J-4 - Internal Cryogenics - SOW 07-10-2024.pdf
PDF 2 MB Posted
- Attached to
- LBNF Internal Cryogenics
- Solicitation number
- LBNF-357777-JD
About this file
This document is a Statement of Work (SOW) for the Internal Cryogenics piping systems for the first two cryostats of the Long-Baseline Neutrino Facility (LBNF) project. The successful bidder shall engineer, manufacture, pack, and deliver 30 vacuum insulated and uninsulated cryogenic transfer lines and their supports to the project warehouse near the Sanford Underground Research Facility in South Dakota.
The scope includes piping systems to transfer liquid and gaseous argon inside the cryostats for purging, cooling, filling, and recirculating the liquid argon, as well as venting boil-off gas. The SOW outlines the technical requirements, interface requirements, manufacturing and assembly requirements, shipping, examinations, inspections, and tests. It also lists the deliverables for the engineering phase, Option #1 manufacturing for the VD cryostat, and Option #2 manufacturing for the HD cryostat. The project is being managed by the Department of Energy's Fermi National Accelerator Laboratory.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US
LBNF/DUNE-US
Internal Cryogenics
Scope of Work and Performance
Specification
Document Number: EDMS 2211972
Mark Adamowski
Lead Cryogenics System Engineer
Matt Maciazka
Cryogenics System Engineer
David Montanari
LBNF FDC Cryogenics Project Manager
Internal Cryogenics Scope of Work and Performance Specification
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page ii
Document Approvals
Signatures Required Signature & Date Approved
Originator: Matt Maciazka Cryogenics Systems Engineer
Approver: Jeremy Duncan Procurement Responsible Person
Approver: Jolie Macier LBNF FDC Project Manager
Approver: David Montanari LBNF FDC Cryogenics Project Manager
Approver: Mark Adamowski Lead Cryogenics Systems Engineer
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page iii
Revision History and Version Control
This version of the document may not be the current or approved revision. The current revision is maintained in the LBNF/DUNE Document Management System (DocDB) or the Engineering & Equipment Data Management Service (EDMS) where internal Project document approvals are managed. DocDB can be accessed through the web by authorized users (https://docs.dunescience.org/), and EDMS can be accessed through the web at https://edms.cern.ch. This document can be identified by the revision date as indicated in the Version Control Table below.
The current, approved version is always available in DocDB or EDMS.
Author Revision Date
Location (EDMS) Description of Changes
Kevin Haaf 08/10/21 Original
David Montanari 06/22/21 General comments
Kevin Haaf 09/01/22 Updates to major sections
Matt Maciazka 07/27/23 2211972 v.5 Updates, new template
Matt Maciazka 12/27/23 GAr Purge Line descoping
Matt Maciazka 04/11/24 2211972 v.6 Document name change for RFP release.
Minor editorial changes.
Appendix list update.
David Montanari 07/09/24 Comments
Matt Maciazka 07/10/24 2211972 v.7
Exclusive use of HD (FD-1) and VD (FD-2) names for the cryostats instead of “first” and “second”.
Figures update.
Not applicable tests deleted.
Language polished.
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page iv
Table of Contents
Document Approvals .................................................................................................................................... ii
Revision History and Version Control .......................................................................................................... iii
List of Figures .............................................................................................................................................. vii
List of Tables .............................................................................................................................................. viii
Acronyms and Abbreviations ....................................................................................................................... ix
1 Scope of the Document ..................................................................................................................... 1-1
2 Terms Used in the Document ............................................................................................................ 2-1
3 Applicable Codes and Standards ........................................................................................................ 3-1
4 Introduction ....................................................................................................................................... 4-3
5 Scope of the Supply............................................................................................................................ 5-3
5.1 Scope of the Supply Structure ................................................................................................... 5-4
5.2 Additional Requirements for the Scope ..................................................................................... 5-5
6 General Description ........................................................................................................................... 6-6
6.1 Modes of Operation ................................................................................................................... 6-6
7 General Requirements ....................................................................................................................... 7-9
7.1 LAr Distribution Requirements ................................................................................................ 7-10
7.2 External Supports (LAr Distribution) ........................................................................................ 7-11
7.3 External Supports (Cooldown) ................................................................................................. 7-14
8 Interface Requirements ................................................................................................................... 8-15
9 Other Requirements ........................................................................................................................ 9-16
9.1 Mechanical ............................................................................................................................... 9-16
