J. 1.2 RELEVANT PAST PERFORMANCE SURVEY.docx
DOCX document 38 KB Posted
- Attached to
- Worldwide Electrical Power Federal contract opportunity
- Solicitation number
- 19AQMM22R0332
About this file
This document contains a past performance survey for a solicitation seeking electrical power systems engineering services. The survey requests evaluations of a contractor's performance on a previous relevant contract to assess conformance with specifications, adherence to schedule, business conduct, compliance with contract terms, and technical experience. Specific criteria address factors such as proactive performance, key personnel effectiveness, responsiveness to changes, accuracy of invoices, experience with generators, switchgear, transformers and other electrical equipment, controls systems, and energy projects. Ratings use a scale of unacceptable, acceptable and exceptional. The solicitation number listed is 19AQMM22R0332 for worldwide electrical power issued by the Department of State Office of Acquisition Management.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Past performance for RFP SAQMMA16R0004
RELEVANT PAST PERFORMANCE SURVEY
Power Systems Engineering Solicitation 2023
CONTRACT INFORMATION
Please provide the following information to assist us in tracking responses received and resolving any conflicts in the evaluation process if necessary.
a. Contractor: ______________________________________________
b. Contract Number: ______________________________________________
Name of Evaluator: _________________________________
Telephone Number: _________________________________
Facsimile Number: _________________________________
Organization/Office Symbol: _________________________________
Mailing Address: _________________________________
Position/Title/Grade: _________________________________
Length of involvement with contract: _________________________________
Degree or extent of involvement with contract: ___________________________
Period of Performance: __________________ to _____________________
Initial Contract Value: $_____________________
Current or Completed Contract Value: $_____________________
Brief Description of Requirement:
Thank you in advance for completing this survey. THIS INFORMATION WILL BE PROTECTED IN ACCORDANCE WITH FAR 15.1004 (e).
COMPLEXITY SCORING CRITERIA:
Routine: The project includes:
-electrical equipment Preventive Maintenance -low voltage Breakers and panelboards installation or replacement (under 600A) -Installation or replacement of transformers and generators under 75KVA and under 600V
Moderate Complexity: The project includes at least one of the tasks below:
-Low voltage switchgear installation or replacement requiring temporary system -Medium voltage equipment installations or replacement -Photovoltaic systems installation -Installation or replacement of transformers and generators over 75KVA.
-Installation or replacement of low voltage AVR -Installation or replacement of medium voltage AVR
Very Complex: The project includes three or more of the tasks below:
-Low voltage switchgear installation or replacement requiring temporary system -Medium voltage equipment installations or replacement -Photovoltaic systems installation -Installation or replacement of transformers and generators over 75KVA.
-Installation or replacement of low voltage AVR -Installation or replacement of medium voltage AVR
Complexity of the effort:
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Routine Moderate Very Complexity Complex
SCORING CRITERIA FOR ELEMENTS I TO V
EXCEPTIONAL - Indicates the Contractor's performance within the area of evaluation clearly and consistently exceeds contractual requirements.
ACCEPTABLE - Indicates no problem in area of evaluation or has only minor problems for which solutions were satisfactory.
UNACCEPTABLE - Indicates serious problems in the evaluation area. The Contractor is/was in danger of being unable to satisfy contractual requirements and timely recovery is not likely or did not occur.
I. CONFORMANCE TO SPECIFICATIONS AND STANDARDS OF GOOD WORKMANSHIP
1a. Overall ability to pro-actively and aggressively perform contract requirements.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
1b. Effectiveness and reliability of contractor's Key Personnel.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
1c. Ability to effectively implement "start up" contract performance.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
II. ADHERANCE TO CONTRACT SCHEDULE
2a. Overall performance in planning, scheduling, and monitoring.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
2b. Completion of major milestones on schedule.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
2c. Timely completion within period of performance.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
2d. Overall performance in complying with Schedule of Values (SOV) Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
III. GENERAL BUSINESS CONDUCT AND BUSINESS-LIKE CONCERN FOR THE CUSTOMER
3a Responsiveness and flexibility in responding to changes.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
3b. Responsiveness/capability to respond to surge/short term requirements.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
3c. Accuracy and completeness of vouchers/invoices.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
IV. COMPLIANCE WITH THE TERMS AND CONDITIONS OF THE CONTRACT
4a. Quality, completeness, and accuracy of price proposals.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
4b. Accuracy and timeliness of required reports.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
4c. Ability to perform within negotiated prices.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
V. TECHNICAL RELEVANT EXPERIENCE
To be considered relevant to the Utility Management Program, the past contract shall have had one, or more than one, of the tasks below:
5a. Experience with Disel Generators, include major overhauls and rebuilds, load banks, fuel tanks, and fuel systems.
Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
5b. Experience with Switchgear and Switchboard Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
5c. Experience with ATS and UPS systems.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
5d. Experience with MV and LV AVR Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
5e. Experience with paralleling Switchgear Please circle the appropriate rating below or check □ if N/A.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
5e. Experience with Control and Logic Control
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
5f. Experience with MV and LV Transformers and duct bank.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
5g. Experience with lighting and lighting control.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
5h. Experience with lightning protections systems (LPS), Grounding/bonding systems.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
5i. Experience with photovoltaic systems, wind energy systems, battery energy storage systems and electric vehicle charging systems.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
5j. Experience with short circuit, coordination, and arch flash studies.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
5k. Experience with Electrical Design based on applicable codes.
0 1 2 3 4 5 6 7 8 9 10 ½____ ½_____½____ ½_____½_____½____ ½____ ½____ ½_____½______½ Unacceptable Acceptable Exceptional
File details come from the government source that posted it. Updated .