J.9 SECTION B TABLES.xlsx

XLSX spreadsheet 58 KB Posted

Attached to
Worldwide Electrical Power Federal contract opportunity
Solicitation number
19AQMM22R0332
Issued by
Department of State Office of Acquisition Management

About this file

This document contains a template for a Section B pricing table for a federal contract solicitation issued by the Department of State Office of Acquisition Management.

The pricing table template includes line items for labor costs by position for the base year and four option years, survey and design costs, shipping costs, travel costs, construction costs, and indirect costs. Labor categories listed include project manager, engineers, inspectors, technicians, craft laborers, and other support roles. Construction line items reference statement of work parts but costs are to be determined. All costs are left blank indicating final pricing will be negotiated.

The related federal contract opportunity is for worldwide electrical power services with solicitation number 19AQMM22R0332. No further details are provided on required products or services, response dates, or other salient information.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE YEAR

BASE YEAR CONTRACT

9CLIN
NO.LABOR COSTS
11NOLaborsUNITQTY$/UNITTOTAL $
1200011Project ManagerHR1680$0
2Senior Electrical EngineerHR1440$0
3Senior Mechanical EngineerHR960$0
4Senior Civil/Structural EngineerHR960$0
5Controls Application EngineerHR960$0
6Fire Protection EngineerHR960$0
7Junior Electrical EngineerHR1440$0
8Junior Mechanical EngineerHR960$0
9Junior Civil/Structural EngineerHR960$0
10Electrical InspectorHR1200$0
11Quality Control RepresentativeHR2160$0
12Master ElectricianHR2160$0
13Journeyman ElectricianHR2160$0
14Medium Voltage Journeyman LinemanHR960$0
15NETA/ANSI TechnicianHR1440$0
16Generator TechnicianHR1440$0
17Master HVACHR1440$0
18Journeyman HVACHR1440$0
19NICET Fire Alarm TechnicianHR960$0
20NICET Fire Sprinkler TechnicianHR960$0
21Fuel Service TechnicianHR960$0
22WelderHR960$0
23CarpenterHR960$0
24Master PlumberHR960$0
25Journeyman PlumberHR960$0
26Helper/LaborerHR960$0
27CAD TechnicianHR960$0
28Scheduler/PlannerHR960$0
29EstimatorHR960$0
30LogisticianHR960$0
31Packing laborHR960$0
32OtherHR960$0
16Labor Subtotal:$0
CLIN
NO.SURVEY AND DESIGN COSTS
1NOSURVEY AND DESIGN SERVICE FEEUNITQTY$/UNITTOTAL $
300021Provide survey and design for Government's approval, the design package shall be including but not limited to plans, project specs, design analysis with all calc, and cat sheets. At least three submissions for Government review; 35%, 65% and 100%/IFC.LSTBD/TO$0
6Survey and Design Subtotal:$0
CLIN
NO.SHIPPING COSTS
7NOSHIPPING COSTSUNITQTY$/UNITTOTAL $
00031Container PurchaseEATBD/TO$0
2Packing/ Crating FeeLSTBD/TO$0
3Export Document FeeLSTBD/TO$0
4Container Security Prep/Dunnage Wall (if applicable)LSTBD/TO$0
5Load/Block/Brace FeeLSTBD/TO$0
6Drayage to Port FeeLSTBD/TO$0
7Ocean/Air Freight Transportation FeeLSTBD/TO$0
8Customs Clearance FeeLSTBD/TO$0
9Delivery Post FeeLSTBD/TO$0
Shipping Subtotal:$0
CLIN
NO.TRAVEL COSTS
NOTRAVEL COSTSUNITQTY$/UNITTOTAL $
00041Round Trip TicketEATBD/TO$0
2Labor Travel CostEATBD/TO$0
3LodgingDAYTBD/TO$0
4M&IEDAYTBD/TO$0
5Miscellaneous travelDAYTBD/TO$0
6Travel PER DIEMDAYTBD/TO$0
Travel Subtotal:$0
CLIN
NO.CONSTRUCTION COSTS
NOMATERIAL, EQUIPMENT AND SERVICESUNITQTY$/UNITTOTAL $
00051SOW-part 1TBD/TOTBD/TO$0
.SOW-part 34TBD/TOTBD/TO$0
.SOW-part 35TBD/TOTBD/TO$0
.SOW-part 36TBD/TOTBD/TO$0
100SOW-part 37TBD/TOTBD/TO$0
Construction Subtotal:$0
CLIN
NO.INDIRECT COST
20NOINDIRECT COSTUNITQTY$/UNITTOTAL $
2100061Building Permits FeeLSTBD/TO$0
2Utility Permits FeeEATBD/TO$0
3Other Permits FeeEATBD/TO$0
4Licenses FeeEATBD/TO$0
5Defense Base Act InsuranceEATBD/TO$0
6Bond InsuranceEATBD/TO$0
7Danger Pay (if applicable)EATBD/TO$0
Indirect Subtotal:$0
GRAND TOTAL:$0

