This document is Addendum No. 3 to ITB-2026-01, issued by the City of Milton, Florida, for the Effluent Sprayfields and Pipeline Route Clearing and Grubbing project. The addendum announces a second mandatory pre-bid conference scheduled for Wednesday, February 4, 2026 at 10:00 a.m. CST at 6738 Dixon Street, Milton, Florida, with attendance optional for those who attended the first pre-bid conference on January 13, 2026. The revised schedule establishes a written questions deadline of Wednesday, February 11, 2026 at 2:00 p.m. CST, with answers posted by Wednesday, February 18, 2026 at 2:00 p.m. CST, and sealed bids due Wednesday, February 25, 2026 at 2:00 p.m. CST. The project involves clearing and grubbing approximately 350 acres across four sites and a pipeline corridor, with work to be completed in phases: Site 2, Pipeline Route, Site 4, and Site 3 (contingent on Santa Rosa County development order issuance). Sites 2 and 4 will serve as effluent disposal sprayfields combined with sod farming, while Site 3 will accommodate a 4.0 million gallons per day wastewater treatment plant, with the remaining areas designated as a piping corridor. Work is expected to be substantially completed within 360 days and fully completed within 390 days of the Notice to Proceed.
The addendum significantly modifies the contract documents by removing numerous EJCDC standard forms and specifications, including Instructions to Bidders, the original Bid Form and Bid Bond, General and Supplementary Conditions, and various administrative procedures, to be replaced by City-provided formats. Contract payments will be structured on a unit price basis rather than lump sum, with all clearing and grubbing work compensated per acre cleared, and general conditions and mobilization costs limited to no more than 10 percent of the total bid. Key specifications have been revised, including reducing the prior project experience threshold from $10,000,000 to $1,000,000 under the Contractor Qualifications Statement, and modifications to temporary stormwater pollution control and site clearing specifications. The addendum clarifies that Davis-Bacon prevailing wage requirements do not apply to this project, allows debris burning with Division of Forestry permission, and confirms that no permanent or temporary grass seeding will be required post-clearing. Control points and northing/easting coordinates will be provided to contractors rather than requiring independent surveys. The project encompasses six specific parcel numbers across Santa Rosa County, and a KML file showing site locations has been made available to registered prospective bidders.
View the file
Other files for this state and local contract opportunity
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M. Hagler, P.E.
BDI/PNS
1/28/2026
K:\255 Milton\25570.06 Clearing and Grubbing\Bidding\Addendems\Addendum 3\25570.06 C&G Addendum 3.docx
25570.6 ADDENDUM NO. 3 1
ADDENDUM NO. 3
CITY OF MILTON
EFFLUENT SPRAYFIELDS AND PIPELINE ROUTE CLEARING AND GRUBBING
January 29, 2026 ITB Number: 2026-01
BDI Project No. 25570.06
The following changes have been made to the plans & specifications for the above project:
During the initial advertising and bidding process, the City of Milton has determined that there were potential bidders who were not aware of the bidding or the nature of the work. The City has decided to conduct a second mandatory pre-bid conference. Those proposed bidders who attended the first pre-bid conference will not be required to attend the second pre-bid conference. The bidding schedule changes as follows:
Second Mandatory Pre-bid Conference: Wednesday, February 4, 2026 @ 10:00 am (CST)
6738 Dixon Street, Milton, FL
Questions Deadline: Wednesday, February 11, 2026 @2:00 pm (CST)
Answers Posted: Wednesday, February 18, 2026 @ 2:00 pm (CST)
BIDS DUE: Wednesday, February 25, 2026 @ 2:00 pm (CST)
Minutes of Pre-Bid meeting, with sign-in sheet held on 1.13.2026 are attached.
A. CONTRACT DOCUMENTS/SPECIFICATIONS
ITEM DOCUMENT CHANGE
1.
C-451 EJCDC Qualifications
Statement
Section 11 – Construction Experience, first paragraph, size of current projects of similar nature is changed from
$10,000,000 to $1,000,000.
2.
