J-0200000-13 ELINs.xlsx

XLSX spreadsheet 602 KB Posted

Attached to
Base Operations Support (BOS) Services for Naval Air Station (NAS) Key West, Florida and outlying areas.
Solicitation number
N69450-24-R-0020
Issued by

About this file

This document appears to be an Exhibit Line Item Numbers (ELINS) spreadsheet related to a federal contract opportunity. The solicitation is for Base Operations Support (BOS) Services at Naval Air Station Key West, Florida and outlying areas, and includes facility management, facility investment, pest control, utilities management, base support vehicles and equipment, and other related services.

The spreadsheet provides pricing details for recurring and non-recurring work under the contract, including labor categories, service orders, preventive maintenance, pest control, and other recurring services. Pricing is broken down by various customer locations and types of services. The contract includes a base period and two option periods. Key details include estimated quantities, unit of measure, and unit prices for the various line items. The contract appears to be open for negotiated task orders, with the government reserving the right to negotiate unit prices.

View the file

Other files

File Type Posted
N6945024R0020 JL-1_0003.xlsx XLSX spreadsheet
N6945024R0020 _SectionJ_0003.pdf PDF
N6945024R0020_Fire Protection Systems Inventory_0003.xlsx XLSX spreadsheet
N6945024R0020_0003.pdf PDF
J-0200000-13 ELINS_0003.xlsx XLSX spreadsheet
N6945024R0020_ConformedSectionB_0003.pdf PDF
N6945024R0020_0002.pdf PDF
N6945024R0020_JL-7 GPI Responses_0002.pdf PDF
J-0200000-13 ELINS_0002.xlsx XLSX spreadsheet
N6945024R0020_Fire Protection Systems Inventory_0002.xlsx XLSX spreadsheet
N6945024R0020_SectionJ_0002.pdf PDF
N6945024R0020_JL-1_Labor_Hours_0002.xlsx XLSX spreadsheet
N6945024R0020_SectionC_0002.pdf PDF
J-1502000-14 Equipment Assets Condition Ratings_0002.xlsx XLSX spreadsheet
N6945024R0020_JL-5_Site_Visit_Brief_0001.pdf PDF
N6945024R0020_JL-6_Site_Visit_Sign-In_Sheets_0001.pdf PDF
N6945024R0020_SectionC_0001.pdf PDF
N6945024R0020_0001.pdf PDF
DBA_WD_FL20240147.pdf PDF
N6945024R0020_Fire Protection Systems Inventory.xlsx XLSX spreadsheet
N6945024R0020.pdf PDF
N6945024R0020_JL-4_Site Visit Itinerary.pdf PDF
J-0200000-08 Maximo Direct Entry Procedures.docx DOCX document
DBA_WD_FL20240022 (Mod 2).pdf PDF
N6945024R0020_JM-2_PPQ.docx DOCX document
N6945024R0020_SectionF.pdf PDF
N6945024R0020_SectionC.pdf PDF
J-0200000-11_SPCC Plan.pdf PDF
N6945024R0020 JL-1_Labor_Hours.xlsx XLSX spreadsheet
N6945024R0020_JL-3_SECNAV5512.pdf.pdf PDF
N6945024R0020_SectionJ.pdf PDF
J-0200000-05 Service Provider Information.xlsx XLSX spreadsheet
N6945024R0020_JL-2_GPIF.xlsx XLSX spreadsheet
N6945024R0020_JM-1_Corporate Experience.docx DOCX document
SCA_WD_2015-4583(Rev.-26).pdf PDF
J-0200000-06 Asset Information.xlsx XLSX spreadsheet
J-0200000-10 Characteristic Meter Reading Information.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001 - RW Base Period