9.2 Flexible Elements in Pipes ........................................................................................................ 9-16
9.3 Thermal Isolation ..................................................................................................................... 9-16
9.4 MLI Use .................................................................................................................................... 9-19
9.5 Leak Tightness .......................................................................................................................... 9-20
9.6 Materials .................................................................................................................................. 9-20
10 Manufacturing and Assembly Requirements ............................................................................ 10-21
10.1 Manufacturing ....................................................................................................................... 10-21
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page v
10.2 Welding .................................................................................................................................. 10-21
10.3 Tube and Pipe Bending .......................................................................................................... 10-22
10.4 Cleaning .................................................................................................................................. 10-22
11 Shipping ...................................................................................................................................... 11-22
12 Examinations, Inspections, Tests ............................................................................................... 12-23
12.1 General ................................................................................................................................... 12-23
12.2 Non-Destructive Tests of Welds ............................................................................................ 12-25
12.3 Helium Leak Tightness Tests .................................................................................................. 12-26
12.3.1 General ........................................................................................................................... 12-26
12.3.2 From the Atmosphere to Insulation Vacuum ................................................................ 12-26
12.3.3 From Process Pipes to Insulation Vacuum ..................................................................... 12-26
12.3.4 From the Atmosphere to Process Pipes ......................................................................... 12-27
12.4 Cold Test................................................................................................................................. 12-27
12.5 Pressure Test .......................................................................................................................... 12-27
12.6 Cleanliness Control ................................................................................................................ 12-28
12.7 Dimensional Control .............................................................................................................. 12-28
12.8 Factory Acceptance ................................................................................................................ 12-28
12.9 Transport Accelerations ......................................................................................................... 12-28
12.10 Factory Outlet Inspection .................................................................................................. 12-29
12.11 FRA Incoming Inspection (at SURF) .................................................................................... 12-29
13 Deliverables for the Kick-Off Meeting........................................................................................ 13-30
14 Deliverables for Engineering Phase ........................................................................................... 14-30
15 Deliverables for Option #1 Manufacturing ................................................................................ 15-31
16 Deliverables for Option #2 Manufacturing ................................................................................ 16-31
Appendix A – Weight and Dimensions Limit for Transport ..................................................................... 16-1
Appendix B – Internal Cryogenics 3D Model and Drawings .................................................................... 16-1
Appendix C – Internal Cryogenics Interfaces ........................................................................................... 16-1
Appendix D – LBNF Cryostat Penetrations ............................................................................................... 16-1
Appendix E – LBNF P&ID .......................................................................................................................... 16-1
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page vi
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page vii
List of Figures
Figure 6-1: 3D view of the LAr Recirculation distribution networks .......................................................... 6-7 Figure 6-2: 3D view of the Cooldown manifolds (blue lines) within the first cryostat .............................. 6-8 Figure 6-3: Zoom in of the P&ID of the GAr Purge and LAr Distribution for the LBNF cryostats (shown on the VD) ....................................................................................................................................................... 6-8 Figure 6-4: Zoom in of the P&ID of the Cooldown Manifolds for the LBNF HD Cryostat .......................... 6-8 Figure 7-1: LAr recirculation pipe penetrations on the HD cryostat (with red arrows pointing to them) .. 7- Figure 7-2: Cryostat walls and floor membrane visualization ................................................................. 7-13 Figure 7-3: Cooldown penetrations into the second cryostat (circled in light blue) ............................... 7-14 Figure 7-4: Pipe routing for Cooldown Manifolds (shown in blue).......................................................... 7-15 Figure 7-5: Example of cross-beam element to be used to support the Cooldown manifold................. 7-15