OPTION 1

OPTION YEAR ONE CONTRACT

9CLIN
NO.LABOR COSTS
11NOLaborsUNITQTY$/UNITTOTAL $
1210011Project ManagerHR1680$0
2Senior Electrical EngineerHR1440$0
3Senior Mechanical EngineerHR960$0
4Senior Civil/Structural EngineerHR960$0
5Controls Application EngineerHR960$0
6Fire Protection EngineerHR960$0
7Junior Electrical EngineerHR1440$0
8Junior Mechanical EngineerHR960$0
9Junior Civil/Structural EngineerHR960$0
10Electrical InspectorHR1200$0
11Quality Control RepresentativeHR2160$0
12Master ElectricianHR2160$0
13Journeyman ElectricianHR2160$0
14Medium Voltage Journeyman LinemanHR960$0
15NETA/ANSI TechnicianHR1440$0
16Generator TechnicianHR1440$0
17Master HVACHR1440$0
18Journeyman HVACHR1440$0
19NICET Fire Alarm TechnicianHR960$0
20NICET Fire Sprinkler TechnicianHR960$0
21Fuel Service TechnicianHR960$0
22WelderHR960$0
23CarpenterHR960$0
24Master PlumberHR960$0
25Journeyman PlumberHR960$0
26Helper/LaborerHR960$0
27CAD TechnicianHR960$0
28Scheduler/PlannerHR960$0
29EstimatorHR960$0
30LogisticianHR960$0
31Packing laborHR960$0
32OtherHR960$0
16Labor Subtotal:$0
CLIN
NO.SURVEY AND DESIGN COSTS
1NOSURVEY AND DESIGN SERVICE FEEUNITQTY$/UNITTOTAL $
310021Provide survey and design for Government's approval, the design package shall be including but not limited to plans, project specs, design analysis with all calc, and cat sheets. At least three submissions for Government review; 35%, 65% and 100%/IFC.LSTBD/TO$0
6Survey and Design Subtotal:$0
CLIN
NO.SHIPPING COSTS
7NOSHIPPING COSTSUNITQTY$/UNITTOTAL $
10031Container PurchaseEATBD/TO$0
2Packing/ Crating FeeLSTBD/TO$0
3Export Document FeeLSTBD/TO$0
4Container Security Prep/Dunnage Wall (if applicable)LSTBD/TO$0
5Load/Block/Brace FeeLSTBD/TO$0
6Drayage to Port FeeLSTBD/TO$0
7Ocean/Air Freight Transportation FeeLSTBD/TO$0
8Customs Clearance FeeLSTBD/TO$0
9Delivery Post FeeLSTBD/TO$0
Shipping Subtotal:$0
CLIN
NO.TRAVEL COSTS
NOTRAVEL COSTSUNITQTY$/UNITTOTAL $
10041Round Trip TicketEATBD/TO$0
2Labor Travel CostEATBD/TO$0
3LodgingDAYTBD/TO$0
4M&IEDAYTBD/TO$0
5Miscellaneous travelDAYTBD/TO$0
6Travel PER DIEMDAYTBD/TO$0
Travel Subtotal:$0
CLIN
NO.CONSTRUCTION COSTS
NOMATERIAL, EQUIPMENT AND SERVICESUNITQTY$/UNITTOTAL $
10051SOW-part 1TBD/TOTBD/TO$0
.SOW-part 34TBD/TOTBD/TO$0
.SOW-part 35TBD/TOTBD/TO$0
.SOW-part 36TBD/TOTBD/TO$0
100SOW-part 37TBD/TOTBD/TO$0
Construction Subtotal:$0
CLIN
NO.INDIRECT COST
20NOINDIRECT COSTUNITQTY$/UNITTOTAL $
2110061Building Permits FeeLSTBD/TO$0
2Utility Permits FeeEATBD/TO$0
3Other Permits FeeEATBD/TO$0
4Licenses FeeEATBD/TO$0
5Defense Base Act InsuranceEATBD/TO$0
6Bond InsuranceEATBD/TO$0
7Danger Pay (if applicable)EATBD/TO$0
Indirect Subtotal:$0
GRAND TOTAL:$0

