This document is Amendment A00009 to Solicitation 75H701-24-R-00035 for the PIMC ED & CSR construction project in Phoenix, AZ. The amendment provides responses to Pre-Proposal Inquiries 5-10, revises clause H.1 Work Hours, incorporates new attachments, and extends the proposal due date from August 21, 2024 to August 27, 2024. Key details include:
- The project scope is to upgrade ventilation in the Emergency Department and Fast Track waiting areas, and upgrade flooring, walls, and ventilation in the Central Supply Room.
- The project is a small business set-aside under NAICS code 236220, with a construction magnitude between $1-5 million.
- The Period of Performance is 180 calendar days from date of notice to proceed.
- The solicitation is being procured as a Firm Fixed Price contract using Lowest Price Technically Acceptable evaluation criteria.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00009
N/A
KELLY J. BRITTON
Project: PH23PH05H6, PIMC ED & CSR
Amendment A00009 is to provide responses to Pre-Proposal Inquires 5-10, revise clause H.1 Work Hours, incorporate Attachments J01h-J01j and extend the proposal due date from August 21, 2024 to August 27, 2024 by 2:00 PM MST. Included in this modification is an updated SF1442, updating Block 13.
SEE CONTINUATION PAGES
Indian Health Service Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104
See Block 6
75H701-24-R-00035
PH23PH05H6
1 27
08/13/2024
05/24/2024
Amendment of Solicitation Amendment A00009 under Solicitation 75H701-24-R-00035 Project PH23PH05H6, PIMC ED & CSR
SUMMARY OF CHANGES
1. The purpose of Amendment A00009 is as follows:
a. Provide responses to Pre-Proposal Inquires 5 through 10, including Attachment 1 - After Hours Work Locations and Attachment 2 - Mechanical Zoning.
b. Section H, Clause H.1 Work Hours is changed as follows:
H.1. WORK HOURS
PIMC’s normal business hours are 8:00 AM – 5:00 PM, Monday through Friday (excluding Federal holidays). Work in and around the PIMC’s ED Waiting Room and ED Fast Track shall be performed during nights and weekends only; Monday through Friday 8:00 PM to 6:00 AM and anytime on Saturday and Sunday. Reference Attachment 1 After Hours Work Locations for exact locations for after-hours work.
Work at other times must be approved by the COR. Requests to work outside normal business hours shall be submitted in writing to the COR not less than 48 hours in advance of the proposed modified schedule. This requirement is due to the need for security of patients, government personnel and property. There must be a 'responsible government agent' on site when any contractor is present on IHS property.
Note: Four (4) day work weeks will be considered upon written request and must be clearly identified in the project schedule.
c. Incorporate the following Attachments:
i. Attachment J01h After Hours Work Locations
ii. Attachment J01i Mechanical Zoning
iii. Attachment J01j TAB Report PIMC Campus Projects
d. Section J – List of Attachments is revised as follows:
SECTION J – LIST OF ATTACHMENTS
Attachment # and Document Title Date # of Pages
J01a Specifications - PIMC ED & CSR (Conformed with Addendum 02) 01/29/2024 276 J01b Drawings - PIMC ED & CSR 08/08/2023 42 Addendum 01 (Amendment A00002) 7/3/2024 2 Addendum 2 (Amendment A00006) 7/18/2024 2 J01c Location Maps N/A 2 J01d Infection Control Risk Assessment Permit N/A 2 J01e Above Ceiling Work Permit N/A 2 J01f PIMC Asbestos Survey - Bldg 233 Hospital Feb 2003 83 J01g Government Furnished Equipment N/A 1 J01h After Hours Work Locations (Amendment A00009) N/A 1 J01i Mechanical Zoning (Amendment A00009) N/A 2 J01j TAB Report PIMC Campus Projects (Amendment A00009) 1/25/2023 18 J02 Wage Determination: General Decision Number Mod 4 AZ20240039
(Amendment A00007) 07/19/2024 5
Amendment A00009 under Solicitation 75H701-24-R-00035 Project PH23PH05H6, PIMC ED & CSR
J03 Self Performed Calculation Sheet N/A 4 J04 2024 Exemption Letter for a Qualifying Hospital 12/29/2023 3 J04a Arizona Form 5000HC – Transaction Privilege Tax Healthcare Exemption
Certificate Nov 2020 2
J05 Company Specialized Experience Form N/A 2 J06 Past Performance Questionnaire N/A 5 J07 OF-306 Declaration for Federal Employment Oct 2019 3 J08 Addendum to OF-306 (Childcare Form) N/A 2
e. The proposal due date is extended from August 21, 2024 to August 27, 2024 by 2:00 PM MST.
Included in this modification is an updated SF1442, updating Block 13.
END OF SUMMARY OF CHANGES
Amendment A00009 under Solicitation 75H701‐24‐R‐00035 Project PH23PH05H6, PIMC ED & CSR
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-24-R-00035
PROJECT: PIMC ED & CSR
LOCATION: Phoenix AZ
PROJECT NO: PH23PH05H6
DOCUMENT
OWNER:
Kelly Britton PHONE: 602-364-5081 DOCUMENTS:
DATE: 8/13/2024 DEPARTMENT: IHS/PAO/DFE
Item No.
Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response
Amendment A00009 dated 8/13/2024
5.
Spec Section 015010
Will it be required to work out of an ICRA containment cart? PIMC/ Derrick
All ICRA requirements are contained under SECTION 015010 of the specifications. The procedures on how to submit an Infection Control Plan and how it is approved is also contained under this section.
6. H.1. Work Hours
Will we be required to work off hours for all this work? I read this is normal business hours
PIMC/
Derrick
Reference revised clause H.1. WORK HOURS which adds after‐hours work for in and around the PIMC’s ED Waiting Room and ED Fast Track. See attached Attachment J01h After Hours Work Locations for exact locations for after‐hours work.
7. I would like to see the original balance reports. Spec states the COTR will supply them if asked.
PIMC/
Derrick
See attached Attachment J01j TAB Report PIMC Campus Projects, dated January 25, 2023
8. Do we know which air hander unit serves which area, I am not locating them on the drawings?
PIMC/
Derrick/
BWS
See attached Attachment J01i Mechanical Zoning drawings for areas served.
9. Just to confirm that the due date is still August 21, 2024? Kelly Reference Amendment A00009
10. L.9 Is it OK to leave the Gantt chart in the excel‐type format? Kelly As stated in L.9., “The offeror’s proposal package shall be submitted electronically in PDF format only.”
x
T
T
T
T
T
T
4-1
8Ø
8∅
T
T
T
T
T
T
T
T
T
SH.
31 29 23 19 5
X
BB
FF
JJ
E.W.F.
F.H.C.
WOMENS
TOILET
E-102
MEN'S TOILET
E-103
DPFS OFFICE
M-49
ED WAITING
1-039
WATING
CIRCULATION
C1-23
ED WAITING
SPILL OVER
AREA
1-037
WORK AREA 1
1-034
WORK AREA 2
1-035RECEPTION
1-033
WORK AREA 3
1-032
OPEN OFFICE
1-031
MED ROOM
1-024
EXAM1
1-023
EXAM 2
1-022
EXAM 3
1-021
STAFF
WORKROOM
1-019
RECEPTION
M-24
VITALS
1-014
WAITING
M-24A
EAST
CORRIDOR 1
C1-22
EXPRESS
CARE
CORRIDOR
C1-17
WAITING
1-089
PHARMACY
CORRIDOR
C1-19
CORRIDOR
C1-18
CORRESP.
CLERK
1-028
INCOMPLETE
CHART
1-027
SUPV
1-025
INCOMPLETE
CHART
1-026
CHIEF - HR
OFFICE
M-46
CORRIDOR
C1-20
CORRIDOR
C1-21
MED ROOM
E-117
EXAM 9
E-124
EXAM 10
E-123
TELECOMM
E-110
MEDICAL
DIRECTOR
E-109
NURSE SUPV.
E-108
EXIT
E-107
OBSERVATION
E-106
VITALS
E-105
NURSE FIRST
TRIAGE
E-104
16x16 EXH. DTR.
24x24 EG
700 CFM
VAV
46-B-2
VAV
45-B-2
VAV
39-B-2
(E) CD
225 CFM
(E) EG
250 CFM
(E) EG
100 CFM
(E) CD
150 CFM
(E) RG
125 CFM
(E) CD
75 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) EG
125 CFM
(E) CD
75 CFM
(E) CD
100 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) CD
75 CFM
(E) RG
50 CFM
(E) CD
75 CFM
(E) RG
50 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
75 CFM
(E) CD
75 CFM
(E) CD
75 CFM
(E) RG
500 CFM
(E) CD
150 CFM
(E) RG
150 CFM
(E) EG
100 CFM
(E) EG
100 CFM
(E) CD
75 CFM
(E) CD
150 CFM
22x22 EG
400 CFM
(E) CD
125 CFM
MAKE CONNECTION
TO EXIST. TRUNK
DUCT
MAKE CONNECTION
TO EXIST. TRUNK
DUCT
14x14
16x16
(E) CD
500 CFM
(E) CD
500 CFM
(E) RG
450 CFM
(E) CD
525 CFM
(E) CD
200 CFM
(E) RG
200 CFM
(E) RG
300 CFM
(E) CD
75 CFM
(E) CD
50 CFM
(E) CD
250 CFM
(E) CD
300 CFM (E) RG
450 CFM
(E) CD
500 CFM
(E) SD
225 CFM
(E) SD
200 CFM
(E) SD
225 CFM
(E) CD
225 CFM
(E) EG
250 CFM
(E) CD
125 CFM
(E) CD
125 CFM
(E) CD
75 CFM
(E) CD
50 CFM
(E) CD
125 CFM
(E) EG
75 CFM
(E) CD
50 CFM
14"x14"
14x14 EHX. DTR
10" RND
10" RND
6" RND
6" RND
6" RND
6" RND
14"x12"
24"x12"
14"x12"
23090
6422 E. SPEEDWAY BLVD. Suite 130
TUCSON, ARIZONA, 85710
(520) 323-3858
PROJECT No.
www.ZonaMEP.com
TECHNICAL ENGINEERING, PLLC.
MECHANICAL . PLUMBING . ELECTRICAL
R
VI
H
P
S
N I D
C E
I
A
A N
HE
TL H
S
E
E
H
N M
E
A R
P
T O F
T
C
D
SU
S
A
E
TAE L
H
N V I
S E R
U M A
H U. S. DEPARTMENT
OF HEALTH AND
HUMAN SERVICES
INDIAN HEALTH SERVICE
DIVISION OF FACILITIES ENGINEERING
PHOENIX AREA
ARCHITECTS
4636 N. 32nd Street
480.980.9054 Fax 520.795.6171
www.bwsarchs.com
BURNS WALD-HOPKINS SHAMBACH ARCHITECTS
DRAWN BY:
CONSULTANTS
Phoenix, Arizona 85018
CHECKED BY:
CAD DWG FILE:
PROJECT NO:
ISSUE:
SHEET OF
REVIEWED:
DFE ENGINEER/PROJECT MANAGER
APPROVED:
DFE BRANCH CHIEF
CONCURRENCE:
DFE CHIEF
DATE
DATE
DATE
REV DATE DESCRIPTION
IHS PROJECT NO.
C
B
A
C
B
A
SHEET TITLE
8/8/23 - CONSTRUCTION DOCS
1818.015.1
75H70123F30021
8/15/23 OWNER COMMENTS
M2.20
MECHANICAL FIRST
FLOOR PLAN
Indian Health Service
PIMC ED & CSR
CIVIL
EEC, Inc 555 E. River Road, #301 Tucson, AZ 85704 Phone: 520.321.4625
MEP
Zona Technical Eng 6422 E. Speedway Blvd., Unit 130 Tucson, AZ 85710 Phone: 520.200.2612
STRUCTURAL
Turner Structural Eng 2806 N Alvernon Way, 400 Tucson, AZ 85712 Phone: 520.323.3422
4212 N 16TH ST
PHOENIX, AZ
1/8" = 1'-0"M2.20
1 MECHANICAL FIRST FLOOR PLAN
Expires 12/31/202112/31/2024
08/
24 42
J01h After Hours Work Locations
DABuck Cloud+
DABuck Cloud+ Night and weekend work.
DABuck Cloud+
DABuck Cloud+ Night and weekend work.
FD
STERILIZATION
PREP
OFFICE
PREP
101A DECONTAMINATION
BREAK ROOM
LOBBY /
SUPPLIES
SUPPLIES
OFFICE
STERILIZATION
VAV
14-A-1
VAV
21-A-1
VAV
19-A-1
VAV
20-A-1
SUPPLY ROOM
101B
24"x16"
16"x12" 12"x12"
"x
28"x16"
"x
"x
"x
22"x16"
"x
"x
EXISTING RETURN DUCT
EXISTING EXHAUST DUCT
EXISTING
SUPPLY
DUCTS
12x12 FCDA
300 CFM
(TYP. 2 PL.)
