This is a bid schedule form for a dormitory renovation project at Joint Base McGuire-Dix-Lakehurst (JB MDL), New Jersey, detailing price items for Contract FA448425R0001. The base bid (Item 0001) covers comprehensive renovation of Dormitory 2621, including selective demolition, renovation of sleeping rooms, bathrooms, common areas, lobby, ABA public toilet, service areas, mechanical/electrical/telecom rooms, and installation of a new mechanical system.

The schedule includes four fixed allowance items: $20,000 for slab-on-grade removal and disposal (350 SF), $25,000 for asbestos-containing materials removal (500 SF), $20,000 for structural concrete flowable fill (20 CY), and $25,000 for window replacement. There are no option items included (marked as N/A). Bidders must provide pricing for all items to be considered responsive, and unit price extensions will be verified by the government. The form includes provisions for how lump sum adjustments should be applied to unit prices if modifications are submitted.

View the file

Other files

File Type Posted
J-16 Questions and Answers Version 2.pdf PDF
Solicitation Amendment FA448425R00010007 SF 30.pdf PDF
J-18 revised A-612_door hardware schedule.pdf PDF
Solicitation Amendment FA448425R00010006 SF 30.pdf PDF
J-17 Design Analysis.pdf PDF
Solicitation Amendment FA448425R00010005 SF 30.pdf PDF
Solicitation Amendment FA448425R00010004 SF 30.pdf PDF
J-16 Questions and Answers Version 1.pdf PDF
Solicitation Amendment FA448425R00010003 SF 30.pdf PDF
Solicitation Amendment FA448425R00010002 SF 30.pdf PDF
J-14 Pre-Bid Addendum No 1_112624.pdf PDF
J-15 Site Visit Sign in Sheet_112624.pdf PDF
Solicitation Amendment FA448425R00010001 SF 30.pdf PDF
J-12 Section L_112724.pdf PDF
J-6 Specifications - Vol I_032224.pdf PDF
J-8 Bid Schedule_101624.pdf PDF
Solicitation - FA448425R0001.pdf PDF
C-1 Statement of Work_082224.pdf PDF
J-7 Specifications - Vol II_032224.pdf PDF
J-11 Past Performance Questionnaire_102824.pdf PDF
J-12 Section L_111324.pdf PDF
J-1 Materials Submittal_070324.pdf PDF
J-3 JBMDL AT Awareness Guide for Contractors_22APR24.pdf PDF
J-5 Medical Statement.docx DOCX document
J-9 Drawings_032224.pdf PDF
J-10 Wage Determination Burlington County_110124.pdf PDF
J-13 Section M_111224.pdf PDF
J-2 JBMDL Antiterrosim Awareness for Contractors (Trifold)_22APR 24.pdf PDF
J-4 SFS Appendix- Contractor Appendix_Sep 23.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1 - THE SCHEDULE

SECTION B (repair Dormitory 2621, PTFL 21-1010)

SUPPLIES OR SERVICE AND PRICES/COSTS

ITEM SUPPLIES/SERVICES (Base Bid) QUANTITY UNIT

UNIT

PRICE AMOUNT

0001 Provide all labor, equipment, appliances, and materials, and furnish and perform all work in strict accordance with the specifications, schedules, and drawings forming parts thereof, subject to the terms and conditions of the contract to include selective demolition, renovation and reconfiguration of Dormitory 2621. It includes renovating the sleeping rooms, bathrooms, common areas include lobby, ABA public toilet, service areas include mechanical, electrical and telecom rooms along with a new mechanical system.

1 JOB $_________ $_________

TOTAL (Base Bid) $_________

ITEM SUPPLIES/SERVICES (Option Items) QUANTITY UNIT

UNIT

PRICE AMOUNT

N/A N/A

1 LS $_N/A_ $_N/A_

TOTAL (Option Items) $_N/A_

ITEM SUPPLIES/SERVICES QUANTITY UNIT

ALLOWANCE

AMOUNT

0002 Removal and disposal of slab-on-grade excluding loading and disposal. (350 SF). 1 LS $_$20,000

0003 Removal and disposal of additional asbestos-containing materials. (500 SF).

1 LS $_$25,000

LS

LS

$_$20,000

$_$25,000

Structural concrete, in place, Flowable fill (20 CY).

Window Replacement

TOTAL

GRAND TOTAL (Line items 0001 through 0005) $_________

NOTE 1: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.

NOTE 2: If a modification to a bid based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro-rata basis to every unit price in the bid schedule.

NOTE 3: (Applicable to Items 0002 thru 0005) The amounts are an allowance. In no case shall the contractor change amounts shown on this bid schedule for these services.

NOTE 4: Failure to provide a bid on all items will render your bid non-responsive.