OPTION 2

OPTION YEAR TWO CONTRACT

9CLIN
NO.LABOR COSTS
11NOLaborsUNITQTY$/UNITTOTAL $
1220011Project ManagerHR1680$0
2Senior Electrical EngineerHR1440$0
3Senior Mechanical EngineerHR960$0
4Senior Civil/Structural EngineerHR960$0
5Controls Application EngineerHR960$0
6Fire Protection EngineerHR960$0
7Junior Electrical EngineerHR1440$0
8Junior Mechanical EngineerHR960$0
9Junior Civil/Structural EngineerHR960$0
10Electrical InspectorHR1200$0
11Quality Control RepresentativeHR2160$0
12Master ElectricianHR2160$0
13Journeyman ElectricianHR2160$0
14Medium Voltage Journeyman LinemanHR960$0
15NETA/ANSI TechnicianHR1440$0
16Generator TechnicianHR1440$0
17Master HVACHR1440$0
18Journeyman HVACHR1440$0
19NICET Fire Alarm TechnicianHR960$0
20NICET Fire Sprinkler TechnicianHR960$0
21Fuel Service TechnicianHR960$0
22WelderHR960$0
23CarpenterHR960$0
24Master PlumberHR960$0
25Journeyman PlumberHR960$0
26Helper/LaborerHR960$0
27CAD TechnicianHR960$0
28Scheduler/PlannerHR960$0
29EstimatorHR960$0
30LogisticianHR960$0
31Packing laborHR960$0
32OtherHR960$0
16Labor Subtotal:$0
CLIN
NO.SURVEY AND DESIGN COSTS
1NOSURVEY AND DESIGN SERVICE FEEUNITQTY$/UNITTOTAL $
320021Provide survey and design for Government's approval, the design package shall be including but not limited to plans, project specs, design analysis with all calc, and cat sheets. At least three submissions for Government review; 35%, 65% and 100%/IFC.LSTBD/TO$0
6Survey and Design Subtotal:$0
CLIN
NO.SHIPPING COSTS
7NOSHIPPING COSTSUNITQTY$/UNITTOTAL $
20031Container PurchaseEATBD/TO$0
2Packing/ Crating FeeLSTBD/TO$0
3Export Document FeeLSTBD/TO$0
4Container Security Prep/Dunnage Wall (if applicable)LSTBD/TO$0
5Load/Block/Brace FeeLSTBD/TO$0
6Drayage to Port FeeLSTBD/TO$0
7Ocean/Air Freight Transportation FeeLSTBD/TO$0
8Customs Clearance FeeLSTBD/TO$0
9Delivery Post FeeLSTBD/TO$0
Shipping Subtotal:$0
CLIN
NO.TRAVEL COSTS
NOTRAVEL COSTSUNITQTY$/UNITTOTAL $
20041Round Trip TicketEATBD/TO$0
2Labor Travel CostEATBD/TO$0
3LodgingDAYTBD/TO$0
4M&IEDAYTBD/TO$0
5Miscellaneous travelDAYTBD/TO$0
6Travel PER DIEMDAYTBD/TO$0
Travel Subtotal:$0
CLIN
NO.CONSTRUCTION COSTS
NOMATERIAL, EQUIPMENT AND SERVICESUNITQTY$/UNITTOTAL $
20051SOW-part 1TBD/TOTBD/TO$0
.SOW-part 34TBD/TOTBD/TO$0
.SOW-part 35TBD/TOTBD/TO$0
.SOW-part 36TBD/TOTBD/TO$0
100SOW-part 37TBD/TOTBD/TO$0
Construction Subtotal:$0
CLIN
NO.INDIRECT COST
20NOINDIRECT COSTUNITQTY$/UNITTOTAL $
2120061Building Permits FeeLSTBD/TO$0
2Utility Permits FeeEATBD/TO$0
3Other Permits FeeEATBD/TO$0
4Licenses FeeEATBD/TO$0
5Defense Base Act InsuranceEATBD/TO$0
6Bond InsuranceEATBD/TO$0
7Danger Pay (if applicable)EATBD/TO$0
Indirect Subtotal:$0
GRAND TOTAL:$0