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page viii
List of Tables
Table 6-1: Modes of operation .................................................................................................................. 6-6 Table 9-1: Maximum allowable heat leaks for cryogenic vacuum insulated pipes ................................. 9-16 Table 9-2: Vacuum levels in an insulation vacuum jacket (vacuum jacket) ............................................. 9-17 Table 9-3: Vacuum vessel pressure range ............................................................................................... 9-18 Table 9-4: Maximum acceptable helium leak rates ................................................................................. 9-20 Table 12-1: Minimum control point for manufacturing and installation of the supply ........................ 12-24
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page ix
Acronyms and Abbreviations
Acronym Definition
AACEI AACE International (Formerly the Association for the Advancement of Cost Engineering)
ACI American Concrete Institute
ANSI American National Standards Institute
APA Anode Plane Assembly
API American Petroleum Institute
ASCE American Society of Civil Engineers
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
AUP Authorization for Use and Possession
BPVC Boiler and Pressure Vessel Code (ASME)
CAD Computer-Aided Design
CGA Compressed Gas Association
CFR Code of Federal Regulation
CUC Central Utility Cavern
DOE Department of Energy
DUNE Deep Underground Neutrino Experiment
DXF Data Exchange Format
EJMA Expansion Joint Manufacturers Association
EN European Norm
ES&H Environment Safety & Health
ESH Environment Safety and Health
EVMS Earn Value Management System
FAT Factory Acceptance Tests
FD-1 Far Detector 1
FD-2 Far Detector 2
FDC Far Detectors & Cryogenics
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page x
Acronym Definition
FDR Final Design Review
FEA Finite Element Analysis
FEED Front-End Engineering Design
FMEA Failure Mode and Effect Analysis
FRA Fermi Research Alliance LLC
FSCF Far Site Conventional Facilities
FSF Far Site Facilities
GAr Gaseous Argon
GAN Gaseous Nitrogen
GC General Contractor
GN2 Gaseous Nitrogen
HAZOP Hazard and Operability Analysis
HP Hold Point
IC Installation Coordinator
IEC International Electric Code
IEEE Institute of Electrical and Electronics Engineers
IKC In-Kind Contribution
IRR Installation Readiness Review
ISA International Society of Automation
ISO International Standards Organization
LAr Liquid Argon
LBNF Long-Baseline Neutrino Facility
LBNF/DUNE-US Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment-United States – Refers to the US DOE line-item project
LIN Liquid Nitrogen
LN2 Liquid Nitrogen
MIP Manufacturing and Inspection Plan
MLI Multi-Layer Insulation
MS Microsoft
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page xi
Acronym Definition
MTBF Mean Time Between Failures
MTTF Mean Time to Failure
MTTR Mean Time to Repair
NB National Board of Boiler and Pressure Vessels Inspectors
NEC National Electric Code
NEMA National Electrical Manufacturers Association
NET No-Earlier-Than
NFPA National Fire Protection Association
NIST National Institute for Standards and Technology
NLT No-Later-Than
NP Notification Point
NTP Notice To Proceed
NWD Navisworks Document
OEM Original Equipment Manufacturer
OSHA Occupational Safety and Health Administration
PDF Portable Data Format
PDR Preliminary Design Review
PED Pressure Equipment Directive
PFD Process Flow Diagram
PLC Programmable Logic Controller
PRR Production Readiness Review
P&ID Piping and Instrumentation Diagram
QA Quality Assurance
QC Quality Control
QM Quality Manual
RFP Request for Proposals
SCADA Supervisory Control and Data Acquisition
SDSTA South Dakota Science and Technology Authority
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US Page xii
Acronym Definition
SLD Single Line Diagram
SLIN Subcontract Line Item Number
SOW Statement of Work
SPVD Simple Pressure Vessel Directive
STEP Standard for the Exchange of Product Data
SURF Sanford Underground Research Facility
T&C Terms and Conditions
UL Underwriters Laboratories
V&I Valves and Instruments
VIP Vacuum Insulated Pipe
VJ Vacuum-Jacketed
Scope of Work and Performance Specification Scope of the Document
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 3-1
1 Scope of the Document
This document defines the Scope of Work for the Internal Piping for the first two cryostats as part of the Long-Baseline Neutrino Facility (LBNF). Exceptions to these specifications shall not be permitted, except by written approval from FRA.
2 Terms Used in the Document
The following terms define provisions within this document. “May” indicates a condition is neither required nor prohibited. “Should” indicates a recommended provision as good practice but is not a requirement. “Shall” indicates a requirement.
Engineering and Construction Codes will be referred to as Codes to refer collectively to various safety standards the scope shall comply with. This will be reflective of both American and International Codes, depending on the applicable Code used by the Subcontractor’s governing body.
3 Applicable Codes and Standards
Below are codes, standards, and directives to which the Subcontractor shall adhere, and which shall be applied to the engineering, manufacturing, assembly, and testing of the system subject to this Statement of Work (SOW). All the codes, standards, and directives are intended to be used in their latest published edition at the time of engineering, and include, but are not limited to:
ACI 318 Building Code Requirements for Structural Concrete and Commentary
ALPEMA standards
ANSI ASC A14.3 Safety Requirements for Fixed Ladders
ANSI/ASSE A1264.1 Safety Requirements for Workplace Surfaces
ANSI/ISA-5.1 Instrumentation Symbols and Identification
ANSI/ISA-75.01.01 Flow Equations for Sizing Control Valves
API 520 Sizing, Selection, and Installation of Pressure-reliving Devices
API 521 Pressure-relieving and Depressuring Systems
API 526 Flanged Steel Pressure-relief Valves
API RP 615 Valve Selection Guide
ASCE/SEI 7 Minimum Design Loads for Buildings & Other Structures
ASME B30.20 Below-the-Hook Lifting Devices
ASME B30.26 Rigging Hardware
ASME B30.9 Slings
ASME B31.3 Process Piping
