J-0200000-13 ELINs.xlsx
XLSX spreadsheet 602 KB Posted
- Attached to
- Base Operations Support (BOS) Services for Naval Air Station (NAS) Key West, Florida and outlying areas.
- Solicitation number
- N69450-24-R-0020
About this file
This document appears to be an Exhibit Line Item Numbers (ELINS) spreadsheet related to a federal contract opportunity. The solicitation is for Base Operations Support (BOS) Services at Naval Air Station Key West, Florida and outlying areas, and includes facility management, facility investment, pest control, utilities management, base support vehicles and equipment, and other related services.
The spreadsheet provides pricing details for recurring and non-recurring work under the contract, including labor categories, service orders, preventive maintenance, pest control, and other recurring services. Pricing is broken down by various customer locations and types of services. The contract includes a base period and two option periods. Key details include estimated quantities, unit of measure, and unit prices for the various line items. The contract appears to be open for negotiated task orders, with the government reserving the right to negotiate unit prices.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 - RW Base Period
| Attachment J-0200000-13 | ||||||||
| Exhibit Line Item Numbers (ELINS) | ||||||||
| Solicitation No.: N69450-24-R-0020 | ||||||||
| Line Item 0001 - Recurring Work - Base Period | ||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||
| ELIN/Sub-ELINs A001 through A013 | ||||||||
| Customer | ELIN | Sub-ELIN | Annex/Sub-annex | |||||
| Category | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | ||
| CNIC | A001 | A001AA | 1501000 | Facility Management | 3.1 | Work Order Tracking | 12 | MO |
| CNIC | A001 | A001AB | 1501000 | Facility Management | 3.2 | NAVFAC MAXIMO Data Entry | 12 | MO |
| CNIC | A001 | A001AC | 1501000 | Facility Management | 3.3 | Infrastructure Condition Assessment Program (ICAP) Services | 12 | MO |
| CNIC | A001 | A001AD | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 25 | EA |
| CNIC | A001 | A001AE | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 30 | EA |
| CNIC | A001 | A001AF | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 50 | EA |
| CNIC | A001 | A001AG | 1502000 | Preventive Maintenance Program | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO |
| CNIC | A001 | A001AH | 1502000 | Preventive Maintenance Program | 3.2.2 | Automatic Door Opener Systems | 12 | MO |
| CNIC | A001 | A001AJ | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO |
| CNIC | A001 | A001AK | 1502000 | Preventive Maintenance Program | 3.2.4 | Fire Protection Systems | 12 | MO |
| CNIC | A001 | A001AL | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO |
| CNIC | A001 | A001AM | 1502000 | Other Recurring Services Program | 3.4.1 | Exhaust Hoods and Ducts | 12 | MO |
| CNIC | A001 | A001AN | 1502000 | Other Recurring Services Program | 3.4.2 | Treatment, Sampling and Testing Services Program | 12 | MO |
| CNIC | A001 | A001AP | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| CNIC | A001 | A001AQ | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 70 | EA |
| CNIC | A001 | A001AR | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| ARMY SF | A002 | A002AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 12 | EA |
| ARMY SF | A002 | A002AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 12 | EA |
| ARMY SF | A002 | A002AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 15 | EA |
| ARMY SF | A002 | A002AD | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO |
| ARMY SF | A002 | A002AF | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO |
| ARMY SF | A002 | A002AG | 1502000 | Other Recurring Services Program | 3.4.1 | Exhaust Hoods and Ducts | 12 | MO |
| ARMY SF | A002 | A002AH | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| ARMY SF | A002 | A002AJ | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | EA |
| ARMY SF | A002 | A002AK | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| NGIS | A003 | A003AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 12 | EA |
| NGIS | A003 | A003AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 12 | EA |
| NGIS | A003 | A003AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 12 | EA |
| NGIS | A003 | A003AD | 1502000 | Preventive Maintenance Program | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO |
| NGIS | A003 | A003AE | 1502000 | Preventive Maintenance Program | 3.2.2 | Automatic Door Opener Systems | 12 | MO |
| NGIS | A003 | A003AF | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO |
| NGIS | A003 | A003AG | 1502000 | Preventive Maintenance Program | 3.2.4 | Fire Protection Systems | 12 | MO |
| NGIS | A003 | A003AH | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO |
| NGIS | A003 | A003AJ | 1502000 | Other Recurring Services Program | 3.4.2 | Treatment, Sampling and Testing Services Program | 12 | MO |
