2 44C/dei/Shared%20Documents/Electrical%20System%20Load%20Calculator.xls&action=defau lt
2.8.2.7 Fire Life Safety Bus
The design shall comply with the requirements of the National Electrical Code (NEC), Life Safety Code (LSC), and International Building Code (IBC). These requirements are outlined in the July 2021 Fire Life Safety (FLS)/ Electrical Workgroup Final Submission report. It is the designer’s responsibility to adapt these requirements into the facility’s design and provide a functional code-compliant design. If load shedding is necessary, the designer is responsible for designing a code-compliant design utilizing the general principles shown in the electrical drawings.
2.8.2.8 Security
Standard security requirements apply for a Security Level 1 (SL1) facility in accordance with FAA Order 1600.69C, FAA Facility Security Management Program. The final security level determination and associated requirements will need to be coordinated with the Service Area Servicing Security Element (SSE).
2.8.2.9 Communications
Existing RTR location on cab roof top. Complete a spectrum analysis if the RTR can be on the new ATCT. Contact DEI for further information.
2.8.2.10 Communications Diversity
Not applicable to this ATCT.
2.8.2.11 Fiber Loop
Not applicable to this ATCT.
2.8.2.12 Slat Wall
Slat wall consoles will be utilized in the Cab.
2.8.2.13 Contract Weather Observer
Not applicable – No Contract Weather Observation (CWO) presence.
2.8.2.14 Smoking
An exterior smoking area will be included as part of the design for this building.
2.8.2.15 Lactation Room
One lactation room shall be included in the design. The room shall adhere to the Aerospace Industries Association (AIA) Best Practices for lactation rooms and include the following at a minimum:
1) 1. 84 sq. ft. in size.
2) 2. User-operated lockable door.
3) 3. Chair and 18" x 32" minimum work surface.
4) 4. Sink and mini refrigerator.
2.8.2.16 Secured Fence Area
A perimeter security fence is required.
2.8.2.17 Sustainability
All new ATO design projects are required to meet the Guiding Principles for Sustainable Buildings and Associated Instructions. Contact Mr. Gabriel Velicu, Terminal Facilities Design, Engineering, Integration Sustainability Lead, with any questions.
Email: Gabriel.Velicu@faa.gov. Office Phone: 202-267-8722.
2.8.2.18 Disposition
The project includes the disposition of FAA equipment and the demolition of the existing facility.
2.8.2.19 Fuel Piping
The memorandum titled "ATO Fuel Storage Tank, Piping Identification," dated October 3, 2019, requires all visible/exposed piping carrying flammable or combustible fluid to be painted yellow and marked in accordance with ANSI/ ASME A13-1.
2.8.2.20 Funding
Funding for this project is being provided by the Infrastructure Investment and Jobs Act (IIJA)/Bipartisan Infrastructure Law (BIL).
2.8.2.21 Integrated Logistic Support Plan
An Integrated Logistic Support Plan (ILSP) is required to provide a disciplined, unified, and iterative approach to the management and support of National Airspace System (NAS) operational requirements through maintenance planning, supply support, support equipment, technical data, direct work maintenance staffing, maintenance support facilities, computer resources support, training and packaging handling storage and transportation where applicable.
2.8.2.22 Water Supply
Water service (domestic and fire) on the airport is currently supplied via an Airport owned and operated well system. There have been reports at the existing ATCT that this system is somewhat unreliable, and the service is not potable. As a result bottled water is supplied to the facility on a reoccurring basis for applicable domestic purposes.
The design team should therefore explore the available alternatives and perform a cost and reliability feasibility study. Alternatives shall include but may not be limited to;
1. Utilize the existing airport well system with supplemental on-site storage for fire protection along with a facility water treatment system as required based on an analysis of the existing airport water supply.
2. Extend public water from the closest available source
3. Installation of an FAA on-site well(s) system serving the new facility.
4. Any water system servicing the facility, supplemental or whole, shall be connected to emergency electrical service (essential bus/EG).
2.8.2.23 Electrical Service
Extension of 3-phase electrical service to the site will be required for supply to the standard FAA 3-phase Radial system.
