Summary
These engineering plans and specifications are prepared for the City of Ocala's Runway 36 Runway Safety Area (RSA) Grading project at Ocala International Airport (OCF), with FAA funding under project number 3-12-0055-038-2026 and FDOT financial project number 457809-1-94-01. The project scope requires a contractor to furnish all labor, materials, equipment, supervision, and incidentals necessary to regrade the Runway 36 RSA to meet current Federal Aviation Administration design standards. Work includes site preparation, demolition of existing gravel service roads, stripping and stockpiling of topsoil, excavation, placement of approved fill material, fine grading to design elevations and slopes, and site restoration including reinstallation of salvaged gravel service roads, placement of topsoil, finish grading, and sodding of disturbed areas. The contractor must also protect and modify existing airfield infrastructure including utilities, lighting systems, and navigational aids (NAVAIDS), and adjust the elevations of select Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR) to accommodate proposed grading. The project is divided into two phases: Phase 1 involves grading the Runway Safety Area during night work (8:00 PM to 6:00 AM) over 30 calendar days with runway closure required, and a closeout phase extending an additional 30 days for a total project duration of 60 days.
The earthwork summary indicates total topsoil available on site of 2,088 cubic yards, with borrow requirements of 3,087 cubic yards compacted (3,632 cubic yards loose borrow required with a 15 percent shrinkage factor applied). The contractor is responsible for construction stakeout and survey verification, maintaining airfield pavements free of debris, coordinating all activities with airport operations and the engineer to minimize interference with aircraft operations, obtaining all necessary permits, and complying with all environmental rules and regulations. Liquidated damages will be assessed for each day beyond the specified contract time that a phase is not substantially complete. The contractor must maintain minimum badging requirements with at least one badged employee supervising crews at all times, provide a water truck onsite for dust control, install and maintain daily lighted "X" runway closure markers, and provide flagmen at active taxiway and runway crossings. Construction safety requirements include compliance with FAA Advisory Circulars 150/5370-2, 150/5200-18, and 150/5210-5, use of low-profile barricades with red flashing lights adjacent to active operational areas, and protection of all existing utilities and navigational aids from damage.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREPARED BY:
TAMPA, FL 33634
5550 W. IDLEWILD AVENUE, SUITE 115
(813) 330-2704
CERTIFICATE OF AUTHORIZATION NO.: 30862
DRAWING INDEX
DWG. No. DESCRIPTION
C3.1
G0.0
LOCATION MAP
OCALA, FLORIDA
VICINITY MAP
RUNWAY 36 RSA GRADING
AT
BID DOCUMENTS
PROJECT
LOCATION
G2.0
EXISTING CONDITIONS
COVER SHEET
GENERAL NOTES
FDOT FINANCIAL PROJECT NO.: 457809-1-94-01
FAA FUNDING NO.: 3-12-0055-038-2026
CITY OF OCALA PROJECT NO: AIR/260692
G1.0 PROJECT LAYOUT PLAN & HAUL ROUTES
MARK MORLEY, FL P.E. NO. 59813
G3.1-G3.2 CONSTRUCTION SAFETY & PHASING PLAN, NOTES AND DETAILS
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR
THE ABOVE SHEETS IN ACCORDANCE WITH RULE 61615-23.004, F.A.C.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND
SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
C5.1 GRADING AND DRAINAGE PLAN
DRAWING INDEX (ELECTRICAL)
THE BELOW NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR
THE ABOVE SHEETS IN ACCORDANCE WITH RULE 61615-23.004, F.A.C.
SHEET. No. DESCRIPTION
AIRFIELD ELECTRICAL LEGEND AND NOTESE0.1
MALSR MODIFICATION PLAN E1.1
MALSR PROFILE PLANE2.1
STATION 08 FOUNDATION AND STRUCTURE DETAILSE3.1
C6.1 PLAN & PROFILE
DOUG HAMBRECHT, FL P.E. NO. 57145
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR
THE ABOVE SHEETS IN ACCORDANCE WITH RULE 61615-23.004, F.A.C.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND
SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
C1.0 KEY SHEET
C2.0 SURVEY CONTROL PLAN
C4.1 DEMOLITION PLAN
C7.1 SODDING PLAN
STATION 08 ELECTRICAL DETAILSE3.0
AutoCAD SHX Text Phone: 811
AutoCAD SHX Text Sunshine State One Call of Florida, Inc.
AutoCAD SHX Text It's the Law!
AutoCAD SHX Text Call 48 hours
AutoCAD SHX Text before you dig
AutoCAD SHX Text Jacksonville
AutoCAD SHX Text Daytona
AutoCAD SHX Text Gainesville
AutoCAD SHX Text Palm Beach
AutoCAD SHX Text Miami
AutoCAD SHX Text Lauderdale
AutoCAD SHX Text Titusville
AutoCAD SHX Text Tampa
AutoCAD SHX Text Key West
AutoCAD SHX Text Fort Myers
AutoCAD SHX Text Vero Beach
AutoCAD SHX Text Pensacola
AutoCAD SHX Text Tallahassee
AutoCAD SHX Text
APPROXIMATE SCALE IN MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Beach
AutoCAD SHX Text
NORTH
AutoCAD SHX Text Orlando
AutoCAD SHX Text West
AutoCAD SHX Text Fort
AutoCAD SHX Text 737-300
AutoCAD SHX Text
NORTH
AutoCAD SHX Text 1" = 1000'
AutoCAD SHX Text
OCALA INTERNATIONAL AIRPORT
AutoCAD SHX Text
OCALA INTERNATIONAL AIRPORT
AIR
RELEASE
VALVE
2'x2' CONC.
DUCT
2'x2' CONC.
DUCT
2'x2' CONC. DUCT
2'x2' CONC. DUCT
2'x2' CONC.
DUCT
2'x2' CONC.
DUCT
2'x2' CABLE DUCT
10' WIDE LIMEROCK DRIVE 10' WIDE LIMEROCK DRIVE
' W
ID
E
LI
M
ER
O
C K
D R
IV
E
VAULT
EX
IS
TI
N
G B
ER
M
ANTENNA
F.A.A.
BUILDING
LI
M
ER
O
C K
D R
IV
E
AS
PH
AL
T
D R
IV
E
ROUGH ASPHALT
DRIVE
ASPHALT BLAST PAD
RUNWAY LIGHTS
RUNWAY LIGHTS
RUNWAY LIGHTS
CONC.
SLAB WITH
WARNING
LIGHTS
EXISTING
BERM
F.A.A.
ELECTRIC
VAULT
ELECTRIC
TRANSFORMER
PAD
CONC.
VAULT
STOP SIGN
2'x2' MALSER P. CABLE2'x2' CONC.
DUCT
2'x2' MALSER P.
CABLE
LIGHTS
GRAVEL
TELEPHONE
BOX
ELECTRIC
BOX
PROJECT LIMITS
ACCESS GATE
STAGING AREA
EQUIPMENT,
MATERIALS,
AND POVs
A-13
A-11
TAXIWAY A-12
G1.0
0 60 120 240
CONTRACTOR'S STAGING AREA
LEGEND
PROJECT LIMITS
CONTRACTOR'S HAUL ROUTE
Fil e P ath : C:
\U se rs\ ma ram .al da da
\Bo x\I
CE
TP
A\A
VIA
TIO
N\
Oc ala
\26 -03
1 R
SA
G rad ing \C
AD
D-dw g\(
2)_
G1 .0-
PR
OJ
EC
T L
AY
OU
T.d wg
D ate
: 4/
/20
2:
PM
REVISIONS
26-031
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
JM
JM MA
APRIL 2026
RUNWAY 36 RSA GRADING
341-334-000-000-09-33173
D
ES
IG
N
D O
C U
M
EN
TS
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
341-334-000-000-09-33173
PROJECT LAYOUT PLAN
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
Sheet Number:
Fil e P ath : C:
\U se rs\ ma ram .al da da
\Bo x\I
CE
TP
A\A
VIA
TIO
N\
Oc ala
\26 -03
1 R
SA
G rad ing \C
AD
D-dw g\(
3)_
G2 .0-
GE
NE
RA
L N
OT
ES
.dw g
D ate
: 4/
/20
2:
PM
REVISIONS
26-031
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
JM
JM MA
APRIL 2026
RUNWAY 36 RSA GRADING
341-334-000-000-09-33173
D
ES
IG
N
D O
C U
M
EN
TS
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
341-334-000-000-09-33173
GENERAL NOTES
GENERAL NOTES
1. CONSTRUCTION STAKE-OUT SHALL BE PERFORMED BY CONTRACTOR IN ACCORDANCE
WITH ARTICLE 50-06 OF THE GENERAL PROVISIONS OF THE CONTRACT DOCUMENTS. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL MEASUREMENTS
THAT MAY BE REQUIRED TO LAY OUT THE CONSTRUCTION. THE COST OF STAKING WILL
NOT BE PAID FOR DIRECTLY AND SHALL BE INCLUDED IN THE UNIT PRICES FOR THE
VARIOUS ITEMS OF WORK.
2. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE CLEANUP AND DISPOSAL OF ALL TRASH
AND DEBRIS CREATED BY HIS WORK OR PERSONNEL. NO BURNING IS ALLOWED ON SITE.
ALL TRASH AND DEBRIS MUST BE DISPOSED OF OFFSITE.
