This document contains a template for a Section B pricing table for a federal contract solicitation issued by the Department of State Office of Acquisition Management.
The pricing table template includes line items for labor costs by position for the base year and four option years, survey and design costs, shipping costs, travel costs, construction costs, and indirect costs. Labor categories listed include project manager, engineers, inspectors, technicians, craft laborers, and other support roles. Construction line items reference statement of work parts but costs are to be determined. All costs are left blank indicating final pricing will be negotiated.
The related federal contract opportunity is for worldwide electrical power services with solicitation number 19AQMM22R0332. No further details are provided on required products or services, response dates, or other salient information.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE YEAR
BASE YEAR CONTRACT
| 9 | CLIN | |||||||
| NO. | LABOR COSTS | |||||||
| 11 | NO | Labors | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 12 | 0001 | 1 | Project Manager | HR | 1680 | $0 | ||
| 2 | Senior Electrical Engineer | HR | 1440 | $0 | ||||
| 3 | Senior Mechanical Engineer | HR | 960 | $0 | ||||
| 4 | Senior Civil/Structural Engineer | HR | 960 | $0 | ||||
| 5 | Controls Application Engineer | HR | 960 | $0 | ||||
| 6 | Fire Protection Engineer | HR | 960 | $0 | ||||
| 7 | Junior Electrical Engineer | HR | 1440 | $0 | ||||
| 8 | Junior Mechanical Engineer | HR | 960 | $0 | ||||
| 9 | Junior Civil/Structural Engineer | HR | 960 | $0 | ||||
| 10 | Electrical Inspector | HR | 1200 | $0 | ||||
| 11 | Quality Control Representative | HR | 2160 | $0 | ||||
| 12 | Master Electrician | HR | 2160 | $0 | ||||
| 13 | Journeyman Electrician | HR | 2160 | $0 | ||||
| 14 | Medium Voltage Journeyman Lineman | HR | 960 | $0 | ||||
| 15 | NETA/ANSI Technician | HR | 1440 | $0 | ||||
| 16 | Generator Technician | HR | 1440 | $0 | ||||
| 17 | Master HVAC | HR | 1440 | $0 | ||||
| 18 | Journeyman HVAC | HR | 1440 | $0 | ||||
| 19 | NICET Fire Alarm Technician | HR | 960 | $0 | ||||
| 20 | NICET Fire Sprinkler Technician | HR | 960 | $0 | ||||
| 21 | Fuel Service Technician | HR | 960 | $0 | ||||
| 22 | Welder | HR | 960 | $0 | ||||
| 23 | Carpenter | HR | 960 | $0 | ||||
| 24 | Master Plumber | HR | 960 | $0 | ||||
| 25 | Journeyman Plumber | HR | 960 | $0 | ||||
| 26 | Helper/Laborer | HR | 960 | $0 | ||||
| 27 | CAD Technician | HR | 960 | $0 | ||||
| 28 | Scheduler/Planner | HR | 960 | $0 | ||||
| 29 | Estimator | HR | 960 | $0 | ||||
| 30 | Logistician | HR | 960 | $0 | ||||
| 31 | Packing labor | HR | 960 | $0 | ||||
| 32 | Other | HR | 960 | $0 | ||||
| 16 | Labor Subtotal: | $0 | ||||||
| CLIN | ||||||||
| NO. | SURVEY AND DESIGN COSTS | |||||||
| 1 | NO | SURVEY AND DESIGN SERVICE FEE | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 3 | 0002 | 1 | Provide survey and design for Government's approval, the design package shall be including but not limited to plans, project specs, design analysis with all calc, and cat sheets. At least three submissions for Government review; 35%, 65% and 100%/IFC. | LS | TBD/TO | $0 | ||
| 6 | Survey and Design Subtotal: | $0 | ||||||
| CLIN | ||||||||
| NO. | SHIPPING COSTS | |||||||
| 7 | NO | SHIPPING COSTS | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 0003 | 1 | Container Purchase | EA | TBD/TO | $0 | |||
| 2 | Packing/ Crating Fee | LS | TBD/TO | $0 | ||||
| 3 | Export Document Fee | LS | TBD/TO | $0 | ||||
| 4 | Container Security Prep/Dunnage Wall (if applicable) | LS | TBD/TO | $0 | ||||
| 5 | Load/Block/Brace Fee | LS | TBD/TO | $0 | ||||
| 6 | Drayage to Port Fee | LS | TBD/TO | $0 | ||||
| 7 | Ocean/Air Freight Transportation Fee | LS | TBD/TO | $0 | ||||
| 8 | Customs Clearance Fee | LS | TBD/TO | $0 | ||||
| 9 | Delivery Post Fee | LS | TBD/TO | $0 | ||||
| Shipping Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | TRAVEL COSTS | |||||||
| NO | TRAVEL COSTS | UNIT | QTY | $/UNIT | TOTAL $ | |||
| 0004 | 1 | Round Trip Ticket | EA | TBD/TO | $0 | |||
| 2 | Labor Travel Cost | EA | TBD/TO | $0 | ||||
| 3 | Lodging | DAY | TBD/TO | $0 | ||||
| 4 | M&IE | DAY | TBD/TO | $0 | ||||
| 5 | Miscellaneous travel | DAY | TBD/TO | $0 | ||||
| 6 | Travel PER DIEM | DAY | TBD/TO | $0 | ||||
| Travel Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | CONSTRUCTION COSTS | |||||||
| NO | MATERIAL, EQUIPMENT AND SERVICES | UNIT | QTY | $/UNIT | TOTAL $ | |||
| 0005 | 1 | SOW-part 1 | TBD/TO | TBD/TO | $0 | |||
| . | SOW-part 34 | TBD/TO | TBD/TO | $0 | ||||
| . | SOW-part 35 | TBD/TO | TBD/TO | $0 | ||||
| . | SOW-part 36 | TBD/TO | TBD/TO | $0 | ||||
| 100 | SOW-part 37 | TBD/TO | TBD/TO | $0 | ||||
| Construction Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | INDIRECT COST | |||||||
| 20 | NO | INDIRECT COST | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 21 | 0006 | 1 | Building Permits Fee | LS | TBD/TO | $0 | ||
| 2 | Utility Permits Fee | EA | TBD/TO | $0 | ||||
| 3 | Other Permits Fee | EA | TBD/TO | $0 | ||||
| 4 | Licenses Fee | EA | TBD/TO | $0 | ||||
| 5 | Defense Base Act Insurance | EA | TBD/TO | $0 | ||||
| 6 | Bond Insurance | EA | TBD/TO | $0 | ||||
| 7 | Danger Pay (if applicable) | EA | TBD/TO | $0 | ||||
| Indirect Subtotal: | $0 | |||||||
| GRAND TOTAL: | $0 |
OPTION 1
OPTION YEAR ONE CONTRACT
| 9 | CLIN | |||||||
| NO. | LABOR COSTS | |||||||
| 11 | NO | Labors | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 12 | 1001 | 1 | Project Manager | HR | 1680 | $0 | ||
| 2 | Senior Electrical Engineer | HR | 1440 | $0 | ||||
| 3 | Senior Mechanical Engineer | HR | 960 | $0 | ||||
| 4 | Senior Civil/Structural Engineer | HR | 960 | $0 | ||||
| 5 | Controls Application Engineer | HR | 960 | $0 | ||||
| 6 | Fire Protection Engineer | HR | 960 | $0 | ||||
| 7 | Junior Electrical Engineer | HR | 1440 | $0 | ||||
| 8 | Junior Mechanical Engineer | HR | 960 | $0 | ||||
| 9 | Junior Civil/Structural Engineer | HR | 960 | $0 | ||||
| 10 | Electrical Inspector | HR | 1200 | $0 | ||||
| 11 | Quality Control Representative | HR | 2160 | $0 | ||||
| 12 | Master Electrician | HR | 2160 | $0 | ||||
| 13 | Journeyman Electrician | HR | 2160 | $0 | ||||
| 14 | Medium Voltage Journeyman Lineman | HR | 960 | $0 | ||||
| 15 | NETA/ANSI Technician | HR | 1440 | $0 | ||||
| 16 | Generator Technician | HR | 1440 | $0 | ||||
| 17 | Master HVAC | HR | 1440 | $0 | ||||
| 18 | Journeyman HVAC | HR | 1440 | $0 | ||||
| 19 | NICET Fire Alarm Technician | HR | 960 | $0 | ||||
| 20 | NICET Fire Sprinkler Technician | HR | 960 | $0 | ||||
| 21 | Fuel Service Technician | HR | 960 | $0 | ||||
| 22 | Welder | HR | 960 | $0 | ||||
| 23 | Carpenter | HR | 960 | $0 | ||||
| 24 | Master Plumber | HR | 960 | $0 | ||||
| 25 | Journeyman Plumber | HR | 960 | $0 | ||||
| 26 | Helper/Laborer | HR | 960 | $0 | ||||
| 27 | CAD Technician | HR | 960 | $0 | ||||
| 28 | Scheduler/Planner | HR | 960 | $0 | ||||
| 29 | Estimator | HR | 960 | $0 | ||||
| 30 | Logistician | HR | 960 | $0 | ||||
| 31 | Packing labor | HR | 960 | $0 | ||||
| 32 | Other | HR | 960 | $0 | ||||
| 16 | Labor Subtotal: | $0 | ||||||
| CLIN | ||||||||
| NO. | SURVEY AND DESIGN COSTS | |||||||
| 1 | NO | SURVEY AND DESIGN SERVICE FEE | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 3 | 1002 | 1 | Provide survey and design for Government's approval, the design package shall be including but not limited to plans, project specs, design analysis with all calc, and cat sheets. At least three submissions for Government review; 35%, 65% and 100%/IFC. | LS | TBD/TO | $0 | ||
| 6 | Survey and Design Subtotal: | $0 | ||||||
| CLIN | ||||||||
| NO. | SHIPPING COSTS | |||||||
| 7 | NO | SHIPPING COSTS | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 1003 | 1 | Container Purchase | EA | TBD/TO | $0 | |||
| 2 | Packing/ Crating Fee | LS | TBD/TO | $0 | ||||
| 3 | Export Document Fee | LS | TBD/TO | $0 | ||||
| 4 | Container Security Prep/Dunnage Wall (if applicable) | LS | TBD/TO | $0 | ||||
| 5 | Load/Block/Brace Fee | LS | TBD/TO | $0 | ||||
| 6 | Drayage to Port Fee | LS | TBD/TO | $0 | ||||
| 7 | Ocean/Air Freight Transportation Fee | LS | TBD/TO | $0 | ||||
| 8 | Customs Clearance Fee | LS | TBD/TO | $0 | ||||
| 9 | Delivery Post Fee | LS | TBD/TO | $0 | ||||
| Shipping Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | TRAVEL COSTS | |||||||
| NO | TRAVEL COSTS | UNIT | QTY | $/UNIT | TOTAL $ | |||
| 1004 | 1 | Round Trip Ticket | EA | TBD/TO | $0 | |||
| 2 | Labor Travel Cost | EA | TBD/TO | $0 | ||||
| 3 | Lodging | DAY | TBD/TO | $0 | ||||
| 4 | M&IE | DAY | TBD/TO | $0 | ||||
| 5 | Miscellaneous travel | DAY | TBD/TO | $0 | ||||
| 6 | Travel PER DIEM | DAY | TBD/TO | $0 | ||||
| Travel Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | CONSTRUCTION COSTS | |||||||
| NO | MATERIAL, EQUIPMENT AND SERVICES | UNIT | QTY | $/UNIT | TOTAL $ | |||
| 1005 | 1 | SOW-part 1 | TBD/TO | TBD/TO | $0 | |||
| . | SOW-part 34 | TBD/TO | TBD/TO | $0 | ||||
| . | SOW-part 35 | TBD/TO | TBD/TO | $0 | ||||
| . | SOW-part 36 | TBD/TO | TBD/TO | $0 | ||||
| 100 | SOW-part 37 | TBD/TO | TBD/TO | $0 | ||||
| Construction Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | INDIRECT COST | |||||||
| 20 | NO | INDIRECT COST | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 21 | 1006 | 1 | Building Permits Fee | LS | TBD/TO | $0 | ||
| 2 | Utility Permits Fee | EA | TBD/TO | $0 | ||||
| 3 | Other Permits Fee | EA | TBD/TO | $0 | ||||
| 4 | Licenses Fee | EA | TBD/TO | $0 | ||||
| 5 | Defense Base Act Insurance | EA | TBD/TO | $0 | ||||
| 6 | Bond Insurance | EA | TBD/TO | $0 | ||||
| 7 | Danger Pay (if applicable) | EA | TBD/TO | $0 | ||||
| Indirect Subtotal: | $0 | |||||||
| GRAND TOTAL: | $0 |
OPTION 2
OPTION YEAR TWO CONTRACT
| 9 | CLIN | |||||||
| NO. | LABOR COSTS | |||||||
| 11 | NO | Labors | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 12 | 2001 | 1 | Project Manager | HR | 1680 | $0 | ||
| 2 | Senior Electrical Engineer | HR | 1440 | $0 | ||||
| 3 | Senior Mechanical Engineer | HR | 960 | $0 | ||||
| 4 | Senior Civil/Structural Engineer | HR | 960 | $0 | ||||
| 5 | Controls Application Engineer | HR | 960 | $0 | ||||
| 6 | Fire Protection Engineer | HR | 960 | $0 | ||||
| 7 | Junior Electrical Engineer | HR | 1440 | $0 | ||||
| 8 | Junior Mechanical Engineer | HR | 960 | $0 | ||||
| 9 | Junior Civil/Structural Engineer | HR | 960 | $0 | ||||
| 10 | Electrical Inspector | HR | 1200 | $0 | ||||
| 11 | Quality Control Representative | HR | 2160 | $0 | ||||
| 12 | Master Electrician | HR | 2160 | $0 | ||||
| 13 | Journeyman Electrician | HR | 2160 | $0 | ||||
| 14 | Medium Voltage Journeyman Lineman | HR | 960 | $0 | ||||
| 15 | NETA/ANSI Technician | HR | 1440 | $0 | ||||
| 16 | Generator Technician | HR | 1440 | $0 | ||||
| 17 | Master HVAC | HR | 1440 | $0 | ||||
| 18 | Journeyman HVAC | HR | 1440 | $0 | ||||
| 19 | NICET Fire Alarm Technician | HR | 960 | $0 | ||||
| 20 | NICET Fire Sprinkler Technician | HR | 960 | $0 | ||||
| 21 | Fuel Service Technician | HR | 960 | $0 | ||||
| 22 | Welder | HR | 960 | $0 | ||||
| 23 | Carpenter | HR | 960 | $0 | ||||
| 24 | Master Plumber | HR | 960 | $0 | ||||
| 25 | Journeyman Plumber | HR | 960 | $0 | ||||
| 26 | Helper/Laborer | HR | 960 | $0 | ||||
| 27 | CAD Technician | HR | 960 | $0 | ||||
| 28 | Scheduler/Planner | HR | 960 | $0 | ||||
| 29 | Estimator | HR | 960 | $0 | ||||
| 30 | Logistician | HR | 960 | $0 | ||||
| 31 | Packing labor | HR | 960 | $0 | ||||