2.8.23.24 Sanitary Sewage
There is no public sanitary sewer currently available at the site. The design team should perform a study to determine whether it is cost feasible to extend public service to the site or whether an on-site facility treatment system should be used. If the analysis yields an on-site treatment system, all electrical components of such system must be connected to the emergency power (E/G) and the entire system must comply with local building code requirements.
3.0 Program Requirements
3.1 Project Cost
Site specific cost will be developed during the Execution Phase.
3.2 Integrated Program Schedule
The Integrated Program Schedule for DWH will be developed and managed by the cognizant Service Area and reside in the Corporate Work Plan.
3.3 Risk Management
Terminal Facilities Execution will implement a risk management program that includes risk identification, risk classification (severity of consequences and likelihood of occurrence), measures to mitigate or reduce risk to an acceptable level, verification that mitigation measures are incorporated and implemented, and assessment of residual risk during the execution of this project.
4.0 Implementation Planning
Terminal Facilities Execution shall develop and document a plan(s) for achieving the technical, cost, and schedule requirements specified in this document. The plan(s) shall address the following elements.
a) Management Team The roles and responsibilities of key individuals and organizations that will implement this program shall be documented. Identify all relevant functions and disciplines.
b) Program Control Program schedule and cost performance will be managed, measured, evaluated, and reported for all resources supporting the program shall be documented. Also, an explanation of how program activity will be coordinated and reported (e.g., monthly status reviews, quarterly regional reviews, annual service area reviews) shall be documented.
c) Implementation Strategy
The strategy for bringing the new facility, transfer of function/consolidation, or collocation into operational use shall be documented. This strategy typically involves deployment planning; personnel transition, training, and relocation; implementation contract(s) award and administration; site engineering, environmental assessment, lease/procurement, and physical integration; facility design and construction; systems and equipment acquisition/refurbishment and delivery; installation and checkout;
system shakedown; dual operations; joint acceptance and inspection; commissioning;
the removal and disposal of replaced systems, equipment, land, and facilities; and In Service Management.
The training strategy for obtaining the processes, procedures, course material, and skills necessary to train personnel shall be defined. Also, an explanation of how service will be maintained during the transition from the current capability to the new capability.
An integrated program schedule of activities to achieve the above Implementation Strategy shall be developed, showing major program milestones and critical interrelationships between work activities.
As part of the requirements development process, Terminal Facilities Planning has developed a preliminary Transition Management Plan and schedule, which addresses many of the implementation planning elements above. The draft plan and schedule are identified as references to this document; the final plan shall be completed for presentation at Decision Point four. The schedule is also incorporated into the Requirements Document (RD) as Section 3.2, Integrated Program Schedule.
5.0 References
1) Approved DWH ATCT Alternatives Analysis and Business Case.
2) Approved DWH ATCT Siting Report.
3) Approved DWH ATCT Safety Risk Management Document.
6.0 Attachments
1) None.
| DateDigitally signed by Mark A Brandewie Date 20240522 093514 04 00: | |
| Disapproved: | |
| Group Manager Facilities and Security Services AJW24: | |