3. THE CONTRACTOR SHALL VISIT SITE TO DETERMINE EXISTING CONDITIONS PRIOR TO
SUBMITTING BID. THE CONTRACTOR SHALL REPORT TO THE ENGINEER ANY VARIATIONS
FROM THE INFORMATION SHOWN ON THE CONSTRUCTION PLANS.
4. EXISTING EASEMENTS TO OTHER PROPERTIES SHALL BE MAINTAINED AT ALL TIMES.
5. AIRFIELD PAVEMENTS SHALL BE KEPT FREE OF ALL DEBRIS, DIRT, ETC., AT ALL TIMES. ANY
SPILLAGE OF EXCAVATION OR OTHER MATERIAL SHALL BE CLEANED UP IMMEDIATELY BY
THE CONTRACTOR WITH A MOTOR DRIVEN SWEEPER OR VACUUM AS REQUIRED BY THE
ENGINEER. A PROGRAM OF REGULAR AIRFIELD PAVEMENT INSPECTION WILL BE PLANNED
BY THE CONTRACTOR, AIRPORT OPERATIONS AND THE OWNER'S REPRESENTATIVE.
SWEEPERS ARE TO BE EQUIPPED WITH NON-METALLIC BROOMS.
6. ALL NON-PAVED AREAS OUTSIDE THE LIMITS OF CONSTRUCTION WHICH ARE DISTURBED
BY THE CONTRACTOR'S OPERATIONS, SUCH AS THE CONTRACTOR'S ACCESS ROAD,
STAGING AREA, HAUL ROUTES, ETC., SHALL BE RESTORED TO THEIR ORIGINAL CONDITION
AND GRASSED PER ITEM T-901 UPON COMPLETION OF THE PROJECT.
7. ANY DAMAGES DONE TO AIRPORT PROPERTY OR UTILITIES (SUCH AS RUNWAY, TAXIWAYS,
APRONS, FENCING, EXISTING CABLES) WILL BE REPAIRED BY THE CONTRACTOR TO THE
APPROVAL OF THE OWNER OF THE FACILITY IN A SATISFACTORY MANNER. THE
CONTRACTOR WILL BEAR ALL COSTS FOR REPAIRS USING INDUSTRY STANDARD
PRACTICES AND MATERIALS.
8. THE CONTRACTOR SHALL MAINTAIN SECURITY WITHIN THE PROJECT SITE AT ALL TIMES.
NO UNAUTHORIZED PERSONNEL SHALL BE ALLOWED ON THE SITE.
9. CONTRACTOR SHALL MAINTAIN ALL AIRFIELD SAFETY DEVICES SUCH AS STAKED LIMIT
LINES, FOR THE DURATION OF THE PROJECT AS REQUIRED. DAMAGED STAKES OR
FLAGGING SHALL BE REPLACED IMMEDIATELY. CONTRACTOR TO SUBMIT PLAN SHOWING
LOCATION OF LIMIT LINES FOR EACH PHASE AND FOR PROJECT DURATION TO THE
ENGINEER FOR APPROVAL.
10. THE CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY FOR THE COMPLETION OF
THIS PROJECT.
11. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL ENVIRONMENTAL RULES
AND REGULATIONS OF THE CITY, COUNTY, STATE, ARMY CORPS OF ENGINEERS, AND ANY
OTHER JURISDICTIONAL AGENCIES, AND ALL CONDITIONS SET FORTH IN ENVIRONMENTAL
PERMITS.
12. AIRCRAFT OPERATING ON THE AIRFIELD MAKE THE CONSTRUCTION AREA A ZONE OF HIGH
LEVEL NOISE. THE CONTRACTOR IS ADVISED TO TAKE THE NECESSARY PRECAUTIONS,
SUCH AS THE USE OF EAR PLUGS AND EAR MUFFS TO PREVENT EAR INJURY TO ANY
PERSONNEL WORKING IN THE AREA.
13. ALL DISPUTES ARISING FROM THE CONTRACTOR SHALL BE DECIDED BY THE ENGINEER,
WHOSE DECISION SHALL BE FINAL.
14. BURNING OF DEBRIS WILL NOT BE ALLOWED ON AIRPORT PROPERTY.
15. ALL DEMOLISHED MATERIALS BECOME THE PROPERTY OF THE CONTRACTOR UNLESS
OTHERWISE SHOWN IN THE CONTRACT DOCUMENTS. CONSTRUCTION AND DEMOLITION
DEBRIS SHALL BE LEGALLY DISPOSED OF OFF AIRPORT PROPERTY.
16. THE CONTRACTOR SHALL KEEP A WATER TRUCK ONSITE AT ALL TIMES FOR THE PURPOSE
OF CONTROLLING DUST AS REQUIRED BY THE CONTRACT DOCUMENTS.
17. ALL CONSTRUCTION WITHIN A RESTRICTED AREA SHALL BE PERFORMED IN SUCH A
MANNER THAT, AT THE END OF THE CLOSURE PERIOD, IT WILL LEAVE THE SAFETY AREA
WITH NO ABRUPT GRADE CHANGES OR GRADES IN EXCESS OF 5 PERCENT, AND WITH NO
TRENCHES WITH DEPTH OR WIDTH GREATER THAN 3 INCHES.
HAUL ROUTE / STAGING
18. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE STORAGE AND SECURITY OF HIS
MATERIAL AND EQUIPMENT AND SHALL ERECT STORAGE FACILITIES AND FENCING AS
NECESSARY. THE CONTRACTOR'S STORAGE AND STAGING AREA SHALL BE IN THE
LOCATION SHOWN ON DRAWING G1.0.
19. THE CONTRACTOR'S STAGING AREA(S) AND HAUL ROUTES SHOWN ON THE PLANS ARE
GENERAL AND FOR INFORMATIONAL PURPOSES ONLY. THE ACTUAL SIZE AND LOCATION
OF STAGING AREAS AND HAUL ROUTES WILL BE APPROVED BY THE OWNER PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL RESTORE THE GROUND OF THE STAGING AREA AT
THEIR COST.
20. CONTRACTOR WILL NOT BE ALLOWED TO USE ANY OF THE EXISTING RUNWAYS OR
TAXIWAYS AS PART OF THE HAUL ROAD UNLESS SPECIFICALLY AUTHORIZED BY THE
OWNER'S REPRESENTATIVE. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR CROSS
ANY RUNWAY AT ANY TIME WITH CONSTRUCTION VEHICLES OR EQUIPMENT.
21. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT AREA THROUGH THE
PROJECT ACCESS ROUTES APPROVED BY THE ENGINEER ONLY. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR THE SECURITY OF ALL GATES HE USES FOR ACCESS ONTO AIRPORT
PROPERTY. THE CONTRACTOR SHALL POST A GUARD AT ANY ACCESS GATE THAT IS NOT
LOCKED.
22. THE OWNER'S REPRESENTATIVE SHALL DESIGNATE AREAS TO BE USED BY THE
CONTRACTOR FOR THE PARKING OF CONSTRUCTION EQUIPMENT AND VEHICLES WHEN
NOT ENGAGED IN THE CONSTRUCTION DURING NON-WORKING DAYS AND NIGHTS AS WELL
AS AREAS FOR CONTRACTOR'S EMPLOYEES AUTO PARKING.
23. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PROVIDING ALL PERMANENT
AND TEMPORARY UTILITY CONNECTIONS TO THE STAGING AREA.
MOVEMENT ON AIRFIELD
24. AREAS OUTSIDE THE PROJECT LIMITS ARE DESIGNATED AS RESTRICTED AREAS. THE
CONTRACTOR'S FORCES ARE PROHIBITED FROM ENTERING RESTRICTED AREAS AT ANY
TIME, UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER'S REPRESENTATIVE OR
AIRPORT OPERATIONS.
25. THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATIONS AS SHOWN ON THE
CONSTRUCTION SAFETY & PHASING PLAN, AND HIS APPROVED PHASING PLAN. THE
CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE OWNER'S
REPRESENTATIVE TO MINIMIZE INTERFERENCE TO AIRCRAFT OPERATIONS DURING
CONSTRUCTION.
26. NO CONTRACTOR VEHICLES, EQUIPMENT, OR PERSONNEL SHALL CROSS OR BE WITHIN
ANY RUNWAY SAFETY AREA OR WITHIN ANY TAXIWAY OBJECT FREE AREA AS DELINEATED
IN THE PLANS. THE CONTRACTOR SHALL NOT PARK OR LEAVE UNATTENDED ANY
EQUIPMENT WITHIN THE RUNWAY OBJECT FREE AREA (ROFA) OR THE RUNWAY
PROTECTION ZONE (RPZ). EQUIPMENT NOT MANNED AND BEING USED SHALL NOT BE
ALLOWED WITHIN THE ROFA OR RPZ.
27. ALL VEHICLES USED ON THE AIRFIELD SHALL MEET FAA REQUIREMENTS FOR MARKINGS
AND LIGHTING. (SEE AC 150/5210-5D).
28. ALL ACTIVE AIRPORT OPERATIONAL AREAS WHICH ARE ADJACENT TO A CONSTRUCTION
WORK AREA SHALL BE SEPARATED BY TYPE II LOW PROFILE BARRICADES OR OTHER
BARRIER APPROVED BY THE ENGINEER. NO CONSTRUCTION TRAFFIC WILL CROSS ACTIVE
AIRPORT OPERATIONAL AREAS. THE CONTRACTOR SHALL PROVIDE AND INSTALL THE
BARRIERS AS SHOWN ON THE DRAWINGS AND WHERE DIRECTED BY THE ENGINEER. SEE
SPECIFICATION 01030 AND 01530 FOR ADDITIONAL INFORMATION.