| NGIS | A003 | A003AK | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| NGIS | A003 | A003AM | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 53 | EA |
| NGIS | A003 | A003AN | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| DHA | A004 | A004AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 6 | EA |
| DHA | A004 | A004AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 6 | EA |
| DHA | A004 | A004AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 6 | EA |
| DHA | A004 | A004AD | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO |
| DHA | A004 | A004AE | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO |
| DHA | A004 | A004AF | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| DHA | A004 | A004AG | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| DHA | A004 | A004AH | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 25 | MO |
| PWD UEM | A005 | A005AA | 1601000 | Utilities Management | 3.1 | Utilities Operations Support | 12 | EA |
| TARS | A006 | A006AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| TARS | A006 | A006AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| TARS | A006 | A006AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| DECA | A007 | A007AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| DECA | A007 | A007AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | EA |
| DECA | A007 | A007AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| NRL | A008 | A008AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| NRL | A008 | A008AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| NRL | A008 | A008AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| HOUSING | A009 | A009AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| HOUSING | A009 | A009AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| HOUSING | A009 | A009AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| TCTS | A010 | A010AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| TCTS | A010 | A010AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| TCTS | A010 | A010AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| DLA | A011 | A011AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| DLA | A011 | A011AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| DLA | A011 | A011AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| NELO | A012 | A012AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| NELO | A012 | A012AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 4 | EA |
| NELO | A012 | A012AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| MWR | A013 | A013AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 2 | EA |
| MWR | A013 | A013AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 2 | EA |
| MWR | A013 | A013AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 12 | EA |
| MWR | A013 | A013AG | 1502000 | Preventive Maintenance Program | 3.2.4 | Fire Protection Systems | 12 | MO |
&"Times New Roman,Regular"&A Page &P of &N
CLIN 0002 - NRW Base Period
| Attachment J-0200000-13 | ||||||
| Exhibit Line Item Numbers (ELINS) | ||||||
| Solicitation No.: N69450-24-R-0020 | ||||||
| Line Item 0002 - Non-Recurring Work - Base Period | ||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELIN A700 through A711 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Composite Unit Price Labor (UPL) Work |
MUST BE NEGOTIATED BY KO. The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.
A composite UPL shall include all trades not identified in A701 and A702.
Refer to: Section C, Annex 0200000 Management and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL) Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Quatities for each task order will be negotiated as identified in Section C, 0200000. Unit Prices will not be negotiated post award of contract.
Task order completion times will be specified on each task order.
| 150 | LH |
| A701 | Composite UPL Work for Specialty Trades |
MUST BE NEGOTIATED BY KO. The Contractor shall perform all Unit Priced Labor (UPL) work for Specialty Trades (identified below) in accordance with the scope and delivery schedule negotiated per each task order.
A composite UPL for Specialty Trades shall only include the following trades: Elevator Mechanic, High Voltage Electrician, HVAC Mechanic, DDC Technician, WHE Operator and Fire Protection Mechanic. All other wages not associated with the vehicle/equipment mechanic trades in A702 shall be priced in A700. Vehicle/equipment mechanic trades shall be priced in A702.
Refer to: Section C, Annex 0200000 Management and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL) Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Quatities for each task order will be negotiated as identified in Section C, 0200000. Unit Prices will not be negotiated post award of contract.
| Task order completion times will be specified on each task order. | 650 | LH |
| A702 | Composite UPL Work for Vehicle/Equipment Mechanic Trades |
MUST BE NEGOTIATED BY KO. The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.
A composite UPL for Vehicle/Equipment Mechanic shall only include the following trades: Motor Vehicle Mechanic, Motor Vehicle Mechanic Helper, Heavy Equipment Mechanic, WHE/Crane Mechanic, Fire Motor Vehicle Mechanic, and Emergency Services Vehicle Mechanic. All other wages not associated with the identified specialty trades in A701 shall be priced in A700. Specialty trades shall be priced in A701.
Refer to: Section C, Annex 0200000 Management and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL) Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Quatities for each task order will be negotiated as identified in Section C, 0200000. Unit Prices will not be negotiated post award of contract.
Task order completion times will be specified on each task order.
| 200 | LH |
| A703 | Material/Equipment Costs |
MUST BE NEGOTIATED BY KO. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2.
The estitmate quantity (in dollars) is provided. A Fixed burdened rate (FBR) shall be entered in the Unit Price column. The FBR shall include factors for ordering, handling, and stockpiling materials and repair parts. Similar to FBR example in J-0200000-01, if a 10% markup is the Contractor's proposed FBR, the Unit Price should be $1.10. When multiplying the proposed Unit Price by the Estimated Quantity, the Extended Price should be $165,000.
| During administration, if the vendor's invoice on material is $1,000.00 and the unit price is $1.10, the cost of the material to the government will be $1,100.00. (DO - Dollars) | 150,000.00 | DO |
| A704 | Emergency Service Orders - |
| Available on DoD FedMall | Order Facility Investment emergency service orders as necessary when quantities are exhausted for a specific Client ELIN or when a client wants to order an emergency service call who is not covered under the Recurring Work service call section in Spec Item 3.1 of the Facilities Investment Annex. Requirements shall be accomplished per the requirements identified in Spec Items 3.1 and 3.1.1 of Section 1502000 Section C. | 10 | EA |
| A705 | Urgent Service Orders - |
| Available on DoD FedMall | Order Facility Investment urgent service orders as necessary when quantities are exhausted for a specific Client ELIN or when a client wants to order a urgent service call who is not covered under the Recurring Work service call section in Spec Item 3.1 of the Facilities Investment Annex. Requirements shall be accomplished per the requirements identified in Spec Items 3.1 and 3.1.2 of Section 1502000 Section C. | 10 | EA |
| A706 | Routine Service Orders - |
| Available on DoD FedMall | Order Facility Investment routine service orders as necessary when quantities are exhausted for a specific Client ELIN. Requirements shall be accomplished per the requirements identified in Spec Items 3.1 and 3.1.3 of Section 1502000 Section C. | 20 | EA |
| A707 | Survey for Termite and Wood Destroying Organisms |
| Available on DoD FedMall | Provide all labor, material, and equipment to survey for all termites species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles. Time Period to Respond: If swarm, immediately. Otherwise, 1 week. Complete work per time periods specified in J-1503020-08. | 25,000 | SF |
| A708 | Subterranean Termite Control |
| Available on DoD FedMall | Provide all labor, material, and equipment to control infestations of subterranean termites in accordance with J-1503020-04 (Termite Control Specifications). Time Period to Respond: 7 working days after receipt of the task order. Complete work per time periods specified in J-1503020-12. | 11,500 | LF |
| A709 | Drywood Termite Control |
| Available on DoD FedMall | Provide all labor, material, and equipment to prevent, manage, and control Drywood Termites in accordance with J-1503020-04 (Termite Control Specifications). Time Period to Respond: 7 working days after receipt of the task order. Complete work per time periods specified in J-1503020-04. | 180,000 | CF |
| A710 | Other Wood Destroying Organism Controls |
| Available on DoD FedMall | Provide all labor, material, and equipment to prevent, manage, and control non-termite wood destroying organisms including, but not limited to powder post beetles (Lyctids and Bostrichids), Anobiids (furniture and deathwatch beetles), old house borer, carpenter ants, and carpenter bees. Time Period to Respond: 10 working days. Complete work per time periods specified in J-1503020-08. | 25,000 | SF |
| A711 | Bed Bug Control |
Available on DoD FedMall Provide all labor, material, and equipment to control bed bugs. Time Period to Respond: 24 hours. Complete work per time periods specified in J-1503020-07.