| r: | |
| CHARLES V MAURO Digitally signed by CHARLES V MAURO Date 20240530 150611 04 00: | |
| Disapproved_2: Off | |
| Director Financial Services AJGR: | |
| Digitally signed by DOUGLAS E LOCKWOOD DOUGLAS E LOCKWOOD II II Date 20240620 064728 05 00: | |
| Director Technical Operations Central Service Area AJWC: | |
| JOSEPH FIGLIUOLO III Digitally signed by JOSEPH FIGLIUOLO III Date 20240618 170856 04 00: | |
| Director Air Traffic Operations Central Service Area AJT CRow1_2: | |
| Director Air Traffic Operations Headquarters AJT2Row1: | |
| Director Air Traffic Operations Headquarters AJT2Row1_2: | |
| Director Air Traffic Operations Headquarters AJT2Row1_3: X | |
| Director Facilities Engineering Services AJW2: | |
| fill_15: | |
| Vice President Air Traffic Services AJT0Row1: | |
| Vice President Air Traffic Services AJT0Row1_2: | |
| Approved: On | |
| Vice President Technical Operations AJW0: | |
| 1 Source FAAAFTILDWH Quick Look evaluation dated August 30 2018: | |
| Facility Type: | |
| ATCT: | |
| Current Facility Status owned or leased: | |
| Owned: | |
| Planned Realignment 804: | |
| None: | |
| Attached functions: | |
| None_2: | |
| ATC Level: | |
| 6 Tier 2: | |
| Hours of operation: | |
| Current positions: | |
| AirspaceProcedure Changes: | |
| None_3: | |
| FY Operations for 2023: | |
| 170192: | |
| Facility Type_2: | |
| ATCT_2: | |
| Automation: | |
| Siting: | |
| 2292024: | |
| Method of Implementation: | |
| AFTIL I: | |
| undefined: | |
| AirspaceProcedure Changes Planning: | |
| None_4: | |
| Overlying ARTCC: | |
| ZHU: | |
| Controlling TRACON: | |
| I90: | |
| 4 David Wayne Hooks Memorial Airport DWH Replacement Airport Traffic Control Tower AFTIL2 With: | |
| AJT Operational Positions: | |
| OPERATIONAL POSITIONS: | |
| 1: | |
| 1_2: | |
| GROUND CONTROLRow1: | |
| 1Row1: | |
| 1Row1_2: | |
| GROUND CONTROLRow2: | |
| 1Row2: | |
| 1Row2_2: | |
| 3Tower Support Positions: | |
| 3Tower Support Positions_2: | |
| 1FLIGHT DATA: | |
| 1FLIGHT DATA_2: | |
| CAB COORDINATORRow1: | |
| 1Row1_3: | |
| 1Row1_4: | |
| CAB COORDINATORRow2: | |
| 1Row2_3: | |
| 1Row2_4: | |
| Total Tower Positions: | |
| 6: | |
| 6_2: | |
| The following table details the staffing levels for AJT for the DWH ATCT: | |
| AJT Authorized Staffing Numbers: | |
| Air Traffic Manager: | |
| 1_3: | |
| 1_4: | |
| Staff Manager: | |
| Support Manager: | |
| Operations Manager: | |
| Operational Supervisor: | |
| Support Specialist: | |
| Air Traffic Control Specialist: | |
| ATCS Staffing Range MinMaxRow1: | |
| 1013Row1: | |
| 1013Row1_2: | |
| Administrative Officer: | |
| Personnel Specialist: | |
| TA Clerk: | |
| Administrative SupportRow1: | |
| 1Row1_5: | |
| 1Row1_6: | |
| Traffic Management Officer: | |
| Traffic Management Analyst: | |
| Traffic Management Specialist: | |
| 18CONTRACT PERSONNEL: | |
| 18CONTRACT PERSONNEL_2: | |
| Contract Weather Observers: | |
| US Customs Staff: | |
| Contractor Training manager: | |
| Contractors for Training: | |
| Contractor Administrative: | |
| District Manager: | |
| District Facility Manager: | |
| Facility Manager: | |
| SSC Manager: | |
| SSC Coordinator: | |
| Support Specialist_2: | |
| Engineering Technician: | |
| Electronic Technician: | |
| Tech Ops Total: | |
| ROOM FUNCTIONRow1: | |
| Space per StaffRow1: | |
| Final Validated StaffRow1: | |
| Allowable SpaceRow1: | |
| NOTESRow1: | |
| NOTESTERMINAL PERSONNEL: | |
| A r Traff c Manager: | |
| NOTES150: | |
| Operations Front Line Manager: | |
| Admin Assistant: | |
| S ng e Shared Office64: | |
| Support Specia st: | |
| S ng e Shared Office64_2: | |
| A r Traff c Control Spec a ists: | |
| S ng e Shared Office0: | |
| 0Subtotal: | |
| 13Subtotal: | |
| S ng e Shared Office378: | |
| SubtotalRow1: | |
| 0Row2: | |
| 13Row2: | |
| 378Row1: | |
| S ng e Shared OfficeRow5: | |
| SubtotalRow2: | |
| 0Row3: | |
| 13Row3: | |
| 378Row2: | |
| S ng e Shared OfficeRow6: | |