29. THE CONTRACTOR SHALL WORK WITH THE ENGINEER IN SCHEDULING ALL TAXIWAY
OPENINGS/CLOSINGS TO BE CONSISTENT WITH AIRFIELD OPERATIONS. WHEN THE
CONTRACTOR'S OPERATIONS CROSS ACTIVE TAXIWAYS, HE SHALL BE REQUIRED TO
PROVIDE A FLAGMAN ON EACH SIDE OF THE ACTIVE CROSSING TO DIRECT VEHICULAR
TRAFFIC AND PROTECT AIRCRAFT TRAFFIC. THE CONTRACTOR SHALL ALSO HAVE
SUITABLE EQUIPMENT APPROVED BY THE ENGINEER AT EACH CROSSING TO KEEP THE
CROSSING CLEAN OF ALL DIRT AND DEBRIS AND SAFE FOR AIRCRAFT TRAFFIC.
BURIED UTILITIES
30. PRIOR TO DIGGING ANY TRENCHES, THE CONTRACTOR SHALL NOTIFY AIRPORT FOR ALL
UTILITIES (ELECTRIC, GAS, TELEPHONE, WATER, FIBER, AND ETC.) AND OBTAIN LOCATIONS
OF UNDERGROUND UTILITIES.
31. CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND IDENTIFICATION OF ALL
EXISTING UTILITIES AND UNDERGROUND PIPELINES IN CONSTRUCTION AREA. ANY
DAMAGES TO EXISTING UTILITIES OR UNDERGROUND PIPELINES ON OR OFF AIRPORT
PROPERTY SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL REPAIR WORK
SHALL MEET THE APPROVAL OF THE OWNER OF THE DAMAGED UTILITY. NO
REIMBURSEMENT WILL BE ALLOWED FOR UTILITY/PIPE REPAIR OR REPLACEMENT.
32. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES, AIRFIELD LIGHTING AND NAVAIDS
NOT CALLED OUT TO BE REMOVED OR ABANDONED. ANY DAMAGES DONE TO AIRPORT
PROPERTY OR UTILITIES (INCLUDING, BUT NOT LIMITED T0 RUNWAYS, TAXIWAYS, APRONS,
FENCING, EXISTING CABLES, LIGHTING, SIGNS, NAVAIDS) WILL BE REPAIRED BY THE
CONTRACTOR TO THE APPROVAL OF THE OWNER OF THE FACILITY IN A SATISFACTORY
MANNER. THE CONTRACTOR WILL BEAR ALL COSTS FOR REPAIRS.
33. ANY UNPLANNED, UNAPPROVED, OR ACCIDENTAL SHUTDOWN OR INTERRUPTION OF
SERVICE TO ANY LIGHTING CIRCUIT OR NAVIGATIONAL AID REQUIRES IMMEDIATE
NOTIFICATION OF AIRPORT OPERATIONS AND THE OWNER'S REPRESENTATIVE BY THE
CONTRACTOR. THE COST OF MATERIALS AND LABOR REQUIRED TO REPAIR THE LIGHTING
CIRCUIT SHALL BE BORNE BY THE CONTRACTOR.
G2.0
LIQUIDATED DAMAGES
36. LIQUIDATED DAMAGES AS SHOWN ON THE CITY'S BID DOCUMENTS SHALL BE ASSESSED FOR:
A. EACH DAY BEYOND THE SPECIFIED CONTRACT TIME FOR EACH PHASE THAT IS NOT SUBSTANTIALLY COMPLETE.
BADGING
37. A MINIMUM OF ONE EMPLOYEE MUST BE BADGED TO SUPERVISE CREWS AT ALL TIMES. NO COST FOR AIRPORT BADGE.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
VALVE
2'x2' CONC.
DUCT
2'x2' CONC.
DUCT
2'x2' CONC.
DUCT
2'x2' CABLE DUCT
10' WIDE LIMEROCK DRIVE 10' WIDE LIMEROCK DRIVE
' W
ID
E
LI
M
ER
O
C K
D R
IV
E
VAULT
ANTENNA
F.A.A.
BUILDING
ROUGH ASPHALT
DRIVE
ASPHALT BLAST PAD
RUNWAY LIGHTS
RUNWAY LIGHTS
RUNWAY LIGHTS
CONC.
SLAB WITH
WARNING
LIGHTS
EXISTING
BERM
F.A.A.
ELECTRIC
VAULT
ELECTRIC
TRANSFORMER
PAD
CONC.
VAULT
STOP SIGN
2'x2' MALSER P. CABLE2'x2' CONC.
DUCT
LIGHTS
GRAVEL
TELEPHONE
BOX
ELECTRIC
BOX
ACCESS GATE
A-13
A-11
TAXIWAY A-12
STAGING AREA
EQUIPMENT,
MATERIALS,
AND POVs
LIGHTED "X" RUNWAY CLOSURE
AT NIGHT - TO BE PROVIDED BY
THE CONTRACTOR
PLACE LOW PROFILE BARRICADES ON
ALL NON-MOVEMENT LINES, TYP.
(TOTAL: 7 TAXIWAYS)
G3.1
0 75 150 300
Fil e P ath : C:
\U se rs\ ma ram .al da da
\Bo x\I
CE
TP
A\A
VIA
TIO
N\
Oc ala
\26 -03
1 R
SA
G rad ing \C
AD
D-dw g\(
4)_
G3 .1-
G3 .2-
CS
PP
.dw g
D ate
: 4/
/20
:37
AM
REVISIONS
26-031
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
JM
JM MA
APRIL 2026
RUNWAY 36 RSA GRADING
341-334-000-000-09-33173
D
ES
IG
N
D O
C U
M
EN
TS
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
341-334-000-000-09-33173
CONSTRUCTION SAFETY
& PHASING PLAN
LOW PROFILE BARRICADES
RUNWAY CLOSURE MARKER
CONSTRUCTION PHASE 1 LIMITS
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREA
LEGEND
PHASE LIQUIDATED
THE CONTRACTOR MAY ONLY PERFORM WORK AT NIGHT.
RUNWAY IS TO BE CLOSED DURING ANY CONSTRUCTION WORK.
ANY DEVIATION FROM THIS SCHEDULE REQUIRES PRE-APPROVAL
FROM AIRPORT MANAGER. HOURS OF RUNWAY CLOSURE WILL
EXTEND FROM 8:00 PM TO 6:00 AM
DURATION DAMAGES
1 30 CALENDAR
DAYS
(NIGHT WORK)
DESCRIPTION OF WORK IMPACT
REFER TO THE
CITY'S BID
DOCUMENTS FOR
LIQUIDATED
DAMAGES
GRADE THE RUNWAY SAFETY AREA.
RUNWAY CLOSURE MARKER TO BE PLACED BEFORE COMMENCEMENT OF
CONSTRUCTION ACTIVITY AND REMOVED BEFORE RE-OPENING OF
RUNWAY 18-36 DAILY. CONTRACTOR RESPONSIBLE FOR INSTALLING AND
MAINTAINING LIGHTED "X" CLOSURE MARKER DAILY.
PROJECT DURATION NOTES:
1. THE CLOSEOUT PHASE EXTENDS FOR A PERIOD OF 30 DAYS.
2. THE TOTAL PROJECT DURATION EXTENDS FOR A PERIOD OF 60 DAYS.
3. ANY DELAY ATTRIBUTABLE TO REQUIRED COORDINATION WITH THE CONCURRENT PROJECT SHALL CONSTITUTE AN EXCUSABLE
DELAY, AND NO LIQUIDATED DAMAGES SHALL BE ASSESSED FOR SUCH DELAYS.
NOTE: THE CONTRACTOR SHALL COORDINATE MALSR CONSTRUCTION
EFFORT WITH THE CONCURRENT PROJECT THAT WILL TAKEPLACE WIITHIN
THE SAME PROJECT LIMITS/ PROJECT TIMEFRAME.
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
ROFA
RSA
G3.2Fil ath : C:
\U se rs\ ma ram .al da da
\Bo x\I
CE
TP
A\A
VIA
TIO
N\
Oc ala
\26 -03
1 R
SA
G rad ing \C
AD
D-dw g\(
4)_
G3 .1-
G3 .2-
CS
PP
.dw g
D ate
: 4/
/20
2:
PM
REVISIONS
26-031
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
JM
JM MA
APRIL 2026
RUNWAY 36 RSA GRADING
341-334-000-000-09-33173
D
ES
IG
N
D O
C U
M
EN
TS
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
341-334-000-000-09-33173
CSPP NOTES & DETAILS
CAUTION LIGHTS
LOW PROFILE BARRICADE DETAIL
N.T.S.
NOTES:
1) ALL BARRICADES SHALL BE LINKED END TO END IN ALL LOCATIONS.
2) FRANGIBLE, LOW PROFILE BARRICADES SHALL BE USED WHERE
WORK IS ADJACENT TO ACTIVE AIRCRAFT OR INSIDE OF AN ACTIVE
TAXIWAY'S SAFETY AREA. CAUTION LIGHTS TO BE RED IN COLOR AND
FLASHING DURING HOURS OF DARKNESS.
3) SECURE EACH BARRICADES WITH TWO SAND BAGS OR USE WATER
FILLED.
3'
MIN.
3'
MIN.
