Correction.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Worldwide Electrical Power Federal contract opportunity
Solicitation number
19AQMM22R0332
Issued by
Department of State Office of Acquisition Management

About this file

This document contains proposed modifications to a federal indefinite delivery indefinite quantity (IDIQ) contract for worldwide electrical power services. Key details include:

  • The contract is between the Department of State Office of Acquisition Management and an IDIQ contractor to provide electrical power services at overseas locations on both a routine and emergency basis. Response times for routine, urgent and emergency service calls are defined.

  • Services include project management, design, construction, repair and maintenance of electrical power systems. Task orders will specify work requirements and response times which may include special visa or travel arrangements for austere locations.

  • Pricing is on a firm-fixed price basis per task order. Invoices are paid upon government acceptance of work. No partial payments are allowed.

  • Proposed modifications include changes to response time requirements, definitions of maintenance tiers, quality plan and insurance requirements, and experience levels for key personnel like the project manager.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

NOitem # in IDIQExsitingCorrection / Replace with
1C.4.6.Design the Project: unless otherwise stated in the

Task Order, the Contractor shall submit the project design to the COR not later than 15 calendar days following the site visit.” Design the Project: unless otherwise stated in the Task Order, the Contractor shall submit the project concept design (30%) to the COR later than 15 calendar days following the site visit.

2C.9.3.3.Submit Invoices. The Contractor shall submit invoices upon successful completion, commissioning, and government acceptance of the task order. The Contractor should be cognizant of the fact that full payment will be made only after all performance
requirements have been satisfied for the completed Task Order. No Partial payments or progress payments will be granted. The cost to prepare and submit invoices is part of and shall be included in the firm, fixed price based on the approved execution proposal prepared and submitted.The Contractor shall submit invoices based on

Schedule of Values (SOV) template is attached in Section J.

3 C.9.3.4.3. Department of State (DOS) commissioning representatives will accept the work and recommend payment upon satisfactory testing, documentation, and completion of all requirements. The Contractor is responsible for ensuring that all commissioning testing is completed, documented, and accepted by the Government in accordance with the approved project schedule and approved execution proposal. Department of State (DOS) commissioning representatives will recommend for the COR to accept the work and authorize payment upon satisfactory testing, documentation, and completion of all requirements. The Contractor is responsible for ensuring that all commissioning testing is completed, documented, and accepted by the Government in accordance with the approved project schedule and approved execution proposal.

4L.14.4.1.1-
item 2Surveys should include contracts that were executed on behalf of OBO/CFSM/FAC/PS –
Utility Management Program.Surveys should include contracts that were executed on behalf of OBO/OPS/FAC/PS –

Utility Management Program if applicable 5 B.7. The cost of any labor, materials or equipment and shipment/packaging/crating required in conjunction with the services rendered herein, shall be included in the firm fixed-price Task Order, unless otherwise noted in the Task Order. The contractor is required to follow an itemized list of Bill of Quantities (BOQ) and provide pricing as instructed in B.9. The Contractor shall use the Project Cost Estimate Template (See Section J, Project Cost Estimate Template) for providing the itemized cost break-down of all costs associated with each individual task order. The cost of any labor, materials, or equipment, and shipment/packaging/crating required in conjunction with the services rendered herein, shall be included in the firm fixed-price Task Order, unless otherwise noted in the Task Order. The contractor is required to follow an itemized list of Bill of Quantities (BOQ) and provide pricing as instructed in B.9. for providing the itemized cost break-down of all costs associated with each individual task order.

6 C.1.5 Added to C.1.5 Repair and Maintenance Levels definitions:

• Tier 1 Operator Level maintenance. End user or Locally Engaged Staff technicians performing routine checks, maintenance, and inspections; daily checks, monthly exercise, engine service, etc.

• Tier 2 Identifies a trained, licensed, certified technician such as IMAP, IDIQ contractors or FAC SMEs, performing planned maintenance such as annual inspections.

• Tier 3 are Factory Certified, OEM technicians performing repairs, comprehensive 5-year maintenance, rebuilds etc.

7G.4.4.1Remove item 6. Contractor Quality management Plan.
8C.1.5.1All task orders for work activities will specify the required response time, as defined below. Task order specified response times shall also specify whether or not the requirements include visa receipts or special travel arrangements to austere locations.

Routine Work shall be scheduled by the Contractor according to task order specifics, customer priorities and taking into account any host country visa processing time and flight schedules.

Routine Trouble Calls shall be completed within seven (7) working days of NTP receipt, obtaining any necessary visas and flight schedules. If delays are encountered, the CO shall approve any time extension request either via e- mail or written order/order modification. Extension requests may be necessary due to material or subcontracting issues etc.

Urgent Trouble Calls, the Contractor shall be on the job site and working within two (2) days after receipt of notice to proceed and obtaining any necessary host country visas and flight schedules. Work shall commence upon arrival in country with coordination of Post Facility Manager or designated representative. Work shall be executed during normal duty hours and during non-duty hours. The Contractor shall work continuously to correct the problem so Post activities may continue/resume.

