J.8 SCHEDULE OF VALUES FORMAT.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Worldwide Electrical Power Federal contract opportunity
Solicitation number
19AQMM22R0332
Issued by
Department of State Office of Acquisition Management

About this file

This document is a schedule of values template for a federal construction contract. It outlines 16 line item number (LIN) cost elements including labor, survey and design, shipping, travel, construction, and indirect costs. The total proposed cost is left blank. Each LIN includes a brief description, estimated percentage complete for milestones, actual percentage and costs to date, maximum invoice amounts, and retainage. The related solicitation is for worldwide electrical power work issued by the Department of State with number 19AQMM22R0332.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN ALLOCATIONS

TASK ORDER NAME AND NUMBER
CLINDESCRIPTIONTOTAL COST
0001LABOR$------------
0002SURVEY AND DESIGN$------------
0003SHIPPING$------------
0004TRAVEL$------------
0005CONSTRUCTION$------------
0006INDIRECT COST$------------
GRAND TOTAL$------------

SOV

SCHEDULE OF VALUES
No.CLIN#

Base

ContractCLINMilestoneDateMax Progress %Actual Progress %Total CLIN Cost% Max Invoice Amount% Actual Invoice AmountRetainage 10%% Paid Invoice Amount
FromTo
10001LaborDelivered and inspected all equipment to Post

and confirmed it met the Task Order approved

submittals.25%$0.00$0.00$0.00$0.00
20001LaborDemolish and dispose existing material, and provide temp power to existing load25%$0.00$0.00$0.00$0.00
30001LaborInstall all equipment, pass static checkup, no-load test, load test and all control functions50%$0.00$0.00$0.00$0.00
40002Survey and DesignComplete site visit and send conceptual design
report to the COR40%$0.00$0.00$0.00$0.00
50002Survey and DesignSubmit 100% design includes CAD & PDF drawings, tailored Specs, Design analysis narrative and Calc, and Cut Sheets.40%$0.00$0.00$0.00$0.00
60002Survey and DesignSubmit CAD & PDF As-built drawings20%$0.00$0.00$0.00$0.00
70003ShippingContainer Purchase, Export Document, Load/Block/Brace, Drayage to Port, Ocean Freight Transportation40%$0.00$0.00$0.00$0.00
80003ShippingCustoms Clearance, Delivery Post, inspect equipment at the post and confirm it meet the task order approved submittals40%$0.00$0.00$0.00$0.00
90003ShippingDemobilization20%$0.00$0.00$0.00$0.00
100004TravelComplete first site visit /survey40%$0.00$0.00$0.00$0.00
110004TravelComplete Construction Phase50%$0.00$0.00$0.00$0.00
120004TravelClose out10%$0.00$0.00$0.00$0.00
130005ConstructionDemolish and dispose existing material, and provide temp power to existing load10%$0.00$0.00$0.00$0.00
140005ConstructionInstall all equipment, pass static checkup, no-load test, load test and all control functions.70%$0.00$0.00$0.00$0.00
150005ConstructionComplete Commission, training and Close out20%$0.00$0.00$0.00$0.00
160006IndirectStart on-site construction phase100%$0.00$0.00$0.00$0.00
17GRAND TOTAL$0.00$0.00$0.00$0.00

File details come from the government source that posted it. Updated .