ASME B31E Standard for the Seismic Design and Retrofit of Above-Ground Piping Systems
ASME BPVC Boiler and Pressure Vessel Code
ASME BTH-1 Design of Below-the-Hook Lifting Devices
Scope of Work and Performance Specification Applicable Codes and Standards
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 3-2
ASME Y14.100 Engineering Drawing Practices
ASME Y14.5M Dimensioning Tolerance Code
ASTM E2734/E2734M Standard Specification for Dimensions of Knife-Edge Flanges
ASTM A380 Standard Practice for Cleaning, Descaling, and Passivation of Stainless Steel Parts, Equipment, and Systems
ASTM E493 Standard Test Methods for Leaks Using the Mass Spectrometer Leak Detector in the Inside-Out Testing Mode
ASTM E498 Standard Test Methods for Leaks Using the Mass Spectrometer Leak Detector or Residual Gas Analyzer in the Tracer Probe Mode
ASTM E499 Standard Test Methods for Leaks Using the Mass Spectrometer Leak Detector in the Detector Probe Mode
CGA S-1.3 Pressure Relief Standards
CGA G-4.1 Cleaning Equipment for Oxygen Service, Seventh Edition
EN 12300 Cryogenic vessels. Cleanliness for cryogenic service
EN 60534-2 Industrial Process Control Valves
EN 61508 Functional safety of electrical/electronic/ programmable electronic safety-related systems
EJMA standards
IEC 61511 Functional safety - Safety instrumented systems for the process industry sector
IEEE 315 Graphics Symbols for Electrical and Electronics Diagrams (Including Reference Designation Letters)
ISA-75.01.01 Industrial-Process Control Valves
ISA 84.00.01 Functional Safety: Safety Instrumented Systems for the Process Industry Sector
ISA-S20 Specification Forms for Process Measurement and Control Instruments, Primary Elements, and Control Valves
ISA-S5.4 Instrument Loop Diagrams
ISO 23208 Cryogenic vessels - Cleanliness for cryogenic service
ISO 28921-1 Industrial valves. Isolating valves for low-temperature applications - Design, manufacturing, and production testing
ISO 3669 Vacuum technology. Dimensions of knife-edge flanges
NFPA 70E National Electric Code (NEC)
OSHA Standard 1910 General Industry Regulation
OSHA Standard 1926 Safety and Health Regulations for Construction
UL 471 Commercial Refrigerators and Freezers
UL 61010-2-011 Safety Requirements for Electrical Equipment for Measurement, Control, and Laboratory Use - Part 2-011: Particular Requirements for Refrigerating Equipment
UL 508A Industrial Control Panels
Scope of Work and Performance Specification Introduction
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 5-3
The Subcontractor may propose other recognized standards. Their application is subject to prior written approval by Fermi Research Alliance (FRA). In such cases, the Subcontractor shall submit all the necessary documentation for approval to FRA. FRA, at its discretion, reserves the right to veto the use of certain codes or standards, in part or whole. In no event will FRA be responsible for schedule delays or cost increases associated with the review and evaluation of alternative codes or standards proposed by the Subcontractor.
The International Electric Code (IEC) may be used if supporting documentation is provided to prove an equivalent or greater level of safety to that afforded by NFPA 70E NEC. The use of IEC shall be approved by FRA.
4 Introduction
LBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD.
The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.
5 Scope of the Supply
The Internal Cryogenics serves to transfer liquid and gaseous argon (LAr and GAr, respectively) inside the cryostats for the purposes of purging them of their native atmospheres, cooling them down, filling them with LAr, and recirculating that LAr from dedicated purification equipment outside the scope of this supply. In addition, they serve to transfer the boil-off GAr outside the cryostat for normal recondensation inside the argon condensers and vent in case of a pressure rise over the allowable limit.
The successful bidder (hereafter referred to as the “Subcontractor”) shall engineer, manufacture, pack and deliver the Internal cryogenics piping systems for the first two of the LBNF cryostats (hereafter referred to, in whole or in part, as the “supply”) to the project warehouse in the vicinity of the Sanford Underground Research Facility (SURF) in Lead, SD.
The project consists of thirty (30) vacuum insulated and uninsulated cryogenic transfer lines and their supports to the cryostat as defined in this technical specification, and the documents and drawings attached to it.
Scope of Work and Performance Specification Scope of the Supply
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 5-4
5.1 Scope of the Supply Structure
The Internal Cryogenics acquisition is broken down into a Base Subcontract with two Options, as follows:
Base Subcontract
The Base Subcontract includes the detailed engineering for the internal cryogenics for each of the first two (2) LBNF cryostats. The VD (FD-2) cryostat’s internal cryogenics consists of:
1. Two (2) LAr distribution manifolds, each with two (2) branches, also running along the bottom of the cryostat.
2. A single (1) LAr pipe from the top of the cryostat.
3. Two (2) GAr boiloff lines.
4. External supports for items above.
The HD (FD-1) cryostat’s internal cryogenics consists of the following:
5. A series of twenty (20) cooldown manifolds distributed along the top of the cryostat. Each manifold terminates with a special spray nozzle to distribute atomized LAr toward the center of the cryostat.
Additionally, some manifolds branch into two paths before terminating with the spray nozzle.
6. Two (2) LAr distribution manifolds, each with two (2) branches, also running along the bottom of the cryostat.
7. A single (1) LAr pipe from the top of the cryostat.
8. Two (2) GAr boiloff lines.
9. External supports for items above.
Option #1
The Option #1 Subcontract SOW is the procurement of materials and manufacturing of the Internal Cryogenics subsystem for the VD (FD-2) cryostat. It also includes the testing of the fabricated items per applicable codes and standards and in accordance with the specifications, and the delivery of equipment to SURF.
The extent of the work is the engineering, procurement of materials, manufacturing, manufacturing drawings, factory inspection and testing, documentation, packing, transport, and delivery to SURF for the VD cryostat’s Internal Cryogenics and its support as described in this SOW.
Upon completion of Final Acceptance tests, a two (2) year warranty against materials and workmanship defects shall commence.
Scope of Work and Performance Specification Scope of the Supply
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 5-5
Option #2
The Option #2 Subcontract SOW is the procurement of materials and manufacturing of the Internal Cryogenics subsystem for the HD (FD-1) cryostat. It also includes the testing of the fabricated items per applicable codes and standards and in accordance with the specifications, and the delivery of equipment to SURF.
The extent of the work is the engineering, procurement of materials, manufacturing, manufacturing drawings, factory inspection and testing, documentation, packing, transport, and delivery to SURF for the HD cryostat’s Internal Cryogenics and its support as described in this SOW.
Upon completion of Final Acceptance tests, a two (2) year warranty against materials and workmanship defects shall commence.
5.2 Additional Requirements for the Scope
Additional requirements for the scope are outlined below:
1. The Subcontractor shall furnish all facilities, equipment, special tooling, consumables, materials, and labor for the work described in this SOW except where explicitly excluded in this and related documentation.
2. The Subcontractor shall provide all materials and labor for engineering, analysis, manufacturing, validation, and delivery of the supply.
3. The Subcontractor shall provide detailed, signed, certified shop drawings that meet the requirements referenced in Section 3.
4. The Subcontractor shall perform stress and thermal analyses for the supply to verify the code and performance requirements.
5. The Subcontractor shall provide the complete technical documentation for the supply, including individual technical items and elements.
6. All engineering analyses, engineering models, and manufacturing drawings shall be subject to approval by FRA.
7. The Subcontractor shall conduct all tests, inspections, examinations, material tests, and non-destructive examinations required by the applicable codes and perform any resulting repairs or replacements.
8. The Subcontractor shall furnish all parts deemed necessary during the installation process, including spare parts for non-reusable items (e.g., gaskets for Conflat Flanges).
9. FRA (or its designated representative agent) reserves the right to witness and inspect any part during the fabrication, assembly, and testing at the Subcontractor or Subcontractor’s suppliers / sub-Subcontractors’ site with as little as one day’s notice.
Scope of Work and Performance Specification General Description
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 6-6
6 General Description
The internal cryogenics piping is responsible for circulating GAr and LAr within the cryostat itself, in order to purge the vessel of its initial atmosphere, cool it to cryogenic temperatures, fill it, and circulate purified LAr back into the cryostat throughout the life of the experiment. The supply also accommodates the circulation of boil-off gas out of the cryostat and relieve over and under-pressure conditions as necessary.
This scope includes those transfer pipe networks required for each of the operational modes of the experiment. For the purposes of this Statement of Work, the pipe networks shown in Figure 6-1, Figure 6-2, and referenced in the appendices are the maximum size envelopes that can be used in the final design. These spaces shall not be exceeded by the Subcontractor.
6.1 Modes of Operation
The cryogenic systems at LBNF function in a variety of operational modes at all phases of the experiment lifecycle (note that all but the Cooldown mode are common for both cryostats; the VD cryostat does not require an initial Cooldown phase and is instead filled directly with LAr). These modes are described in Table 6-1.
Table 6-1: Modes of operation
Mode Name Description
GAr Purge and Circulation
Initially, each cryostat will be filled with air, which shall be removed by means of a “piston purge”, a relatively slow flow of warm GAr originating from the bottom of the cryostat, which pushes impurities to the top of the vessel and out to be vented. Following the initial purge, the loop is closed, with GAr sweeping impurities from the bottom to the top of the cryostat and out to a dedicated purification system. The re-purified argon is subsequently reintroduced to the bottom of the cryostat until the contaminant levels are reduced to sub-ppm levels. This GAr circulation within the cryostats is handled entirely by one of the LAr Recirculation lines, shown in in Figure 6-1.
Cryostat Cooldown
The HD cryostat and detector must be cooled in a controlled manner—to this end, purified LAr is introduced at the top of the cryostat to be circulated within the vessel. The Cooldown manifolds for the HD cryostat are shown in Figure 6-2; isometric drawings are included in Appendix B. The VD cryostat does not feature this mode (and consequently lacks the Cooldown manifolds as well).
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 6-7
Mode Name Description
Cryostat Filling and Steady State Operations
Once the cryostat and detector are cooled to roughly 90 K, they may be filled with purified LAr. The filling of each cryostat varies in duration, from eight to fourteen months depending on the cooling power available. Once filled, each cryostat proceeds to the primary operational phase of the experiment.
During this time, the cryostats’ LAr must be continually re-circulated through the purification system by means of external pumps (not part of the Supply).
Initially, two pumps per cryostat are used to circulate a large flow through the purification skids; this flow is maintained until the required argon purity level is achieved, at which time the flow (and therefore the number of pumps in operation) is reduced. Boiloff gas is concurrently recondensed in the condensers above the cryostat and combined with the recirculation flow prior to purification, with the total flow reintroduced into the cryostat at the bottom. The circulation of LAr into each cryostat are handled by their two LAr distribution headers, shown in blue in Figure 6-1.