NOTE:
SAFETY FLAG SHALL BE PROMINENTLY DISPLAYED ON ALL
CONSTRUCTION EQUIPMENT. AN AMBER FLASHING LIGHT IS
REQUIRED FOR NIGHT WORK AND MAY BE SUBSTITUTED FOR
THE FLAG DURING THE DAY.
CONSTRUCTION SAFETY FLAG
TRAFFIC CONE
N.T.S.
AVIATION ORANGE
AVIATION WHITE
NOTES
1. THE CONTRACTOR SHALL OBTAIN, HAVE KNOWLEDGE OF, AND INCORPORATE THE FOLLOWING SAFETY PROVISIONS
INTO THE CONSTRUCTION PROJECT:
1.1. OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION - AC 150/5370-2, LATEST EDITION.
1.2. AIRPORT SAFETY SELF-INSPECTION - AC 150/5200-18, LATEST EDITION.
1.3. PAINTING, MARKING AND LIGHTING OF VEHICLES USED ON AIRPORTS - AC 150/5210-5, LATEST EDITION.
1.4. CODE OF FEDERAL REGULATIONS (CFR) PART 139
2. NOTICE TO AIRMEN (NOTAM) - THE AIRPORT WILL ISSUE ALL NOTAMS TO THE FAA FLIGHT SERVICE STATION RELATED
TO THIS PROJECT IN ACCORDANCE WITH ESTABLISHED CRITERIA.
3. FOR OTHER CONDITIONS RELATED TO SAFETY, SEE SPECIFICATIONS.
4. PRIOR TO THE CLOSURE OF ANY AIRFIELD PAVEMENT, THE CONTRACTOR SHALL PROVIDE A MINIMUM OF 3
DAYS NOTICE SO A NOTAM CAN BE ISSUED.
5. AIRCRAFT TRAFFIC SHALL HAVE THE RIGHT-OF-WAY AT ALL TIMES.
6. THE CONTRACTOR WILL NOT BE ALLOWED TO USE ANY OF THE EXISTING RUNWAYS, TAXIWAYS, OR VEHICLE PARKING AREAS AS PART OF THE HAUL ROAD UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER.
7. THE CONTRACTOR SHALL CONDUCT THEIR CONSTRUCTION OPERATIONS AS SHOWN ON THE PLANS. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE OWNER TO MINIMIZE
INTERFERENCE TO AIRCRAFT OPERATIONS DURING CONSTRUCTION.
8. NO CONTRACTOR VEHICLES, EQUIPMENT, OR PERSONNEL SHALL CROSS OR BE WITHIN ANY RUNWAY, TAXIWAY, OR
TAXILANE OBJECT FREE AREA UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER.
9. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER IN SCHEDULING ALL AIRFIELD PAVEMENT OPENINGS/CLOSINGS TO BE CONSISTENT WITH AIRFIELD OPERATIONS. WHEN THE CONTRACTOR'S OPERATIONS CROSS ACTIVE TAXIWAYS OR RUNWAYS HE SHALL BE REQUIRED TO PROVIDE A FLAGMAN ON EACH SIDE OF ACTIVE CROSSING TO DIRECT VEHICULAR TRAFFIC AND PROTECT AIRCRAFT TRAFFIC. THE CONTRACTOR SHALL ALSO HAVE SUITABLE EQUIPMENT APPROVED BY THE ENGINEER AT EACH CROSSING TO KEEP THE
CROSSING CLEAN OF ALL DIRT AND DEBRIS AND SAFE FOR AIRCRAFT TRAFFIC.
10. ALL AIRFIELD PAVEMENTS SHALL BE KEPT FREE OF DIRT AND ALL OTHER DEBRIS AT ALL TIMES. ANY SPILLAGE OF EXCAVATION OF OTHER MATERIAL SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR USING A VACUUM OR MOTOR-DRIVEN SWEEPER. A PROGRAM OF REGULAR INSPECTION OF AIRFIELD PAVEMENTS SHALL BE IMPLEMENTED AS
PART OF THE CONTRACTOR'S SAFETY PLAN COMPLIANCE DOCUMENT.
11. ANY UNPLANNED, UNAPPROVED, OR ACCIDENTAL SHUTDOWN OR INTERRUPTION OF SERVICE TO ANY LIGHTING CIRCUIT OR NAVIGATIONAL AID REQUIRES IMMEDIATE NOTIFICATION OF THE AIRPORT MANAGER AND ENGINEER BY THE CONTRACTOR. THE COST OF MATERIALS AND LABOR REQUIRED TO REPAIR THE LIGHTING CIRCUIT SHALL BE BORNE BY
THE CONTRACTOR.
12. THE CONTRACTOR SHALL PROTECT ALL NAVIGATIONAL AIDS (NAVAIDS) DURING CONSTRUCTION. CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGE TO EXISTING NAVAIDS. ANY DAMAGE TO NAVAIDS MAY REQUIRE SUBMITTALS FOR REPAIR OF THE DAMAGED FACILITY TO BE APPROVED BY THE ENGINEER. THE ENGINEER SHALL BE NOTIFIED OF ANY
DAMAGE AND IMMEDIATE REPAIR AT THE CONTRACTOR'S EXPENSE WILL BE REQUIRED.
13. CONTRACTOR SHALL MAINTAIN ALL AIRFIELD SAFETY DEVICES SUCH AS STAKED LIMIT LINES, FOR THE DURATION OF THE PROJECT AS REQUIRED. DAMAGED STAKES OR FLAGGING SHALL BE REPLACED IMMEDIATELY. CONTRACTOR TO SUBMIT PLAN SHOWING LOCATION OF LIMIT LINES FOR EACH PHASE AND FOR PROJECT
DURATION TO THE ENGINEER FOR APPROVAL.
14. ALL ACTIVE AIRPORT OPERATIONAL AREAS WHICH ARE ADJACENT TO A CONSTRUCTION WORK AREA SHALL BE SEPARATED BY LOW PROFILE BARRICADES WITH RED FLASHING LIGHTS. THE CONTRACTOR SHALL PROVIDE, MAINTAIN, AND INSTALL THE BARRICADES.
15. BARRICADES USED TO CLOSE NON-AIRFIELD AREAS SUCH AS ROADS OR PARKING LOTS SHALL CONFORM TO FDOT INDEX 600. ACCEPTABLE OPTIONS INCLUDE PLASTIC DRUMS, TYPE I BARRICADE, TYPE II BARRICADE, OR TYPE III
BARRICADE.
16. THE CONTRACTOR SHALL PROVIDE TEMPORARY R11-2, 48 x 30 "ROAD CLOSED" SIGNS TO BE USED IN CONJUNCTION WITH TRAFFIC BARRELS AT ALL LOCATIONS TO BE CLOSED TO VEHICULAR TRAFFIC.
17. CONTRACTOR MAY AT HIS OPTION PROVIDE TEMPORARY CHAIN LINK FENCE AROUND THE CONTRACTOR'S STAGING AREA. THE CITY ASSUMES NO RESPONSIBILITY FOR THE SECURITY OF EQUIPMENT, MATERIAL, OR ANY
OTHER ELEMENTS RELATED TO THE CONTRACTOR'S OPERATIONS.
18. THE CONTRACTOR SHALL PROMINENTLY DISPLAY AVIATION SAFETY FLAGS ON ALL CONSTRUCTION EQUIPMENT AT THE HIGHEST POINT ON EACH PIECE OF EQUIPMENT. ALL VEHICLES MUST BE MARKED WITH CONTRACTOR OR
SUBCONTRACTOR COMPANY NAME.
19. FOR OTHER CONDITIONS RELATING TO SAFETY, SEE CONSTRUCTION SAFETY AND PHASING DOCUMENT (CSPP).
20. GATES MUST REMAIN CLOSED AT ALL TIMES UNLESS GUARDED BY A COMPETENT EMPLOYEE OF THE CONTRACTOR.
FLAG
(SEE DETAIL
THIS SHEET)
LIGHTED "X" RUNWAY CLOSURE
N.T.S.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
VALVE
2'x2' CONC.
DUCT
2'x2' CONC.
DUCT
2'x2' CONC. DUCT
2'x2' CONC. DUCT
2'x2' CONC.
DUCT
2'x2' CONC.
DUCT
2'x2' CABLE DUCT
10' WIDE LIMEROCK DRIVE 10' WIDE LIMEROCK DRIVE
' W
ID
E
LI
M
ER
O
C K
D R
IV
E
VAULT
EX
IS
TI
N
G B
ER
M
ANTENNA
F.A.A.
BUILDING
LI
M
ER
O
C K
D R
IV
E
AS
PH
AL
T
D R
IV
E
ROUGH ASPHALT
DRIVE
ASPHALT BLAST PAD
RUNWAY LIGHTS
RUNWAY LIGHTS
RUNWAY LIGHTS
CONC.
SLAB WITH
WARNING
LIGHTS
EXISTING
BERM
F.A.A.
ELECTRIC
VAULT
ELECTRIC
TRANSFORMER
PAD
CONC.
VAULT
STOP SIGN
2'x2' MALSER P. CABLE2'x2' CONC.
DUCT
2'x2' MALSER P.
CABLE
LIGHTS
GRAVEL
TELEPHONE
BOX
ELECTRIC
BOX
ACCESS GATE
A-11
TAXIWAY A-12
CX.1
A-13
C1.0
0 75 150 300
Fil e P ath : C:
\U se rs\ ma ram .al da da
\Bo x\I
CE
TP
A\A
VIA
TIO
N\
Oc ala
\26 -03
1 R
SA
G rad ing \C
AD
D-dw g\(
6)_
C1 .0-
KE
Y M
AP
.dw g D ate : 4/
/20
2:
PM
REVISIONS
26-031
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
JM
JM MA
APRIL 2026
RUNWAY 36 RSA GRADING
341-334-000-000-09-33173
D
ES
IG
N
D O
C U
M
EN
TS
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
341-334-000-000-09-33173
KEY MAP
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
A-13
A-11
TAXIWAY A-12
BM-1
SET IRON ROD & CAP (5 8"WITLB5091)
NORTHING = 1753964.6440
EASTING = 584574.6840
ELEVATION = 65.23'
BM-2
SET IRON ROD & CAP (5 8"WITLB5091)
NORTHING = 1753935.0300
EASTING = 585419.6290
ELEVATION = 72.37'
BM-3
SET IRON ROD & CAP (5 8"WITLB5091)
NORTHING = 1752903.6160
EASTING = 585388.6730
ELEVATION = 65.72'
BM-4
SET IRON ROD & CAP (5 8"WITLB5091)
NORTHING = 1752878.8670
EASTING = 584570.6039
ELEVATION = 75.72'
S87°59'34"E 845.46'
S1°43'09"W 1031.88'
S88°16'02"W 818.44'
N0°12'55"E 1085.78'
Fil e P ath : C:
\U se rs\ ma ram .al da da
\Bo x\I
CE
TP
A\A
VIA
TIO
N\
Oc ala
\26 -03
1 R
SA
G rad ing \C
AD
D-dw g\(
7)_
C2 .0
Su rve y C on tro l P lan .dw g D ate : 4/
/20
2:
PM
REVISIONS
26-031
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
JM
JM MA
APRIL 2026
RUNWAY 36 RSA GRADING
341-334-000-000-09-33173
D
ES
IG
N
D O
C U
M
EN
TS
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
341-334-000-000-09-33173
C2.0
SURVEY CONTROL PLAN
0 75 150 300
GENERAL SURVEY REQUIREMENTS:
1. THE NEED FOR PRECISE SURVEY CONTROLS IS OF THE UTMOST IMPORTANCE ON
THE PROJECT TO VALIDATE QUANTITIES AND MAINTAIN THE OVERALL PROJECT
BUDGET. THE CONTRACTOR, IN ADDITION TO VERIFYING THE DESIGN SURVEY
CONTROLS, SHALL ALSO VERIFY THE TOPOGRAPHIC SURVEY. THE DESIGN
SURVEY SHALL BE MADE AVAILABLE TO THE CONTRACTOR WITH FULL
EXPECTATION OF COMPLIANCE. ANY DISCREPANCIES WITH THE DESIGN SURVEY
SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER FOR
RESOLUTION PRIOR TO PROCEEDING WITH ANY FIELD WORK. NO CONSTRUCTION
WORK MAY BEGIN UNTIL THE SURVEY VERIFICATION IS COMPLETED.
2. CONTRACTOR'S SURVEY: THE CONTRACTOR WILL BE GIVEN THE DESIGN SURVEY
FOR HIS/HER REVIEW PRIOR TO LAYOUT. UPON VERIFICATION OF THE DESIGN
SURVEY THE CONTRACTOR SHALL SET UP A LONGITUDINAL AND TRANSVERSE
GRID WHICH MATCHES THE DESIGN SURVEY GRID ON THE PAVED SURFACES
(ALONG THE STATIONING) EXTENDING OUTWARD TO THE EDGE OF THE WORK.
THE HORIZONTAL (X, Y) AND THE VERTICAL (Z) COORDINATES OF EACH POINT ON
THE GRID SHALL BE PLOTTED AND SUBMITTED TO THE ENGINEER FOR REVIEW AT
LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION ACTIVITIES. SURVEY SHALL BE
PROVIDED IN ELECTRONIC FORMAT (AUTOCAD CIVIL 3D).
SURVEY CONTROL NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL CONTROL POINTS TO BE USED FOR
CONSTRUCTION PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITY. SHOULD
ANY DISCREPANCIES BE FOUND, THE CONTRACTOR SHALL IMMEDIATELY ALERT
THE ENGINEER AND SHALL NOT PROCEED WITH CONSTRUCTION UNTIL THE
DISCREPANCIES ARE RESOLVED.
2. THE CONTRACTOR SHALL PROTECT ALL CONSTRUCTION CONTROL POINTS
DURING THE ENTIRE DURATION OF CONSTRUCTION. SHOULD SOME CONTROL
POINTS BE DISLODGED, THE CONTRACTOR SHALL RE-SET THEM.
SURVEY CONTROL POINTS:
BM-1
N: 1753964.6440' E: 584574.6840'
ELEV.: 65.23'
BM-2
N:1753935.0300' E: 585419.6290'
ELEV.: 72.37'
BM-3
N:1752903.6160' E: 585388.6730'
ELEV.: 65.72'
BM-4
N:1752878.8670' E: 584570.6040'
ELEV.: 75.72'
HORIZONTAL PROJECTION
NAD83 FLORIDA STATE PLANES,
WEST ZONE, US FOOT
VERTICAL DATUM
NAVD88
SURVEY NOTES:
1. DATE OF FIELD SURVEY: FEBRUARY 12, 2026
2. SUBJECT TO RIGHTS OF WAY, RESTRICTIONS, EASEMENTS AND RESERVATIONS OF
RECORD.
3. UNLESS OTHERWISE SHOWN, UNDERGROUND IMPROVEMENTS NOT LOCATED.
4. PUBLIC RECORDS NOT SEARCHED BY R.M. BARRINEAU & ASSOCIATES, INC.
5. BEARINGS AND STATE PLANE COORDINATES DEPICTED HEREON ARE GRID, WEST
FLORIDA ZONE, NAD-83 (CORS96) EPOCH:2002.0000), BASED ON TRIMBLE VIRTUAL
REFERENCE STATION NETWORK AND REFERENCED TO CITY OF OCALA ENGINEERING
DEPARTMENT CONTROL POINT 0011.
6. VERTICAL DATUM BASED ON CITY OF OCALA ENGINEERING DEPARTMENT CONTROL
POINT 0011 WITH AN ELEVATION OF 85.20', NAVD-88.
7. ORIENTATION FOR THE IMPROVEMENTS SHOWN HEREON SHOULD NOT BE USED TO
RECONSTRUCT BOUNDARY LINES.
8. ADDITIONS OR DELETIONS TO SURVEY MAPS BY OTHER THAN THE SIGNING PARTY OR
PARTIES IS PROHIBITED WITHOUT WRITTEN CONSENT OF THE SIGNING PARTY OR
PARTIES.
9. THIS SURVEY DEPICTS THE PROPERTY AS IT EXISTED ON THE SURVEY DATE, NOT
NECESSARILY THE SIGNATURE DATE.
10. THIS SURVEY HAS BEEN PREPARED FOR THE EXCLUSIVE BENEFIT OF THE PARTY(IES)
NAMED HEREON, AND SHALL NOT BE DUPLICATED OR RELIED UPON BY ANY OTHER
INDIVIDUAL OR ENTITY WITHOUT AUTHORIZATION FROM R.M. BARRINEAU & ASSOCIATES,
INC.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
GRAVEL
e P ath : C:
\U se rs\ ma ram .al da da
\Bo x\I
CE
TP
A\A
VIA
TIO
N\
Oc ala
\26 -03
1 R
SA
G rad ing \C
AD
D-dw g\(
8)_
C3 .1-
C3 .2
Ex ist ing C on dit ion Pl an .dw g D ate : 4/
/20
2:
PM
REVISIONS
26-031
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
JM
JM MA
APRIL 2026
RUNWAY 36 RSA GRADING
341-334-000-000-09-33173
D
ES
IG
N
D O
C U
M
EN
TS
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
341-334-000-000-09-33173
C3.1
EXIST. CONDITION PLAN
0 20 40 80
LEGEND
AutoCAD SHX Text
80' ELECTIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
60' ELECTRIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
20' ELECTRIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
25' ELECTRIC EASEMENT PER O.R.B. 160, PAGE 761
AutoCAD SHX Text 150.48' (2.28 CHAINS) ' (2.28 CHAINS) 8 CHAINS) CHAINS) ELECTRIC EASEMENT PER DEED BOOK 271, PAGE 15 & & O.R.B. 9, PAGE 494
AutoCAD SHX Text 75.81
AutoCAD SHX Text 75.73
AutoCAD SHX Text 75.69
AutoCAD SHX Text 75.61
AutoCAD SHX Text 75.53
AutoCAD SHX Text 75.31
AutoCAD SHX Text 75.08
AutoCAD SHX Text 74.94
AutoCAD SHX Text 75.39
AutoCAD SHX Text 75.30
AutoCAD SHX Text 75.23
AutoCAD SHX Text 75.22
AutoCAD SHX Text 75.18
AutoCAD SHX Text 74.97
AutoCAD SHX Text 76.10
AutoCAD SHX Text 76.04
AutoCAD SHX Text 75.97
AutoCAD SHX Text 75.89
AutoCAD SHX Text 75.79
AutoCAD SHX Text 75.74
AutoCAD SHX Text 75.66
AutoCAD SHX Text 75.60
AutoCAD SHX Text 75.55
AutoCAD SHX Text 75.52
AutoCAD SHX Text 75.24
AutoCAD SHX Text 75.28
AutoCAD SHX Text 74.93
AutoCAD SHX Text 74.30
AutoCAD SHX Text 74.45
AutoCAD SHX Text 74.59
AutoCAD SHX Text 74.60
AutoCAD SHX Text 75.15
AutoCAD SHX Text 74.33
AutoCAD SHX Text 75.08
AutoCAD SHX Text 75.51
AutoCAD SHX Text 75.68
AutoCAD SHX Text 75.36
AutoCAD SHX Text 75.16
AutoCAD SHX Text 75.30
AutoCAD SHX Text 75.27
AutoCAD SHX Text 75.45
AutoCAD SHX Text 75.53
AutoCAD SHX Text 75.60
AutoCAD SHX Text 75.59
AutoCAD SHX Text 75.61
AutoCAD SHX Text 75.70
AutoCAD SHX Text 75.76
AutoCAD SHX Text 75.85
AutoCAD SHX Text 76.05
AutoCAD SHX Text 76.03
AutoCAD SHX Text 75.96
AutoCAD SHX Text 75.90
AutoCAD SHX Text 75.81
AutoCAD SHX Text 75.80
AutoCAD SHX Text 75.70
AutoCAD SHX Text 75.65
AutoCAD SHX Text 75.59
AutoCAD SHX Text 75.57
AutoCAD SHX Text 75.83
AutoCAD SHX Text 75.84
AutoCAD SHX Text 75.91
AutoCAD SHX Text 75.97
AutoCAD SHX Text 76.04
AutoCAD SHX Text 76.05
AutoCAD SHX Text 76.16
AutoCAD SHX Text 76.23
AutoCAD SHX Text 76.29
AutoCAD SHX Text 76.31
AutoCAD SHX Text 76.57
AutoCAD SHX Text 76.58
AutoCAD SHX Text 76.49
AutoCAD SHX Text 76.40
AutoCAD SHX Text 76.28
AutoCAD SHX Text 76.19
AutoCAD SHX Text 76.16
AutoCAD SHX Text 76.07
AutoCAD SHX Text 76.06
AutoCAD SHX Text 75.82
AutoCAD SHX Text 75.20
AutoCAD SHX Text 75.11
AutoCAD SHX Text 75.62
AutoCAD SHX Text 75.76
AutoCAD SHX Text 75.86
AutoCAD SHX Text 75.89
AutoCAD SHX Text 75.96
AutoCAD SHX Text 76.04
AutoCAD SHX Text 76.10
AutoCAD SHX Text 76.18
AutoCAD SHX Text 76.28
AutoCAD SHX Text 76.32
AutoCAD SHX Text 76.34
AutoCAD SHX Text 73.98
AutoCAD SHX Text 73.15
AutoCAD SHX Text 72.50
AutoCAD SHX Text 71.76
AutoCAD SHX Text 71.06
AutoCAD SHX Text 70.18
AutoCAD SHX Text 69.40
AutoCAD SHX Text 69.36
AutoCAD SHX Text 69.96
AutoCAD SHX Text LIGHT PEDESTAL CONCRETE ELEVATION = 69.19' BASE PLATE ELEVATION = 70.08' CENTER OF LIGHT ELEVATION = 78.48'
AutoCAD SHX Text
LIGHT PEDESTAL CONCRETE ELEVATION = 74.23' CENTER OF LIGHT ELEVATION = 79.38'
AutoCAD SHX Text
LIGHT PEDESTAL CONCRETE ELEVATION = 74.07' CENTER OF LIGHT ELEVATION = 79.22'
AutoCAD SHX Text
LIGHT PEDESTAL CONCRETE ELEVATION = 74.08' CENTER OF LIGHT ELEVATION = 79.20'
AutoCAD SHX Text
MONUMENT SIGN A13/36
AutoCAD SHX Text 70.73
AutoCAD SHX Text 71.39
AutoCAD SHX Text 71.91
AutoCAD SHX Text 72.60
AutoCAD SHX Text 73.16
AutoCAD SHX Text 74.20
AutoCAD SHX Text 74.76
AutoCAD SHX Text
PROJECT LIMITS
AutoCAD SHX Text
PROJECT LIMITS
AutoCAD SHX Text
PROJECT LIMITS
AutoCAD SHX Text N:1753915.429 E:585349.809
AutoCAD SHX Text N:1753916.226 E:584609.847
AutoCAD SHX Text
ET
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
VAULT
AutoCAD SHX Text LIGHT PEDESTAL CONCRETE ELEVATION = 74.45' BASE PLATE ELEVATION = 74.55' CENTER OF LIGHT ELEVATION = 78.17'
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
EXISTING GRAVEL SERVICE ROAD
AutoCAD SHX Text
EXISTING GRAVEL SERVICE ROAD
AutoCAD SHX Text
EXISTING GRAVEL SERVICE ROAD
AutoCAD SHX Text
RUNWAY THRESHOLD
AutoCAD SHX Text
EXISTING GRAVEL SERVICE ROAD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
RSA
AutoCAD SHX Text
ROFA
AutoCAD SHX Text
EXISTING RUNWAY SAFETY AREA
AutoCAD SHX Text
EXISTING RUNWAY OBJECT FREE AREA
AutoCAD SHX Text
EXIST. ASPHALT PAVEMENT
AutoCAD SHX Text
OFZ
AutoCAD SHX Text
EXISTING RUNWAY OBJECT FREE ZONE
EXISTING RUNWAY LIGHTS
REFER TO THE ELECTRICAL SHEETS FOR THE LIGHT AND PEDESTAL
STRIP AND STOCKPILE THE SHOWN EXCAVATION LIMITS
24 25
CONTROL POINTS
POINT #
NORTHING
1753570.6073
1753556.3585
1753586.6553
1753579.2693
1753779.8679
1753817.2172
1753832.8154
1753847.3508
1753861.5821
1753824.8898
1753777.9091
1753723.4320
1753678.7864
1753681.0480
1753623.0925
1753574.5888
1753524.6854
1753512.8068
1753534.2366
1753546.6797
1753528.3114
1753496.7442
1753488.5188
1753519.8220
1753553.2588
1753566.5320
1753605.3647
1753732.1465
1753758.7484
1753772.1719
1753754.8992
EASTING
585007.8306
584998.7975
585143.4756
585135.9981
585092.7919
585080.5199
585028.4402
584979.0486
584838.8714
584843.7671
584857.7145
584761.0597
584729.8705
584709.3581
584712.8797
584822.3399
584886.0649
584979.3939
585029.4258
585046.0029
585086.3461
585100.3385
585137.4009
585138.3846
585131.2927
585157.8971
585191.8884
585192.0098
585179.0228
585164.7722
585118.7577
NOTE: GRAVEL SERVICE ROAD MATERIAL (6" DEPTH)
SHALL BE STOCKPILED AND REINSTALLED BY THE
CONTRACTOR UPON COMPLETION OF GRADING
WORK
EXISTING GRAVEL SERVICE ROAD TO BE
REMOVED AND STOCKPILED (SEE NOTE)
EXISTING GRAVEL SERVICE ROAD TO BE REMOVED
Fil e P ath : C:
\U se rs\ ma ram .al da da
\Bo x\I
CE
TP
A\A
VIA
TIO
N\
Oc ala
\26 -03
1 R
SA
G rad ing \C
AD
D-dw g\(
9)_
C4 .1-
C4 .2
De mo litio n P lan .dw g D ate : 4/
/20
2:
PM
REVISIONS
26-031
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
JM
JM MA
APRIL 2026
RUNWAY 36 RSA GRADING
341-334-000-000-09-33173
D
ES
IG
N
D O
C U
M
