J01e Above Ceiling Work Permit.pdf
PDF 54 KB Posted
- Attached to
- PIMC ED & CSR (Phoenix, AZ) Federal contract opportunity
- Solicitation number
- 75H701-24-R-00035
About this file
This document is an Above Ceiling Work Permit, which is required for contractors performing work above the ceiling at the Phoenix Indian Medical Center (PIMC). The permit outlines the type of work to be performed, such as inspections, electrical, data, piping, HVAC, and fire system work. It requires the inspector to discuss potential concerns with the contractor before and after the work is completed, including the locations of fire and smoke barriers, materials touching the fire sprinkler pipe, gaps in the ceiling tiles, and painting of medical gas pipes. The permit must be signed by the inspector before and after the work is performed.
The related federal contract opportunity is for a construction project at the PIMC Emergency Department (ED) and Central Supply Room (CSR). The scope of work includes upgrading the ventilation in the ED and Fast Track waiting areas, and upgrading the flooring, walls, and ventilation in the CSR. The contract is a Firm Fixed Price (FFP) requirement solicited as a 100% Small Business set-aside under NAICS code 236220, with a contract period of 180 calendar days. The estimated construction magnitude is between $1,000,000 and $5,000,000.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABOVE CEILING WORK PERMIT
DATE: CONTRACTOR:
NAME: ADDRESS:
PHONE: CONTACT PERSON:
TYPE OF WORK:
a Inspection o Electrical o Data o Other Cables o Medical Gases a
D a a
Piping a Air Conditioning a Insulation work
Fire Stopping
Lighting Nurse callo Fire systems o Plumbing Systems
Project time period:
FROM: TO:
To be completed by PIMC Inspector
Date:
a Discussed locations of nearby fire and smoke barriers a Discussed foreign materials touching fire sprinkler pipe a Discussed gaps in ceilingtile o Discussed painting of medical gas pipes
Work Concerns:
Inspector signature (prior to work beginning)
ABOVE CEILING WORK INSPECTION
Date:
o Inspected work area for fire and smoke barrier penetrations o Inspected work area for foreign materials touching fire sprinkler pipe o Inspected work area for gaps in ceiling tile o Inspected work area for painting of medical gas pipes
Inspection Concerns:
Inspector signature (after work completion)
File details come from the government source that posted it. Updated .