Emergency Trouble Calls, the Contractor shall be on the job site and working within one (1) day after receipt of notice to proceed and obtaining any necessary host country visas and flight schedules. Work shall commence upon arrival in country with coordination of Post Facility Manager or designated representative. Work shall be executed during normal duty hours and during non-duty hours. The Contractor shall work continuously to correct the problem so Post activities may continue/resume.

Emergency Callout During Deployment, in the event of a natural disaster, terrorist event or any other National Security or related event that may impact, or effect Post operational capability or readiness, the contractor may be called upon to assist Post with system repairs or restorations. The contractor shall contact, as practical and as soon as possible the CO and COR, as needed, for technical direction. The Contractor shall provide qualified labor, supervision, and management necessary to support the Post Emergency Response Team. All task orders for work activities will specify the required response time, as defined below. Task order specified response times shall also specify whether or not the requirements include visa receipts or special travel arrangements to austere locations.

Routine Work shall be scheduled by the Contractor according to task order specifics, customer priorities and taking into account any host country visa processing time and flight schedules.

Routine Trouble Calls, the Contractor shall be on the job site and working within seven (7) days after receipt of notice to proceed, obtaining any necessary visas and flight schedules. If delays are encountered, the CO shall approve any time extension request either via e- mail or written order/order modification. Extension requests may be necessary due to material or subcontracting issues etc.

Urgent Trouble Calls, the Contractor shall be on the job site and working within two (2) days after receipt of notice to proceed and obtaining any necessary host country visas and flight schedules. Work shall commence upon arrival in country with coordination of Post Facility Manager or designated representative. Work shall be executed during normal duty hours and during non-duty hours. The Contractor shall work continuously to correct the problem so Post activities may continue/resume.

Emergency Trouble Calls, the Contractor shall be on the job site and working within one (1) day after receipt of notice to proceed and obtaining any necessary host country visas and flight schedules. Work shall commence upon arrival in country with coordination of Post Facility Manager or designated representative. Work shall be executed during normal duty hours and during non-duty hours. The Contractor shall work continuously to correct the problem so Post activities may continue/resume.

Emergency Callout During Deployment, in the event of a natural disaster, terrorist event or any other National Security or related event that may impact, or effect Post operational capability or readiness, the contractor may be called upon to assist Post with system repairs or restorations. The contractor shall contact, as practical and as soon as possible the CO and COR, as needed, for technical direction. The Contractor shall provide qualified labor, supervision, and management necessary to support the Post Emergency Response Team.

9 B.10.1 1. Project Manager (PM): shall possess skill and ability to plan and oversee the building process of various construction projects from start to finish and to successfully achieve the project objectives. Support day-to-day operations and be hands-on in problem solving, equipment troubleshooting, process development, and issue resolution. Maintains a culture that prioritizes safety and quality through communication, action, and accountability. Manage project scope, schedule, cost, and resources to ensure goals are achieved consistently on time during construction. References all work-related communication with base contract, technical specification, Statement of Work when needed and maintain good relationship with Utility Management (UM) staff. Collaborate with engineers, Technicians, and other workers in the same project to provide real time data work progress report to the COR on a weekly basis. Choose subcontractors and delegate their responsibilities. Response in a professional manner to any delays, emergencies and problems that can arise and report it to UM. Comply with safety, Quality control, Quality assurance, and building codes as well as legal requirements. Report project progress and update project schedule accordingly. The assigned project manager shall possess interpersonal skills (e.g., leadership, team building, communication, decision making, etc.) and capabilities to accomplish work through the project team and other stakeholders. PM shall have minimum 10 years’ experience in Construction Project Management and hold a bachelor’s degree or higher in Electrical Engineering from accredited university and Project Management Professional (PMP) Certificate from Project Management Institute (PMI). The PM is the Point of Contact (POC) with the CO and COR. The PM shall be subject to acceptance by the Contracting Officer. 1. Project Manager (PM): shall possess skill and ability to plan and oversee the building process of various construction projects from start to finish and to successfully achieve the project objectives. Support day-to-day operations and be hands-on in problem solving, equipment troubleshooting, process development, and issue resolution. Maintains a culture that prioritizes safety and quality through communication, action, and accountability. Manage project scope, schedule, cost, and resources to ensure goals are achieved consistently on time during construction. References all work-related communication with base contract, technical specification, Statement of Work when needed and maintain good relationship with Utility Management (UM) staff. Collaborate with engineers, Technicians, and other workers in the same project to provide real time data work progress report to the COR on a weekly basis. Choose subcontractors and delegate their responsibilities. Response in a professional manner to any delays, emergencies and problems that can arise and report it to UM. Comply with safety, Quality control, Quality assurance, and building codes as well as legal requirements. Report project progress and update project schedule accordingly. The assigned project manager shall possess interpersonal skills (e.g., leadership, team building, communication, decision making, etc.) and capabilities to accomplish work through the project team and other stakeholders. PM shall have minimum 5 years’ experience in Construction Project Management and hold a bachelor’s degree or higher in Electrical Engineering from accredited university. The PM is the Point of Contact (POC) with the CO and COR. The PM shall be subject to acceptance by the Contracting Officer.