J.1.3 CASE SCENARIO U.S. EMBASSY ASUNCION PARAGUAY.docx

DOCX document 714 KB Posted

Attached to
Worldwide Electrical Power Federal contract opportunity
Solicitation number
19AQMM22R0332
Issued by
Department of State Office of Acquisition Management

About this file

This document contains a sample task order for electrical system upgrades at the U.S. Embassy in Asuncion, Paraguay. The task order requires replacing the entire 60Hz power plant and providing utility power from the existing 50Hz system, including low-voltage electrical systems, step-down transformers, converters, meters, cables, and conduits. Additional requirements include replacing the UPS powering Load 5, improving the system design to reduce generator usage during power fluctuations, including 10% spare capacity, installing a computer-based power monitoring system, and alarm panels. The sample task order worksheet provides a breakdown of labor categories and estimated costs, as well as costs for survey and design, shipping, travel, construction materials and services, and indirect expenses. It relates to the Worldwide Electrical Power solicitation issued by the Department of State Office of Acquisition Management.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J.1.3

CASE SCENARIO

SAMPLE TASK ORDER

Offeror shall submit a sample task order proposal containing the following based on the following Sample Task Order description and Drawings. (Consider that the information below is not 100% accurate, contractor shall use technical competency to fix errors and use assumption. All errors fixed and assumptions shall be indicated in the narrative)

a. Project narrative of 500 words or more, including

i. Executive Summary,

ii. Concept of Operations,

iii. Installation plan,

b. Project Schedule,

c. Schematic Design drawings and new Single Line Diagram (SLD),

d. Equipment List,

e. Transportation and shipping plan,

f. Personnel Travel and Lodging plan,

g. Construction security plan,

h. Sub-contracting plan,

i. Bill of Materials,

j. Staff matrix – of names and qualifications for all on-site construction individuals that offeror would reasonably expect to assign to this sample task order,

k. Itemized proposal.

l. Copy of electrical contractor license

SAMPLE TASK ORDER

Description

Location: US Embassy, Asunción, Paraguay

Situation: The embassy has two distinct electrical systems on neighboring properties. One is 60Hz, and the other is 50Hz. The 60Hz power system is on generator power 24 hours per day. Loads 1 and 2 are on the 60Hz power system. There is a working UPS powering Load 1. There is no 60Hz utility power available. The 60Hz power plant has exceeded it’s useful service life and that part of the embassy is experiencing equipment malfunctions and complete black-outs. The 50Hz power system is connected to utility power at 22kV and steps down to 11kV. There is an 11kV, 50Hz power plant rated 5MVA that provides power to Loads 3, 4, 5, and 6 when the local utility is unavailable. The UPS powering Load 5 has failed and is operating in by-pass mode.

Power Plant 1: Nominal 120/208 60Hz Utility Power: Nominal 22/11kV 50Hz Power Plant 2: Nominal 11kV 50Hz

Utility Power Quality: Incoming voltage rapidly fluctuates from 21-23kV and the frequency shifts from 59-61Hz. Fluctuations and shifts vary in time duration from transient events up to 15 seconds.

Utility Reliability: 30 – 40 power outages per year, typically 30-90 minutes. Rolling black-outs during dry season, 4-6 hours per day.

Task: Replace the entire 60Hz power plant, and provide a power supply from the local utility via the existing 50Hz system. Including, low-voltage electrical system, step-down transformers, converters, meters, cables and conduits. Replace the UPS powering Load 5. The Offeror shall include price option for providing an additional 11kV generator (if needed), with associated cables, terminations, battery charger, and fuel systems.

Requirements: Improve system design. New system shall include voltage regulation and power conditioning equipment in order to reduce the need for generator power during short voltage and frequency fluctuations. Include 10% spare capacity for load growth. Include computer based power monitoring system for recording power quality and consumption. Include two remote alarm panels, configured for audible and visible alarms when utility power is offline and generator power is online.

I. Sample Task Order Existing SLD

II. Sample Task Order Worksheet

BOQ

CLIN

NO.

LABOR COSTS

NO
Labors
UNIT
QTY
$/UNIT
TOTAL $
0001
1
Project Manager
HR
$0
2
Senior Electrical Engineer
HR
$0
3
Senior Mechanical Engineer
HR
$0
4
Senior Civil/Structural Engineer
HR
$0
5
Controls Application Engineer
HR
$0
6
Fire Protection Engineer
HR
$0
7
Junior Electrical Engineer
HR
$0
8
Junior Mechanical Engineer
HR
$0
9
Junior Civil/Structural Engineer
HR
$0
10
Electrical Inspector
HR
$0
11
Quality Control Representative
HR
$0
12
Master Electrician
HR
$0
13
Journeyman Electrician
HR
$0
14
Medium Voltage Journeyman Lineman
HR
$0
15
NETA/ANSI Technician
HR
$0
16
Generator Technician
HR
$0
17
Master HVAC
HR
$0
18
Journeyman HVAC
HR
$0
19
NICET Fire Alarm Technician
HR
$0
20
NICET Fire Sprinkler Technician
HR
$0
21
Fuel Service Technician
HR
$0
22
Welder
HR
$0
23
Carpenter
HR
$0
24
Master Plumber
HR
$0
25
Journeyman Plumber
HR
$0
26
Helper/Laborer
HR
$0
27
CAD Technician
HR
$0
28
Scheduler/Planner
HR
$0
29
Estimator
HR
$0
30
Logistician
HR
$0
31
Packing labor
HR
$0
32
Other
HR
$0
Labor Subtotal:
$0

CLIN

SURVEY AND DESIGN COSTS

NO
SURVEY AND DESIGN SERVICE FEE
UNIT
QTY
$/UNIT
TOTAL $
0002
1
Provide survey and design for Government's approval, the design package shall be including but not limited to plans, project specs, design analysis with all calculations, and catalog sheets. At least three submissions for Government review; 35%, 65% and 100%/IFC.
LS
TBD/TO
$0
Survey and Design Subtotal:
$0

CLIN

SHIPPING COSTS

NO
SHIPPING COSTS
UNIT
QTY
$/UNIT
TOTAL $
0003
1
Container Purchase
EA
TBD/TO
$0
2
Packing/ Crating Fee
LS
TBD/TO
$0
3
Export Document Fee
LS
TBD/TO
$0
4
Container Security Prep/Dunnage Wall (if applicable)
LS
TBD/TO
$0
5
Load/Block/Brace Fee
LS
TBD/TO
$0
6
Drayage to Port Fee
LS
TBD/TO
$0
7
Ocean/Air Freight Transportation Fee
LS
TBD/TO
$0
8
Customs Clearance Fee
LS
TBD/TO
$0
9
Delivery Post Fee
LS
TBD/TO
$0
Shipping Subtotal:
$0

CLIN

TRAVEL COSTS

NO
TRAVEL COSTS
UNIT
QTY
$/UNIT
TOTAL $
0004
1
Round Trip Ticket
EA
TBD/TO
$0
2
Labor Travel Cost
EA
TBD/TO
$0
3
Lodging
DAY
TBD/TO
$0
4
M&IE
DAY
TBD/TO
$0
5
Miscellaneous travel
DAY
TBD/TO
$0
6
Travel PER DIEM
DAY
TBD/TO
$0
Travel Subtotal:
$0

CLIN

CONSTRUCTION COSTS

NO
MATERIAL, EQUIPMENT AND SERVICES
UNIT
QTY
$/UNIT
TOTAL $
0005
1
SOW-part 1
TBD/TO
TBD/TO
$0
.
SOW-part 2
TBD/TO
TBD/TO
$0
.
SOW-part 3
TBD/TO
TBD/TO
$0
.
SOW-part 4
TBD/TO
TBD/TO
$0
100
SOW-part 100
TBD/TO
TBD/TO
$0
Construction Subtotal:
$0

CLIN

INDIRECT COST

NO
INDIRECT COST
UNIT
QTY
$/UNIT
TOTAL $
0006
1
Building Permits Fee
LS
TBD/TO
$0
2
Utility Permits Fee
EA
TBD/TO
$0
3
Other Permits Fee
EA
TBD/TO
$0
4
Licenses Fee
EA
TBD/TO
$0
5
Defense Base Act Insurance
EA
TBD/TO
$0
6
Bond Insurance
EA
TBD/TO
$0
7
Danger Pay (if applicable)
EA
TBD/TO
$0
Indirect Subtotal:
$0
GRAND TOTAL:
$0

END OF SAMPLE TASK ORDER