22x22 RGA
550 CFM
EXISTING SUPPLY DUCT
9x9 FCDA
200 CFM
(TYP. 2 PL.)
22x22 RGA
550 CFM
(TYP. 2 PL.)
9x9 FCDA
250 CFM
(TYP. 4 PL.)
9x9 FCDA
150 CFM
12x12 FCDA
300 CFM
EXISTING RETURN DUCT
12x12 CDA
400 CFM
6x6 EGA
100 CFM
12x12 CDA
300 CFM
(TYP. 2 PL.)
9x9 CDA
250 CFM
(TYP. 3 PL.)
22x22 RGA
650 CFM
12x12 CDA
400 CFM
22x10 RGA
475 CFM
9x9 CDA
275 CFM
12x12 FCDA
300 CFM
22x10 EGA
400 CFM
(TYP. 2 PL.)
9x9 FCDA
225 CFM
(TYP. 4 PL.)
22x22 RGA
850 CFM
22x10 EGA
175 CFM
(TYP. 2 PL.)
22x10 EGA
250 CFM
VAV
13-A-1(E)
(E) RGA REBAL.
TO 125 CFM
(E) EGA
REBAL. TO
650 CFM
20"x16"
16"x16"
16"x12"
20"x16"
PROVIDE AP
IN DUCT
PROVIDE AP
IN DUCT
NOTE:
MECHANICAL CONTRACTOR SHALL MODIFY (E) S/A
DUCTWORK FROM (E) VAV 13-A-1 UNDER THIS
CONTRACT IN COORDINATION WITH INSTALLATION
OF S/A DUCTWORK FROM VAV 14-A-1
TAB CONTRACTOR SHALL REBALANCE (E)
TERMINAL UNIT BASED ON PRE-DEMOLITION TAB
REPORT & REMOVAL OF SUPPLY TO SUPPLY
ROOM #101B. PROVIDE FINAL CALCULATION IN
NOTES FOR TERMINAL UNIT W/ FINAL BALANCE
REPORT.
H T
T
T
T
JANITOR'S CLOSET
(E) EGA REBAL.
TO 50 CFM
REMOVE & REPLACE SANITARY
FLOOR DRAIN. CONN. TO (E)
PLUMBING ROUGH-IN & PATCH
AS NECESSARY.
P-1
ELECTRICAL
MECHANICAL
CORRIDOR
1B
CORRIDOR
100A
23090
6422 E. SPEEDWAY BLVD. Suite 130
TUCSON, ARIZONA, 85710
(520) 323-3858
PROJECT No.
www.ZonaMEP.com
TECHNICAL ENGINEERING, PLLC.
MECHANICAL . PLUMBING . ELECTRICAL
R
VI
H
P
S
N I D
C E
I
A
A N
HE
TL H
S
E
E
H
N M
E
A R
P
T O F
T
C
D
SU
S
A
E
TAE L
H
N V I
S E R
U M A
H U. S. DEPARTMENT
OF HEALTH AND
HUMAN SERVICES
INDIAN HEALTH SERVICE
DIVISION OF FACILITIES ENGINEERING
PHOENIX AREA
ARCHITECTS
4636 N. 32nd Street
480.980.9054 Fax 520.795.6171
www.bwsarchs.com
BURNS WALD-HOPKINS SHAMBACH ARCHITECTS
DRAWN BY:
CONSULTANTS
Phoenix, Arizona 85018
CHECKED BY:
CAD DWG FILE:
PROJECT NO:
ISSUE:
SHEET OF
REVIEWED:
DFE ENGINEER/PROJECT MANAGER
APPROVED:
DFE BRANCH CHIEF
CONCURRENCE:
DFE CHIEF
DATE
DATE
DATE
REV DATE DESCRIPTION
IHS PROJECT NO.
C
B
A
C
B
A
SHEET TITLE
8/8/23 - CONSTRUCTION DOCS
1818.015.1
75H70123F30021
8/15/23 OWNER COMMENTS
M2.10
MECHANICAL GROUND
FLOOR PLAN
Indian Health Service
PIMC ED & CSR
CIVIL
EEC, Inc 555 E. River Road, #301 Tucson, AZ 85704 Phone: 520.321.4625
MEP
Zona Technical Eng 6422 E. Speedway Blvd., Unit 130 Tucson, AZ 85710 Phone: 520.200.2612
STRUCTURAL
Turner Structural Eng 2806 N Alvernon Way, 400 Tucson, AZ 85712 Phone: 520.323.3422
4212 N 16TH ST
PHOENIX, AZ
1/8" = 1'-0"M2.10
1 MECHANICAL GROUND FLOOR PLAN
Expires 12/31/202112/31/2024
08/
(E) AHU-1
J01i Mechanical Zoning x
T
T
T
T
T
T
4-1
8Ø
8∅
T
T
T
T
T
T
T
T
T
SH.
31 29 23 19 5
X
BB
FF
JJ
E.W.F.
F.H.C.
WOMENS
TOILET
E-102
MEN'S TOILET
E-103
DPFS OFFICE
M-49
ED WAITING
1-039
WATING
CIRCULATION
C1-23
ED WAITING
SPILL OVER
AREA
1-037
WORK AREA 1
1-034
WORK AREA 2
1-035RECEPTION
1-033
WORK AREA 3
1-032
OPEN OFFICE
1-031
MED ROOM
1-024
EXAM1
1-023
EXAM 2
1-022
EXAM 3
1-021
STAFF
WORKROOM
1-019
RECEPTION
M-24
VITALS
1-014
WAITING
M-24A
EAST
CORRIDOR 1
C1-22
EXPRESS
CARE
CORRIDOR
C1-17
WAITING
1-089
PHARMACY
CORRIDOR
C1-19
CORRIDOR
C1-18
CORRESP.
CLERK
1-028
INCOMPLETE
CHART
1-027
SUPV
1-025
INCOMPLETE
CHART
1-026
CHIEF - HR
OFFICE
M-46
CORRIDOR
C1-20
CORRIDOR
C1-21
MED ROOM
E-117
EXAM 9
E-124
EXAM 10
E-123
TELECOMM
E-110
MEDICAL
DIRECTOR
E-109
NURSE SUPV.
E-108
EXIT
E-107
OBSERVATION
E-106
VITALS
E-105
NURSE FIRST
TRIAGE
E-104
16x16 EXH. DTR.