C-200 EJCDC Instructions to
Bidders
Remove this specification in its entirety.
3.
Remove 4. Bid Form Remove this Form in its entirety, Bid Form table and Basis of
Payment is here attached and will be incorporated at the end of the ITB 2026-01.
4.
C-430 EJCDC Bid Bond Remove this bond form in its entirety, Surety to provide bond.
5.
C-510 EJCDC Notice of Award Remove this Form in its entirety, City provides this in letter format.
6. C-520 EJCDC Agreement Remove this Agreement in its entirety.
7.
C-550 EJCDC Notice to
Proceed
Remove the Notice to Proceed in its entirety, City provides this in letter format.
8.
C-610 EJCDC Performance
Bond
Remove the Performance Bond Form in its entirety, Surety is to provide bond.
9.
C-615 EJCDC Payment Bond Remove the Payment Bond Form in its entirety, Surety is to provide bond.
1/28/2026
K:\255 Milton\25570.06 Clearing and Grubbing\Bidding\Addendems\Addendum 3\25570.06 C&G Addendum 3.docx
25570.6 ADDENDUM NO. 3 2
ITEM DOCUMENT CHANGE
10.
C-620 EJCDC Application for
Payment
Remove the Application for Payment in its entirety, City is providing form.
11.
C-625 EJCDC Certificate of
Substantial Completion
Remove Certificate of Substantial Agreement in its entirety, City is providing format for the Certificate of Substantial
Completion.
12.
EJCDC C-700 Standard
General Conditions
Remove Standard General Conditions in its entirety.
13.
EJCDC C-800 Supplementary
Conditions
Remove Supplementary Conditions in its entirety.
14.
15 – Certificate of Owners
Attorney
Remove the Certificate of Owners Attorney in its entirety.
15.
FDEP Supplementary
Conditions
Remove FDEP Supplementary Conditions in its entirety.
16.
C-941 EJCDC Change Order Remove Change Order from in its entirety, new Construction
Contract provides layout for change order requests.
17. 01 10 00 Summary Remove Specification in its entirety.
18.
01 26 00 Contract
Modification Procedures
Remove Specification in its entirety.
19. 01 29 00 Payment Procedures Remove Specification in its entirety.
20.
01 31 00 Project
Management and
Coordination
Remove Specification in its entirety.
21.
01 32 00 Construction
Progress Documentation
Remove Specification in its entirety.
22.
01 32 16 Construction
Progress Schedule
Remove Specification in its entirety.
23.
01 32 33 Photographic
Documentation
Remove Specification in its entirety.
24.
01 40 00 Quality
Requirements
Remove Specification in its entirety.
25. 01 73 00 Execution Remove Specification in its entirety.
26. 01 77 00 Closeout Procedures Remove Specification in its entirety.
27. 32 92 00 Seeding Remove Specification in its entirety.
28.
Attachment 1A Remove Standard Protection Measure for the Eastern Indigo
Snake, information addressed in Special Conditions 00702.
29.
Attachment 1B Remove Eastern Indigo Snake Brochure, information addressed in Special Conditions 00702.
30.
Attachment 1C Remove Eastern Indigo Snake Poster, information addressed in Special Conditions 00702.
31.
Attachment 1D Remove Eastern Indigo Snake Monitoring Report, information addressed in Special Conditions 00702.
32.
Attachment 2 Remove Treasury Restore Act Terms and Conditions, project is not funded in full or in part by Treasury Restore funds.
1/28/2026
K:\255 Milton\25570.06 Clearing and Grubbing\Bidding\Addendems\Addendum 3\25570.06 C&G Addendum 3.docx
25570.6 ADDENDUM NO. 3 3
ITEM DOCUMENT CHANGE
33.
Attachment 3 Remove CSI Form 13.4A, Construction Contracts addresses
Field Orders.
34.
Attachment 4 Remove CSI Form 13.6A, Construction Contract addresses
Change Orders.
35. 00702 Special Conditions Add Specification 00702 Special Conditions
36.
01 57 23 Temporary Storm
Water Pollution Control
Replace 01 57 23 with 01 57 23 Add 3 Temporary Storm
Water Pollution Control
37. 31 10 00 Site Clearing Replace 31 10 00 with 31 10 00 Site Clearing Add 3
B. CONSTRUCTION PLANS
SHEET
NO. CHANGE
C. QUESTIONS AND CLARIFICATIONS
Questions:
1. Can KMZ files be provided showing the sites?
A: A KML file was previously sent directly to the proposed bidders that registered at the first mandatory prebid via the email addresses provided. That file is posted with this addendum.
2. Will Contract be paid in lump sum or unit price?
A: The contract will pay out by unit price.
3. Will the project be cleared all at the same time?
A: The project will be cleared in phases as follows: (subject to change determined by
100% gopher tortoise survey)
1. Site 2
2. Pipeline Route
3. Site 4
4. Site 3 (contingent upon issuance of development order by Santa Rosa County
1/28/2026
K:\255 Milton\25570.06 Clearing and Grubbing\Bidding\Addendems\Addendum 3\25570.06 C&G Addendum 3.docx
25570.6 ADDENDUM NO. 3 4
4. What will each site be used for once cleared?
A. Site 2 and 4 will primarily be used for effluent disposal (sprayfields) combined with sod farming. Site 3 will be a 4.0 million gallons per day wastewater treatment plant.
The rest of the project will be utilized as a corridor for piping.
5. What is the depth of the grubbing/ root raking required?
A. Grubbing and root raking requirements are included in Specification 31 10 00 Add 3.
6. Once cleared, will permanent or temporary grass be placed over the cleared area?
A. No grass will be required to be planted once the project is cleared. Seeding
Specification 32 92 00 is deleted in its entirety.
7. Will the limits of the clearing be identified or will survey be needed?
A. Control points and northing/easting coordinates will be provided.
8. Can a site visit be scheduled?
A. A site visit was conducted at 9:00 am Wednesday, January 21, 2026.
9. Will plot #s be given?
A. The drawings sheets that have been provided list the plot #s for all parcels associated with this project. Listed below are those parcel #s.
i. Site 2: 22-2N-27-0000-00200-0000
ii. Site 3: 21-2N-27-0000-00300-0000
iii. Site 4: 21-2N-27-0000-00100-0000
iv. Pipe Corridor: 21-2N-27-0000-00211-0000
v. Pipe Corridor: 28-2N-27-0000-00101-0000
vi. Pipe Corridor: 29-2N-27-0000-00105-0000
10. Will the RFI deadline be extended?
A. The date for questions has been revised and is stated hereinabove.
1/28/2026
K:\255 Milton\25570.06 Clearing and Grubbing\Bidding\Addendems\Addendum 3\25570.06 C&G Addendum 3.docx
25570.6 ADDENDUM NO. 3 5
11. I was looking at the bid documents and on the SOW it is saying approximately 350 acres and on the Bid Form (last page) it is saying +/-295 acres. Can you specify which one the bid needs to reflect?
A. Reference to acreage throughout the documents has been changed to 350 acres. It is a unit price and payment will reflect acreage actually cleared.
12. Will the City allow burning on the property of debris or is the city looking for all debris to be hauled off?
A. Burning will be allowed with permission from the Division of Forestry.
13. Will this project require Davis Bacon?
A. This project does not require Davis Bacon Wages.
14. Is there a way to have another pre-bid meeting or make the mandatory meeting a non-mandatory meeting?
A. A second mandatory pre-bid has been scheduled. The date is recorded at the top of this addendum. Proposed bidders who attended the first pre-bid are not required to attend the second pre-bid.
DEADLINE FOR QUESTIONS
The deadline for questions is Wednesday, February 11, 2026 @ 2:00 pm (CST).
The CONTRACTOR shall acknowledge receipt of this ADDENDUM by signing below, including a copy with the BID, and acknowledge where indicated on page 2 of the Contractor’s Proposal Form.
CONTRACTOR
BY
DATE