OPTION 3

OPTION YEAR THREE CONTRACT

9CLIN
NO.LABOR COSTS
11NOLaborsUNITQTY$/UNITTOTAL $
1230011Project ManagerHR1680$0
2Senior Electrical EngineerHR1440$0
3Senior Mechanical EngineerHR960$0
4Senior Civil/Structural EngineerHR960$0
5Controls Application EngineerHR960$0
6Fire Protection EngineerHR960$0
7Junior Electrical EngineerHR1440$0
8Junior Mechanical EngineerHR960$0
9Junior Civil/Structural EngineerHR960$0
10Electrical InspectorHR1200$0
11Quality Control RepresentativeHR2160$0
12Master ElectricianHR2160$0
13Journeyman ElectricianHR2160$0
14Medium Voltage Journeyman LinemanHR960$0
15NETA/ANSI TechnicianHR1440$0
16Generator TechnicianHR1440$0
17Master HVACHR1440$0
18Journeyman HVACHR1440$0
19NICET Fire Alarm TechnicianHR960$0
20NICET Fire Sprinkler TechnicianHR960$0
21Fuel Service TechnicianHR960$0
22WelderHR960$0
23CarpenterHR960$0
24Master PlumberHR960$0
25Journeyman PlumberHR960$0
26Helper/LaborerHR960$0
27CAD TechnicianHR960$0
28Scheduler/PlannerHR960$0
29EstimatorHR960$0
30LogisticianHR960$0
31Packing laborHR960$0
32OtherHR960$0
16Labor Subtotal:$0
CLIN
NO.SURVEY AND DESIGN COSTS
1NOSURVEY AND DESIGN SERVICE FEEUNITQTY$/UNITTOTAL $
330021Provide survey and design for Government's approval, the design package shall be including but not limited to plans, project specs, design analysis with all calc, and cat sheets. At least three submissions for Government review; 35%, 65% and 100%/IFC.LSTBD/TO$0
6Survey and Design Subtotal:$0
CLIN
NO.SHIPPING COSTS
7NOSHIPPING COSTSUNITQTY$/UNITTOTAL $
30031Container PurchaseEATBD/TO$0
2Packing/ Crating FeeLSTBD/TO$0
3Export Document FeeLSTBD/TO$0
4Container Security Prep/Dunnage Wall (if applicable)LSTBD/TO$0
5Load/Block/Brace FeeLSTBD/TO$0
6Drayage to Port FeeLSTBD/TO$0
7Ocean/Air Freight Transportation FeeLSTBD/TO$0
8Customs Clearance FeeLSTBD/TO$0
9Delivery Post FeeLSTBD/TO$0
Shipping Subtotal:$0
CLIN
NO.TRAVEL COSTS
NOTRAVEL COSTSUNITQTY$/UNITTOTAL $
30041Round Trip TicketEATBD/TO$0
2Labor Travel CostEATBD/TO$0
3LodgingDAYTBD/TO$0
4M&IEDAYTBD/TO$0
5Miscellaneous travelDAYTBD/TO$0
6Travel PER DIEMDAYTBD/TO$0
Travel Subtotal:$0
CLIN
NO.CONSTRUCTION COSTS
NOMATERIAL, EQUIPMENT AND SERVICESUNITQTY$/UNITTOTAL $
30051SOW-part 1TBD/TOTBD/TO$0
.SOW-part 34TBD/TOTBD/TO$0
.SOW-part 35TBD/TOTBD/TO$0
.SOW-part 36TBD/TOTBD/TO$0
100SOW-part 37TBD/TOTBD/TO$0
Construction Subtotal:$0
CLIN
NO.INDIRECT COST
20NOINDIRECT COSTUNITQTY$/UNITTOTAL $
2130061Building Permits FeeLSTBD/TO$0
2Utility Permits FeeEATBD/TO$0
3Other Permits FeeEATBD/TO$0
4Licenses FeeEATBD/TO$0
5Defense Base Act InsuranceEATBD/TO$0
6Bond InsuranceEATBD/TO$0
7Danger Pay (if applicable)EATBD/TO$0
Indirect Subtotal:$0
GRAND TOTAL:$0