| S ng e Shared OfficeTECHNICAL OPERATIONS PERSONNEL: | |
| ATSS Desk Space and Tech Library: | |
| 32Subtotal: | |
| 0Subtotal_2: | |
| Workspace for visitng ATSSs and Tech Ops document storage160: | |
| SubtotalRow1_2: | |
| 32Row2: | |
| 0Row2_2: | |
| 160Row1: | |
| Workspace for visitng ATSSs and Tech Ops document storageRow2: | |
| SubtotalRow2_2: | |
| 32Row3: | |
| 0Row3_2: | |
| 160Row2: | |
| Workspace for visitng ATSSs and Tech Ops document storageRow3: | |
| Workspace for visitng ATSSs and Tech Ops document storageAIR TRAFFIC SPACES: | |
| AT Space: | |
| Qu et Room: | |
| 100Subtotal: | |
| 1Subtotal: | |
| FAA Contro ed ATCTs on y250: | |
| SubtotalRow1_3: | |
| 100Row2: | |
| 1Row2_5: | |
| 250Row1: | |
| FAA Contro ed ATCTs on yRow2: | |
| SubtotalRow2_3: | |
| 100Row3: | |
| 1Row3: | |
| 250Row2: | |
| FAA Contro ed ATCTs on yRow3: | |
| FAA Contro ed ATCTs on yTECHNICAL OPERATIONS REQUIREMENTS: | |
| Electronics Equipment Space: | |
| FAA Contro ed ATCTs on y536: | |
| Electronics Tech Ops Room: | |
| TELCO: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellness64: | |
| 64Subtotal: | |
| 1Subtotal_2: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellness973: | |
| SubtotalRow1_4: | |
| 64Row2: | |
| 1Row2_6: | |
| 973Row1: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellnessRow3: | |
| SubtotalRow2_4: | |
| 64Row3: | |
| 1Row3_2: | |
| 973Row2: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellnessRow4: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellnessENVIRONMENTAL SUPPORT MECHELEC SPACE: | |
| Electr cal Equipment Space: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellness912: | |
| Fire Pump Room: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellness130: | |
| Fire Life Safety Electr cal Room: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellness160: | |
| Mechanical Equipment Space: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellness1244: | |
| Storage: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellness300: | |
| 300Subtotal: | |
| 1Subtotal_3: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellness2746: | |
| SubtotalRow1_5: | |
| 300Row2: | |
| 1Row2_7: | |
| 2746Row1: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellnessRow12: | |
| SubtotalRow2_5: | |
| 300Row3: | |
| 1Row3_3: | |
| 2746Row2: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellnessRow13: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellnessJOINT USE MISC SUPPORT AREAS: | |
| Wellness and Locker Room: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellness225: | |
| Lactation Room with s nk: | |
| Mult purpose room Site adapt th s room to meet facility needs Space must not be site adapted for high occupancy use such as lounge breakroom conference collaboration wellness84: | |
| Smoking Room: | |
| Collaboration Room: | |
| Exter or she ter225: | |
| Jan tor Closet: | |
| Exter or she ter100: | |
| Storage_2: | |
| Exter or she ter240: | |
| Womans Restroom: | |
| Exter or she ter64: | |
| Mens Restroom: | |
| Exter or she ter64_2: | |
| Lounge: | |
| Exter or she ter225_2: | |
| Training Room: | |
| Exter or she ter150: | |
| 150Subtotal: | |
| 1Subtotal_4: | |
| Exter or she ter1377: | |
| SubtotalRow1_6: | |
| 150Row2: | |
| 1Row2_8: | |
| 1377Row1: | |
| Exter or she terRow9: | |
| 150Lobbies Restrooms Corridors etc shown on PAU design: | |
| 1Lobbies Restrooms Corridors etc shown on PAU design: | |
| Exter or she ter2010: | |
| Lobbies Restrooms Corridors etc shown on PAU designRow1: | |
| 150Row4: | |
| 1Row4: | |
| 2010Row1: | |
| Exter or she terRow11: | |
| 150TOTAL ATCT SPACE: | |
| 1TOTAL ATCT SPACE: | |
| Exter or she ter7894: | |
| 2024-08-02T10:25:03-0400 | |
| DALE BURDETTE MC NEAL |
| Check Box2: Yes | |
| 2024-08-05T10:22:45-0400 | |
| MALCOLM ANDREWS |
| 2024-08-23T14:13:14-0400 | |
| JAMES D LINNEY |
File details come from the government source that posted it. Updated .