J01e Above Ceiling Work Permit.pdf

PDF 54 KB Posted

Attached to
PIMC ED & CSR (Phoenix, AZ) Federal contract opportunity
Solicitation number
75H701-24-R-00035
Issued by
Department of Health and Human Services Indian Health Service

About this file

This document is an Above Ceiling Work Permit, which is required for contractors performing work above the ceiling at the Phoenix Indian Medical Center (PIMC). The permit outlines the type of work to be performed, such as inspections, electrical, data, piping, HVAC, and fire system work. It requires the inspector to discuss potential concerns with the contractor before and after the work is completed, including the locations of fire and smoke barriers, materials touching the fire sprinkler pipe, gaps in the ceiling tiles, and painting of medical gas pipes. The permit must be signed by the inspector before and after the work is performed.

The related federal contract opportunity is for a construction project at the PIMC Emergency Department (ED) and Central Supply Room (CSR). The scope of work includes upgrading the ventilation in the ED and Fast Track waiting areas, and upgrading the flooring, walls, and ventilation in the CSR. The contract is a Firm Fixed Price (FFP) requirement solicited as a 100% Small Business set-aside under NAICS code 236220, with a contract period of 180 calendar days. The estimated construction magnitude is between $1,000,000 and $5,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to PIMC ED & CSR (Phoenix, AZ), newest first.
File Type Posted
B05 Amendment A00010 (75H701-24-R-00035).pdf PDF
J02 WD AZ20240039 Mod 5 2024.08.16.pdf PDF
B05 Amendment A00009 (75H701-24-R-00035).pdf PDF
J01j TAB Report PIMC Campus Projects.pdf PDF
J01h After Hours Work Locations.pdf PDF
J01i Mechanical Zoning.pdf PDF
B05 Amendment A00008 (75H701-24-R-00035).pdf PDF
J02 WD AZ20240039 Mod 4 2024.07.19.pdf PDF
B05 Amendment A00007 (75H701-24-R-00035).pdf PDF
B05 Amendment A00006 (75H701-24-R-00035).pdf PDF
J01a Specifications PIMC ED-CSR 2024.01.29 (Conformed w-Addendum 02).pdf PDF
B05 Amendment A00005 (75H701-24-R-00035).pdf PDF
A05 Amendment A00004 (75H701-24-R-00035).pdf PDF
A05 Amendment A00003 (75H701-24-R-00035).pdf PDF
A05 Amendment A00002 (75H701-24-R-00035).pdf PDF
A05 Amendment A00001 (75H701-24-R-00035).pdf PDF
J01c Location Map.pdf PDF
J01d Infection Control Risk Assessment Permit.pdf PDF
J01f PIMC Asbestos Survey - Bldg 233 Hospital (Feb 2003).pdf PDF
J05 Company Specialized Experience Form Construction.pdf PDF
J01g GFE PIMC ED-CSR.pdf PDF
J02 WD AZ20240039 Mod 2 2024.05.17.pdf PDF
J07 OF 306 Declaration for Federal Employment.pdf PDF
J08 Addendum to OF-306 (Childcare Form).pdf PDF
B01 RFP 75H70124R00035 PIMC ED CSR.pdf PDF
J06 PPQ.pdf PDF
J01a Specifications - PIMC ED-CSR 2024.01.29.pdf PDF
J01b Drawings - PIMC ED-CSR 2023.08.08.pdf PDF
J03 Self Performed Calculation Sheet.pdf PDF
J04a FORMS_TPT_5000HC_11228.pdf PDF
J04 2024 Exemption Letter for a Qualifying Hospital.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABOVE CEILING WORK PERMIT

DATE: CONTRACTOR:

NAME: ADDRESS:

PHONE: CONTACT PERSON:

TYPE OF WORK:

a Inspection o Electrical o Data o Other Cables o Medical Gases a

D a a

Piping a Air Conditioning a Insulation work

Fire Stopping

Lighting Nurse callo Fire systems o Plumbing Systems

Project time period:

FROM: TO:

To be completed by PIMC Inspector

Date:

a Discussed locations of nearby fire and smoke barriers a Discussed foreign materials touching fire sprinkler pipe a Discussed gaps in ceilingtile o Discussed painting of medical gas pipes

Work Concerns:

Inspector signature (prior to work beginning)

ABOVE CEILING WORK INSPECTION

Date:

o Inspected work area for fire and smoke barrier penetrations o Inspected work area for foreign materials touching fire sprinkler pipe o Inspected work area for gaps in ceiling tile o Inspected work area for painting of medical gas pipes

Inspection Concerns:

Inspector signature (after work completion)

File details come from the government source that posted it. Updated .