J.8 SCHEDULE OF VALUES FORMAT.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Worldwide Electrical Power Federal contract opportunity
- Solicitation number
- 19AQMM22R0332
About this file
This document is a schedule of values template for a federal construction contract. It outlines 16 line item number (LIN) cost elements including labor, survey and design, shipping, travel, construction, and indirect costs. The total proposed cost is left blank. Each LIN includes a brief description, estimated percentage complete for milestones, actual percentage and costs to date, maximum invoice amounts, and retainage. The related solicitation is for worldwide electrical power work issued by the Department of State with number 19AQMM22R0332.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN ALLOCATIONS
| TASK ORDER NAME AND NUMBER | ||
| CLIN | DESCRIPTION | TOTAL COST |
| 0001 | LABOR | $------------ |
| 0002 | SURVEY AND DESIGN | $------------ |
| 0003 | SHIPPING | $------------ |
| 0004 | TRAVEL | $------------ |
| 0005 | CONSTRUCTION | $------------ |
| 0006 | INDIRECT COST | $------------ |
| GRAND TOTAL | $------------ |
SOV
| SCHEDULE OF VALUES | |
| No. | CLIN# |
Base
| Contract | CLIN | Milestone | Date | Max Progress % | Actual Progress % | Total CLIN Cost | % Max Invoice Amount | % Actual Invoice Amount | Retainage 10% | % Paid Invoice Amount | |
| From | To | ||||||||||
| 1 | 0001 | Labor | Delivered and inspected all equipment to Post |
and confirmed it met the Task Order approved
| submittals. | 25% | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| 2 | 0001 | Labor | Demolish and dispose existing material, and provide temp power to existing load | 25% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3 | 0001 | Labor | Install all equipment, pass static checkup, no-load test, load test and all control functions | 50% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 4 | 0002 | Survey and Design | Complete site visit and send conceptual design | ||||||||||
| report to the COR | 40% | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| 5 | 0002 | Survey and Design | Submit 100% design includes CAD & PDF drawings, tailored Specs, Design analysis narrative and Calc, and Cut Sheets. | 40% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 6 | 0002 | Survey and Design | Submit CAD & PDF As-built drawings | 20% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 7 | 0003 | Shipping | Container Purchase, Export Document, Load/Block/Brace, Drayage to Port, Ocean Freight Transportation | 40% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 8 | 0003 | Shipping | Customs Clearance, Delivery Post, inspect equipment at the post and confirm it meet the task order approved submittals | 40% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 9 | 0003 | Shipping | Demobilization | 20% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 10 | 0004 | Travel | Complete first site visit /survey | 40% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 11 | 0004 | Travel | Complete Construction Phase | 50% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 12 | 0004 | Travel | Close out | 10% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 13 | 0005 | Construction | Demolish and dispose existing material, and provide temp power to existing load | 10% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 14 | 0005 | Construction | Install all equipment, pass static checkup, no-load test, load test and all control functions. | 70% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 15 | 0005 | Construction | Complete Commission, training and Close out | 20% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 16 | 0006 | Indirect | Start on-site construction phase | 100% | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 17 | GRAND TOTAL | $0.00 | $0.00 | $0.00 | $0.00 |