EN
TS
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
341-334-000-000-09-33173
C4.1
DEMOLITION PLAN
0 20 40 80
LEGEND
NOTE:
AutoCAD SHX Text
80' ELECTIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
60' ELECTRIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
20' ELECTRIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
25' ELECTRIC EASEMENT PER O.R.B. 160, PAGE 761
AutoCAD SHX Text 150.48' (2.28 CHAINS) ' (2.28 CHAINS) 8 CHAINS) CHAINS) ELECTRIC EASEMENT PER DEED BOOK 271, PAGE 15 & & O.R.B. 9, PAGE 494
AutoCAD SHX Text 75.81
AutoCAD SHX Text 75.73
AutoCAD SHX Text 75.69
AutoCAD SHX Text 75.61
AutoCAD SHX Text 75.53
AutoCAD SHX Text 75.31
AutoCAD SHX Text 75.08
AutoCAD SHX Text 74.94
AutoCAD SHX Text 75.39
AutoCAD SHX Text 75.30
AutoCAD SHX Text 75.23
AutoCAD SHX Text 75.22
AutoCAD SHX Text 75.18
AutoCAD SHX Text 74.97
AutoCAD SHX Text 76.10
AutoCAD SHX Text 76.04
AutoCAD SHX Text 75.97
AutoCAD SHX Text 75.89
AutoCAD SHX Text 75.79
AutoCAD SHX Text 75.74
AutoCAD SHX Text 75.66
AutoCAD SHX Text 75.60
AutoCAD SHX Text 75.55
AutoCAD SHX Text 75.52
AutoCAD SHX Text 75.24
AutoCAD SHX Text 75.28
AutoCAD SHX Text 74.93
AutoCAD SHX Text 74.30
AutoCAD SHX Text 74.45
AutoCAD SHX Text 74.59
AutoCAD SHX Text 74.60
AutoCAD SHX Text 75.15
AutoCAD SHX Text 74.33
AutoCAD SHX Text 75.08
AutoCAD SHX Text 75.51
AutoCAD SHX Text 75.68
AutoCAD SHX Text 75.36
AutoCAD SHX Text 75.16
AutoCAD SHX Text 75.30
AutoCAD SHX Text 75.27
AutoCAD SHX Text 75.45
AutoCAD SHX Text 75.53
AutoCAD SHX Text 75.60
AutoCAD SHX Text 75.59
AutoCAD SHX Text 75.61
AutoCAD SHX Text 75.70
AutoCAD SHX Text 75.76
AutoCAD SHX Text 75.85
AutoCAD SHX Text 76.05
AutoCAD SHX Text 76.03
AutoCAD SHX Text 75.96
AutoCAD SHX Text 75.90
AutoCAD SHX Text 75.81
AutoCAD SHX Text 75.80
AutoCAD SHX Text 75.70
AutoCAD SHX Text 75.65
AutoCAD SHX Text 75.59
AutoCAD SHX Text 75.57
AutoCAD SHX Text 75.83
AutoCAD SHX Text 75.84
AutoCAD SHX Text 75.91
AutoCAD SHX Text 75.97
AutoCAD SHX Text 76.04
AutoCAD SHX Text 76.05
AutoCAD SHX Text 76.16
AutoCAD SHX Text 76.23
AutoCAD SHX Text 76.29
AutoCAD SHX Text 76.31
AutoCAD SHX Text 76.57
AutoCAD SHX Text 76.58
AutoCAD SHX Text 76.49
AutoCAD SHX Text 76.40
AutoCAD SHX Text 76.28
AutoCAD SHX Text 76.19
AutoCAD SHX Text 76.16
AutoCAD SHX Text 76.07
AutoCAD SHX Text 76.06
AutoCAD SHX Text 75.82
AutoCAD SHX Text 75.20
AutoCAD SHX Text 75.11
AutoCAD SHX Text 75.62
AutoCAD SHX Text 75.76
AutoCAD SHX Text 75.86
AutoCAD SHX Text 75.89
AutoCAD SHX Text 75.96
AutoCAD SHX Text 76.04
AutoCAD SHX Text 76.10
AutoCAD SHX Text 76.18
AutoCAD SHX Text 76.28
AutoCAD SHX Text 76.32
AutoCAD SHX Text 76.34
AutoCAD SHX Text 73.98
AutoCAD SHX Text 73.15
AutoCAD SHX Text 72.50
AutoCAD SHX Text 71.76
AutoCAD SHX Text 71.06
AutoCAD SHX Text 70.18
AutoCAD SHX Text 69.40
AutoCAD SHX Text 69.36
AutoCAD SHX Text 69.96
AutoCAD SHX Text LIGHT PEDESTAL CONCRETE ELEVATION = 69.19' BASE PLATE ELEVATION = 70.08' CENTER OF LIGHT ELEVATION = 78.48'
AutoCAD SHX Text
LIGHT PEDESTAL CONCRETE ELEVATION = 74.23' CENTER OF LIGHT ELEVATION = 79.38'
AutoCAD SHX Text
LIGHT PEDESTAL CONCRETE ELEVATION = 74.07' CENTER OF LIGHT ELEVATION = 79.22'
AutoCAD SHX Text
LIGHT PEDESTAL CONCRETE ELEVATION = 74.08' CENTER OF LIGHT ELEVATION = 79.20'
AutoCAD SHX Text
MONUMENT SIGN A13/36
AutoCAD SHX Text 70.73
AutoCAD SHX Text 71.39
AutoCAD SHX Text 71.91
AutoCAD SHX Text 72.60
AutoCAD SHX Text 73.16
AutoCAD SHX Text 74.20
AutoCAD SHX Text 74.76
AutoCAD SHX Text
PROJECT LIMITS
AutoCAD SHX Text
PROJECT LIMITS
AutoCAD SHX Text
PROJECT LIMITS
AutoCAD SHX Text N:1753915.429 E:585349.809
AutoCAD SHX Text N:1753916.226 E:584609.847
AutoCAD SHX Text
ET
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
VAULT
AutoCAD SHX Text LIGHT PEDESTAL CONCRETE ELEVATION = 74.45' BASE PLATE ELEVATION = 74.55' CENTER OF LIGHT ELEVATION = 78.17'
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
EXISTING GRAVEL SERVICE ROAD TO RAMIN
AutoCAD SHX Text
EXISTING GRAVEL SERVICE ROAD
AutoCAD SHX Text
RUNWAY THRESHOLD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
RSA
AutoCAD SHX Text
ROFA
AutoCAD SHX Text
EXISTING RUNWAY SAFETY AREA
AutoCAD SHX Text
EXISTING RUNWAY OBJECT FREE AREA
AutoCAD SHX Text
EXIST. ASPHALT PAVEMENT
AutoCAD SHX Text
OFZ
AutoCAD SHX Text
EXISTING RUNWAY OBJECT FREE ZONE
AutoCAD SHX Text
EXISTING RUNWAY LIGHTS
AutoCAD SHX Text
REMOVAL OF EXISTING GRAVEL SERVICE ROAD
1. PRIOR TO GRADING OPERATIONS, THE CONTRACTOR SHALL STRIP A PRIOR TO GRADING OPERATIONS, THE CONTRACTOR SHALL STRIP A MINIMUM OF 6 INCHES OF TOPSOIL WITHIN THE PROJECT LIMITS, OR AS DIRECTED BY THE ENGINEER. 2. STRIPPED MATERIAL SHALL BE CONSIDERED TOPSOIL AND SHALL BE STRIPPED MATERIAL SHALL BE CONSIDERED TOPSOIL AND SHALL BE STOCKPILED ON SITE IN APPROVED LOCATIONS. 3. STOCKPILES SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION STOCKPILES SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION IN ACCORDANCE WITH THE PROJECT EROSION AND SEDIMENT CONTROL REQUIREMENTS. 4. STOCKPILED TOPSOIL SHALL BE MAINTAINED IN A CONDITION SUITABLE STOCKPILED TOPSOIL SHALL BE MAINTAINED IN A CONDITION SUITABLE FOR REUSE, INCLUDING PROTECTION FROM CONTAMINATION, SEGREGATION, AND EXCESSIVE DRYING. 5. NO DELETERIOUS MATERIALS, DEBRIS, OR UNSUITABLE SOILS SHALL BE NO DELETERIOUS MATERIALS, DEBRIS, OR UNSUITABLE SOILS SHALL BE MIXED WITH STOCKPILED TOPSOIL. 6. STOCKPILED TOPSOIL SHALL BE REUSED FOR FINAL TOPSOILING, SLOPE STOCKPILED TOPSOIL SHALL BE REUSED FOR FINAL TOPSOILING, SLOPE DRESSING, AND RESTORATION AREAS. 7. ANY EXCESS TOPSOIL NOT REQUIRED FOR PROJECT RESTORATION ANY EXCESS TOPSOIL NOT REQUIRED FOR PROJECT RESTORATION SHALL BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH APPLICABLE REGULATIONS. 8. ANY DEFICIENCY IN REQUIRED TOPSOIL QUANTITIES SHALL BE SUPPLIED ANY DEFICIENCY IN REQUIRED TOPSOIL QUANTITIES SHALL BE SUPPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
4+
5+
6+
7+
8+
9+
+0
+0
74.00
.0
.00 69
.5
.5
69.50
.5
70.00
.0
.0
70.00
.50
70.50
70.50
.5
71.00
71.00
.00
71.00
71.50
71.50
71.50
71.50 71.50
71.50
72.00
72.00
72.00
72.00
72.00 72.00
72.50
72.5072.50
72.50
72.50
73.00
73.00 73.00
73.50
GRAVEL
Fil e P ath : C:
\U se rs\ ma ram .al da da
\Bo x\I
CE
TP
A\A
VIA
TIO
N\
Oc ala
\26 -03
1 R
SA
G rad ing \C
AD
D-dw g\(
)_C 5.1
-C 5.2
G rad ing
Dr ain ag e P lan .dw g D ate : 4/
/20
2:
PM
REVISIONS
26-031
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
JM
JM MA
APRIL 2026
RUNWAY 36 RSA GRADING
341-334-000-000-09-33173
D
ES
IG
N
D O
C U
M
EN
TS
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
341-334-000-000-09-33173
C5.1
GRADING & DRAINAGE PLAN
0 20 40 80
LEGEND
EARTHWORK SUMMARY
BORROW ADJUSTMENT
NOTE:
NOTE: TOTAL TOPSOIL AVAILABLE ON SITE: 2,088 CY
AutoCAD SHX Text
80' ELECTIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
60' ELECTRIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
20' ELECTRIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
25' ELECTRIC EASEMENT PER O.R.B. 160, PAGE 761
AutoCAD SHX Text 150.48' (2.28 CHAINS) ' (2.28 CHAINS) 8 CHAINS) CHAINS) ELECTRIC EASEMENT PER DEED BOOK 271, PAGE 15 & & O.R.B. 9, PAGE 494
AutoCAD SHX Text LIGHT PEDESTAL CONCRETE ELEVATION = 69.19' BASE PLATE ELEVATION = 70.08' CENTER OF LIGHT ELEVATION = 78.48'
AutoCAD SHX Text
LIGHT PEDESTAL CONCRETE ELEVATION = 74.23' CENTER OF LIGHT ELEVATION = 79.38'
AutoCAD SHX Text
LIGHT PEDESTAL CONCRETE ELEVATION = 74.07' CENTER OF LIGHT ELEVATION = 79.22'
AutoCAD SHX Text
LIGHT PEDESTAL CONCRETE ELEVATION = 74.08' CENTER OF LIGHT ELEVATION = 79.20'
AutoCAD SHX Text
MONUMENT SIGN A13/36
AutoCAD SHX Text
PROJECT LIMITS
AutoCAD SHX Text
PROJECT LIMITS
AutoCAD SHX Text
PROJECT LIMITS
AutoCAD SHX Text N:1753915.429 E:585349.809
AutoCAD SHX Text N:1753916.226 E:584609.847
AutoCAD SHX Text
ET
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
VAULT
AutoCAD SHX Text LIGHT PEDESTAL CONCRETE ELEVATION = 74.45' BASE PLATE ELEVATION = 74.55' CENTER OF LIGHT ELEVATION = 78.17'
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
EXISTING GRAVEL SERVICE ROAD
AutoCAD SHX Text
EXISTING GRAVEL SERVICE ROAD
AutoCAD SHX Text
EXISTING GRAVEL SERVICE ROAD
AutoCAD SHX Text
RUNWAY THRESHOLD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
RSA
AutoCAD SHX Text
ROFA
AutoCAD SHX Text
EXISTING RUNWAY SAFETY AREA
AutoCAD SHX Text
EXISTING RUNWAY OBJECT FREE AREA
AutoCAD SHX Text
EXIST. ASPHALT PAVEMENT
AutoCAD SHX Text
OFZ
AutoCAD SHX Text
EXISTING RUNWAY OBJECT FREE ZONE
AutoCAD SHX Text
EXISTING RUNWAY LIGHTS
AutoCAD SHX Text
UNCLASSIFIED EXCAVATION
AutoCAD SHX Text 2,088
AutoCAD SHX Text
CY
AutoCAD SHX Text
BORROW
AutoCAD SHX Text 3,087
AutoCAD SHX Text
SY
AutoCAD SHX Text
(a) EXCAVATION
AutoCAD SHX Text 0.00
AutoCAD SHX Text
CY
AutoCAD SHX Text
(d) NET VOLUME
AutoCAD SHX Text 3,087
AutoCAD SHX Text
CY
AutoCAD SHX Text
(b) STRIPPING
AutoCAD SHX Text 2,088
AutoCAD SHX Text
CY
AutoCAD SHX Text
(e) OTHER FILL
AutoCAD SHX Text 0.00
AutoCAD SHX Text
CY
AutoCAD SHX Text
(c) UNSUITABLE
AutoCAD SHX Text 0.00
AutoCAD SHX Text
CY
AutoCAD SHX Text
(f) EXCAVATION SUBTOTAL
AutoCAD SHX Text 2,088
AutoCAD SHX Text
CY
AutoCAD SHX Text
(g) FILL SUBTOTAL
AutoCAD SHX Text 3,087
AutoCAD SHX Text
CY
AutoCAD SHX Text (g-a) BORROW
AutoCAD SHX Text 3,087
AutoCAD SHX Text
CY
AutoCAD SHX Text
COMPACTED BORROW REQUIRED
AutoCAD SHX Text 3,087
AutoCAD SHX Text
CY
AutoCAD SHX Text
SHRINKAGE FACTOR
AutoCAD SHX Text 15%
AutoCAD SHX Text
LOOSE BORROW REQUIRED
AutoCAD SHX Text 3,632
AutoCAD SHX Text
CY
EARTHWORK QUANTITIES ARE BASED ON FINAL SURFACE VOLUME QUANTITIES ARE BASED ON FINAL SURFACE VOLUME QUANTITIES ARE BASED ON FINAL SURFACE VOLUME ARE BASED ON FINAL SURFACE VOLUME ARE BASED ON FINAL SURFACE VOLUME BASED ON FINAL SURFACE VOLUME BASED ON FINAL SURFACE VOLUME ON FINAL SURFACE VOLUME ON FINAL SURFACE VOLUME FINAL SURFACE VOLUME FINAL SURFACE VOLUME SURFACE VOLUME SURFACE VOLUME VOLUME VOLUME CALCULATIONS AND INCLUDE 6-INCH STRIPPING OF TOPSOIL OVER THE AND INCLUDE 6-INCH STRIPPING OF TOPSOIL OVER THE AND INCLUDE 6-INCH STRIPPING OF TOPSOIL OVER THE INCLUDE 6-INCH STRIPPING OF TOPSOIL OVER THE INCLUDE 6-INCH STRIPPING OF TOPSOIL OVER THE 6-INCH STRIPPING OF TOPSOIL OVER THE 6-INCH STRIPPING OF TOPSOIL OVER THE STRIPPING OF TOPSOIL OVER THE STRIPPING OF TOPSOIL OVER THE OF TOPSOIL OVER THE OF TOPSOIL OVER THE TOPSOIL OVER THE TOPSOIL OVER THE OVER THE OVER THE THE THE ENTIRE PROJECT AREA. STRIPPED TOPSOIL SHALL BE STOCKPILED ON SITE PROJECT AREA. STRIPPED TOPSOIL SHALL BE STOCKPILED ON SITE PROJECT AREA. STRIPPED TOPSOIL SHALL BE STOCKPILED ON SITE AREA. STRIPPED TOPSOIL SHALL BE STOCKPILED ON SITE AREA. STRIPPED TOPSOIL SHALL BE STOCKPILED ON SITE STRIPPED TOPSOIL SHALL BE STOCKPILED ON SITE STRIPPED TOPSOIL SHALL BE STOCKPILED ON SITE TOPSOIL SHALL BE STOCKPILED ON SITE TOPSOIL SHALL BE STOCKPILED ON SITE SHALL BE STOCKPILED ON SITE SHALL BE STOCKPILED ON SITE BE STOCKPILED ON SITE BE STOCKPILED ON SITE STOCKPILED ON SITE STOCKPILED ON SITE ON SITE ON SITE SITE SITE FOR REUSE. A 15 PERCENT SHRINKAGE FACTOR HAS BEEN APPLIED TO REUSE. A 15 PERCENT SHRINKAGE FACTOR HAS BEEN APPLIED TO REUSE. A 15 PERCENT SHRINKAGE FACTOR HAS BEEN APPLIED TO A 15 PERCENT SHRINKAGE FACTOR HAS BEEN APPLIED TO A 15 PERCENT SHRINKAGE FACTOR HAS BEEN APPLIED TO 15 PERCENT SHRINKAGE FACTOR HAS BEEN APPLIED TO 15 PERCENT SHRINKAGE FACTOR HAS BEEN APPLIED TO PERCENT SHRINKAGE FACTOR HAS BEEN APPLIED TO PERCENT SHRINKAGE FACTOR HAS BEEN APPLIED TO SHRINKAGE FACTOR HAS BEEN APPLIED TO SHRINKAGE FACTOR HAS BEEN APPLIED TO FACTOR HAS BEEN APPLIED TO FACTOR HAS BEEN APPLIED TO HAS BEEN APPLIED TO HAS BEEN APPLIED TO BEEN APPLIED TO BEEN APPLIED TO APPLIED TO APPLIED TO TO TO BORROW FOR ESTIMATING LOOSE BORROW QUANTITIES.
G R
AVEL
5+006+007+008+009+0010+0011+0012+00
.0
70.00
70.00 70.00
70.50 70.50
70.50
71.00
71.0071.00
.50
71.50
71.50
.5
1.
.00
.0
.0
.0
72.00
.5
.5
.5
.0
73.00
.5
6+00
.2
7+00
.1
.4
8+00
.1
.2
9+00
.7
.6
10+00
-3.000%
1.920%
STA. 9+60.74
ELEV. 72.85
PROPOPSED GRADE
STA. 6+24.96
ELEV. 73.98
PROPOPSED GRADE
Fil e P ath : C:
\U se rs\ ma ram .al da da
\Bo x\I
CE
TP
A\A
VIA
TIO
N\
Oc ala
\26 -03
1 R
SA
G rad ing \C
AD
D-dw g\(
1)_
C6 .1-
C6 .2
Pla n a nd Pr ofi le.
dw g
D ate
: 4/
/20
2:
PM
REVISIONS
26-031
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
JM
JM MA
APRIL 2026
RUNWAY 36 RSA GRADING
341-334-000-000-09-33173
D
ES
IG
N
D O
C U
M
EN
TS
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
341-334-000-000-09-33173
C6.1
PLAN AND PROFILE
0 20 40 80
AutoCAD SHX Text
80' ELECTIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
60' ELECTRIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
20' ELECTRIC & SEWER EASEMENT PER O.R.B. 1737, PAGE 909
AutoCAD SHX Text
25' ELECTRIC EASEMENT PER O.R.B. 160, PAGE 761
AutoCAD SHX Text 150.48' (2.28 CHAINS) ' (2.28 CHAINS) 8 CHAINS) CHAINS) ELECTRIC EASEMENT PER DEED BOOK 271, PAGE 15 & & O.R.B. 9, PAGE 494
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
EXISTING GRAVEL SERVICE ROAD
AutoCAD SHX Text
EXISTING GRAVEL SERVICE ROAD
AutoCAD SHX Text
RUNWAY THRESHOLD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .