J-8 Bid Schedule_101624.pdf
PDF 181 KB Posted
- Attached to
- B2621 Dorm Construction Renovations
- Solicitation number
- FA448425R0001
About this file
This document is a Bid Schedule for the repair and renovation of Dormitory 2621 at Joint Base McGuire-Dix-Lakehurst (JB MDL) in New Jersey. The work includes renovating the sleeping rooms, bathrooms, common areas, mechanical, electrical, and telecom rooms, and installing a new HVAC system. The bid schedule provides a detailed breakdown of the base bid and option items, including quantities, unit prices, and total amounts for the various renovation activities. The allowance items include removal and disposal of slab-on-grade, asbestos-containing materials, and structural concrete. Pricing details require a breakdown of material, labor, equipment, subcontractor costs, and overhead. This bid schedule is part of a larger Request for Proposal (RFP) for the B2621 Dorm Construction Renovations project, which is a new construction requirement for the Department of the Air Force Air Mobility Command.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 1 - THE SCHEDULE
SECTION B (repair Dormitory 2621, PTFL 21-1010)
SUPPLIES OR SERVICE AND PRICES/COSTS
UNIT
ITEM SUPPLIES/SERVICES (Base Bid) QUANTITY UNIT PRICE AMOUNT
0001 Provide all labor, equipment, appliances, and materials, and furnish and perform all work in strict accordance with the specifications, schedules, and drawings forming parts thereof, subject to the terms and conditions of the contract to include selective demolition, renovation and reconfiguration of Dormitory 2621. It includes renovating the sleeping rooms, bathrooms, common 1 JOB $ $ areas include lobby, ABA public toilet, service areas include mechanical, electrical and telecom rooms along with a new mechanical system.
TOTAL (Base Bid) $
UNIT
ITEM SUPPLIES/SERVICES (Option Items) QUANTITY UNIT PRICE AMOUNT N/A N/A
1 LS $_N/A_ $_N/A_
TOTAL (Option Items) $_N/A_
ALLOWANCE
ITEM
SUPPLIES/SERVICES QUANTITY UNIT
Removal and disposal of slab-on-grade excluding
AMOUNT
loading and disposal. (350 SF). 1 LS $_$20,000
0003 Removal and disposal of additional asbestos-containing 1 LS $_$25,000 materials. (500 SF).
0004 Structural concrete, in place, Flowable fill (20 CY). 1 LS $_$20,000
TOTAL $
GRAND TOTAL (Line items 0001 through 0004) $
PRICING DETAILS:
For evaluation purposes, the offeror shall provide detailed proposals in response to this RFP. Pricing shall include a detailed breakdown of all the cost elements attributed to each line item in the bid schedule and the requirements of the SOW and specifications. Price breakdown shall include sufficient details to permit an analysis of profit, and all the costs: (i) Material (ii) Labor (iii) Equipment (iv) Subcontractor’s costs as applicable and (v) Overhead.
NOTE 1: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.
NOTE 2: If a modification to a bid based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro-rata basis to every unit price in the bid schedule.
NOTE 3: (Applicable to Items 0002 thru 0004) The amounts are an allowance. In no case shall the contractor change amounts shown on this bid schedule for these services.
NOTE 4: Failure to provide a bid on all items will render your bid non-responsive.