24x24 EG
700 CFM
VAV
46-B-2
VAV
45-B-2
VAV
39-B-2
(E) CD
225 CFM
(E) EG
250 CFM
(E) EG
100 CFM
(E) CD
150 CFM
(E) RG
125 CFM
(E) CD
75 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) EG
125 CFM
(E) CD
75 CFM
(E) CD
100 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) CD
75 CFM
(E) RG
50 CFM
(E) CD
75 CFM
(E) RG
50 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
75 CFM
(E) CD
75 CFM
(E) CD
75 CFM
(E) RG
500 CFM
(E) CD
150 CFM
(E) RG
150 CFM
(E) EG
100 CFM
(E) EG
100 CFM
(E) CD
75 CFM
(E) CD
150 CFM
22x22 EG
400 CFM
(E) CD
125 CFM
MAKE CONNECTION
TO EXIST. TRUNK
DUCT
MAKE CONNECTION
TO EXIST. TRUNK
DUCT
14x14
16x16
(E) CD
500 CFM
(E) CD
500 CFM
(E) RG
450 CFM
(E) CD
525 CFM
(E) CD
200 CFM
(E) RG
200 CFM
(E) RG
300 CFM
(E) CD
75 CFM
(E) CD
50 CFM
(E) CD
250 CFM
(E) CD
300 CFM (E) RG
450 CFM
(E) CD
500 CFM
(E) SD
225 CFM
(E) SD
200 CFM
(E) SD
225 CFM
(E) CD
225 CFM
(E) EG
250 CFM
(E) CD
125 CFM
(E) CD
125 CFM
(E) CD
75 CFM
(E) CD
50 CFM
(E) CD
125 CFM
(E) EG
75 CFM
(E) CD
50 CFM
14"x14"
14x14 EHX. DTR
10" RND
10" RND
6" RND
6" RND
6" RND
6" RND
14"x12"
24"x12"
14"x12"
23090
6422 E. SPEEDWAY BLVD. Suite 130
TUCSON, ARIZONA, 85710
(520) 323-3858
PROJECT No.
www.ZonaMEP.com
TECHNICAL ENGINEERING, PLLC.
MECHANICAL . PLUMBING . ELECTRICAL
R
VI
H
P
S
N I D
C E
I
A
A N
HE
TL H
S
E
E
H
N M
E
A R
P
T O F
T
C
D
SU
S
A
E
TAE L
H
N V I
S E R
U M A
H U. S. DEPARTMENT
OF HEALTH AND
HUMAN SERVICES
INDIAN HEALTH SERVICE
DIVISION OF FACILITIES ENGINEERING
PHOENIX AREA
ARCHITECTS
4636 N. 32nd Street
480.980.9054 Fax 520.795.6171
www.bwsarchs.com
BURNS WALD-HOPKINS SHAMBACH ARCHITECTS
DRAWN BY:
CONSULTANTS
Phoenix, Arizona 85018
CHECKED BY:
CAD DWG FILE:
PROJECT NO:
ISSUE:
SHEET OF
REVIEWED:
DFE ENGINEER/PROJECT MANAGER
APPROVED:
DFE BRANCH CHIEF
CONCURRENCE:
DFE CHIEF
DATE
DATE
DATE
REV DATE DESCRIPTION
IHS PROJECT NO.
C
B
A
C
B
A
SHEET TITLE
8/8/23 - CONSTRUCTION DOCS
1818.015.1
75H70123F30021
8/15/23 OWNER COMMENTS
M2.20
MECHANICAL FIRST
FLOOR PLAN
Indian Health Service
PIMC ED & CSR
CIVIL
EEC, Inc 555 E. River Road, #301 Tucson, AZ 85704 Phone: 520.321.4625
MEP
Zona Technical Eng 6422 E. Speedway Blvd., Unit 130 Tucson, AZ 85710 Phone: 520.200.2612
STRUCTURAL
Turner Structural Eng 2806 N Alvernon Way, 400 Tucson, AZ 85712 Phone: 520.323.3422
4212 N 16TH ST
PHOENIX, AZ
1/8" = 1'-0"M2.20
1 MECHANICAL FIRST FLOOR PLAN
Expires 12/31/202112/31/2024
08/
(E) AHU-2
(E) AHU-4
J01i Mechanical Zoning
Project: PIMC CAMPUS PROJECTS
Location: 4212 N 16TH STREET, PHOENIX AZ 85016
Engineer: ZONA TECHNICAL ENGINEERING
Prepared for: ZONA TECHNICAL ENGINEERING
Project Number:
Date:
Michael Ziegler
Test & Balance Engineer
TAB Technology, Inc.
1912 North Rosemont
Mesa, Az 85205 480-964-0187
25-Jan-23
Associated Air Balance Council Certificate No: 98-01-42
TEST AND BALANCE REPORT
This is to certify that TAB Technology, Inc. has balanced the systems described herein to their optimum performance capabilities. The testing and balancing has been performed in accordance with the standard requirements and procedures of the Associated Air Balance Council and the results are herein recorded.
J01j TAB Report PIMC Campus Projects
TTI
TAB Technology Inc.
Date: 1/10/2022 Tech: BW
Note #
1 AHU-2 was in full economizer at time of readings. It appears we only
EF-27 has a bad motor and is not running at this time.
pre-read a small portion of the areas served by this air handler. The unit traverse CFM is far more than the total from VAV pre-reads.
AHU-4 Is a multi zone system, the return grill total is much less than the return traverse total indicating leakage somewhere in the ceiling.
Technician Notes
The OSA damper was 100% closed at the time of testing.
EF-3A & 3B These fans are setup for one to be a stand by. Both fans were rotated in the cycle to acquire CFM Readings.
Air Handler Test
Project: Date:
System: Tech:
Print ID:
4.06 0.25
4.06 1.08
-0.40 0.82
3.84 0.22
Hz: 65 C to C:
4bn-/78.75/pf/mb/55/pf/sx5g
AHU-2
4.06
3.84
Pre-read VAV Total
5.06
Required Final Traverse Total
TTI
TAB Technology, Inc.
PIMC CAMPUS PROJECTS
AHU-2 BW
Alliance Air Products
6038 34320
01/19/23
3.81
2.98
-1.22
-1.22
4 @20 1848.0
AHU-2 Was in full economizer at the time of testing
DIRECT
DRIVE
VFD
1.15
System Static Set Point:
100%
In - Out - Delta P
Humidifier In - Out -
Delta P
Mark
Manufacturer
Model, Size
Conditions
Total CFM
External/Total Fan
Static Press.
Fan Static Press.
Inlet - Outlet
Cooling Coil
In - Out - Delta P
Heating Coil
In - Out - Delta P
Filter
In - Out - Delta P
Remarks:
NA NA
Motor HP - RPM
Motor Voltage
Motor Amps
Service Factor
Motor Frame
Outside Air
Drive Belts
Fan Pulley
Motor Sheave
Fan RPM
Motor AdJ
IN/OUT:
23.30
480/483/480/3460/3 16.2/16.3/16.3 16.3/16.6/16.4 16.3/16.4/16.4 16.5/16.3/16.4
1848/1854/1843/1851
VAV Box Schedule with Terminal Device
Project: Date: 12/21/22 System: Tech: BW/CD
Print ID:
Area Plan Control Size /
Served Tag Tag Diameter Max Min Max Min
40-B-2 8"/8" NA NA 241 NA
41-B-2 8"/8" NA NA 312 NA
42-B-2 12"/12" NA NA 421 NA
44-B-2 "8/8" NA NA 349 NA
45-B-2 8"/8' NA NA 631 NA
Terminal Normal Cooling Heating
No. Size Velocity CFM Velocity CFM Velocity CFM
40-1 12X12 241 236 247
40-B-2 TOTAL 241 236 247
41-1 12X12 312 319 294
41-B-2 TOTAL 312 319 294
42-1 10X10 122 182 144 42-2 6X12 100 111 102 42-3 6X12 78 90 82 42-4 6X12 121 284 250
42-B-2 TOTAL 421 667 578
44-1 12X12 349 377 339
44-B-2 TOTAL 349 377 339
45-1 10X10 138 131 122 45-2 10X10 136 137 120 45-3 10X10 111 119 112 45-4 10X10 93 90 107 45-5 10X10 153 163 149
45-B-2 TOTAL 631 640 610
Remarks:
TTI
TAB Technology, Inc.
Required CFM Final CFM "K"
Factor Notes
Exsiting Pneumatic Dual Duct VAV
PIMC CAMPUS PROJECTS
Room
Number "K" Notes with Terminal Device
Project: Date: 12/21/22 System: Tech: BW/CD
Print ID:
Area Plan Control Size /
Served Tag Tag Diameter Max Min Max Min
46-B-2 12"/12" NA NA 1,084 NA
48-B-2 8"/8" NA NA 437 NA
49-B-2 8"/8" NA NA 430 NA
Terminal Normal Cooling Heating
No. Size Velocity CFM Velocity CFM Velocity CFM
46-1 10''Ø 129 143 115 46-2 12X12 322 419 332 46-3 12X12 318 442 348 46-4 12X12 315 432 341
46-B-2 1,084 1,436 1,136
48-1 12X12 437 432 386
48-B-2 TOTAL 437 432 386
49-1 10X10 225 280 237 49-2 10X10 205 267 243
49-B-2 TOTAL 430 547 480
Remarks:
Room
Number "K" Notes
TTI
TAB Technology, Inc.
PIMC CAMPUS PROJECTS
Exsiting Pneumatic Dual Duct VAV
Required CFM Final CFM "K"
Factor Notes with Terminal Device
Project: Date: 12/21/22 System: Tech: ME,DE
Print ID:
Area Plan Control Size /
Served Tag Tag Diameter Max Min Max Min
VB-01 8" / 8" NA NA 355 NA
VB-03 8" / 8" NA NA 847 NA
VB-04 8" / 8" NA NA 297 NA
Terminal AS IS Cooling Heating
No. Size Velocity CFM Velocity CFM Velocity CFM
E154 01-1 08''Ø 88 85 54 E122 01-2 08''Ø 85 88 66 E121 01-3 08''Ø 103 97 70 E155 01-4 08''Ø 79 82 67
355 352 257
E127 03-1 08''Ø 231 215 190 E129 03-2 08''Ø 200 217 186 E131 03-3 08''Ø 154 116 106 E155 03-4 08''Ø 262 225 186
847 773 668
E124 04-1 08''Ø 63 154 61 E123 04-2 08''Ø 55 171 54 E128 04-3 08''Ø 42 120 46 E130 04-4 08''Ø 63 206 65 E132 04-5 08''Ø 74 191 75
297 842 301
Remarks:
Room
Number "K" Notes
VB-01 TOTAL
VB-03 TOTAL
VB-04 TOTAL
TTI
TAB Technology, Inc.
PIMC CAMPUS PROJECTS
EXISTING VAVS
Required CFM Final CFM "K"
Factor with Terminal Device
Project: Date: 12/21/22 System: Tech: ME,DE
Print ID:
Area Plan Control Size /
Served Tag Tag Diameter Max Min Max Min
VB-05 8" / 8" NA NA 288 NA
VB-06 8" / 8" NA NA 346 NA
Terminal AS IS Cooling Heating
No. Size Velocity CFM Velocity CFM Velocity CFM
E113 05-1 08''Ø 35 47 28 E108 05-2 08''Ø 87 82 52 E109 05-3 08''Ø 69 77 40
E110 05-4 08''Ø NA NA NA (1)
E111 05-5 08''Ø 97 115 71
288 321 191
E106 06-1 08''Ø 289 286 169
CORR 06-2 08''Ø 57 72 42
346 358 211
Remarks:
Room
Number "K" Notes
1. Locked door no key
VB-05 TOTAL
VB-06 TOTAL
TTI
TAB Technology, Inc.
PIMC CAMPUS PROJECTS
EXISTING VAVS
Required CFM Final CFM "K"
Factor
Terminal Device
Schedule
Project: Date: 01/19/23 System: Tech: BW/DH Print ID:
No. Size Velocity CFM Velocity CFM Velocity CFM
E121 2-1 08''Ø 1.00 238 238 237 E122 2-2 08''Ø 1.00 220 219 217 E104 2-3 08''Ø 1.00 62 60 66 E156 2-4 12''Ø 1.00 501 512 510 E156 2-5 12''Ø 1.00 722 734 730 E124 2-6 08''Ø 1.00 155 146 147 E123 2-7 08''Ø 1.00 249 254 245
E108 2-8 08''Ø 1.00 NA 142 139
E109 2-9 08''Ø 1.00 148 159 162
E110 2-10 12''Ø 1.00 NA NA NA (1)
E111 2-11 10''Ø 1.00 157 166 155 E130 2-12 08''Ø 1.00 209 211 217 E129 2-13 08''Ø 1.00 270 272 267 E127 2-14 08''Ø 1.00 203 204 198 137 2-15 24X12 1.00 673 688 674
Waiting 2-16 24X12 1.00 570 571 532 Waiting 2-17 24X12 1.00 372 384 399
NA 2-18 18X12 1.00 64 65 64
131 2-19 12X6 1.00 316 302 312 132 2-20 12X6 1.00 36 31 30 132 2-21 12X6 1.00 10 10 11 135 2-22 12X8 1.00 154 153 154 134 2-23 12X8 1.00 215 214 216 130 2-24 12X6 1.00 302 289 289 126 2-25 12X6 1.00 420 427 427 138 2-26 12X6 1.00 180 183 185 127 2-27 18X6 1.00 364 409 405 127 2-28 12X6 1.00 358 365 372 129 2-29 18X6 1.00 536 523 524 125 2-30 12X8 1.00 500 514 507 124 2-31 12X8 1.00 312 311 310 123 2-32 12x6 1.00 200 203 204
8,716 8,959 8,905
All outlets tested with a digital flow hood, which is self-compensating for altitude and back pressure.
Remarks:
Notes
1. Door locked no key.
AHU-2 RETURN TOTAL
TTI
TAB Technology, Inc.
PIMC CAMPUS PROJECTS
AHU-2 RETURN TOTAL
Room
Number
Terminal "K"
NORMAL COOLING HEATING
Air Handler Test
Project: Date:
System: Tech:
Print ID:
4.15 0.02
4.15
-0.11 0.81
4.17 0.33
4.15 0.33
Hz: 60 C to C:
C8254-FCH-L
AHU-4
3.84
4.15
Preliminary
5.07
Required Final Traverse Total
TTI
TAB Technology, Inc.
PIMC CAMPUS PROJECTS
AHU-4 BW
ENERGY LABS
01/19/23
4.17
4.15
-0.92
-0.92
5.0 1765+/-
3.82
1 OSA DAMPER 100% CLOSED
DIRECT
DRIVE
VFD
184T
1.15
System Static Set Point:
(1)
Cold Deck Final
Filter In - Out
Hot Deck Final Filter
In - Out
Mark
Manufacturer
Model, Size
Conditions
Total CFM
External/Total Fan
Static Press.
Fan Static Press.
Inlet - Outlet
Cooling Coil
In - Out - Delta P
Heating Coil
In - Out - Delta P
Filter
In - Out - Delta P
Remarks:
NA NA NA
Motor HP - RPM
Motor Voltage
Motor Amps
Service Factor
Motor Frame
Outside Air
Drive Belts
Fan Pulley
Motor Sheave
Fan RPM
Motor AdJ
IN/OUT:
6.20
480/483/480/3460/3
5.2/5.3/5.2
J01j TAB Report PIMC Campus Projects dave Highlight 0.0 dave Highlight
Exhaust Fan Test
Project: Date: 01/19/23 System: Tech: BW Print ID:
Req'd Final Req'd Final Req'd Final Req'd Final
3,552 19,907
0.86 1.68
-0.69 -1.35
0.17 0.33
2.0 2 @15.0
1755 1762 1770 1383/1385
460/3 480/480 483/3 460/3 480/480
483/3
2.75 1.2/1.2
1.1 17.90
10.1/10.4/ 10.6
10.6/10.5/
1762 1383/1385
Remarks:
TTI
TAB Technology, Inc.
PIMC CAMPUS PROJECTS
RF-4 and RF-2
Conditions
Mark RF-4 RF-2
Manufacturer ENERGY LABS Alliance Air Products
Motor RPM
Model, Size C8254-FCH-L 4BN-78.75
Total CFM
Fan Static Pressure
Fan Inlet Pressure
Fan Outlet Pressure
Motor HP
Motor Volts/Phase
Motor Amps
Fan RPM
Motor Sheave DIRECT
Fan Pulley DRIVE DRIVE
DIRECT
Motor Frame 145T 254
Drive Belt(s) VFD VFD
Center to Center NA NA
Motor Service Factor 1.15 1.15
Sys Static Set Point NA NA
Motor Adjust In/Out NA NA
Herts 60.00 56.00
Schedule
Project: Date: 12/21/22 System: Tech: ME/DE Print ID:
No. Size Velocity CFM Velocity CFM Velocity CFM
E101 Z1-1 10''Ø 117 117 254 E101 Z1-2 10''Ø 103 103 222 E101 Z1-3 10''Ø 96 96 191 E101 Z1-4 10''Ø 101 101 246
417 417 913
E120 Z2-1 12''Ø 269 269 516 E153 Z2-2 10''Ø 247 247 532 E118 Z2-3 08''Ø 143 143 522 E118 Z2-4 08''Ø 166 166 523
825 825 2,093
E153 Z3-1 10''Ø 57 57 111 E116 Z3-2 10''Ø 61 61 124 E115 Z3-3 10''Ø 76 76 138 E115 Z3-4 10''Ø 66 66 119 E105 Z3-5 08''Ø 104 104 132 E117 Z3-6 06''Ø 36 36 76
400 400 700
All outlets tested with a digital flow hood, which is self-compensating for altitude and back pressure.
Remarks:
Notes
1. Not installed
TTI
TAB Technology, Inc.
PIMC CAMPUS PROJECTS
AHU-B-2 RETURN
Room
Number
Terminal "K"
AS IS COOLING HEATING
ZONE 1 TOTAL
ZONE 2 TOTAL
ZONE 3 TOTAL
J01j TAB Report PIMC Campus Projects dave Highlight dave Highlight 2,093 dave Highlight dave Highlight dave Highlight dave Highlight dave Text Box 1,642 dave Text Box 3,706
Schedule
Project: Date: 12/21/22 System: Tech: ME,DE Print ID:
No. Size Velocity CFM Velocity CFM Velocity CFM
E119 EXR-4-1 14''Ø 1.00 35 38 37
E120 EXR-4-2 10''Ø 1.00 302 312 318
E153 EXR-4-3 14''Ø 1.00 478 469 487
E101 EXR-4-4 14''Ø 1.00 337 332 330
E101 EXR-4-5 14''Ø 1.00 310 312 317
AHU 4 RETURN TOTAL 1,462 1,463 1,489
All outlets tested with a digital flow hood, which is self-compensating for altitude and back pressure.
Remarks:
Notes
TTI
TAB Technology, Inc.
PIMC CAMPUS PROJECTS
AHU-4 RETURN TOTAL
Room
Number
Terminal "K"
NORMAL COOLING HEATING
Duct Traverse Test Sheet
Project: Date: 01/19/23 System: Tech: BW Print ID:
Design Preliminary Final
FPM CFM FPM CFM FPM CFM Static Pressure
AHU-4
ZONE 1 953 (1)
ZONE 2 14"X12" 1.160 1896 2212 2.35
ZONE 3 18"X12" 1.500 498 747 3.16
SUPPLY TOTAL 3912 3.16
AHU-4 24"X24" 4.000 888 3552 -0.49
RETURN TOTAL
AHU-2
SUPPLY TOTAL 120"X96" 80.000 429 34320
AHU-2
RETURN TOTAL18 @ 3.25"X47.5"19.290 1032 19907
AHU-2
OSA 1 19 @ 4"X55" 29.020 699 20285
OSA 2 19 @ 4"X37" 19.520 688 13430
OSA TOTAL 33715
EF-3A&3B 12''Ø 0.785 1519 1192 -1.21
EF-27 18''Ø 1.760 (2)
Remarks:
1. Calculated air flow, no reliable traverse location found
2. Fan has a bad motor, not running.
TTI
TAB Technology, Inc.
DUCT TRAVERSE
System
Zone/Branch
Duct
Size
Area
(sq. ft.)
PIMC CAMPUS PROJECTS
Exhaust Fan Test
Project: Date: 01/19/23 System: Tech: BW Print ID:
Req'd Final Req'd Final Req'd Final Req'd Final
586 596 (2)
NA NA
-1.21 -1.27
NA NA
0.5 0.5 2.0
1725 NA 1725 NA 1740
208/1 211/1 208/1 211/1 208/1
3.70 2.50 3.70 2.40 11.80
NA NA
Remarks:
1. Unable to shut fan down due to COVID
2. Bad motor not running.
Motor RPM
Motor HP
60.00
Motor Frame
60.00
2"/2" 2"/2" 4"/2"
NA NA
Herts
Sys Static Set Point
Motor Adjust In/Out
Center to Center
Conditions
Motor Service Factor 1.25 1.25 1.00
16" 16" 18"
NA
Model, Size
Manufacturer
Drive Belt(s)
Fan Pulley
Motor Sheave
Fan RPM
Motor Amps
Total CFM
Fan Outlet Pressure
Fan Inlet Pressure
Fan Static Pressure
Motor Volts/Phase
NA NA AX49
56 56 182T
1VL40 X 5/8 1VL40 X 5/8 1vl56 x 1 1/8
NA NA NA
TWIN CITY FAN TWIN CITY FAN TWIN CITY FAN
TFE-90C7 TFE-90C7 TFE-15OC11
TTI
TAB Technology, Inc.
EF-3A EF-3B EF-27
PIMC CAMPUS PROJECTS
EF-3A, EF-3B, EF-27
Mark
Schedule
Project: Date: 12/21/22 System: Tech: ME/DE Print ID:
No. Size Velocity CFM Velocity CFM Velocity CFM
E119 1A-1 8 1.00 119 E102 1-1 08''Ø 1.00 173 E103 1-2 08''Ø 1.00 132 E125 1-3 06''Ø 1.00 20 E126 1-4 06''Ø 1.00 30 E131 1-5 08''Ø 1.00 500 E132 1-6 08''Ø 1.00 577 E112 1-7 06''Ø 1.00 44
All outlets tested with a digital flow hood, which is self-compensating for altitude and back pressure.
Remarks:
Notes
1. Bad Fan Motor
TTI
TAB Technology, Inc.
PIMC CAMPUS PROJECTS
Exhaust
Room
Number
Terminal "K"
Required Preliminary Final
0.004
-0.008
+0.003
-0.005
Wall -0.002
-0.004
-0.11-0.006-0.003
REVIEW DURRANT
REMODEL FROM 2009
Emergency Department
41-1 44-1
40-1
42-2 42-342-4
42-1
46-2 46-3 46-4 46-5
45-1
45-2 45-3 45-4 45-5
49-1
49-2
49-3
2-15 2-16 2-17
2-18
2-19
2-20 2-21
2-22
2-23
2-24
2-25
2-26
2-27
2-
2-
2-
2-
2-32
VB
VB
VB
R-1
8Ø
R-1
8Ø
VB-3
VB-4
VB-5
NOTE:
REFER TO SHEET M4A FOR
MECHANICAL SYMBOLS SCHEDULE.
NOTE:
REFER TO ARCHITECTURAL RCP FOR
SUPPLY/DIFFUSER GRILLE PLACEMENT.
VB
VB
8"Ø UP TO
EF-3 ON ROOF
VB
R-1
12Ø
T-2
6Ø
T-1
6Ø
T-2
6Ø
T-1
6Ø
8"Ø UP TO
EF-2 ON ROOF
VB-BOX
26X10
CONNECT
TO EXISTING
12X6
CONNECT
TO EXISTING
GENERAL NOTES:
A. CONTRACTOR TO FIELD VERIFY EXISITING CONDITIONS.
B. MECHANICAL CONTRACTOR TO COORDINATE DEMOLITION
AND NEW CONSTRUCTION WITH OTHER TRADES.
M2A
HVAC NEW CONSTRUCTION
PHASE 1
TD
JH
4' 8'0 16'
NORTH
EMERGENCY DEPARTMENT HVAC NEW CONSTRUCTION PLAN
P H
O E
N I X
N
D I A
N
M
E D
I C
A L
C
E N
T E
R
R E
M O
D E
L
P
H A
S E
P H
O E
N I X
A
R I Z
O N
A
R
D ANTRU R
E M
E R
G E
N C
Y
D
E P
A R
T M
E N
T
C C
E
A
S B
U I L T
T
REVISIONS
AS-BUILT SET 3-6-120
01-1
01-4
1-4 1-3
2-5 2-4
2-6 2-7
03-1
03-2
03-3
03-4
04-1 04-2
04-3
04-4
04-5
06-1
06-2
05-1
05-2
05-3
05-4
05-5
1-5 1-6
1-7
2-8
2-9
2-10
2-11
2-12
2-13
2-14
-0.015
-0.010
-0.006
-0.009
-0.007 -0.010
-0.004
-0.005
+0.009
0.006
-0.009
-0.010
-0.021
-0.029
14x6
VB
VB
S-1
8Ø
S-1
10Ø
S-1
12Ø
S-3
10Ø
S-3
10Ø
S-3
10Ø
S-3
10Ø
S-1
8Ø
S-1
10Ø
S-1
10Ø
S-2
6Ø
E-1
6Ø
R-1
12Ø
E-2
14Ø
VB
10Ø UP TO
EF-1 ON ROOF
T-1
8Ø
VB-7
4-3
VB-1
VB-2
VB-6
4-1
4-2
NOTE:
SEE SHEET M4B FOR MECHANICAL
SYMBOLS SCHEDULE.
NOTE:
REFER TO ARCHITECTURAL RCP FOR
SUPPLY/DIFFUSER GRILLE PLACEMENT.
T
T
T
T
T
T
T
E-2
8Ø
T-1
8Ø
E-1
14Ø
T-2
6Ø
T-1
6Ø
T-2
6Ø
T-2
6Ø
T-1
6Ø
T-1
6Ø
T-2
6Ø
T-1
6Ø
T-2
6Ø
T-1
6Ø
Ø
Ø
Ø
Ø
6Ø
6Ø
8X8
GENERAL NOTES:
A. CONTRACTOR TO FIELD VERIFY EXISITING CONDITIONS.
B. MECHANICAL CONTRACTOR TO COORDINATE DEMOLITION
AND NEW CONSTRUCTION WITH OTHER TRADES.
M2B
HVAC NEW CONSTRUCTION
PHASE 2
TD
JH
P H
O E
N
X
N
D I A
N
M
E D
I C
A L
C
E N
T E
R
R E
M O
D E
L
P
H A
P H
O E
N I X
A
R I Z
O N
A
E M
E R
G E
N C
Y
D
E P
A R
T M
E N
T
4' 8'0 16'
NORTH
EMERGENCY DEPARTMENT HVAC NEW CONSTRUCTION PLAN
C C
E
A
S B
U I L T
T
REVISIONS
AS-BUILT SET 3-6-120
C O
N F
IR
M
S T
A T
U S
O F
H A
N D
S K
E T
C H
E D
M O
D
IF
IC
A
T
IO
N S
IN
N
E X
T S
H E
E T
01-1
01-2
01-3
01-4
Z1-1
Z1-2
Z1-3
Z1-4
Z2-1
Z2-2
Z2-3
Z2-4
Z3-1
Z3-2
Z3-3
Z3-4
Z3-5
Z3-6
4-1
4-2
2-1
4-3
2-2
4-4
4-5
2-3
2-4
2-5
2-6
1-1
1-2
1-31-4
1A-1
2-7
+0.009
+0.002
-0.012
0.002
0.006 -0.009
-0.012
-0.008
-0.011
0.002
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
75H701-24-R-00035
Indian Health Service Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104
Project: PH23PH05H6, PIMC ED & CSR
Location: Phoenix Indian Medical Center (PIMC), 4212 North 16th Street, Phoenix, AZ, 85016
See Section L for Proposal Submittal Instructions and Site Visit Information.
This project will be procured as a 100% Small Business set-aside under North American Industry Classification System (NAICS) code 236220 Commercial and Institutional Building Construction. The associated size standard for this procurement is $45 million.
CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $1,000,000 and $5,000,000, in accordance with FAR 36.204(f).
Indian Health Service, Phoenix Area OEHE Attn: Kelly Britton 40 N. Central Ave, Suite 720 Phoenix, AZ 85004
Kelly Britton (602) 245-2206 or kelly.britton@ihs.gov
PH23PH05H6
1 5505/24/2024
8/27/2024
2:00 PM
10 days after award
F.2. FAR 52.211-10
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
B.3.
Indian Health Service, DES - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104
Indian Health Service Attn: Financial Management 40 N Central Avenue, Suite 512 Phoenix, AZ 85004
KELLY J. BRITTON
LUMP SUM TOTAL $________________
| J01h After Hours Work Locations.pdf |
| 75H70123F30021 PIMC ED & CSR l Construction Document Submittal |
| General |
| G1.10 INDEX, ABBREVIATIONS, SYMBOLS & PROJECT DATA |
| G1.20 CODE ANALYSIS, CODE REVIEW PLANS |
| G1.30 ARCHITECTURAL SITE PLAN |
| Civil |
| C1.0 COVER SHEET |
| C2.0 UTILITIES SHEET |
| C3.0 DETAILS |
| Architectural |
| D2.10 LOWER LEVEL DEMOLITION PLAN |
| D2.10A DEMO EQUIPMENT PLAN |
| D3.10 DEMOLITION CEILING PLAN -LOWER LEVEL |
| D3.20 DEMOLITION CEILING PLAN -FIRST FLOOR PLAN |
| A2.10 LOWER LEVEL FLOOR PLAN |
| A2.10A LOWER LEVEL EQUIPMENT PLAN |
| A2.20 TEMPORARY MOBILE TRAILER PLAN |
| A2.30 ROOM FINISH SCHEDULE & INTERIOR ELEVATIONS |
| A3.10 REFLECTED CEILING PLAN -LOWER LEVEL |
| A3.20 REFLECTED CEILING PLAN -FIRST FLOOR |
| A4.10 ROOF PLAN |
| A8.10 STAIR PLANS, SECTIONS & DETAILS |
| Mechanical |
| M0.10 MECHANICAL GENERAL INFORMATION |
| MD2.10 MECHANICAL DEMO GROUND FLOOR PLAN |
| MD2.20 MECHANICAL DEMO FIRST FLOOR PLAN |
| M2.10 MECHANICAL GROUND FLOOR PLAN |
| M2.20 MECHANICAL FIRST FLOOR PLAN |
| M3.10 CSR AIRFLOW DIAGRAM PLAN |
| M3.20 ED WAITING ROOM AIRFLOW DIAGRAM PLAN |
| M4.10 MECHANICAL ROOF PLAN |
| M5.10 MECHANICAL VENTILATION CALCULATIONS |
| M5.20 MECHANICAL EQUIPMENT SCHEDULES |
| M6.10 MECHANICAL DETAILS |
| M7.10 MECHANICAL CONTROLS |
| M7.20 MECHANICAL CONTROLS |
| Plumbing |
| P0.00 PLUMBING GENERAL INFORMATION |
| P1.00 PLUMBING SITE PLAN |
| P2.00 PLUMBING ISOMETRICS |
| Fire Protections |
| FP2.10 FIRE PROTECTION GROUND FLOOR PLAN |
| Electrical |
| E0.01 ELECTRICAL GENERAL INFORMATION |
| E1.00 ELECTRICAL SITE PLAN |
| E2.10 ELECTRICAL GROUND FLOOR PLANS |
| E2.20 ELECTRICAL FIRST FLOOR PLAN |
| E3.10 ELECTRICAL ONE-LINE |
| E4.10 ELECTRICAL SCHEDULES |
| B05 75H70124R00035 Amendment A00009 Page 2.pdf |
| SECTION J – LIST OF ATTACHMENTS |
File details come from the government source that posted it. Updated .