OPTION 4

OPTION YEAR FOUR CONTRACT

9CLIN
NO.LABOR COSTS
11NOLaborsUNITQTY$/UNITTOTAL $
1240011Project ManagerHR1680$0
2Senior Electrical EngineerHR1440$0
3Senior Mechanical EngineerHR960$0
4Senior Civil/Structural EngineerHR960$0
5Controls Application EngineerHR960$0
6Fire Protection EngineerHR960$0
7Junior Electrical EngineerHR1440$0
8Junior Mechanical EngineerHR960$0
9Junior Civil/Structural EngineerHR960$0
10Electrical InspectorHR1200$0
11Quality Control RepresentativeHR2160$0
12Master ElectricianHR2160$0
13Journeyman ElectricianHR2160$0
14Medium Voltage Journeyman LinemanHR960$0
15NETA/ANSI TechnicianHR1440$0
16Generator TechnicianHR1440$0
17Master HVACHR1440$0
18Journeyman HVACHR1440$0
19NICET Fire Alarm TechnicianHR960$0
20NICET Fire Sprinkler TechnicianHR960$0
21Fuel Service TechnicianHR960$0
22WelderHR960$0
23CarpenterHR960$0
24Master PlumberHR960$0
25Journeyman PlumberHR960$0
26Helper/LaborerHR960$0
27CAD TechnicianHR960$0
28Scheduler/PlannerHR960$0
29EstimatorHR960$0
30LogisticianHR960$0
31Packing laborHR960$0
32OtherHR960$0
16Labor Subtotal:$0
CLIN
NO.SURVEY AND DESIGN COSTS
1NOSURVEY AND DESIGN SERVICE FEEUNITQTY$/UNITTOTAL $
340021Provide survey and design for Government's approval, the design package shall be including but not limited to plans, project specs, design analysis with all calc, and cat sheets. At least three submissions for Government review; 35%, 65% and 100%/IFC.LSTBD/TO$0
6Survey and Design Subtotal:$0
CLIN
NO.SHIPPING COSTS
7NOSHIPPING COSTSUNITQTY$/UNITTOTAL $
40031Container PurchaseEATBD/TO$0
2Packing/ Crating FeeLSTBD/TO$0
3Export Document FeeLSTBD/TO$0
4Container Security Prep/Dunnage Wall (if applicable)LSTBD/TO$0
5Load/Block/Brace FeeLSTBD/TO$0
6Drayage to Port FeeLSTBD/TO$0
7Ocean/Air Freight Transportation FeeLSTBD/TO$0
8Customs Clearance FeeLSTBD/TO$0
9Delivery Post FeeLSTBD/TO$0
Shipping Subtotal:$0
CLIN
NO.TRAVEL COSTS
NOTRAVEL COSTSUNITQTY$/UNITTOTAL $
40041Round Trip TicketEATBD/TO$0
2Labor Travel CostEATBD/TO$0
3LodgingDAYTBD/TO$0
4M&IEDAYTBD/TO$0
5Miscellaneous travelDAYTBD/TO$0
6Travel PER DIEMDAYTBD/TO$0
Travel Subtotal:$0
CLIN
NO.CONSTRUCTION COSTS
NOMATERIAL, EQUIPMENT AND SERVICESUNITQTY$/UNITTOTAL $
40051SOW-part 1TBD/TOTBD/TO$0
.SOW-part 34TBD/TOTBD/TO$0
.SOW-part 35TBD/TOTBD/TO$0
.SOW-part 36TBD/TOTBD/TO$0
100SOW-part 37TBD/TOTBD/TO$0
Construction Subtotal:$0
CLIN
NO.INDIRECT COST
20NOINDIRECT COSTUNITQTY$/UNITTOTAL $
2140061Building Permits FeeLSTBD/TO$0
2Utility Permits FeeEATBD/TO$0
3Other Permits FeeEATBD/TO$0
4Licenses FeeEATBD/TO$0
5Defense Base Act InsuranceEATBD/TO$0
6Bond InsuranceEATBD/TO$0
7Danger Pay (if applicable)EATBD/TO$0
Indirect Subtotal:$0
GRAND TOTAL:$0

File details come from the government source that posted it. Updated .