EA = per Room 15 EA
ROOM
TOTAL NON-RECURRING WORK LINE ITEMS
Page &P of &N
CLIN 0003 - RW 1st Opt Period
| Attachment J-0200000-13 | ||||||||
| Exhibit Line Item Numbers (ELINS) | ||||||||
| Solicitation No.: N69450-24-R-0020 | ||||||||
| Line Item 0003 - Recurring Work - 1st Option Period | ||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||
| ELIN/Sub-ELINs B001 through B013 | ||||||||
| Customer | ELIN | Sub-ELIN | Annex/Sub-annex | |||||
| Category | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | ||
| CNIC | B001 | B001AA | 1501000 | Facility Management | 3.1 | Work Order Tracking | 12 | MO |
| CNIC | B001 | B001AB | 1501000 | Facility Management | 3.2 | NAVFAC MAXIMO Data Entry | 12 | MO |
| CNIC | B001 | B001AC | 1501000 | Facility Management | 3.3 | Infrastructure Condition Assessment Program (ICAP) Services | 12 | MO |
| CNIC | B001 | B001AD | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 25 | EA |
| CNIC | B001 | B001AE | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 30 | EA |
| CNIC | B001 | B001AF | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 50 | EA |
| CNIC | B001 | B001AG | 1502000 | Preventive Maintenance Program | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO |
| CNIC | B001 | B001AH | 1502000 | Preventive Maintenance Program | 3.2.2 | Automatic Door Opener Systems | 12 | MO |
| CNIC | B001 | B001AJ | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO |
| CNIC | B001 | B001AK | 1502000 | Preventive Maintenance Program | 3.2.4 | Fire Protection Systems | 12 | MO |
| CNIC | B001 | B001AL | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO |
| CNIC | B001 | B001AM | 1502000 | Other Recurring Services Program | 3.4.1 | Exhaust Hoods and Ducts | 12 | MO |
| CNIC | B001 | B001AN | 1502000 | Other Recurring Services Program | 3.4.2 | Treatment, Sampling and Testing Services Program | 12 | MO |
| CNIC | B001 | B001AP | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| CNIC | B001 | B001AQ | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 70 | EA |
| CNIC | B001 | B001AR | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| ARMY SF | B002 | B002AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 12 | EA |
| ARMY SF | B002 | B002AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 12 | EA |
| ARMY SF | B002 | B002AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 15 | EA |
| ARMY SF | B002 | B002AD | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO |
| ARMY SF | B002 | B002AF | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO |
| ARMY SF | B002 | B002AG | 1502000 | Other Recurring Services Program | 3.4.1 | Exhaust Hoods and Ducts | 12 | MO |
| ARMY SF | B002 | B002AH | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| ARMY SF | B002 | B002AJ | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | EA |
| ARMY SF | B002 | B002AK | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| NGIS | B003 | B003AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 12 | EA |
| NGIS | B003 | B003AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 12 | EA |
| NGIS | B003 | B003AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 12 | EA |
| NGIS | B003 | B003AD | 1502000 | Preventive Maintenance Program | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO |
| NGIS | B003 | B003AE | 1502000 | Preventive Maintenance Program | 3.2.2 | Automatic Door Opener Systems | 12 | MO |
| NGIS | B003 | B003AF | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO |
| NGIS | B003 | B003AG | 1502000 | Preventive Maintenance Program | 3.2.4 | Fire Protection Systems | 12 | MO |
| NGIS | B003 | B003AH | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO |
| NGIS | B003 | B003AJ | 1502000 | Other Recurring Services Program | 3.4.2 | Treatment, Sampling and Testing Services Program | 12 | MO |
| NGIS | B003 | B003AK | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| NGIS | B003 | B003AM | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 53 | EA |
| NGIS | B003 | B003AN | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| DHA | B004 | B004AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 6 | EA |
| DHA | B004 | B004AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 6 | EA |
| DHA | B004 | B004AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 6 | EA |
| DHA | B004 | B004AD | 1502000 | Preventive Maintenance Program | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO |
| DHA | B004 | B004AE | 1502000 | Inspection, Testing and Certification Program | 3.3.1 | Vertical Transportation Equipment (VTE) | 12 | MO |
| DHA | B004 | B004AF | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| DHA | B004 | B004AG | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| DHA | B004 | B004AH | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 25 | MO |
| PWD UEM | B005 | B005AA | 1601000 | Utilities Management | 3.1 | Utilities Operations Support | 12 | EA |
| TARS | B006 | B006AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| TARS | B006 | B006AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| TARS | B006 | B006AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| DECA | B007 | B007AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| DECA | B007 | B007AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 12 | EA |
| DECA | B007 | B007AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| NRL | B008 | B008AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| NRL | B008 | B008AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| NRL | B008 | B008AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| HOUSING | B009 | B009AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| HOUSING | B009 | B009AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| HOUSING | B009 | B009AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| TCTS | B010 | B010AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| TCTS | B010 | B010AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| TCTS | B010 | B010AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| DLA | B011 | B011AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| DLA | B011 | B011AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 6 | EA |
| DLA | B011 | B011AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| NELO | B012 | B012AA | 1503020 | Pest Control | 3.1 | Scheduled Pest Control Services | 12 | MO |
| NELO | B012 | B012AB | 1503020 | Pest Control | 3.2 | Pest Control Service Orders | 4 | EA |
| NELO | B012 | B012AC | 1503020 | Pest Control | 3.3 | Pest Management Reporting | 12 | MO |
| MWR | B013 | B013AA | 1502000 | Service Orders | 3.1.1 | Emergency Service Orders | 2 | EA |
| MWR | B013 | B013AB | 1502000 | Service Orders | 3.1.2 | Urgent Service Orders | 2 | EA |
| MWR | B013 | B013AC | 1502000 | Service Orders | 3.1.3 | Routine Service Orders | 12 | EA |
| MWR | B013 | B013AG | 1502000 | Preventive Maintenance Program | 3.2.4 | Fire Protection Systems | 12 | MO |
&"Times New Roman,Regular"&A Page &P of &N
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
CLIN 0004 - NRW 1st Opt Period
| Attachment J-0200000-13 | ||||||
| Exhibit Line Item Numbers (ELINS) | ||||||
| Solicitation No.: N69450-24-R-0020 | ||||||
| Line Item 0004 - Non-Recurring Work - 1st Option Period | ||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELIN B700 through B711 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Unit Price Labor Work |
MUST BE NEGOTIATED BY KO. The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.
A composite UPL shall include all trades not identified in B701 and B702.
Refer to: Section C, Annex 0200000 Management and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL) Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Quatities for each task order will be negotiated as identified in Section C, 0200000. Unit Prices will not be negotiated post award of contract.
Task order completion times will be specified on each task order.
| 150 | LH |
| B701 | Composite UPL Work for Specialty Trades |
MUST BE NEGOTIATED BY KO. The Contractor shall perform all Unit Priced Labor (UPL) work for Specialty Trades (identified below) in accordance with the scope and delivery schedule negotiated per each task order.
A composite UPL for Specialty Trades shall only include the following trades: Elevator Mechanic, High Voltage Electrician, HVAC Mechanic, DDC Technician, WHE Operator and Fire Protection Mechanic. All other wages not associated with the vehicle/equipment mechanic trades in B702 shall be priced in B700. Vehicle/equipment mechanic trades shall be priced in B702.
Refer to: Section C, Annex 0200000 Management and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL) Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Quatities for each task order will be negotiated as identified in Section C, 0200000.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .