J-4 - Price Schedule.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Library of Congress - Wayfinding Fabrication
- Solicitation number
- 030ADV26R0030
- Issued by
-
Library of Congress
About this file
This is a Price Schedule attachment for Library of Congress Solicitation 030ADV26R0005 for wayfinding fabrication, delivery, and installation services at the Thomas Jefferson building. The document establishes the pricing framework for both base requirements and optional external signage work, organized by deliverable categories that correspond to the Statement of Work (Section C).
The base requirements include nine deliverable categories: site visits and field dimension meetings (C.3.2), CAD detail drawings for exhibit elements (C.3.3), graphic files and proofs (C.3.4), material samples and mockups for C-1, C-2, and M-1 signs (C.3.5), fabrication of all wayfinding components (C.3.6), delivery (C.3.8), installation (C.3.9), punch list documentation (C.3.10), operations manual (C.3.11), and one-year warranty coverage (C.3.12). The optional work mirrors these tasks for external signage, including site visits, detail drawings, graphics, prototypes for M-2, N-1, P-1, Q-1, and R-1 signs, external signage fabrication, delivery, installation, punch list, operations manual, and warranty. Offerors must provide firm fixed prices for each deliverable and detailed breakdowns showing labor categories, materials, units, unit amounts, and number of units to support total pricing calculations. The template includes separate subtotals for base requirements and options, with a combined total line for the complete proposal.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Price Schedule
| Library of Congress - Solicitation 030ADV26R0005 |
| Attachment J-4 |
| Project Title: Wayfinding Fabrication, Delivery and Installation |
| Offeror shall read the Statement of Work at Section C and provide firm fixed prices for the deliverables listed below as cross referenced in Section F |
| Paragraph Reference | Description of Event/Deliverable | Amount |
| C.3.2 Site Visits, Field Dimensions, Meetings | Kick off meeting and site visit to complete field dimension, review exhibit components and delivery requirements. | NSP |
| C.3.3 - Detail Drawings | Generate drawings in CAD of each typical exhibit element to be fabricated for review/approval by LOC staff related to the Treasures gallery. | |
| C.3.4 - Graphics | Deliver Electric Files and Proofs to COR | |
| C.3.5 Material Samples, Prototypes and Mockups | Deliver prototypes for C-1, C-2 signs, and M-1. | |
| C.3.6. Sign Fabrication - Wayfinding Signage | Fabricate all Wayfinding components | |
| C.3.8 – Delivery | Deliver all wayfinding componenets described at section C.3.6 | |
| C.3.9 - Installation | Install all wayfinding components described at section C.3.6 | |
| C.3.10 – Punch List | Deliver Punchlist | |
| C.3.11 – Operations Manual | Deliver Operations Manual | |
| C.3.12 - Warranty | One Year Warranty | |
| Base Requirements Sub-Total | $ - 0 | |
| C.3.2.b – OPTION: Site visits, Field dimensions, meetings for Optional External Signage | Site visit to complete field dimension, review space and delivery requirements for optional external signage. | NSP |
| C.3.3.a – OPTION: Detail Drawings for Optional External Signage | Generate drawings in CAD of each typical optional external wayfinding element for review/approval by LOC. | |
| C.3.4.a – OPTION: Graphics | Deliver Electric Files and Proofs for Optional external signage | |
| C.3.5.a – OPTION: External Signage Samples, Prototypes and Mockups | Deliver prototypes for M-2, N-1, P-1, Q-1,R-1 | |
| C.3.7 – OPTION: External Wayfinding Signage Fabrication | Fabricate all optional external wayfinding signage as described in Section C.3.7 | |
| C.3.8.a – OPTION: Delivery – External Wayfinding Signage | Deliver all optional external wayfinding signage. | |
| C.3.9.a OPTION: Installation – External Wayfinding Signage | Install all optional external wayfinding signage. | |
| C.3.10.a Punch List for Optional External Signage | Deliver Punch List for Optional external signage to COR | |
| C.3.11.a OPTION: Operations Manual for External Signage | Deliver Operations Manual for Optional external signage to COR | |
| C.3.12.a – OPTION: One Year Warranty for External Signage | 1 year Warranty for Optional External signage | |
| Options Sub-Total | $ - 0 | |
| Base Requirements + Options Total | $ - 0 |
2. Price Detail Offeror shall provide details for how prices were derived for each deliverable, including, but not limited to services, labor categories and required hours.
| Labor Category/Material/Item | Units | Unit Amount | No. of Units | Total | Deliverable Total | ||
| C.3.3 Detail Drawings | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.4 Graphics | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.5 Material Samples, Prototypes and Mockups | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.6 Sign Fabrication – | |||||||
| Wayfinding Signage | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.8 Delivery | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.9 Installation | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.10 Punch List | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.11 Operations Manual | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.12 One Year Warranty | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| BASE REQUIREMENTS SUB-TOTAL: | $ - 0 | ||||||
| C.3.3.a – OPTION: Detail Drawings for Optional External Signage | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.4.a – OPTION: Graphics | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.5.a – OPTION: External Signage Samples, Prototypes and Mockups | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.7 – OPTION: External Wayfinding Signage Fabrication | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.8.a – OPTION: Delivery – External Wayfinding Signage | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.9.a OPTION: Installation – External Wayfinding Signage | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.10.a Punch List for Optional External Signage | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.11.a OPTION: Operations Manual for External Signage | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| C.3.12.a – OPTION: One Year Warranty for External Signage | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | ||||||
| OPTIONS SUB-TOTAL: | $ - 0 | ||||||
| BASE REQUIREMENTS + OPTIONS TOTAL: | $ - 0 |
File details come from the government source that posted it. Updated .