Figure 6-1: 3D view of the LAr Recirculation distribution networks
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 6-8
Figure 6-2: 3D view of the Cooldown manifolds (blue lines) within the HD cryostat
The pertinent sections of the LBNF P&ID are shown in Figure 6-3 and Figure 6-4. The full P&ID is available as Appendix E.
Figure 6-3: Zoom in of the P&ID of the GAr Purge and LAr Distribution for the LBNF cryostats (shown on the VD)
Figure 6-4: Zoom in of the P&ID of the Cooldown Manifolds for the LBNF HD Cryostat
Scope of Work and Performance Specification General Requirements
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 7-9
In addition to the piping required for the modes of operation outlined above, this scope also includes an emergency LAr Return line used to drain LAr from the condensers above the cryostat in the event of power failure, the boil-off lines that serve to provide a normal outlet for the GAr to the condensers, and the pipes within the cryostats that serve the pressure relief devices that protect against unacceptable pressure conditions within the vessel. These three networks are small lengths within the cryostat, and their envelopes are shown in Appendix B.
Appendix C lists all of the transfer lines required for this supply, along with their pertinent fluid parameters.
7 General Requirements
Each piping system shall:
Distribute either GAr or LAr from the Infrastructure cryogenics subsystem during the various modes of operation as described above.
− The LAr Distribution manifolds shall have distribution points penetrated along their horizontal runs to evenly distribute LAr and GAr into the cryostats during operations.
− The Cooldown manifolds within the HD cryostat terminate in TPU Unijet Hydraulic Flat Spray, size 70 atomizing spray nozzles from Spraying Systems Co. (Part number 1/4HHSJ- SS6013). There shall be five such nozzles evenly spaced along each manifold near the cryostat center, each pointed horizontally towards the vessel’s centerline.
Each piping system shall have vacuum insulation at heights of 0.55 m relative to the floor of the cryostat. Below that height, the piping manifolds shall be uninsulated.
The thermal contraction of the different materials used at low temperature, whenever giving rise to unacceptable stresses, loads and deformations, shall be compensated by the use of appropriate components and supporting or fixation, systems. These supports shall:
LAr Distribution (horizontal, on the floor): Be supported from the floor of the cryostat by means of pads and/or other supports that are part of this technical specification and supply.
The supports shall include a Teflon layer underneath to avoid scratching the metal that constitutes the floor of the cryostat (SS 304L). They shall also include a Teflon layer where they are in contact with the pipes to avoid scratching them, as well as allowing them to slide to account for their thermal expansion and contraction. Special concerns for these supports are outlined in the External Supports subsection of this scope. No welding is permitted to the floor of the cryostat, only to the top and bottom corners. These are further described in Section 7.2.
LAr Distribution (vertical): Be supported from the side of the cryostat by means of pads and/or other supports that are part of this technical specification and supply. The supports shall include a Teflon layer underneath to avoid scratching the metal that constitutes the wall of the cryostat (SS 304L). They shall also include a Teflon layer where they are in contact with the pipes to
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 7-10 avoid scratching them, as well as allowing them to slide to account for their thermal expansion and contraction. Special concerns for these supports are outlined in the External Supports subsection of this scope. No welding is permitted to the side of the cryostat, only to the top and bottom corners. Additional supports for the horizontal parts of the expansion loops (C-shaped portions) may be supported from special M10 threaded connections in the ceiling (close to the top corners).
Cooldown manifolds: The cooldown piping may rest against support beams that carry the detector modules. These beams span the length of the cryostat and shall be made available to simply support the cooldown manifolds. The supports shall include a Teflon layer where they are in contact with the pipes to avoid scratching them, as well as allowing them to slide to account for their thermal expansion and contraction.
No welding is permitted to the side, ceiling, and floor of the cryostat, only to the top and bottom corners.
7.1 LAr Distribution Requirements
The LAr Recirculation piping is divided into two networks. The LAr Recirculation networks main sections span nearly the length of the cryostat on its floor. Both networks, however, enter the cryostat at discrete points on the roof of the cryostat, as shown in Figure 7-1.
Figure 7-1: LAr recirculation pipe penetrations on the HD cryostat (with red arrows pointing to them)
Each of these two piping systems shall be vacuum jacketed within the cryostat at heights exceeding 0.55 m above the vessel floor. Below that height the piping shall be uninsulated. The horizontal runs of the piping systems (at the floor of the cryostats) shall be uninsulated as well. The subcontractor shall employ appropriate means (e.g., flex components or similar) to reduce stresses within the pipe systems and eliminate the potential for the vertical runs to lift any horizontal piping from their supports at the bottom of the cryostat. The subcontractor shall provide stress and deflection analyses to support the design for FRA approval.
Both networks (two LAr Recirculation) shall be directed as shown in Appendix B. The LAr Recirculation networks shall each be split into two sections at the floor, with one leg from each section directed towards
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 7-11 the cryostats’ long edges. Both pipe networks then span the length of the cryostat, terminating about 1 m from the short edge opposite their entrance penetrations.
The sizes of the vertical and horizontal runs for each network are included in Appendix C. The appendix specifies two different pipe envelopes for LAr recirculation networks. The first envelope size refers to the vertical section and manifold (spanning the cryostat short edge) for each network. The second envelope refers to the long horizontal runs that tap from the primary manifold. These envelopes represent the maximum possible pipe size for the respective pipe runs; in all cases, the Supplier is responsible for sizing the pipes based on the flow rates and supply pressures to the pipe networks.
Both pipe networks at the cryostat floor shall have their centerlines at 180 mm above the cryostat floor, irrespective of pipe size. Each secondary pipe (the four total LAr Recirculation pipes that span the length of the cryostat) shall have orifices every 0.25 m along their length penetrated into their underside to distribute their contents evenly throughout the vessel. The subcontractor shall provide flow calculations for each network subject to FRA approval showing the pressure drop through the systems and expected flow through each orifice. Care shall be taken in the sizing of these orifices to ensure the most even flow possible during the appropriate operational modes (i.e., the steady state operations of the cryostat for the LAr Distribution headers).
7.2 External Supports (LAr Distribution)
The long runs of horizontal pipe at the cryostats’ floors require several simple supports distributed along their lengths. These supports shall allow the pipes to contract freely as the internal temperature of the vessel decreases. Care in the support placement shall be taken to avoid allowing the pipes to slide from the supports as they contract.
The Subcontractor shall use structural supports that are designed to withstand all the loads for all modes of operations from the transfer lines to the support brackets to the stainless steel membrane corner pieces, and from the transfer liners to the floor of the cryostats. There shall not be any permanent deformations. The Subcontractor shall submit to FRA all loads for all conditions that the transfer lines may transfer to the supports. The design of the supports (including the support brackets) shall be such to minimize the loads transferred, especially the momenta.
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 7-12
The Subcontractor shall ensure that all the necessary calculations are performed to verify that:
The overall stresses remain within acceptable values as specified in the chosen applicable standards with all loads applied, including the deformation of the pipes with temperature and pressure.
The displacements of the various manifolds with respect to each other with all loads applied are within acceptable limits (contacts between VJs of different manifolds and VJs and other uninsulated process pipes are not accepted).
The pipes can freely slide in the top supports to avoid adding unnecessary loads to the supports themselves, including the support brackets.
The pipes can freely slide over the side supports to avoid adding unnecessary loads to the supports themselves, including the support brackets.
The pipes can freely slide over the bottom supports to avoid adding unnecessary loads to the supports themselves, including the support brackets. Due to the thermal contraction of the vertical runs, the bottom manifolds will tend to lift and detach from the bottom supports. These items shall be designed in such a way to avoid the detachment of the pipes from the bottom supports.
The floor is made of a 1.2 mm metallic membrane with corrugations on a 0.34 m pitch to allow for thermal expansion and contraction. Each support shall be located inside square corrugations (Figure 7-2) measuring 0.34 m x 0.34 m. If a square shape is selected, each bottom support shall not exceed 200 mm x 200 mm. If a circular shape is selected, each bottom support shall not exceed 200 mm in diameter.
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 7-13
Figure 7-2: Cryostat walls and floor membrane visualization
If needed, the vertical runs can also be supported from the side wall. These structural supports, supplied by the Subcontractor, shall be designed to adequately accommodate all loads from the relevant internal cryogenics piping. These loads shall be transferred either to the cryostat floor or side via simple unidirectional supports, or, in the case of momenta, to the cryostat corners. The support design shall be such to minimize these transfer loads, with special care given to the momenta.
Any support scheme shall account for the thermal contraction of the internal piping. As the distribution manifolds for the LAr piping span nearly the length of the cryostat (see Figure 6-1), the thermal contractions will be large, that is, on the order of the corrugation pitch. The bottom support structures are prohibited from contacting the corrugations themselves, either due to the motion of the piping or their own thermal contraction. Therefore, the support structure shall not be free to move with the pipes as they contract. Note that in the given modes of operations the vacuum insulated pipes have two load cases:
Process pipe at cryogenic temperature and vacuum jacket at room temperature during the commissioning and throughout the fill (the part that is in the gas phase).
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 7-14
Process pipe and vacuum jacket at cryogenic temperature throughout the fill (the part already in the liquid phase) and during steady state operations.
Note that, whatever support structure is chosen, the center of each horizontal pipe run shall be 180 mm above the cryostat floor. Any component of the support structure for the LAr piping at the bottom of the cryostat that passes over a corrugation shall be at least 40 mm above the corrugation’s highest point.
The location of all supports shall be submitted to FRA for approval, along with supporting calculations and all loads transferred to the cryostat. Note that it is preferable that the loads be taken by the ports identified in Figure 7-1 if possible.
The Subcontractor shall also take into account that the position of the external supports has an influence on the natural frequencies of the system and therefore an impact on the system response to transport accelerations, seismic and flow induced vibrations.
7.3 External Supports (Cooldown)
The cooldown piping for the HD cryostat enters the vessel by means of twenty penetrations along its long edges, as shown in Figure 7-3 and detailed in Appendix D.
Figure 7-3: Cooldown penetrations into the HD cryostat (circled in light blue)
From these penetrations, the Cooldown manifolds are routed towards the cryostat’s center. An example of this routing is shown in Figure 7-4, however, final routing shall be designed by the Subcontractor and approved by the FRA. Each pipe is routed such that it may be supported on one of the cross-beams that hold the detector aloft (see Figure 7-5 for an example). The load on the support beam should be no more than 165 lbf (75 kg) per pipe.
Scope of Work and Performance Specification Interface Requirements
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 8-15
Figure 7-4: Possible pipe routing for Cooldown Manifolds (shown in blue)
Figure 7-5: Example of cross-beam element to be used to support the Cooldown manifold
8 Interface Requirements
The supply primarily interfaces with the LBNF cryostat, though it shall also accept LAr and GAr as appropriate from piping systems outside the cryostat that are themselves beyond the scope of this document. With respect to the cryostat interfaces, the supply shall be subject to the requirements outlined below:
The connections to the cryostat shall be of the flanged type (standard CF flange type). For each transfer line, there shall be a CF on the outside of the outer vacuum jacket (or the process pipe if uninsulated) to connect to a mating flange on the cryostat port. The Internal Cryogenics pipes all have connections to the Infrastructure Cryogenics piping outside of the vessels, with a vacuum break outside the cryostat.
Most connections within the cryostat (i.e., process pipe connections to a manifold or a straight pipe segment) shall be welded. Exempt from welding are the horizontal runs of the LAr Recirculation systems (located near the cryostat floor), which shall be interconnected using Conflat Flanges (CF).
Scope of Work and Performance Specification Other Requirements
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 9-16
9 Other Requirements
9.1 Mechanical
1. All piping shall have adequate flexibility for all design conditions.
2. Welded connections shall be used wherever possible, including all piping inside the cryostat, except for the horizontal runs of the LAr Recirculation systems.
3. Sections of the horizontal runs of the LAr Recirculation systems (located near the cryostat floor) shall be interconnected using Conflat Flanges (CF).
4. When gaskets are required, metal gaskets shall be used whenever possible.
1. Conflat Flanges (CF) shall be used on process pipes (vacuum insulated and uninsulated).
9.2 Flexible Elements in Pipes
1. Flexible hoses and bellows may be used within vacuum jacket insulation only. However:
2. Bellows should pass a receiving leak test to ensure they are leak-tight before welding.
3. The Subcontractor shall provide a plan to protect the bare convolutions of the bellows during welding, testing, and transport.
4. Unbraided bellows are not allowed; all bellows must have at least a single braid for protection.
2. Whenever possible, all hoses and bellow shall be welded. When not possible, hydroformed bellows are allowed subject to FRA approval.
3. Multiple layered bellows shall be engineered to have a vent hole between each layer to prevent trapped volume gas from over pressurization.
4. The Subcontractor should limit the usage of bellows and flexible hoses, promoting the use of flexibility analysis where possible.
9.3 Thermal Isolation
Cryogenic pipes shall be vacuum insulated, in combination with aluminized mylar, Multi-Layer Insulation (MLI), with no active mechanical pumping. The maximum allowable heat load on the process pipe surface of every vacuum-insulated cryogenic pipe, due to radiation and conduction through the supports, shall be less than maximum allowable heat leak given in the Table 9-1. No ice shall be visible on the outside of the vacuum insulation while in normal operation (with the process pipe carrying cryogenic fluid).
Table 9-1: Maximum allowable heat leaks for cryogenic vacuum insulated pipes
Pipe size, inch Heat leak
Process pipe Vacuum Jacket Btu/hr/ft W/m
0.5 2 1.71 0.50
Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE) - US 9-17
Pipe size, inch Heat leak
Process pipe Vacuum Jacket Btu/hr/ft W/m
1 3 2.22 0.65
1.5 3.5 2.90 0.85
2 4 3.92 1.15
3 5 5.97 1.75
4 6 7.68 2.25
6 8 10.24 3.00
The required vacuum levels in the insulation vacuum, also called vacuum jacket, are listed in Table 9-2.
The pumping ports shall be engineered to avoid the intake of any loose MLI. The installation of grids at the inlet of each pumping port is acceptable provided they do not compromise the pumping process by excessive pressure drop and that they are engineered to prevent blocking by MLI. Each vacuum space shall be equipped with an InstuTech Stinger convection vacuum gauge, part number CVM211GGL. Other devices are subject to written FRA approval.
The design of the internal assemblies shall allow for proper conductance during pumping operations.
Conductance holes in the internal supports shall be foreseen whenever deemed necessary to allow evacuation of the complete internal volume to reach the specified insulation vacuum pressures.
The maximum pumping speed shall be determined for transfer lines to avoid deterioration of MLI, taking into account the internal conductance and…