About this file

This is a Table of Contents document for the Runway 36 RSA Grading project at Ocala International Airport (OCF) in Ocala, Florida, organized under Invitation to Bid (ITB) AIR/260692. The project requires an experienced contractor to furnish all labor, materials, equipment, supervision, and incidentals necessary to complete the Runway 36 Runway Safety Area (RSA) Grading Project in accordance with FAA design standards. The scope of work encompasses site preparation, demolition, earthwork, grading, material reuse, and site restoration, including removal of existing gravel service roads, stripping and stockpiling of topsoil, and salvage of suitable aggregate for reuse. Earthwork operations involve excavation, placement of approved AASHTO A-3 fill material, and fine grading to achieve design elevations and slopes, with the finished RSA required to be stable and compliant with FAA requirements. The contractor must also reinstall the salvaged gravel service road, place topsoil, perform finish grading, and sod disturbed areas. Additionally, the project involves protection and modification of existing airfield infrastructure, including utilities, lighting systems, and navigation aids (NAVAIDS), with specific requirements to adjust elevations of Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR) and coordinate with concurrent FAA projects for conduit and infrastructure installation.

The document serves as a comprehensive index to the contract's technical specifications, exhibits, and requirements, organized into multiple sections including FAA General Provisions, General Requirements, General Construction Items, Technical Specifications, Construction Safety and Phasing Plans, and Engineering Plans. The contract documentation references Contract Number CIP/260015 and includes detailed specifications for construction layout and survey, removal of existing pavements, excavation and embankment work, sodding, topsoil placement, and electrical modifications related to airfield lighting systems. The document structure indicates a fully developed design with engineering plans, survey control documentation, demolition and grading plans, and electrical specifications for MALSR modifications.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RW 36 RSA Grading Project Table of Content International Airport 1

TABLE OF CONTENTS

RUNWAY 36 RSA GRADING PROJECT

OCALA INTERNATIONAL AIRPORT

Exhibit D – FAA GENERAL PROVISIONS / CONTRACT PROVION GUIDELINES FOR

OBLIGATED SPONSORS AND AIRPORT IMPROVEMENT PROGRAM PROJECTS

• Section 10 – Definition of Terms ……………………………………………..GP-10-1 – GP-10-8

• Section 40 – Scope of Work ……………………………………………..…GP-40 -1 – GP – 40-4

• Section 50 – Control of Work ………………………….………………..…GP-50 -1 – GP – 50-6

• Section 60 – Control of Materials …………………….………………..…GP-60 -1 – GP – 60-3

• Section 70 – Legal Regulations and Responsibility to Public ….…GP-70 -1 – GP – 70-6

• Section 80 – Execution and Progress …………………….………………GP-80 -1 – GP – 80-7

• Section 90 – Measurement and Payment …………………….…..……GP-90 -1 – GP – 90-9

• Section 100 - Contract Provisions ………………….….……………GP-100 -1 – GP – 100-86

EXHIBIT E – GENERAL REQUIREMENTS

• Section 01010 – Summary of Work……………………….….………..…01010 -1 – 01010 -5

• Section 01030 – Airport Project Procedures……………………………01030 -1 – 01030 -5

• Section 01040 – Project Coordination………………….….…….………01040 -1 – 01040 -4

• Section 01070 – Abbreviations & Symbols………………………………01070 -1 – 01070 -4

• Section 01090 – Regulations & Definitions………………………………01090 -1 – 01090 -2

• Section 01095 – NPDES Compliance…………………………..…………01095 -1 – 01095 -2

• Section 01150 – Measurement & Payment………………………………01150 -1 – 01150 -3

• Section 01300 – Submittals………………………………………….………01300 -1 – 01300 -5

• Section 01400 – Quality Control Services……………………….………01400 -1 – 01400 -2

• Section 01530 – Airfield Temporary Markings & Barricades.….……01530 -1 – 01530 -2

• Section 01600 – Materials & Equipment……………………….……..…01600 -1 – 01600 -3

• Section 01700 – Contract Closeout & Forms……………..….……..…01700 -1 – 01700 -8

• Section 01710 – Cleaning & Disposal……………………….….……..…01710 -1 – 01710 -2

• Section 01720 – Project Record Documents………………...……..…01720 -1 – 01720 -3

• Section 01740 – Warranties & Bonds………………..............……..…01740 -1 – 01740 -2

• Section 02000 – Construction Layout and Survey……………..…..…02000 -1 – 02000 -3

Exhibit C CONTRACT# CIP/260015

International Airport 2

EXHIBIT F – GENERAL CONSTRUCTION ITEMS

• Section C-100 – Contractor Quality Control Program (CQCP) ……..C-100-1 – C-100-7

• Section C-105 - Mobilization ………………………………………………….C-105-1 – C-105-2

• Section C-102 - Temporary Air and Water Pollution, Soil Erosion, and Siltation

Control…………………………………………………………………………….….C-102-1 – C-102-4

• Section C-110 – Method of Estimating Percentage of Material….....C-110-1 – C-110-8

EXHIBIT G – TECHNICAL SPECIFICATIONS

• Item 02000 – Construction Layout and As-Built Survey ……………02000 -1 – 02000 -3

• Item P-101 – Removal of Existing Pavements ……………………..….….P-101-1 – P-101-4

• Item P-152 – Excavation and Embankment ………………………..….….P-152-1 – P-152-8

• Item T-904 – Sodding ……………………………………………………..….….T-904-1 – P-904-4

• Item T-904 – Top Soil ……………………………………………………..….….T-905-1 – P-905-3

EXHIBIT H – CONSTRUCTION SAFETY AND PHASING PLAN (CSPP)

• Report o Introduction o Project Description o Coordination o Phasing o Areas and Operations Affected o Protection of NAVAIDs o Contractor Access o Wildlife Management o FOD Management o Notification of Construction Activities o Inspection Requirements o Underground Utilities o Hazard Marking and Lighting o Protection of Safety Areas (RSA/ROFA) o Other Construction Limitations

• Appendices:

o Appendix A – CSPP Plan Sheets o Appendix B – Daily Safety Inspection Checklist

International Airport 3

EXHIBIT J – ENGINEERING PLANS

• G0.0 – Cover Sheet

• G1.0 – Project Layout & Haul Routes

• G2.0 – General Notes

• G3.1–G3.2 – CSPP Plans & Details

• C1.0 – Key Sheet

• C2.0 – Survey Control Plan

• C3.1 – Existing Conditions

• C4.1 – Demolition Plan

• C5.1 – Grading & Drainage Plan

• C6.1 – Plan & Profile

• C7.1 – Sodding Plan

• E0.1 – Electrical Legend & Notes

• E1.1 – MALSR Modification Plan

• E2.1 – MALSR Profile

• E3.0 / E3.1 – Electrical Details