| 32 | Other | HR | 960 | $0 | ||||
| 16 | Labor Subtotal: | $0 | ||||||
| CLIN | ||||||||
| NO. | SURVEY AND DESIGN COSTS | |||||||
| 1 | NO | SURVEY AND DESIGN SERVICE FEE | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 3 | 2002 | 1 | Provide survey and design for Government's approval, the design package shall be including but not limited to plans, project specs, design analysis with all calc, and cat sheets. At least three submissions for Government review; 35%, 65% and 100%/IFC. | LS | TBD/TO | $0 | ||
| 6 | Survey and Design Subtotal: | $0 | ||||||
| CLIN | ||||||||
| NO. | SHIPPING COSTS | |||||||
| 7 | NO | SHIPPING COSTS | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 2003 | 1 | Container Purchase | EA | TBD/TO | $0 | |||
| 2 | Packing/ Crating Fee | LS | TBD/TO | $0 | ||||
| 3 | Export Document Fee | LS | TBD/TO | $0 | ||||
| 4 | Container Security Prep/Dunnage Wall (if applicable) | LS | TBD/TO | $0 | ||||
| 5 | Load/Block/Brace Fee | LS | TBD/TO | $0 | ||||
| 6 | Drayage to Port Fee | LS | TBD/TO | $0 | ||||
| 7 | Ocean/Air Freight Transportation Fee | LS | TBD/TO | $0 | ||||
| 8 | Customs Clearance Fee | LS | TBD/TO | $0 | ||||
| 9 | Delivery Post Fee | LS | TBD/TO | $0 | ||||
| Shipping Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | TRAVEL COSTS | |||||||
| NO | TRAVEL COSTS | UNIT | QTY | $/UNIT | TOTAL $ | |||
| 2004 | 1 | Round Trip Ticket | EA | TBD/TO | $0 | |||
| 2 | Labor Travel Cost | EA | TBD/TO | $0 | ||||
| 3 | Lodging | DAY | TBD/TO | $0 | ||||
| 4 | M&IE | DAY | TBD/TO | $0 | ||||
| 5 | Miscellaneous travel | DAY | TBD/TO | $0 | ||||
| 6 | Travel PER DIEM | DAY | TBD/TO | $0 | ||||
| Travel Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | CONSTRUCTION COSTS | |||||||
| NO | MATERIAL, EQUIPMENT AND SERVICES | UNIT | QTY | $/UNIT | TOTAL $ | |||
| 2005 | 1 | SOW-part 1 | TBD/TO | TBD/TO | $0 | |||
| . | SOW-part 34 | TBD/TO | TBD/TO | $0 | ||||
| . | SOW-part 35 | TBD/TO | TBD/TO | $0 | ||||
| . | SOW-part 36 | TBD/TO | TBD/TO | $0 | ||||
| 100 | SOW-part 37 | TBD/TO | TBD/TO | $0 | ||||
| Construction Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | INDIRECT COST | |||||||
| 20 | NO | INDIRECT COST | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 21 | 2006 | 1 | Building Permits Fee | LS | TBD/TO | $0 | ||
| 2 | Utility Permits Fee | EA | TBD/TO | $0 | ||||
| 3 | Other Permits Fee | EA | TBD/TO | $0 | ||||
| 4 | Licenses Fee | EA | TBD/TO | $0 | ||||
| 5 | Defense Base Act Insurance | EA | TBD/TO | $0 | ||||
| 6 | Bond Insurance | EA | TBD/TO | $0 | ||||
| 7 | Danger Pay (if applicable) | EA | TBD/TO | $0 | ||||
| Indirect Subtotal: | $0 | |||||||
| GRAND TOTAL: | $0 |
OPTION 3
OPTION YEAR THREE CONTRACT
| 9 | CLIN | |||||||
| NO. | LABOR COSTS | |||||||
| 11 | NO | Labors | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 12 | 3001 | 1 | Project Manager | HR | 1680 | $0 | ||
| 2 | Senior Electrical Engineer | HR | 1440 | $0 | ||||
| 3 | Senior Mechanical Engineer | HR | 960 | $0 | ||||
| 4 | Senior Civil/Structural Engineer | HR | 960 | $0 | ||||
| 5 | Controls Application Engineer | HR | 960 | $0 | ||||
| 6 | Fire Protection Engineer | HR | 960 | $0 | ||||
| 7 | Junior Electrical Engineer | HR | 1440 | $0 | ||||
| 8 | Junior Mechanical Engineer | HR | 960 | $0 | ||||
| 9 | Junior Civil/Structural Engineer | HR | 960 | $0 | ||||
| 10 | Electrical Inspector | HR | 1200 | $0 | ||||
| 11 | Quality Control Representative | HR | 2160 | $0 | ||||
| 12 | Master Electrician | HR | 2160 | $0 | ||||
| 13 | Journeyman Electrician | HR | 2160 | $0 | ||||
| 14 | Medium Voltage Journeyman Lineman | HR | 960 | $0 | ||||
| 15 | NETA/ANSI Technician | HR | 1440 | $0 | ||||
| 16 | Generator Technician | HR | 1440 | $0 | ||||
| 17 | Master HVAC | HR | 1440 | $0 | ||||
| 18 | Journeyman HVAC | HR | 1440 | $0 | ||||
| 19 | NICET Fire Alarm Technician | HR | 960 | $0 | ||||
| 20 | NICET Fire Sprinkler Technician | HR | 960 | $0 | ||||
| 21 | Fuel Service Technician | HR | 960 | $0 | ||||
| 22 | Welder | HR | 960 | $0 | ||||
| 23 | Carpenter | HR | 960 | $0 | ||||
| 24 | Master Plumber | HR | 960 | $0 | ||||
| 25 | Journeyman Plumber | HR | 960 | $0 | ||||
| 26 | Helper/Laborer | HR | 960 | $0 | ||||
| 27 | CAD Technician | HR | 960 | $0 | ||||
| 28 | Scheduler/Planner | HR | 960 | $0 | ||||
| 29 | Estimator | HR | 960 | $0 | ||||
| 30 | Logistician | HR | 960 | $0 | ||||
| 31 | Packing labor | HR | 960 | $0 | ||||
| 32 | Other | HR | 960 | $0 | ||||
| 16 | Labor Subtotal: | $0 | ||||||
| CLIN | ||||||||
| NO. | SURVEY AND DESIGN COSTS | |||||||
| 1 | NO | SURVEY AND DESIGN SERVICE FEE | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 3 | 3002 | 1 | Provide survey and design for Government's approval, the design package shall be including but not limited to plans, project specs, design analysis with all calc, and cat sheets. At least three submissions for Government review; 35%, 65% and 100%/IFC. | LS | TBD/TO | $0 | ||
| 6 | Survey and Design Subtotal: | $0 | ||||||
| CLIN | ||||||||
| NO. | SHIPPING COSTS | |||||||
| 7 | NO | SHIPPING COSTS | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 3003 | 1 | Container Purchase | EA | TBD/TO | $0 | |||
| 2 | Packing/ Crating Fee | LS | TBD/TO | $0 | ||||
| 3 | Export Document Fee | LS | TBD/TO | $0 | ||||
| 4 | Container Security Prep/Dunnage Wall (if applicable) | LS | TBD/TO | $0 | ||||
| 5 | Load/Block/Brace Fee | LS | TBD/TO | $0 | ||||
| 6 | Drayage to Port Fee | LS | TBD/TO | $0 | ||||
| 7 | Ocean/Air Freight Transportation Fee | LS | TBD/TO | $0 | ||||
| 8 | Customs Clearance Fee | LS | TBD/TO | $0 | ||||
| 9 | Delivery Post Fee | LS | TBD/TO | $0 | ||||
| Shipping Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | TRAVEL COSTS | |||||||
| NO | TRAVEL COSTS | UNIT | QTY | $/UNIT | TOTAL $ | |||
| 3004 | 1 | Round Trip Ticket | EA | TBD/TO | $0 | |||
| 2 | Labor Travel Cost | EA | TBD/TO | $0 | ||||
| 3 | Lodging | DAY | TBD/TO | $0 | ||||
| 4 | M&IE | DAY | TBD/TO | $0 | ||||
| 5 | Miscellaneous travel | DAY | TBD/TO | $0 | ||||
| 6 | Travel PER DIEM | DAY | TBD/TO | $0 | ||||
| Travel Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | CONSTRUCTION COSTS | |||||||
| NO | MATERIAL, EQUIPMENT AND SERVICES | UNIT | QTY | $/UNIT | TOTAL $ | |||
| 3005 | 1 | SOW-part 1 | TBD/TO | TBD/TO | $0 | |||
| . | SOW-part 34 | TBD/TO | TBD/TO | $0 | ||||
| . | SOW-part 35 | TBD/TO | TBD/TO | $0 | ||||
| . | SOW-part 36 | TBD/TO | TBD/TO | $0 | ||||
| 100 | SOW-part 37 | TBD/TO | TBD/TO | $0 | ||||
| Construction Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | INDIRECT COST | |||||||
| 20 | NO | INDIRECT COST | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 21 | 3006 | 1 | Building Permits Fee | LS | TBD/TO | $0 | ||
| 2 | Utility Permits Fee | EA | TBD/TO | $0 | ||||
| 3 | Other Permits Fee | EA | TBD/TO | $0 | ||||
| 4 | Licenses Fee | EA | TBD/TO | $0 | ||||
| 5 | Defense Base Act Insurance | EA | TBD/TO | $0 | ||||
| 6 | Bond Insurance | EA | TBD/TO | $0 | ||||
| 7 | Danger Pay (if applicable) | EA | TBD/TO | $0 | ||||
| Indirect Subtotal: | $0 | |||||||
| GRAND TOTAL: | $0 |
OPTION 4
OPTION YEAR FOUR CONTRACT
| 9 | CLIN | |||||||
| NO. | LABOR COSTS | |||||||
| 11 | NO | Labors | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 12 | 4001 | 1 | Project Manager | HR | 1680 | $0 | ||
| 2 | Senior Electrical Engineer | HR | 1440 | $0 | ||||
| 3 | Senior Mechanical Engineer | HR | 960 | $0 | ||||
| 4 | Senior Civil/Structural Engineer | HR | 960 | $0 | ||||
| 5 | Controls Application Engineer | HR | 960 | $0 | ||||
| 6 | Fire Protection Engineer | HR | 960 | $0 | ||||
| 7 | Junior Electrical Engineer | HR | 1440 | $0 | ||||
| 8 | Junior Mechanical Engineer | HR | 960 | $0 | ||||
| 9 | Junior Civil/Structural Engineer | HR | 960 | $0 | ||||
| 10 | Electrical Inspector | HR | 1200 | $0 | ||||
| 11 | Quality Control Representative | HR | 2160 | $0 | ||||
| 12 | Master Electrician | HR | 2160 | $0 | ||||
| 13 | Journeyman Electrician | HR | 2160 | $0 | ||||
| 14 | Medium Voltage Journeyman Lineman | HR | 960 | $0 | ||||
| 15 | NETA/ANSI Technician | HR | 1440 | $0 | ||||
| 16 | Generator Technician | HR | 1440 | $0 | ||||
| 17 | Master HVAC | HR | 1440 | $0 | ||||
| 18 | Journeyman HVAC | HR | 1440 | $0 | ||||
| 19 | NICET Fire Alarm Technician | HR | 960 | $0 | ||||
| 20 | NICET Fire Sprinkler Technician | HR | 960 | $0 | ||||
| 21 | Fuel Service Technician | HR | 960 | $0 | ||||
| 22 | Welder | HR | 960 | $0 | ||||
| 23 | Carpenter | HR | 960 | $0 | ||||
| 24 | Master Plumber | HR | 960 | $0 | ||||
| 25 | Journeyman Plumber | HR | 960 | $0 | ||||
| 26 | Helper/Laborer | HR | 960 | $0 | ||||
| 27 | CAD Technician | HR | 960 | $0 | ||||
| 28 | Scheduler/Planner | HR | 960 | $0 | ||||
| 29 | Estimator | HR | 960 | $0 | ||||
| 30 | Logistician | HR | 960 | $0 | ||||
| 31 | Packing labor | HR | 960 | $0 | ||||
| 32 | Other | HR | 960 | $0 | ||||
| 16 | Labor Subtotal: | $0 | ||||||
| CLIN | ||||||||
| NO. | SURVEY AND DESIGN COSTS | |||||||
| 1 | NO | SURVEY AND DESIGN SERVICE FEE | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 3 | 4002 | 1 | Provide survey and design for Government's approval, the design package shall be including but not limited to plans, project specs, design analysis with all calc, and cat sheets. At least three submissions for Government review; 35%, 65% and 100%/IFC. | LS | TBD/TO | $0 | ||
| 6 | Survey and Design Subtotal: | $0 | ||||||
| CLIN | ||||||||
| NO. | SHIPPING COSTS | |||||||
| 7 | NO | SHIPPING COSTS | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 4003 | 1 | Container Purchase | EA | TBD/TO | $0 | |||
| 2 | Packing/ Crating Fee | LS | TBD/TO | $0 | ||||
| 3 | Export Document Fee | LS | TBD/TO | $0 | ||||
| 4 | Container Security Prep/Dunnage Wall (if applicable) | LS | TBD/TO | $0 | ||||
| 5 | Load/Block/Brace Fee | LS | TBD/TO | $0 | ||||
| 6 | Drayage to Port Fee | LS | TBD/TO | $0 | ||||
| 7 | Ocean/Air Freight Transportation Fee | LS | TBD/TO | $0 | ||||
| 8 | Customs Clearance Fee | LS | TBD/TO | $0 | ||||
| 9 | Delivery Post Fee | LS | TBD/TO | $0 | ||||
| Shipping Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | TRAVEL COSTS | |||||||
| NO | TRAVEL COSTS | UNIT | QTY | $/UNIT | TOTAL $ | |||
| 4004 | 1 | Round Trip Ticket | EA | TBD/TO | $0 | |||
| 2 | Labor Travel Cost | EA | TBD/TO | $0 | ||||
| 3 | Lodging | DAY | TBD/TO | $0 | ||||
| 4 | M&IE | DAY | TBD/TO | $0 | ||||
| 5 | Miscellaneous travel | DAY | TBD/TO | $0 | ||||
| 6 | Travel PER DIEM | DAY | TBD/TO | $0 | ||||
| Travel Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | CONSTRUCTION COSTS | |||||||
| NO | MATERIAL, EQUIPMENT AND SERVICES | UNIT | QTY | $/UNIT | TOTAL $ | |||
| 4005 | 1 | SOW-part 1 | TBD/TO | TBD/TO | $0 | |||
| . | SOW-part 34 | TBD/TO | TBD/TO | $0 | ||||
| . | SOW-part 35 | TBD/TO | TBD/TO | $0 | ||||
| . | SOW-part 36 | TBD/TO | TBD/TO | $0 | ||||
| 100 | SOW-part 37 | TBD/TO | TBD/TO | $0 | ||||
| Construction Subtotal: | $0 | |||||||
| CLIN | ||||||||
| NO. | INDIRECT COST | |||||||
| 20 | NO | INDIRECT COST | UNIT | QTY | $/UNIT | TOTAL $ | ||
| 21 | 4006 | 1 | Building Permits Fee | LS | TBD/TO | $0 | ||
| 2 | Utility Permits Fee | EA | TBD/TO | $0 | ||||
| 3 | Other Permits Fee | EA | TBD/TO | $0 | ||||
| 4 | Licenses Fee | EA | TBD/TO | $0 | ||||
| 5 | Defense Base Act Insurance | EA | TBD/TO | $0 | ||||
| 6 | Bond Insurance | EA | TBD/TO | $0 | ||||
| 7 | Danger Pay (if applicable) | EA | TBD/TO | $0 | ||||
| Indirect Subtotal: | $0 | |||||||
| GRAND TOTAL: | $0 |
File details come from the government source that posted it. Updated .