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation No.: N69450-24-R-0020
Line Item 0001 - Recurring Work - Base Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs A001 through A013
CustomerELINSub-ELINAnnex/Sub-annex
CategorySpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
CNICA001A001AA1501000Facility Management3.1Work Order Tracking12MO
CNICA001A001AB1501000Facility Management3.2NAVFAC MAXIMO Data Entry12MO
CNICA001A001AC1501000Facility Management3.3Infrastructure Condition Assessment Program (ICAP) Services12MO
CNICA001A001AD1502000Service Orders3.1.1Emergency Service Orders25EA
CNICA001A001AE1502000Service Orders3.1.2Urgent Service Orders30EA
CNICA001A001AF1502000Service Orders3.1.3Routine Service Orders50EA
CNICA001A001AG1502000Preventive Maintenance Program3.2.1HVAC and Refrigeration Systems12MO
CNICA001A001AH1502000Preventive Maintenance Program3.2.2Automatic Door Opener Systems12MO
CNICA001A001AJ1502000Preventive Maintenance Program3.2.3Vertical Transportation Equipment (VTE)12MO
CNICA001A001AK1502000Preventive Maintenance Program3.2.4Fire Protection Systems12MO
CNICA001A001AL1502000Inspection, Testing and Certification Program3.3.1Vertical Transportation Equipment (VTE)12MO
CNICA001A001AM1502000Other Recurring Services Program3.4.1Exhaust Hoods and Ducts12MO
CNICA001A001AN1502000Other Recurring Services Program3.4.2Treatment, Sampling and Testing Services Program12MO
CNICA001A001AP1503020Pest Control3.1Scheduled Pest Control Services12MO
CNICA001A001AQ1503020Pest Control3.2Pest Control Service Orders70EA
CNICA001A001AR1503020Pest Control3.3Pest Management Reporting12MO
ARMY SFA002A002AA1502000Service Orders3.1.1Emergency Service Orders12EA
ARMY SFA002A002AB1502000Service Orders3.1.2Urgent Service Orders12EA
ARMY SFA002A002AC1502000Service Orders3.1.3Routine Service Orders15EA
ARMY SFA002A002AD1502000Preventive Maintenance Program3.2.3Vertical Transportation Equipment (VTE)12MO
ARMY SFA002A002AF1502000Inspection, Testing and Certification Program3.3.1Vertical Transportation Equipment (VTE)12MO
ARMY SFA002A002AG1502000Other Recurring Services Program3.4.1Exhaust Hoods and Ducts12MO
ARMY SFA002A002AH1503020Pest Control3.1Scheduled Pest Control Services12MO
ARMY SFA002A002AJ1503020Pest Control3.2Pest Control Service Orders12EA
ARMY SFA002A002AK1503020Pest Control3.3Pest Management Reporting12MO
NGISA003A003AA1502000Service Orders3.1.1Emergency Service Orders12EA
NGISA003A003AB1502000Service Orders3.1.2Urgent Service Orders12EA
NGISA003A003AC1502000Service Orders3.1.3Routine Service Orders12EA
NGISA003A003AD1502000Preventive Maintenance Program3.2.1HVAC and Refrigeration Systems12MO
NGISA003A003AE1502000Preventive Maintenance Program3.2.2Automatic Door Opener Systems12MO
NGISA003A003AF1502000Preventive Maintenance Program3.2.3Vertical Transportation Equipment (VTE)12MO
NGISA003A003AG1502000Preventive Maintenance Program3.2.4Fire Protection Systems12MO
NGISA003A003AH1502000Inspection, Testing and Certification Program3.3.1Vertical Transportation Equipment (VTE)12MO
NGISA003A003AJ1502000Other Recurring Services Program3.4.2Treatment, Sampling and Testing Services Program12MO
NGISA003A003AK1503020Pest Control3.1Scheduled Pest Control Services12MO
NGISA003A003AM1503020Pest Control3.2Pest Control Service Orders53EA
NGISA003A003AN1503020Pest Control3.3Pest Management Reporting12MO
DHAA004A004AA1502000Service Orders3.1.1Emergency Service Orders6EA
DHAA004A004AB1502000Service Orders3.1.2Urgent Service Orders6EA
DHAA004A004AC1502000Service Orders3.1.3Routine Service Orders6EA
DHAA004A004AD1502000Preventive Maintenance Program3.2.3Vertical Transportation Equipment (VTE)12MO
DHAA004A004AE1502000Inspection, Testing and Certification Program3.3.1Vertical Transportation Equipment (VTE)12MO
DHAA004A004AF1503020Pest Control3.1Scheduled Pest Control Services12MO
DHAA004A004AG1503020Pest Control3.2Pest Control Service Orders6EA
DHAA004A004AH1503020Pest Control3.3Pest Management Reporting25MO
PWD UEMA005A005AA1601000Utilities Management3.1Utilities Operations Support12EA
TARSA006A006AA1503020Pest Control3.1Scheduled Pest Control Services12MO
TARSA006A006AB1503020Pest Control3.2Pest Control Service Orders6EA
TARSA006A006AC1503020Pest Control3.3Pest Management Reporting12MO
DECAA007A007AA1503020Pest Control3.1Scheduled Pest Control Services12MO
DECAA007A007AB1503020Pest Control3.2Pest Control Service Orders12EA
DECAA007A007AC1503020Pest Control3.3Pest Management Reporting12MO
NRLA008A008AA1503020Pest Control3.1Scheduled Pest Control Services12MO
NRLA008A008AB1503020Pest Control3.2Pest Control Service Orders6EA
NRLA008A008AC1503020Pest Control3.3Pest Management Reporting12MO
HOUSINGA009A009AA1503020Pest Control3.1Scheduled Pest Control Services12MO
HOUSINGA009A009AB1503020Pest Control3.2Pest Control Service Orders6EA
HOUSINGA009A009AC1503020Pest Control3.3Pest Management Reporting12MO
TCTSA010A010AA1503020Pest Control3.1Scheduled Pest Control Services12MO
TCTSA010A010AB1503020Pest Control3.2Pest Control Service Orders6EA
TCTSA010A010AC1503020Pest Control3.3Pest Management Reporting12MO
DLAA011A011AA1503020Pest Control3.1Scheduled Pest Control Services12MO
DLAA011A011AB1503020Pest Control3.2Pest Control Service Orders6EA
DLAA011A011AC1503020Pest Control3.3Pest Management Reporting12MO
NELOA012A012AA1503020Pest Control3.1Scheduled Pest Control Services12MO
NELOA012A012AB1503020Pest Control3.2Pest Control Service Orders4EA
NELOA012A012AC1503020Pest Control3.3Pest Management Reporting12MO
MWRA013A013AA1502000Service Orders3.1.1Emergency Service Orders2EA
MWRA013A013AB1502000Service Orders3.1.2Urgent Service Orders2EA
MWRA013A013AC1502000Service Orders3.1.3Routine Service Orders12EA
MWRA013A013AG1502000Preventive Maintenance Program3.2.4Fire Protection Systems12MO

