J01h After Hours Work Locations.pdf
PDF 2 MB Posted
- Attached to
- PIMC ED & CSR (Phoenix, AZ) Federal contract opportunity
- Solicitation number
- 75H701-24-R-00035
About this file
This document is a solicitation notice for upcoming Solicitation 75H701-24-R-00035 for the PIMC ED & CSR (Phoenix, AZ) construction project. The scope of work includes upgrading the ventilation in the Emergency Department (ED) and Fast Track waiting areas, as well as upgrading the flooring, walls, and ventilation in the Central Supply Room (CSR). The project will require infection control mitigation. The project is located at the Phoenix Indian Medical Center in Phoenix, AZ, and the period of performance is 180 calendar days from the notice to proceed. The contract type is a single Firm Fixed Price (FFP) contract, and the procurement is a 100% Small Business set-aside under NAICS code 236220 with a $45 million size standard. A site visit is scheduled for June 10, 2024, and all documents will be made available online. The solicitation will be issued as a Request for Proposal (RFP) using Lowest Price Technically Acceptable (LPTA) evaluation criteria.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
x
T
T
T
T
T
T
4-1
8Ø
8∅
T
T
T
T
T
T
T
T
T
SH.
31 29 23 19 5
X
BB
FF
JJ
E.W.F.
F.H.C.
WOMENS
TOILET
E-102
MEN'S TOILET
E-103
DPFS OFFICE
M-49
ED WAITING
1-039
WATING
CIRCULATION
C1-23
ED WAITING
SPILL OVER
AREA
1-037
WORK AREA 1
1-034
WORK AREA 2
1-035RECEPTION
1-033
WORK AREA 3
1-032
OPEN OFFICE
1-031
MED ROOM
1-024
EXAM1
1-023
EXAM 2
1-022
EXAM 3
1-021
STAFF
WORKROOM
1-019
RECEPTION
M-24
VITALS
1-014
WAITING
M-24A
EAST
CORRIDOR 1
C1-22
EXPRESS
CARE
CORRIDOR
C1-17
WAITING
1-089
PHARMACY
CORRIDOR
C1-19
CORRIDOR
C1-18
CORRESP.
CLERK
1-028
INCOMPLETE
CHART
1-027
SUPV
1-025
INCOMPLETE
CHART
1-026
CHIEF - HR
OFFICE
M-46
CORRIDOR
C1-20
CORRIDOR
C1-21
MED ROOM
E-117
EXAM 9
E-124
EXAM 10
E-123
TELECOMM
E-110
MEDICAL
DIRECTOR
E-109
NURSE SUPV.
E-108
EXIT
E-107
OBSERVATION
E-106
VITALS
E-105
NURSE FIRST
TRIAGE
E-104
16x16 EXH. DTR.
24x24 EG
700 CFM
VAV
46-B-2
VAV
45-B-2
VAV
39-B-2
(E) CD
225 CFM
(E) EG
250 CFM
(E) EG
100 CFM
(E) CD
150 CFM
(E) RG
125 CFM
(E) CD
75 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) EG
125 CFM
(E) CD
75 CFM
(E) CD
100 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
125 CFM
(E) CD
75 CFM
(E) RG
50 CFM
(E) CD
75 CFM
(E) RG
50 CFM
(E) CD
125 CFM
(E) RG
100 CFM
(E) CD
75 CFM
(E) CD
75 CFM
(E) CD
75 CFM
(E) RG
500 CFM
(E) CD
150 CFM
(E) RG
150 CFM
(E) EG
100 CFM
(E) EG
100 CFM
(E) CD
75 CFM
(E) CD
150 CFM
22x22 EG
400 CFM
(E) CD
125 CFM
MAKE CONNECTION
TO EXIST. TRUNK
DUCT
MAKE CONNECTION
TO EXIST. TRUNK
DUCT
14x14
16x16
(E) CD
500 CFM
(E) CD
500 CFM
(E) RG
450 CFM
(E) CD
525 CFM
(E) CD
200 CFM
(E) RG
200 CFM
(E) RG
300 CFM
(E) CD
75 CFM
(E) CD
50 CFM
(E) CD
250 CFM
(E) CD
300 CFM (E) RG
450 CFM
(E) CD
500 CFM
(E) SD
225 CFM
(E) SD
200 CFM
(E) SD
225 CFM
(E) CD
225 CFM
(E) EG
250 CFM
(E) CD
125 CFM
(E) CD
125 CFM
(E) CD
75 CFM
(E) CD
50 CFM
(E) CD
125 CFM
(E) EG
75 CFM
(E) CD
50 CFM
14"x14"
14x14 EHX. DTR
10" RND
10" RND
6" RND
6" RND
6" RND
6" RND
14"x12"
24"x12"
14"x12"
23090
6422 E. SPEEDWAY BLVD. Suite 130
TUCSON, ARIZONA, 85710
(520) 323-3858
PROJECT No.
www.ZonaMEP.com
TECHNICAL ENGINEERING, PLLC.
MECHANICAL . PLUMBING . ELECTRICAL
R
VI
H
P
S
N I D
C E
I
A
A N
HE
TL H
S
E
E
H
N M
E
A R
P
T O F
T
C
D
SU
S
A
E
TAE L
H
N V I
S E R
U M A
H U. S. DEPARTMENT
OF HEALTH AND
HUMAN SERVICES
INDIAN HEALTH SERVICE
DIVISION OF FACILITIES ENGINEERING
PHOENIX AREA
ARCHITECTS
4636 N. 32nd Street
480.980.9054 Fax 520.795.6171
www.bwsarchs.com
BURNS WALD-HOPKINS SHAMBACH ARCHITECTS
DRAWN BY:
CONSULTANTS
Phoenix, Arizona 85018
CHECKED BY:
CAD DWG FILE:
PROJECT NO:
ISSUE:
SHEET OF
REVIEWED:
DFE ENGINEER/PROJECT MANAGER
APPROVED:
DFE BRANCH CHIEF
CONCURRENCE:
DFE CHIEF
DATE
DATE
DATE
REV DATE DESCRIPTION
IHS PROJECT NO.
C
B
A
C
B
A
SHEET TITLE
8/8/23 - CONSTRUCTION DOCS
1818.015.1
75H70123F30021
8/15/23 OWNER COMMENTS
M2.20
MECHANICAL FIRST
FLOOR PLAN
Indian Health Service
PIMC ED & CSR
CIVIL
EEC, Inc 555 E. River Road, #301 Tucson, AZ 85704 Phone: 520.321.4625
MEP
Zona Technical Eng 6422 E. Speedway Blvd., Unit 130 Tucson, AZ 85710 Phone: 520.200.2612
STRUCTURAL
Turner Structural Eng 2806 N Alvernon Way, 400 Tucson, AZ 85712 Phone: 520.323.3422
4212 N 16TH ST
PHOENIX, AZ
1/8" = 1'-0"M2.20
1 MECHANICAL FIRST FLOOR PLAN
Expires 12/31/202112/31/2024
08/
24 42
J01h After Hours Work Locations
DABuck Cloud+
DABuck Cloud+ Night and weekend work.
DABuck Cloud+
DABuck Cloud+ Night and weekend work.
| 75H70123F30021 PIMC ED & CSR l Construction Document Submittal |
| General |
| G1.10 INDEX, ABBREVIATIONS, SYMBOLS & PROJECT DATA |
| G1.20 CODE ANALYSIS, CODE REVIEW PLANS |
| G1.30 ARCHITECTURAL SITE PLAN |
| Civil |
| C1.0 COVER SHEET |
| C2.0 UTILITIES SHEET |
| C3.0 DETAILS |
| Architectural |
| D2.10 LOWER LEVEL DEMOLITION PLAN |
| D2.10A DEMO EQUIPMENT PLAN |
| D3.10 DEMOLITION CEILING PLAN -LOWER LEVEL |
| D3.20 DEMOLITION CEILING PLAN -FIRST FLOOR PLAN |
| A2.10 LOWER LEVEL FLOOR PLAN |
| A2.10A LOWER LEVEL EQUIPMENT PLAN |
| A2.20 TEMPORARY MOBILE TRAILER PLAN |
| A2.30 ROOM FINISH SCHEDULE & INTERIOR ELEVATIONS |
| A3.10 REFLECTED CEILING PLAN -LOWER LEVEL |
| A3.20 REFLECTED CEILING PLAN -FIRST FLOOR |
| A4.10 ROOF PLAN |
| A8.10 STAIR PLANS, SECTIONS & DETAILS |
| Mechanical |
| M0.10 MECHANICAL GENERAL INFORMATION |
| MD2.10 MECHANICAL DEMO GROUND FLOOR PLAN |
| MD2.20 MECHANICAL DEMO FIRST FLOOR PLAN |
| M2.10 MECHANICAL GROUND FLOOR PLAN |
| M2.20 MECHANICAL FIRST FLOOR PLAN |
| M3.10 CSR AIRFLOW DIAGRAM PLAN |
| M3.20 ED WAITING ROOM AIRFLOW DIAGRAM PLAN |
| M4.10 MECHANICAL ROOF PLAN |
| M5.10 MECHANICAL VENTILATION CALCULATIONS |
| M5.20 MECHANICAL EQUIPMENT SCHEDULES |
| M6.10 MECHANICAL DETAILS |
| M7.10 MECHANICAL CONTROLS |
| M7.20 MECHANICAL CONTROLS |
| Plumbing |
| P0.00 PLUMBING GENERAL INFORMATION |
| P1.00 PLUMBING SITE PLAN |
| P2.00 PLUMBING ISOMETRICS |
| Fire Protections |
| FP2.10 FIRE PROTECTION GROUND FLOOR PLAN |
| Electrical |
| E0.01 ELECTRICAL GENERAL INFORMATION |
| E1.00 ELECTRICAL SITE PLAN |
| E2.10 ELECTRICAL GROUND FLOOR PLANS |
| E2.20 ELECTRICAL FIRST FLOOR PLAN |
| E3.10 ELECTRICAL ONE-LINE |
| E4.10 ELECTRICAL SCHEDULES |
File details come from the government source that posted it. Updated .