This document is a Test and Balance (TAB) Report for the PIMC Campus Projects located at 4212 N 16th Street, Phoenix, AZ 85016. The report includes details on the testing and balancing of the air handling units (AHU-2 and AHU-4), exhaust fans (EF-3A, EF-3B, and EF-27), and associated VAV boxes and terminal devices. Key findings include AHU-2 operating in full economizer mode, EF-27 having a bad motor, and discrepancies between AHU-4 return air totals and traverse readings indicating potential leakage. The report provides airflow measurements, fan static pressures, motor information, and other system performance details. It also includes a VAV box schedule listing required and final CFM values for the VAV boxes and terminal devices served by the AHUs. Overall, the TAB Report documents the testing and balancing efforts to optimize the performance of the HVAC systems at the PIMC Campus.

View the file

Other files for this federal contract opportunity

Other files attached to PIMC ED & CSR (Phoenix, AZ), newest first.
File Type Posted
B05 Amendment A00010 (75H701-24-R-00035).pdf PDF
J02 WD AZ20240039 Mod 5 2024.08.16.pdf PDF
B05 Amendment A00009 (75H701-24-R-00035).pdf PDF
J01h After Hours Work Locations.pdf PDF
J01i Mechanical Zoning.pdf PDF
B05 Amendment A00008 (75H701-24-R-00035).pdf PDF
J02 WD AZ20240039 Mod 4 2024.07.19.pdf PDF
B05 Amendment A00007 (75H701-24-R-00035).pdf PDF
B05 Amendment A00006 (75H701-24-R-00035).pdf PDF
J01a Specifications PIMC ED-CSR 2024.01.29 (Conformed w-Addendum 02).pdf PDF
B05 Amendment A00005 (75H701-24-R-00035).pdf PDF
A05 Amendment A00004 (75H701-24-R-00035).pdf PDF
A05 Amendment A00003 (75H701-24-R-00035).pdf PDF
A05 Amendment A00002 (75H701-24-R-00035).pdf PDF
A05 Amendment A00001 (75H701-24-R-00035).pdf PDF
J01c Location Map.pdf PDF
J01d Infection Control Risk Assessment Permit.pdf PDF
J01f PIMC Asbestos Survey - Bldg 233 Hospital (Feb 2003).pdf PDF
J05 Company Specialized Experience Form Construction.pdf PDF
J01e Above Ceiling Work Permit.pdf PDF
J01g GFE PIMC ED-CSR.pdf PDF
J02 WD AZ20240039 Mod 2 2024.05.17.pdf PDF
J07 OF 306 Declaration for Federal Employment.pdf PDF
J08 Addendum to OF-306 (Childcare Form).pdf PDF
B01 RFP 75H70124R00035 PIMC ED CSR.pdf PDF
J06 PPQ.pdf PDF
J01a Specifications - PIMC ED-CSR 2024.01.29.pdf PDF
J01b Drawings - PIMC ED-CSR 2023.08.08.pdf PDF
J03 Self Performed Calculation Sheet.pdf PDF
J04a FORMS_TPT_5000HC_11228.pdf PDF
J04 2024 Exemption Letter for a Qualifying Hospital.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: PIMC CAMPUS PROJECTS

Location: 4212 N 16TH STREET, PHOENIX AZ 85016

Engineer: ZONA TECHNICAL ENGINEERING

Prepared for: ZONA TECHNICAL ENGINEERING

Project Number:

Date:

Michael Ziegler

Test & Balance Engineer

TAB Technology, Inc.

1912 North Rosemont

Mesa, Az 85205

480-964-0187

25-Jan-23

Associated Air Balance Council Certificate No: 98-01-42

TEST AND BALANCE REPORT

This is to certify that TAB Technology, Inc. has balanced the systems described herein to their optimum performance capabilities. The testing and balancing has been performed in accordance with the standard requirements and procedures of the Associated Air Balance Council and the results are herein recorded.

J01j TAB Report PIMC Campus Projects

TTI

TAB Technology Inc.

Date: 1/10/2022 Tech: BW

Note #

1 AHU-2 was in full economizer at time of readings. It appears we only

EF-27 has a bad motor and is not running at this time.

pre-read a small portion of the areas served by this air handler. The unit traverse CFM is far more than the total from VAV pre-reads.

AHU-4 Is a multi zone system, the return grill total is much less than the return traverse total indicating leakage somewhere in the ceiling.

Technician Notes

The OSA damper was 100% closed at the time of testing.

EF-3A & 3B These fans are setup for one to be a stand by. Both fans were rotated in the cycle to acquire CFM Readings.

Air Handler Test

Project: Date:

System: Tech:

Print ID:

4.06 0.25

4.06 1.08

-0.40 0.82

3.84 0.22

Hz: 65 C to C:

4bn-/78.75/pf/mb/55/pf/sx5g

AHU-2

4.06

3.84

Pre-read VAV Total

5.06

Required Final Traverse Total

TTI

TAB Technology, Inc.

PIMC CAMPUS PROJECTS

AHU-2 BW

Alliance Air Products

6038 34320

01/19/23

3.81

2.98

-1.22

-1.22

4 @20 1848.0

AHU-2 Was in full economizer at the time of testing

DIRECT

DRIVE

VFD

1.15

System Static Set Point:

100%

In - Out - Delta P

Humidifier In - Out -

Delta P

Mark

Manufacturer

Model, Size

Conditions

Total CFM

External/Total Fan

Static Press.

Fan Static Press.

Inlet - Outlet

Cooling Coil

In - Out - Delta P

Heating Coil

In - Out - Delta P

Filter

In - Out - Delta P

Remarks:

NA NA

Motor HP - RPM

Motor Voltage

Motor Amps

Service Factor

Motor Frame

Outside Air

Drive Belts

Fan Pulley

Motor Sheave

Fan RPM

Motor AdJ

IN/OUT:

23.30

480/483/480/3460/3

16.2/16.3/16.3 16.3/16.6/16.4

16.3/16.4/16.4 16.5/16.3/16.4

1848/1854/1843/1851

VAV Box Schedule with Terminal Device

Project: Date: 12/21/22

System: Tech: BW/CD

Print ID:

Area Plan Control Size /

Served Tag Tag Diameter Max Min Max Min

40-B-2 8"/8" NA NA 241 NA

41-B-2 8"/8" NA NA 312 NA

42-B-2 12"/12" NA NA 421 NA

44-B-2 "8/8" NA NA 349 NA

45-B-2 8"/8' NA NA 631 NA

Terminal Normal Cooling Heating

No. Size Velocity CFM Velocity CFM Velocity CFM

40-1 12X12 241 236 247

40-B-2 TOTAL 241 236 247

41-1 12X12 312 319 294

41-B-2 TOTAL 312 319 294

42-1 10X10 122 182 144

42-2 6X12 100 111 102

42-3 6X12 78 90 82

42-4 6X12 121 284 250

42-B-2 TOTAL 421 667 578

44-1 12X12 349 377 339

44-B-2 TOTAL 349 377 339

45-1 10X10 138 131 122

45-2 10X10 136 137 120

45-3 10X10 111 119 112

45-4 10X10 93 90 107

45-5 10X10 153 163 149

45-B-2 TOTAL 631 640 610

Remarks:

TTI

TAB Technology, Inc.

Required CFM Final CFM "K"

Factor Notes

Exsiting Pneumatic Dual Duct VAV

PIMC CAMPUS PROJECTS

Room

Number "K" Notes with Terminal Device

Project: Date: 12/21/22

System: Tech: BW/CD

Print ID:

Area Plan Control Size /

Served Tag Tag Diameter Max Min Max Min

46-B-2 12"/12" NA NA 1,084 NA

48-B-2 8"/8" NA NA 437 NA

49-B-2 8"/8" NA NA 430 NA

Terminal Normal Cooling Heating

No. Size Velocity CFM Velocity CFM Velocity CFM

46-1 10''Ø 129 143 115

46-2 12X12 322 419 332

46-3 12X12 318 442 348

46-4 12X12 315 432 341

46-B-2 1,084 1,436 1,136

48-1 12X12 437 432 386

48-B-2 TOTAL 437 432 386

49-1 10X10 225 280 237

49-2 10X10 205 267 243

49-B-2 TOTAL 430 547 480

Remarks:

Room

Number "K" Notes

TTI

TAB Technology, Inc.

PIMC CAMPUS PROJECTS

Exsiting Pneumatic Dual Duct VAV

Required CFM Final CFM "K"

Factor Notes with Terminal Device

Project: Date: 12/21/22

System: Tech: ME,DE

Print ID:

Area Plan Control Size /

Served Tag Tag Diameter Max Min Max Min

VB-01 8" / 8" NA NA 355 NA

VB-03 8" / 8" NA NA 847 NA

VB-04 8" / 8" NA NA 297 NA

Terminal AS IS Cooling Heating

No. Size Velocity CFM Velocity CFM Velocity CFM

E154 01-1 08''Ø 88 85 54

E122 01-2 08''Ø 85 88 66

E121 01-3 08''Ø 103 97 70

E155 01-4 08''Ø 79 82 67

355 352 257

E127 03-1 08''Ø 231 215 190

E129 03-2 08''Ø 200 217 186

E131 03-3 08''Ø 154 116 106

E155 03-4 08''Ø 262 225 186

847 773 668

E124 04-1 08''Ø 63 154 61

E123 04-2 08''Ø 55 171 54

E128 04-3 08''Ø 42 120 46

E130 04-4 08''Ø 63 206 65

E132 04-5 08''Ø 74 191 75

297 842 301

Remarks:

Room

Number "K" Notes

VB-01 TOTAL

VB-03 TOTAL

VB-04 TOTAL

TTI

TAB Technology, Inc.

PIMC CAMPUS PROJECTS

EXISTING VAVS

Required CFM Final CFM "K"

Factor with Terminal Device

Project: Date: 12/21/22

System: Tech: ME,DE

Print ID:

Area Plan Control Size /

Served Tag Tag Diameter Max Min Max Min

VB-05 8" / 8" NA NA 288 NA

VB-06 8" / 8" NA NA 346 NA

Terminal AS IS Cooling Heating

No. Size Velocity CFM Velocity CFM Velocity CFM

E113 05-1 08''Ø 35 47 28

E108 05-2 08''Ø 87 82 52

E109 05-3 08''Ø 69 77 40

E110 05-4 08''Ø NA NA NA (1)

E111 05-5 08''Ø 97 115 71

288 321 191

E106 06-1 08''Ø 289 286 169

CORR 06-2 08''Ø 57 72 42

346 358 211

Remarks:

Room

Number "K" Notes

1. Locked door no key

VB-05 TOTAL

VB-06 TOTAL

TTI

TAB Technology, Inc.

PIMC CAMPUS PROJECTS

EXISTING VAVS

Required CFM Final CFM "K"

Factor

Terminal Device

Schedule

Project: Date: 01/19/23

System: Tech: BW/DH

Print ID:

No. Size Velocity CFM Velocity CFM Velocity CFM

E121 2-1 08''Ø 1.00 238 238 237

E122 2-2 08''Ø 1.00 220 219 217

E104 2-3 08''Ø 1.00 62 60 66

E156 2-4 12''Ø 1.00 501 512 510

E156 2-5 12''Ø 1.00 722 734 730

E124 2-6 08''Ø 1.00 155 146 147

E123 2-7 08''Ø 1.00 249 254 245

E108 2-8 08''Ø 1.00 NA 142 139

E109 2-9 08''Ø 1.00 148 159 162

E110 2-10 12''Ø 1.00 NA NA NA (1)

E111 2-11 10''Ø 1.00 157 166 155

E130 2-12 08''Ø 1.00 209 211 217

E129 2-13 08''Ø 1.00 270 272 267

E127 2-14 08''Ø 1.00 203 204 198

137 2-15 24X12 1.00 673 688 674

Waiting 2-16 24X12 1.00 570 571 532

Waiting 2-17 24X12 1.00 372 384 399

NA 2-18 18X12 1.00 64 65 64

131 2-19 12X6 1.00 316 302 312

132 2-20 12X6 1.00 36 31 30

132 2-21 12X6 1.00 10 10 11

135 2-22 12X8 1.00 154 153 154

134 2-23 12X8 1.00 215 214 216

130 2-24 12X6 1.00 302 289 289

126 2-25 12X6 1.00 420 427 427

138 2-26 12X6 1.00 180 183 185

127 2-27 18X6 1.00 364 409 405

127 2-28 12X6 1.00 358 365 372

129 2-29 18X6 1.00 536 523 524

125 2-30 12X8 1.00 500 514 507

124 2-31 12X8 1.00 312 311 310

123 2-32 12x6 1.00 200 203 204

8,716 8,959 8,905

All outlets tested with a digital flow hood, which is self-compensating for altitude and back pressure.

Remarks:

Notes

1. Door locked no key.

AHU-2 RETURN TOTAL

TTI

TAB Technology, Inc.

PIMC CAMPUS PROJECTS

AHU-2 RETURN TOTAL

Room

Number

Terminal "K"

NORMAL COOLING HEATING

Air Handler Test

Project: Date:

System: Tech:

Print ID:

4.15 0.02

4.15

-0.11 0.81

4.17 0.33

4.15 0.33

Hz: 60 C to C:

C8254-FCH-L

AHU-4

3.84

4.15

Preliminary

5.07

Required Final Traverse Total

TTI

TAB Technology, Inc.

PIMC CAMPUS PROJECTS

AHU-4 BW

ENERGY LABS

01/19/23

4.17

4.15

-0.92

-0.92

5.0 1765+/-

3.82

1 OSA DAMPER 100% CLOSED

DIRECT

DRIVE

VFD

184T

1.15

System Static Set Point:

(1)

Cold Deck Final

Filter In - Out

Hot Deck Final Filter

In - Out

Mark

Manufacturer

Model, Size

Conditions

Total CFM

External/Total Fan

Static Press.

Fan Static Press.

Inlet - Outlet

Cooling Coil

In - Out - Delta P

Heating Coil

In - Out - Delta P

Filter

In - Out - Delta P

Remarks:

NA NA NA

Motor HP - RPM

Motor Voltage

Motor Amps

Service Factor

Motor Frame

Outside Air

Drive Belts

Fan Pulley

Motor Sheave

Fan RPM

Motor AdJ

IN/OUT:

6.20

480/483/480/3460/3

5.2/5.3/5.2

J01j TAB Report PIMC Campus Projects dave Highlight 0.0 dave Highlight

Exhaust Fan Test

Project: Date: 01/19/23

System: Tech: BW

Print ID:

Req'd Final Req'd Final Req'd Final Req'd Final

3,552 19,907

0.86 1.68

-0.69 -1.35

0.17 0.33

2.0 2 @15.0

1755 1762 1770 1383/1385

460/3 480/480

483/3 460/3

480/480

483/3

2.75 1.2/1.2

1.1 17.90

10.1/10.4/

10.6

10.6/10.5/

1762 1383/1385

Remarks:

TTI

TAB Technology, Inc.