&"Times New Roman,Regular"&A Page &P of &N

CLIN 0002 - NRW Base Period

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation No.: N69450-24-R-0020
Line Item 0002 - Non-Recurring Work - Base Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 4
ELIN A700 through A711
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
A700Composite Unit Price Labor (UPL) Work

MUST BE NEGOTIATED BY KO. The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

A composite UPL shall include all trades not identified in A701 and A702.

Refer to: Section C, Annex 0200000 Management and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL) Work (Negotiated) for description of UPL Work.

Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Quatities for each task order will be negotiated as identified in Section C, 0200000. Unit Prices will not be negotiated post award of contract.

Task order completion times will be specified on each task order.

150LH
A701Composite UPL Work for Specialty Trades

MUST BE NEGOTIATED BY KO. The Contractor shall perform all Unit Priced Labor (UPL) work for Specialty Trades (identified below) in accordance with the scope and delivery schedule negotiated per each task order.

A composite UPL for Specialty Trades shall only include the following trades: Elevator Mechanic, High Voltage Electrician, HVAC Mechanic, DDC Technician, WHE Operator and Fire Protection Mechanic. All other wages not associated with the vehicle/equipment mechanic trades in A702 shall be priced in A700. Vehicle/equipment mechanic trades shall be priced in A702.

Refer to: Section C, Annex 0200000 Management and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL) Work (Negotiated) for description of UPL Work.

Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Quatities for each task order will be negotiated as identified in Section C, 0200000. Unit Prices will not be negotiated post award of contract.

Task order completion times will be specified on each task order.650LH
A702Composite UPL Work for Vehicle/Equipment Mechanic Trades

MUST BE NEGOTIATED BY KO. The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

A composite UPL for Vehicle/Equipment Mechanic shall only include the following trades: Motor Vehicle Mechanic, Motor Vehicle Mechanic Helper, Heavy Equipment Mechanic, WHE/Crane Mechanic, Fire Motor Vehicle Mechanic, and Emergency Services Vehicle Mechanic. All other wages not associated with the identified specialty trades in A701 shall be priced in A700. Specialty trades shall be priced in A701.

Refer to: Section C, Annex 0200000 Management and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL) Work (Negotiated) for description of UPL Work.

Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Quatities for each task order will be negotiated as identified in Section C, 0200000. Unit Prices will not be negotiated post award of contract.

Task order completion times will be specified on each task order.

200LH
A703Material/Equipment Costs

MUST BE NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.

Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2.

The estitmate quantity (in dollars) is provided. A Fixed burdened rate (FBR) shall be entered in the Unit Price column. The FBR shall include factors for ordering, handling, and stockpiling materials and repair parts. Similar to FBR example in J-0200000-01, if a 10% markup is the Contractor's proposed FBR, the Unit Price should be $1.10. When multiplying the proposed Unit Price by the Estimated Quantity, the Extended Price should be $165,000.

During administration, if the vendor's invoice on material is $1,000.00 and the unit price is $1.10, the cost of the material to the government will be $1,100.00. (DO - Dollars)150,000.00DO
A704Emergency Service Orders -
Available on DoD FedMallOrder Facility Investment emergency service orders as necessary when quantities are exhausted for a specific Client ELIN or when a client wants to order an emergency service call who is not covered under the Recurring Work service call section in Spec Item 3.1 of the Facilities Investment Annex. Requirements shall be accomplished per the requirements identified in Spec Items 3.1 and 3.1.1 of Section 1502000 Section C.10EA
A705Urgent Service Orders -
Available on DoD FedMallOrder Facility Investment urgent service orders as necessary when quantities are exhausted for a specific Client ELIN or when a client wants to order a urgent service call who is not covered under the Recurring Work service call section in Spec Item 3.1 of the Facilities Investment Annex. Requirements shall be accomplished per the requirements identified in Spec Items 3.1 and 3.1.2 of Section 1502000 Section C.10EA
A706Routine Service Orders -
Available on DoD FedMallOrder Facility Investment routine service orders as necessary when quantities are exhausted for a specific Client ELIN. Requirements shall be accomplished per the requirements identified in Spec Items 3.1 and 3.1.3 of Section 1502000 Section C.20EA
A707Survey for Termite and Wood Destroying Organisms
Available on DoD FedMallProvide all labor, material, and equipment to survey for all termites species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles. Time Period to Respond: If swarm, immediately. Otherwise, 1 week. Complete work per time periods specified in J-1503020-08.25,000SF
A708Subterranean Termite Control
Available on DoD FedMallProvide all labor, material, and equipment to control infestations of subterranean termites in accordance with J-1503020-04 (Termite Control Specifications). Time Period to Respond: 7 working days after receipt of the task order. Complete work per time periods specified in J-1503020-12.11,500LF
A709Drywood Termite Control
Available on DoD FedMallProvide all labor, material, and equipment to prevent, manage, and control Drywood Termites in accordance with J-1503020-04 (Termite Control Specifications). Time Period to Respond: 7 working days after receipt of the task order. Complete work per time periods specified in J-1503020-04.180,000CF
A710Other Wood Destroying Organism Controls
Available on DoD FedMallProvide all labor, material, and equipment to prevent, manage, and control non-termite wood destroying organisms including, but not limited to powder post beetles (Lyctids and Bostrichids), Anobiids (furniture and deathwatch beetles), old house borer, carpenter ants, and carpenter bees. Time Period to Respond: 10 working days. Complete work per time periods specified in J-1503020-08.25,000SF
A711Bed Bug Control

Available on DoD FedMall Provide all labor, material, and equipment to control bed bugs. Time Period to Respond: 24 hours. Complete work per time periods specified in J-1503020-07.

EA = per Room 15 EA

ROOM

TOTAL NON-RECURRING WORK LINE ITEMS

Page &P of &N

CLIN 0003 - RW 1st Opt Period

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation No.: N69450-24-R-0020
Line Item 0003 - Recurring Work - 1st Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs B001 through B013
CustomerELINSub-ELINAnnex/Sub-annex
CategorySpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
CNICB001B001AA1501000Facility Management3.1Work Order Tracking12MO
CNICB001B001AB1501000Facility Management3.2NAVFAC MAXIMO Data Entry12MO
CNICB001B001AC1501000Facility Management3.3Infrastructure Condition Assessment Program (ICAP) Services12MO
CNICB001B001AD1502000Service Orders3.1.1Emergency Service Orders25EA
CNICB001B001AE1502000Service Orders3.1.2Urgent Service Orders30EA
CNICB001B001AF1502000Service Orders3.1.3Routine Service Orders50EA
CNICB001B001AG1502000Preventive Maintenance Program3.2.1HVAC and Refrigeration Systems12MO
CNICB001B001AH1502000Preventive Maintenance Program3.2.2Automatic Door Opener Systems12MO
CNICB001B001AJ1502000Preventive Maintenance Program3.2.3Vertical Transportation Equipment (VTE)12MO
CNICB001B001AK1502000Preventive Maintenance Program3.2.4Fire Protection Systems12MO
CNICB001B001AL1502000Inspection, Testing and Certification Program3.3.1Vertical Transportation Equipment (VTE)12MO
CNICB001B001AM1502000Other Recurring Services Program3.4.1Exhaust Hoods and Ducts12MO
CNICB001B001AN1502000Other Recurring Services Program3.4.2Treatment, Sampling and Testing Services Program12MO
CNICB001B001AP1503020Pest Control3.1Scheduled Pest Control Services12MO
CNICB001B001AQ1503020Pest Control3.2Pest Control Service Orders70EA
CNICB001B001AR1503020Pest Control3.3Pest Management Reporting12MO
ARMY SFB002B002AA1502000Service Orders3.1.1Emergency Service Orders12EA
ARMY SFB002B002AB1502000Service Orders3.1.2Urgent Service Orders12EA
ARMY SFB002B002AC1502000Service Orders3.1.3Routine Service Orders15EA
ARMY SFB002B002AD1502000Preventive Maintenance Program3.2.3Vertical Transportation Equipment (VTE)12MO
ARMY SFB002B002AF1502000Inspection, Testing and Certification Program3.3.1Vertical Transportation Equipment (VTE)12MO
ARMY SFB002B002AG1502000Other Recurring Services Program3.4.1Exhaust Hoods and Ducts12MO
ARMY SFB002B002AH1503020Pest Control3.1Scheduled Pest Control Services12MO
ARMY SFB002B002AJ1503020Pest Control3.2Pest Control Service Orders12EA
ARMY SFB002B002AK1503020Pest Control3.3Pest Management Reporting12MO
NGISB003B003AA1502000Service Orders3.1.1Emergency Service Orders12EA
NGISB003B003AB1502000Service Orders3.1.2Urgent Service Orders12EA
NGISB003B003AC1502000Service Orders3.1.3Routine Service Orders12EA
NGISB003B003AD1502000Preventive Maintenance Program3.2.1HVAC and Refrigeration Systems12MO
NGISB003B003AE1502000Preventive Maintenance Program3.2.2Automatic Door Opener Systems12MO
NGISB003B003AF1502000Preventive Maintenance Program3.2.3Vertical Transportation Equipment (VTE)12MO
NGISB003B003AG1502000Preventive Maintenance Program3.2.4Fire Protection Systems12MO
NGISB003B003AH1502000Inspection, Testing and Certification Program3.3.1Vertical Transportation Equipment (VTE)12MO
NGISB003B003AJ1502000Other Recurring Services Program3.4.2Treatment, Sampling and Testing Services Program12MO
NGISB003B003AK1503020Pest Control3.1Scheduled Pest Control Services12MO
NGISB003B003AM1503020Pest Control3.2Pest Control Service Orders53EA
NGISB003B003AN1503020Pest Control3.3Pest Management Reporting12MO
DHAB004B004AA1502000Service Orders3.1.1Emergency Service Orders6EA
DHAB004B004AB1502000Service Orders3.1.2Urgent Service Orders6EA
DHAB004B004AC1502000Service Orders3.1.3Routine Service Orders6EA
DHAB004B004AD1502000Preventive Maintenance Program3.2.3Vertical Transportation Equipment (VTE)12MO
DHAB004B004AE1502000Inspection, Testing and Certification Program3.3.1Vertical Transportation Equipment (VTE)12MO
DHAB004B004AF1503020Pest Control3.1Scheduled Pest Control Services12MO
DHAB004B004AG1503020Pest Control3.2Pest Control Service Orders6EA
DHAB004B004AH1503020Pest Control3.3Pest Management Reporting25MO
PWD UEMB005B005AA1601000Utilities Management3.1Utilities Operations Support12EA
TARSB006B006AA1503020Pest Control3.1Scheduled Pest Control Services12MO
TARSB006B006AB1503020Pest Control3.2Pest Control Service Orders6EA
TARSB006B006AC1503020Pest Control3.3Pest Management Reporting12MO
DECAB007B007AA1503020Pest Control3.1Scheduled Pest Control Services12MO
DECAB007B007AB1503020Pest Control3.2Pest Control Service Orders12EA
DECAB007B007AC1503020Pest Control3.3Pest Management Reporting12MO
NRLB008B008AA1503020Pest Control3.1Scheduled Pest Control Services12MO
NRLB008B008AB1503020Pest Control3.2Pest Control Service Orders6EA
NRLB008B008AC1503020Pest Control3.3Pest Management Reporting12MO
HOUSINGB009B009AA1503020Pest Control3.1Scheduled Pest Control Services12MO
HOUSINGB009B009AB1503020Pest Control3.2Pest Control Service Orders6EA
HOUSINGB009B009AC1503020Pest Control3.3Pest Management Reporting12MO
TCTSB010B010AA1503020Pest Control3.1Scheduled Pest Control Services12MO
TCTSB010B010AB1503020Pest Control3.2Pest Control Service Orders6EA
TCTSB010B010AC1503020Pest Control3.3Pest Management Reporting12MO
DLAB011B011AA1503020Pest Control3.1Scheduled Pest Control Services12MO
DLAB011B011AB1503020Pest Control3.2Pest Control Service Orders6EA
DLAB011B011AC1503020Pest Control3.3Pest Management Reporting12MO
NELOB012B012AA1503020Pest Control3.1Scheduled Pest Control Services12MO
NELOB012B012AB1503020Pest Control3.2Pest Control Service Orders4EA
NELOB012B012AC1503020Pest Control3.3Pest Management Reporting12MO
MWRB013B013AA1502000Service Orders3.1.1Emergency Service Orders2EA
MWRB013B013AB1502000Service Orders3.1.2Urgent Service Orders2EA
MWRB013B013AC1502000Service Orders3.1.3Routine Service Orders12EA
MWRB013B013AG1502000Preventive Maintenance Program3.2.4Fire Protection Systems12MO

&"Times New Roman,Regular"&A Page &P of &N

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

CLIN 0004 - NRW 1st Opt Period

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation No.: N69450-24-R-0020
Line Item 0004 - Non-Recurring Work - 1st Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 4
ELIN B700 through B711
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
B700Unit Price Labor Work

MUST BE NEGOTIATED BY KO. The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

A composite UPL shall include all trades not identified in B701 and B702.

Refer to: Section C, Annex 0200000 Management and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL) Work (Negotiated) for description of UPL Work.

Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Quatities for each task order will be negotiated as identified in Section C, 0200000. Unit Prices will not be negotiated post award of contract.

Task order completion times will be specified on each task order.

150LH
B701Composite UPL Work for Specialty Trades

MUST BE NEGOTIATED BY KO. The Contractor shall perform all Unit Priced Labor (UPL) work for Specialty Trades (identified below) in accordance with the scope and delivery schedule negotiated per each task order.

A composite UPL for Specialty Trades shall only include the following trades: Elevator Mechanic, High Voltage Electrician, HVAC Mechanic, DDC Technician, WHE Operator and Fire Protection Mechanic. All other wages not associated with the vehicle/equipment mechanic trades in B702 shall be priced in B700. Vehicle/equipment mechanic trades shall be priced in B702.

Refer to: Section C, Annex 0200000 Management and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL) Work (Negotiated) for description of UPL Work.

Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Quatities for each task order will be negotiated as identified in Section C, 0200000.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .