ITB_24-29_Sample_Submittal_for_Fire_Protection_(ref_Q&A_III).pdf

PDF 9 MB Posted

Attached to
GLENDALE FIRE STATION State and local contract opportunity
Solicitation number
ITB 24-29
Issued by
Walton County, Florida

About this file

This is a sample submittal document for the Glendale Fire Station Project (ITB No. 24-29) issued by Walton County, Florida, in response to a sealed bid invitation for construction of a new 8,120-square-foot pre-fabricated and engineered steel and wood fire station for Walton County Fire Rescue. The project encompasses comprehensive construction services including mechanical, electrical, plumbing, building construction, and site work on a 7.58-acre undeveloped site located northeast of the intersection of SR-83 and County Highway 2. A non-mandatory pre-bid conference was conducted on April 30, 2024, with a final question submission deadline of May 6, 2024, at 12:00 Noon. Sealed bids were initially due by 3:00 P.M. on May 16, 2024, with a subsequent extension to May 23, 2024. The project timeline allows 220 calendar days for substantial completion from the Notice to Proceed, with liquidated damages assessed at $1,700 per day for substantial completion delays and $850 per day for final completion delays. The facility design must comply with 2017 Florida Building Code standards and will include garage areas, bunk rooms, living quarters, administrative spaces, and support facilities.

Bidders must be licensed General Contractors in accordance with Walton County Ordinance 2009-01 and are required to submit a 5% bid bond with performance and payment bonds. The estimated project cost is approximately $2.8 million, which Walton County has fully budgeted. Water and sewer services are currently unavailable at the site and must be developed as part of the project scope. Bidders must submit extensive documentation including previous experience records, current commitments, drug-free workplace certification, trench safety compliance forms, and unauthorized alien restrictions verification. Local vendor preference considerations apply, and contractors must obtain a County Building Permit prior to commencing work. No specific set-aside designations for disadvantaged enterprises are mentioned in the documentation. The procurement is open to all qualified general contractors, and supplementary contract opportunities may exist for ancillary services such as signage and lighting.

View the file

Other files for this state and local contract opportunity

Other files attached to GLENDALE FIRE STATION, newest first.
File Type Posted
MP04-M4-0.pdf PDF
MP04-M4-0.pdf PDF
ITB_24-29_ADDENDUM_III_Published.pdf PDF
ITB_24-29_ADDENDUM_III_Published.pdf PDF
ITB_24-29_Pre-Bid_Attendance_Sheet.pdf PDF
ITB_24-29_Pre-Bid_Attendance_Sheet.pdf PDF
ITB_24-29_Revised_Submittal_Checklist_(ref_Addendum_II).pdf PDF
ITB_24-29_Revised_Submittal_Checklist_(ref_Addendum_II).pdf PDF
ITB_24-29_Revised_Sheet_E1.2_(ref_Addendum_II).pdf PDF
ITB_24-29_Revised_Sheet_E1.2_(ref_Addendum_II).pdf PDF
ITB_24-29_Revised_Sheet_E0-2_(ref_Addendum_II).pdf PDF
ITB_24-29_Revised_Sheet_E0-2_(ref_Addendum_II).pdf PDF
ITB_24-29_ADDENDUM_II_Published.pdf PDF
ITB_24-29_ADDENDUM_II_Published.pdf PDF
ITB_24-29_ADDENDUM_I_Published.pdf PDF
ITB_24-29_ADDENDUM_I_Published.pdf PDF
ITB_24-29_Sample_Submittal_for_Fire_Protection_(ref_Q&A_III).pdf PDF
ITB_24-29_Revised_Sheets_A1.1-A1.8_C7.1-C7.2_(ref_Addendum_I).pdf PDF
ITB_24-29_Revised_Sheets_A1.1-A1.8_C7.1-C7.2_(ref_Addendum_I).pdf PDF
ITB_24-29_Revised_Sheet_M2.0_(ref_Addendum_I).pdf PDF
ITB_24-29_Revised_Sheet_M2.0_(ref_Addendum_I).pdf PDF
ITB_24-29_Q&A_III_Published.pdf PDF
ITB_24-29_Q&A_III_Published.pdf PDF
Revised_Submittal_Checklist_ITB_24-29_Glendale_Fire_Station.pdf PDF
Revised_Submittal_Checklist_ITB_24-29_Glendale_Fire_Station.pdf PDF
Signage_Spec_WCFR_Glendale_Bldg_-_R3.jpg JPG image
Signage_Spec_WCFR_Glendale_Bldg_-_R3.jpg JPG image
Glendale_Fire_Station_Road_Signage_Proposal.pdf PDF
Glendale_Fire_Station_Road_Signage_Proposal.pdf PDF
Glendale_Fire_Station_Building_Signage_Proposal.pdf PDF
Glendale_Fire_Station_Building_Signage_Proposal.pdf PDF
ITB_24-29_Q_and_A_Published.pdf PDF
ITB_24-29_Q_and_A_Published.pdf PDF
ITB_24-29_Q&A_II_Published.pdf PDF
ITB_24-29_Q&A_II_Published.pdf PDF
Attorney_Approval_of_ITB_24-29_(with_Marked_Changes).pdf PDF
ITB_24-29_Legal_Ad_v.pdf PDF
ITB_24-29_Legal_Ad_v.pdf PDF
Attorney_Approval_of_ITB_24-29_(with_Marked_Changes).pdf PDF
50150622-Glendale_FD_3-20-24_FOR_BID.pdf PDF
50150622_Glendale_Fire_Station_Specs_2024.pdf PDF
ITB_24-29_Glendale_Fire_Station.pdf PDF
50150622_Glendale_Fire_Station_Specs_2024.pdf PDF
ITB_24-29_Glendale_Fire_Station.pdf PDF
50150622-Glendale_FD_3-20-24_FOR_BID.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fire Protection 2 minus drawing Fire Protection

File details come from the government source that posted it. Updated .