This is a requirements document for the refinishing and repair of gymnasium floors, specified as Attachment J-1503010-06. The work involves comprehensive restoration of a gymnasium floor including bleacher management, sanding, sealing, finishing, court markings, and cove base installation.
The contractor must retract existing basketball court bleachers fully before sanding to expose maximum floor area, with areas beneath retracted bleachers exempt from refinishing but requiring blended transitions. All layers of existing floor finish must be removed by sanding with dust control measures and daily disposal of sawdust. The sanding process requires a minimum of three passes using coarse, medium, and fine sandpaper, with the first or second pass applied at 45 degrees to the grain and subsequent passes following the grain direction. The final sanding must produce a smooth, scratch-free surface. The finishing system consists of two sealer coats and two finish coats applied in Commercial Grade Oil Base Polyurethane, with proper drying time and ventilation controls between applications. The contractor must restore all court markings including game lines, NCAA volleyball lines if applicable, Marine Corps emblems in center court, borders, and nomenclature using oil-based enamel paint approved for Commercial Grade Oil Base Polyurethane. The final installation includes new three-inch by four-inch vented cove base with mitered inside corners and pre-molded outside corners per manufacturer specifications. All work must comply with manufacturers' instructions for products and materials used throughout the process.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J-1503010-06
REQUIREMENTS FOR REFINISHING & REPAIR OF GYMNASIUM FLOORS
REPAIRS 1. The Contractor shall ensure existing bleachers on basketball court are in the fully retracted position exposing as much of floor as possible prior to sanding existing floor to raw wood.
a. The areas under the fully retracted bleacher shall not be required to be refinished.
b. The newly refinished floor shall be blended into the area that are not under bleachers section.
c. Contractor may use hand held sander and hand sanding to blend floor for smooth transition.
d. Contractor shall ensure the sealer and finishing products do not interfere with the existing bleacher rollers.
2. Contractor shall remove by sanding all layers of floor finish.
a. Contractor shall take all precautions to minimize the spreading of any dust particles created by this sanding.
b. Contractor is responsible for removing and properly disposing of all sawdust and litter on a daily basis.
c. Contractor shall if needed or desired, to cut off all air flow systems to gym flooring area.
3. Contractor shall repair any split boards or seriously damaged areas of the wood surface.
a. To be repaired as needed.
4. The gym flooring shall be sanded with a minimum of three cuts using coarse, medium, and fine sandpaper. The final sanding shall be performed with a screen and sanded and shall provide a smooth and even surface, free from scratches, drum stop marks, or gouges.
a. Either the first pass or the second pass of drum-type sander shall be at angle of forty-five (45) degrees to the grain, other passes of the drum-type sander shall be in the direction of the grain of strip flooring.
b. Finished edges not reached by the sander shall be performed within hand-held sander or by hand sanding.
5. Perform the final sanding at a time and in a manner that will permit immediate
a. Contractor shall ensure there is adequate ventilation and humidity application of the first seal coat as specified by sealer’s manufacturer’s specifications.
controls in the area to allow for proper drying.
b. Finish flooring in accordance with the Commercial Grade Oil Base Polyurethane finish shall consist of two (2) sealer coats and two (2) finish coats.
6. Contractor shall thoroughly clean floor surface prior to applying a liberal and uniform coat of penetrating sealer with the minimum coverage per manufactures instructions.
a. Contractor shall schedule proper drying time per manufacturer’s instructions.
b. Contractor shall use a clean lamb’s wool screen back disk pad or as recommended by sealer’s manufacturer’s instructions.
c. Buff with steel wool screen back disk pad or as recommended by sealers manufacturer’s instructions.
7. Contractor shall apply a second coat of sealer in same manner as the first coat and allow drying time to completely dry.
8. Vacuum and tack rag the floor in preparation for court layout.
9. Contractor shall re-apply per manufacturer’s instructions all name, logos, basketball court with NCAA volleyball game lines (if applicable).
a. Contractor shall use oil base enamel paint that is designed and approved by Commercial Grade Oil Base Polyurethane.
b. All game lines shall have distinct edges with no overlap and match existing lines.
c. Contractor shall paint Marine Corps emblem in center court, emblem to match existing (if applicable).
d. Contractor shall paint Boarder and nomenclature on boarder.
10. Contractor shall apply two
(2) coats of finish
a. Immediately before applying the first coat of finish, the court floor shall be thoroughly tack ragged giving particular attention to edges and corners.
b. Apply an even first coat of finish in accordance with the manufacturer’s instruction specifications.
ALLOW TO DRY
COMPLETELY.
c. Dry time completed lightly abrade with steel wool or screen to break the surface tension for bonding with the next finish coat.
d. Vacuum the whole gym floor, then double tack rag the floor.
Apply a second coat of finish in accordance with the finish manufacturer’s specifications. DO NOT ABRADE the final coat.
11. Contractor shall install new three (3) inch by four
(4) inch vented cove base per manufacturer’s instructions.
a. Contractor shall miter all inside corners.
b. Contractor shall use pre-molded outside corners.