PIMC CAMPUS PROJECTS

RF-4 and RF-2

Conditions

Mark

RF-4 RF-2

Manufacturer ENERGY LABS Alliance Air Products

Motor RPM

Model, Size

C8254-FCH-L 4BN-78.75

Total CFM

Fan Static Pressure

Fan Inlet Pressure

Fan Outlet Pressure

Motor HP

Motor Volts/Phase

Motor Amps

Fan RPM

Motor Sheave

DIRECT

Fan Pulley

DRIVE DRIVE

DIRECT

Motor Frame 145T 254

Drive Belt(s)

VFD VFD

Center to Center

NA NA

Motor Service Factor

1.15 1.15

Sys Static Set Point

NA NA

Motor Adjust In/Out

NA NA

Herts

60.00 56.00

Schedule

Project: Date: 12/21/22

System: Tech: ME/DE

Print ID:

No. Size Velocity CFM Velocity CFM Velocity CFM

E101 Z1-1 10''Ø 117 117 254

E101 Z1-2 10''Ø 103 103 222

E101 Z1-3 10''Ø 96 96 191

E101 Z1-4 10''Ø 101 101 246

417 417 913

E120 Z2-1 12''Ø 269 269 516

E153 Z2-2 10''Ø 247 247 532

E118 Z2-3 08''Ø 143 143 522

E118 Z2-4 08''Ø 166 166 523

825 825 2,093

E153 Z3-1 10''Ø 57 57 111

E116 Z3-2 10''Ø 61 61 124

E115 Z3-3 10''Ø 76 76 138

E115 Z3-4 10''Ø 66 66 119

E105 Z3-5 08''Ø 104 104 132

E117 Z3-6 06''Ø 36 36 76

400 400 700

All outlets tested with a digital flow hood, which is self-compensating for altitude and back pressure.

Remarks:

Notes

1. Not installed

TTI

TAB Technology, Inc.

PIMC CAMPUS PROJECTS

AHU-B-2 RETURN

Room

Number

Terminal "K"

AS IS COOLING HEATING

ZONE 1 TOTAL

ZONE 2 TOTAL

ZONE 3 TOTAL

J01j TAB Report PIMC Campus Projects dave Highlight dave Highlight 2,093 dave Highlight dave Highlight dave Highlight dave Highlight dave Text Box 1,642 dave Text Box 3,706

Schedule

Project: Date: 12/21/22

System: Tech: ME,DE

Print ID:

No. Size Velocity CFM Velocity CFM Velocity CFM

E119 EXR-4-1 14''Ø 1.00 35 38 37

E120 EXR-4-2 10''Ø 1.00 302 312 318

E153 EXR-4-3 14''Ø 1.00 478 469 487

E101 EXR-4-4 14''Ø 1.00 337 332 330

E101 EXR-4-5 14''Ø 1.00 310 312 317

AHU 4 RETURN TOTAL 1,462 1,463 1,489

All outlets tested with a digital flow hood, which is self-compensating for altitude and back pressure.

Remarks:

Notes

TTI

TAB Technology, Inc.

PIMC CAMPUS PROJECTS

AHU-4 RETURN TOTAL

Room

Number

Terminal "K"

NORMAL COOLING HEATING

Duct Traverse Test Sheet

Project: Date: 01/19/23

System: Tech: BW

Print ID:

Design Preliminary Final

FPM CFM FPM CFM FPM CFM Static Pressure

AHU-4

ZONE 1 953 (1)

ZONE 2 14"X12" 1.160 1896 2212 2.35

ZONE 3 18"X12" 1.500 498 747 3.16

SUPPLY TOTAL 3912 3.16

AHU-4 24"X24" 4.000 888 3552 -0.49

RETURN TOTAL

AHU-2

SUPPLY TOTAL 120"X96" 80.000 429 34320

AHU-2

RETURN TOTAL18 @ 3.25"X47.5"19.290 1032 19907

AHU-2

OSA 1 19 @ 4"X55" 29.020 699 20285

OSA 2 19 @ 4"X37" 19.520 688 13430

OSA TOTAL 33715

EF-3A&3B 12''Ø 0.785 1519 1192 -1.21

EF-27 18''Ø 1.760 (2)

Remarks:

1. Calculated air flow, no reliable traverse location found

2. Fan has a bad motor, not running.

TTI

TAB Technology, Inc.

DUCT TRAVERSE

System

Zone/Branch

Duct

Size

Area

(sq. ft.)

PIMC CAMPUS PROJECTS

Exhaust Fan Test

Project: Date: 01/19/23

System: Tech: BW

Print ID:

Req'd Final Req'd Final Req'd Final Req'd Final

586 596 (2)

NA NA

-1.21 -1.27

NA NA

0.5 0.5 2.0

1725 NA 1725 NA 1740

208/1 211/1 208/1 211/1 208/1

3.70 2.50 3.70 2.40 11.80

NA NA

Remarks:

1. Unable to shut fan down due to COVID

2. Bad motor not running.

Motor RPM

Motor HP

60.00

Motor Frame

60.00

2"/2" 2"/2" 4"/2"

NA NA

Herts

Sys Static Set Point

Motor Adjust In/Out

Center to Center

Conditions

Motor Service Factor

1.25 1.25 1.00

16" 16" 18"

NA

Model, Size

Manufacturer

Drive Belt(s)

Fan Pulley

Motor Sheave

Fan RPM

Motor Amps

Total CFM

Fan Outlet Pressure

Fan Inlet Pressure

Fan Static Pressure

Motor Volts/Phase

NA NA AX49

56 56 182T

1VL40 X 5/8 1VL40 X 5/8 1vl56 x 1 1/8

NA NA NA

TWIN CITY FAN TWIN CITY FAN TWIN CITY FAN

TFE-90C7 TFE-90C7 TFE-15OC11

TTI

TAB Technology, Inc.

EF-3A EF-3B EF-27

PIMC CAMPUS PROJECTS

EF-3A, EF-3B, EF-27

Mark

Schedule

Project: Date: 12/21/22

System: Tech: ME/DE

Print ID:

No. Size Velocity CFM Velocity CFM Velocity CFM

E119 1A-1 8 1.00 119

E102 1-1 08''Ø 1.00 173

E103 1-2 08''Ø 1.00 132

E125 1-3 06''Ø 1.00 20

E126 1-4 06''Ø 1.00 30

E131 1-5 08''Ø 1.00 500

E132 1-6 08''Ø 1.00 577

E112 1-7 06''Ø 1.00 44

All outlets tested with a digital flow hood, which is self-compensating for altitude and back pressure.

Remarks:

Notes

1. Bad Fan Motor

TTI

TAB Technology, Inc.

PIMC CAMPUS PROJECTS

Exhaust

Room

Number

Terminal "K"

Required Preliminary Final

0.004

-0.008

+0.003

-0.005

Wall -0.002

-0.004

-0.11-0.006-0.003

REVIEW DURRANT

REMODEL FROM 2009

Emergency Department

41-1 44-1

40-1

42-2 42-342-4

42-1

46-2 46-3 46-4 46-5

45-1

45-2 45-3 45-4 45-5

49-1

49-2

49-3

2-15 2-16 2-17

2-18

2-19

2-20 2-21

2-22

2-23

2-24

2-25

2-26

2-27

2-

2-

2-

2-

2-32

VB

VB

VB

R-1

8Ø

R-1

8Ø

VB-3

VB-4

VB-5

NOTE:

REFER TO SHEET M4A FOR

MECHANICAL SYMBOLS SCHEDULE.

NOTE:

REFER TO ARCHITECTURAL RCP FOR

SUPPLY/DIFFUSER GRILLE PLACEMENT.

VB

VB

8"Ø UP TO

EF-3 ON ROOF

VB

R-1

12Ø

T-2

6Ø

T-1

6Ø

T-2

6Ø

T-1

6Ø

8"Ø UP TO

EF-2 ON ROOF

VB-BOX

26X10

CONNECT

TO EXISTING

12X6

CONNECT

TO EXISTING

GENERAL NOTES:

A. CONTRACTOR TO FIELD VERIFY EXISITING CONDITIONS.

B. MECHANICAL CONTRACTOR TO COORDINATE DEMOLITION

AND NEW CONSTRUCTION WITH OTHER TRADES.

M2A

HVAC NEW CONSTRUCTION

PHASE 1

TD

JH

4' 8'0 16'

NORTH

EMERGENCY DEPARTMENT HVAC NEW CONSTRUCTION PLAN

P H

O E

N I X

N

D I A

N

M

E D

I C

A L

C

E N

T E

R

R E

M O

D E

L

P

H A

S E

P H

O E

N I X

A

R I Z

O N

A

R

D ANTRU R

E M

E R

G E

N C

Y

D

E P

A R

T M

E N

T

C C

E

A

S B

U I L T

T

REVISIONS

AS-BUILT SET 3-6-120

01-1

01-4

1-4 1-3

2-5 2-4

2-6 2-7

03-1

03-2

03-3

03-4

04-1 04-2

04-3

04-4

04-5

06-1

06-2

05-1

05-2

05-3

05-4

05-5

1-5 1-6

1-7

2-8

2-9

2-10

2-11

2-12

2-13

2-14

-0.015

-0.010

-0.006

-0.009

-0.007 -0.010

-0.004

-0.005

+0.009

0.006

-0.009

-0.010

-0.021

-0.029

14x6

VB

VB

S-1

8Ø

S-1

10Ø

S-1

12Ø

S-3

10Ø

S-3

10Ø

S-3

10Ø

S-3

10Ø

S-1

8Ø

S-1

10Ø

S-1

10Ø

S-2

6Ø

E-1

6Ø

R-1

12Ø

E-2

14Ø

VB

10Ø UP TO

EF-1 ON ROOF

T-1

8Ø

VB-7

4-3

VB-1

VB-2

VB-6

4-1

4-2

NOTE:

SEE SHEET M4B FOR MECHANICAL

SYMBOLS SCHEDULE.

NOTE:

REFER TO ARCHITECTURAL RCP FOR

SUPPLY/DIFFUSER GRILLE PLACEMENT.

T

T

T

T

T

T

T

E-2

8Ø

T-1

8Ø

E-1

14Ø

T-2

6Ø

T-1

6Ø

T-2

6Ø

T-2

6Ø

T-1

6Ø

T-1

6Ø

T-2

6Ø

T-1

6Ø

T-2

6Ø

T-1

6Ø

Ø

Ø

Ø

Ø

6Ø

6Ø

8X8

GENERAL NOTES:

A. CONTRACTOR TO FIELD VERIFY EXISITING CONDITIONS.

B. MECHANICAL CONTRACTOR TO COORDINATE DEMOLITION

AND NEW CONSTRUCTION WITH OTHER TRADES.

M2B

HVAC NEW CONSTRUCTION

PHASE 2

TD

JH

P H

O E

N

X

N

D I A

N

M

E D

I C

A L

C

E N

T E

R

R E

M O

D E

L

P

H A

P H

O E

N I X

A

R I Z

O N

A

E M

E R

G E

N C

Y

D

E P

A R

T M

E N

T

4' 8'0 16'

NORTH

EMERGENCY DEPARTMENT HVAC NEW CONSTRUCTION PLAN

C C

E

A

S B

U I L T

T

REVISIONS

AS-BUILT SET 3-6-120

C O

N F

IR

M

S T

A T

U S

O F

H A

N D

S K

E T

C H

E D

M O

D

IF

IC

A

T

IO

N S

IN

N

E X

T S

H E

E T

01-1

01-2

01-3

01-4

Z1-1

Z1-2

Z1-3

Z1-4

Z2-1

Z2-2

Z2-3

Z2-4

Z3-1

Z3-2

Z3-3

Z3-4

Z3-5

Z3-6

4-1

4-2

2-1

4-3

2-2

4-4

4-5

2-3

2-4

2-5

2-6

1-1

1-2

1-31-4

1A-1

2-7

+0.009

+0.002

-0.012

0.002

0.006 -0.009

-0.012

-0.008

-0.011

0.002