J-11 Past Performance Questionnaire_102824.pdf

PDF 147 KB Posted

Attached to
B2621 Dorm Construction Renovations
Solicitation number
FA448425R0001
Issued by

About this file

This document is a Past Performance Questionnaire related to a federal contract opportunity for the B2621 Dorm Construction Renovations project at Joint Base McGuire-Dix-Lakehurst, New Jersey. The questionnaire requests past performance information on the offeror's quality of service, personnel qualifications, meeting deliverables, management, and timeliness from a respondent who has worked with the offeror previously. The information obtained will be used to assess the offeror's performance risk for the current contract. The related federal contract opportunity is for a dorm renovation project at Joint Base McGuire-Dix-Lakehurst, which includes work such as HVAC system upgrades, bathroom and bedroom refurbishments, and hazardous material removal. The solicitation is being issued by the Department of the Air Force, Air Mobility Command.

View the file

Other files

File Type Posted
J-16 Questions and Answers Version 2.pdf PDF
Solicitation Amendment FA448425R00010007 SF 30.pdf PDF
J-18 revised A-612_door hardware schedule.pdf PDF
Solicitation Amendment FA448425R00010006 SF 30.pdf PDF
J-17 Design Analysis.pdf PDF
Solicitation Amendment FA448425R00010005 SF 30.pdf PDF
J-8 Bid Schedule_011525 .pdf PDF
J-16 Questions and Answers Version 1.pdf PDF
Solicitation Amendment FA448425R00010004 SF 30.pdf PDF
Solicitation Amendment FA448425R00010003 SF 30.pdf PDF
Solicitation Amendment FA448425R00010002 SF 30.pdf PDF
J-12 Section L_112724.pdf PDF
J-15 Site Visit Sign in Sheet_112624.pdf PDF
J-14 Pre-Bid Addendum No 1_112624.pdf PDF
Solicitation Amendment FA448425R00010001 SF 30.pdf PDF
J-4 SFS Appendix- Contractor Appendix_Sep 23.pdf PDF
Solicitation - FA448425R0001.pdf PDF
C-1 Statement of Work_082224.pdf PDF
J-7 Specifications - Vol II_032224.pdf PDF
J-12 Section L_111324.pdf PDF
J-6 Specifications - Vol I_032224.pdf PDF
J-8 Bid Schedule_101624.pdf PDF
J-1 Materials Submittal_070324.pdf PDF
J-3 JBMDL AT Awareness Guide for Contractors_22APR24.pdf PDF
J-5 Medical Statement.docx DOCX document
J-9 Drawings_032224.pdf PDF
J-10 Wage Determination Burlington County_110124.pdf PDF
J-13 Section M_111224.pdf PDF
J-2 JBMDL Antiterrosim Awareness for Contractors (Trifold)_22APR 24.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE AND COVER LETTER

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

When Filled In This Document Is Source Selection Sensitive IAW FAR 2.101 and FAR 3.104

SUBJECT: Request for Past Performance Evaluation

TO:

You have been identified as a point of contact for a past performance evaluation of the firm listed on the attached questionnaire. This firm is currently being considered for B2621 Dorm Construction Renovations at Joint Base McGuire-Dix-Lakehurst, New Jersey (JBMDL, NJ).

Your prompt attention to this questionnaire will be greatly appreciated. If you have any questions concerning this request, please contact Mr. Adam Donofrio at adam.donofrio@us.af.mil or by phone at 609-754-2894.

Raymond Mesler

Contracting Officer

1 Attachment:

Past and Present Performance Questionnaire

PAST PERFORMANCE ASSESSMENT QUESTIONAIRE

87th Contracting Squadron ATTN: Adam Donofrio adam.donofrio@us.af.mil

A. OFFEROR’S INFORMATION:

Company/Organization Name:

Address:

Point of Contact (POC):

Title of POC:

Telephone Number:

Fax Number:

Email:

B. RESPONDENT INFORMATION:

Company/Organization Name:

Address:

Point of Contact (POC):

Title of POC:

Telephone Number:

Fax Number:

Email:

C. CONTRACT INFORMATION:

Contract Title:

Contract Number:

Contracting Officer:

Fax/Phone Number:

Status (i.e. on-going, complete):

Contract Amount (total amount of base plus any options):

Type of Contract:

Performance Period (include base plus any options):

Place of Performance:

mailto:adam.donofrio@us.af.mil

D. BRIEF DESCRIPTION OF CONTRACT REQUIREMENTS (relevant contract deliverables):

E. PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 5 that most accurately describes the Offeror’s performance or situation. If you are unable to rate an item because it was not a requirement, never an issue, or you have no knowledge of the item in question, then you should mark “Unknown”.

5 4 3 2 1

Exceptional Satisfactory Marginal Unsatisfactory Neutral

Performance exceeds contractual requirements to the Government’s benefit. (Risk Level: Very Low)

Performance meets contractual requirements.

(Risk Level:

Moderate)

Performance does not meet some contractual requirements.

The element being assessed reflects a serious problem for which the Contractor has not yet implemented satisfactory corrective actions.

(Risk Level: High)

Performance does not meet most contractual requirements and recovery is not likely in a timely manner.

Contractor’s corrective actions to date are ineffective.

(Risk Level:

Very High)

The Offeror has little/no relevant past performance upon which to base a meaningful performance risk prediction.

(Risk Level:

Unknown)

a. PERFORMANCE and SUPPORTABILITY:

(1) The Contractor provided quality service that adhered to contract requirements, specifications, and standards of professional conduct. 1 2 3 4 5 NA

(2) The Contractor provided quality personnel that met or exceeded the required qualifications 1 2 3 4 5 NA

(3) The Contractor successfully met deliverables established by the contract 1 2 3 4 5 NA

(4) The labor turnover in key personnel and other labor categories was minimal and did not adversely affect Contractor Performance. 1 2 3 4 5 NA

(5) The Contractor had the ability to respond effectively to contract performance issues. 1 2 3 4 5 NA

b. MANAGEMENT:

(1) The Contractor demonstrated an overall effective and quality management effort. 1 2 3 4 5 NA

(2) The Contractor maintained an open line of communication so that the Contracting Officer’s Representative (COR) or Project manager (PM) was apprised of technical and cost issues.

1 2 3 4 5 NA

(3) The Contractor cooperated with the Government or Customer in providing flexible, proactive, and effective solutions to critical contract issues.

1 2 3 4 5 NA

(4) The Contractor provided proactive and effective management of its subcontractors. (If applicable)

1 2 3 4 5 NA

(5) The Contractor maintained an effective ongoing Quality Control Plan to provide for monitoring, analyzing and improving quality contract performance.

NA

c. TIMELINESS/SCHEDULE:

(1) The Contractor consistently demonstrated an ability to quickly recruit instructors or replacement personnel on time to meet the Government or Customer needs.

1 2 3 4 5 NA

(2) The Contractor demonstrated the ability to retain instructors or employees to support contract/task order requirements so that work schedules would not be disrupted.

1 2 3 4 5 NA

(3) The Contractor demonstrated the ability to plan for and provide replacement candidates during the life of the contract to include pre-planned absences, unplanned illnesses, or an extended leave of absence.

1 2 3 4 5 N/A

(4) Credentialing Packages (to include current and complete information) were presented in timely fashion to the applicable facility.

1 2 3 4 5 NA

(5) The Contractor was able to resolve customer complaints quickly and effectively. 1 2 3 4 5 NA

F. OTHER:

(1) Would you award this firm another contract? ( ) Yes, ( ) No. If you answered “No” provide an explanation.

(2) Was the contract terminated for default? ( ) Yes, ( ) No. If you answered “Yes”, provide an explanation.

(3) Has the Contractor ever been given a cure notice, show cause notice, suspension of progress payments, etc.?

( ) Yes, ( ) No. If you answered “Yes”, provide an explanation.

(4) Based upon the information you provided and using the definitions provided in the evaluation criteria above, the overall performance rating you would give this Contractor is:

Exceptional Satisfactory Marginal Unsatisfactory Unknown

COMMENTS: (ALL Unsatisfactory, Marginal, or Exceptional ratings require comments to support the same. Failure to provide comments will render questionnaire void and will not be accepted by the Government):

File details come from the government source that posted it. Updated .