ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_5_Combined.pdf

PDF 26 MB Posted

Attached to
Effluent Sprayfields and Pipeline Route Clearing Grubbing State and local contract opportunity
Solicitation number
ITB-2026-01 A
Issued by
Santa Rosa County, Florida

About this file

This addendum document is issued by the City of Milton, Florida, modifying the plans and specifications for ITB-2026-01 Effluent Sprayfields and Pipeline Route Clearing and Grubbing. The project involves clearing and grubbing approximately 350 acres of timberland in preparation for an effluent disposal system installation, with work substantially completed within 360 days and fully completed within 390 days of the Notice to Proceed. Addendum 5, issued January 29, 2026, incorporates revised specifications for temporary stormwater pollution control and site clearing, replaces four construction plan sheets (C-203, C-204, C-205, and C-900) with updated versions containing control point and silt fence coordinates, and clarifies that stockpiling is no longer required, topsoil may remain in place if cleanliness specifications are met, and mulching of the pipe corridor is acceptable. The City will engage a certified gopher tortoise agent to conduct a 100 percent site survey within 90 days of construction commencement to determine appropriate relocation measures. The deadline for contractor questions was February 11, 2026 at 2:00 p.m. (CST), and bids are due Wednesday, February 25, 2026 at 2:00 p.m. (CST).

Special conditions require contractors to immediately cease work and notify appropriate agencies upon discovery of archaeological artifacts, eastern indigo snakes, or gopher tortoise burrows, with a mandatory 25-foot buffer maintained around tortoise burrows during construction. The contractor must remove garbage daily or provide bear-proof receptacles and comply with all Florida Department of Environmental Protection, Santa Rosa County, and regulatory agency requirements, bearing liability for any associated fines or penalties. The contract includes an acclimate weather determination procedure allowing contract time extensions based on rainfall data from the Milton Wastewater Treatment Facility, comparing actual rainfall days exceeding 0.1 inches against historical averages from September 2021 through August 2025, with the final tally calculated upon substantial completion. Environmental Resource Permits were not required for Sites 2, 4, and the pipeline route, while the engineer is responsible for ERP submittals for Site 3; NPDES permits, if required, are the contractor's responsibility. The project site, spanning approximately 350 acres across four locations (Sites 2, 3, and 4, plus a pipeline route) in Santa Rosa County north of Highway 90, contains suitable gopher tortoise habitat, potential eastern indigo snake habitat, and depressional wetlands requiring protection and specialized handling protocols during construction activities.

View the file

Other files for this state and local contract opportunity

Other files attached to Effluent Sprayfields and Pipeline Route Clearing Grubbing, newest first.
File Type Posted
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_4_Contract.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_4_Contract_Exhibits_B_-_K.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_3_Site_Clearing.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_3_Jan_13_2026_Pre_Bid_Meeting_Minutes.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_3_Temp_Storm_Water_Pollution_Control.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_3_Bid_Form.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_3_Special_Conditions.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Construction_Plans.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_2.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_3.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_1.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing_-_Addendum_1.pdf PDF
ITB-2026-01_Effluent_Sprayfields_and_Pipeline_Route_Clearing_Grubbing.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M. Hagler, P.E.

BDI/PNS

2/18/2026 K:\255 Milton\25570.06 Clearing and Grubbing\Bidding\Addenda\Addendum 5\25570.06 C&G Addendum 5.docx

25570.6 ADDENDUM NO. 5 1

ADDENDUM NO. 5

CITY OF MILTON

EFFLUENT SPRAYFIELDS AND PIPELINE ROUTE CLEARING AND GRUBBING

January 29, 2026 ITB Number: 2026-01

BDI Project No. 25570.06

The following changes have been made to the plans & specifications for the above project:

BIDS DUE: Wednesday, February 25, 2026 @ 2:00 pm (CST)

Minutes of Second Pre-Bid meeting, with sign-in sheet held on 2.4.2026 are attached.

A. CONTRACT DOCUMENTS/SPECIFICATIONS

ITEM DOCUMENT CHANGE

1. 01 57 23 Temporary Storm Water Pollution Control

Replace 01 57 23 with 01 57 23 Add 3 Temporary Storm Water Pollution Control

2. 31 10 00 Site Clearing Replace 31 10 00 with 31 10 00 Site Clearing Add 3

B. CONSTRUCTION PLANS

SHEET

NO. CHANGE

C-203 Replace Sheet C-203 with the attached sheet that includes control point and silt fence coordinates.

C-204 Replace Sheet C-204 with the attached sheet that includes control point and silt fence coordinates.

C-205 Replace Sheet C-205 with the attached sheet that includes control point and silt fence coordinates.

C-900 Replace Sheet C-900 with the attached sheet that had some required edits associated with permitting/permits. NPDES permits are obtained by contractors, if one is required for this project the contract will be responsible to apply for it. Environmental Resource Permits were not required for Sites 2, 4 and the pipeline route. The Engineer is responsible for ERP submittals for Site 3.

C. QUESTIONS AND CLARIFICATIONS

Questions:

1. Is the entire project getting stripped?

Response – see revised specification 31 10 00 Site Clearing Ad 5.

2/18/2026 K:\255 Milton\25570.06 Clearing and Grubbing\Bidding\Addenda\Addendum 5\25570.06 C&G Addendum 5.docx

25570.6 ADDENDUM NO. 5 2

2. Where are we stock piling this large amount of material?

Response – stock piling is no longer required.

3. Is it acceptable to mulch the pipe corridor as shown on plans ‘C-201’ and “C-202’?

Response – mulch and tree removal is acceptable.

4. Can the existing topsoil remain in place, provided we meet the required specifications for cleanliness, without the need for stockpiling?

Response – yes, topsoil is no longer being stripped and stockpiled but the cleanliness must still be met. See revised specification 31 10 00 Site Clearing Ad 5.

5. Will the City of Milton be responsible for the removal of the gopher tortoise?

Response – the City of Milton will engage the services of a certified agent who will make the determination of appropriate action/permitting required to move forward with clearing of each location. Those services will be covered by the City.

Attachments for review but not considered part of the contract:

UES Site 2 Site Specific Survey

UES Site 3 Site Specific Survey

UES Site 4 Site Specific Survey

UES Pipeline Route Site Specific Survey

DEADLINE FOR QUESTIONS

The deadline for questions was Wednesday, February 11, 2026 @ 2:00 pm (CST).

The CONTRACTOR shall acknowledge receipt of this ADDENDUM by signing below, including a copy with the BID, and acknowledge where indicated on page 2 of the Contractor’s Proposal Form.

CONTRACTOR

BY

DATE

SPECIAL CONDITIONS

2/18/2026

25570.06 SPECIAL CONDITIONS 00702-1

ADDENDUM 5

The following Special Conditions take precedence over, or compliment the Plans and Specifications:

1. ARCHEOLOGICAL FINDS

During any activities which involve excavation or ground disturbance, Contractor shall monitor all construction activities. In the event that fortuitous finds or unexpected discoveries, such as prehistoric or historic artifacts, including pottery or ceramics, stone tools or metal implements, or other physical remains that could be associated with North American cultures or early colonial or American settlement are encountered at any time within the project areas, the Contractor should cease all activities involving subsurface disturbance in the immediate vicinity of such discoveries. If the excavation process uncovers items, or evidence thereof, which might be of archaeological, historic, or architectural interest, Contractor shall to stop work immediately and take all reasonable measures to protect the items in a manner sufficient to avoid additional harm until the significance of the discovery can be determined. If items of significance are discovered, the Owner will contact the appropriate agencies for a determination of required actions. Project activities should not resume in the area without written authorization from the Owner.

In the event that any human remains are unearthed, all work shall stop immediately and the area shall be secured in accordance with local, state, and federal statutes.

2. EASTERN INDIGO SNAKE

The eastern indigo snake is classified as a Threatened species by both the USFWS and the Florida Fish and Wildlife Conservation Commission. “Taking” of eastern indigo snakes is prohibited by the Endangered Species Act without a permit. “Take” is defined by the USFWS as an attempt to kill, harm, harass, pursue, hunt, shoot, wound, trap, capture, collect, or engage in any such conduct. Penalties include a maximum fine of $25,000 for civil violations and up to $50,000 and/or imprisonment for criminal offenses, if convicted. Only individuals currently authorized through an issued Incidental Take Statement in association with a USFWS Biological Opinion, or by a Section 10(a)(1)(A) permit issued by the USFWS, to handle an eastern indigo snake are allowed to do so.

A. IF YOU SEE A LIVE EASTERN INDIGO SNAKE ON THE SITE:

• Cease clearing activities and allow the live eastern indigo snake sufficient time to move away from the site without interference;

• Personnel must NOT attempt to touch or handle snake due to protected status.

• Take photographs of the snake, if possible, for identification and documentation purposes.

• Immediately notify supervisor or the applicant’s designated agent, and the appropriate USFWS office, with the location information and condition of the snake.

• If the snake is located in a vicinity where continuation of the clearing or construction activities will cause harm to the snake, the activities must halt until such time that a representative of the USFWS returns the call (within one day) with further guidance as to when activities may resume.

B. IF YOU SEE A DEAD EASTERN INDIGO SNAKE ON THE SITE:

25570.06 SPECIAL CONDITIONS 00702-2

ADDENDUM 5

• Cease clearing activities and immediately notify supervisor or the applicant’s designated agent, and the appropriate USFWS office, with the location information and condition of the snake.

• Take photographs of the snake, if possible, for identification and documentation purposes.

• Thoroughly soak the dead snake in water and then freeze the specimen. The appropriate wildlife agency will retrieve the dead snake.

Telephone numbers of the local USFWS Florida Field Offices to be contacted if a live or dead eastern indigo snake is encountered:

Panama City Field Office – (850) 769-0552

3. BEAR COMMITMENT

If a Florida black bear is observed in or adjacent to the active work area, cease construction, do not disturb it and allow it to leave the area on its own. Report the sighting immediately to the FWC. The Contractor shall be required to remove garbage from the site daily or provide bear-proof garbage receptacles.

4. GOPHER TORTOISE

Gopher tortoise burrows have been identified along the power transmission line across Site 4 and several locations on Site 2. The burrows are within the proposed clearing and grubbing area. The City intends to engage the services of a Gopher Tortoise Agent who will conduct a 100% site survey of each parcel within 90 days of the commencement of construction. The findings of that survey effort will determine actions to be taken prior to commencement, including applications for permits if necessary. Should a Gopher Tortoise burrow be discovered during construction, the Contractor is cautioned to keep any construction activities outside of a 25 foot radius of the burrows until the relocation has occurred. If a gopher tortoise is observed in the active work area, do not disturb it, cease all work in the area, and allow it to leave the area on its own.

5. COMPLIANCE WITH REGULATORY AUTHORITY

It is the Contractor’s responsibility to satisfy any and all requirements as specified by the Florida Department of Environmental Protection (FDEP), Santa Rosa County, or any other regulatory agency relative to Federal, State or County agencies. Contractor shall be liable for and pay fines or penalties associated with his activities as may be levied by authorities having jurisdiction.

6. ACCLIMATE WEATHER DETERMINATION

The procedure below explains the City’s consideration of claims for a contract time extension due to abnormal weather. All days shall be considered as calendar days.

A. The City maintains a spreadsheet that documents the amount of rainfall for each day of the month for rainfall at the Milton WWTF. The data set time period that will be used is the the period from September 2021 tthrough August 2025.

B. From this spreadsheet the average rainfall for each month is calculated. The source for this historical data can be accessed from the records on file at the Milton WWTF. The spreadsheet which will be used for this project appears at the end of this paragraph.

C. Any time there is a documented rainfall of 0.1” or greater, this is counted as a rainfall day. The official measurement used is rainfall at the Milton WWTF. If another measurement location is desired, this must be proposed and accepted by the City before the beginning of the project.

D. Each month the number of rainfall days is determined by the Contractor and verified by the Engineer. This information shall be submitted with each pay application for the last full calendar month.

25570.06 SPECIAL CONDITIONS 00702-3

ADDENDUM 5

E. The number of rainfall days for the month is then compared to the historical recorded average of rainfall days (0.1” and greater of rainfall) for the month.

F. If the number of rainfall days is more than the historical average, then the Contractor has a positive value of rainfall days for the month.

G. If the number of rainfall days is less than the historical average, then the Contractor has a negative value of rainfall days.

H. Upon reaching Substantial Completion for the project, all positive and negative rainfall days for each individual month of the project will be added together for a total number of rainfall days for the project.

I. If this final rainfall day number is a positive number, then the contract has been impacted by that number of rainfall days and the Contract Time will be adjusted accordingly. If the final rainfall day number is either zero or a negative number, then no modification of the Contract Time will be made.

J. The time period for which rainfall days will be considered shall coincide with the dates for commencement of work and Substantial Completion, as defined in the Standard Form of Agreement of the Contract. For partial months, a prorated number of days shall be calculated using the number of Contract days in that month divided by the total number of days in that month, multiplied by the historical number of rainfall days for that month. This calculation shall be rounded to the nearest whole number.

K. If there is a significant, recorded, rainfall event in one, or more, consecutive day(s), the Contractor may submit a claim for additional delay in accordance with the time-frames delineated in paragraph 11.06 of the Standard General Conditions of the Construction Contract. The City will review any such timely filed claim and determine (at the City’s sole discretion) if an additional equitable Contract Time extension is warranted. A decision by the City of such adjustments will occur within a reasonable time of the submission of the claim; the City will not wait until Substantial Completion of the project as described in Item H above.

L. Other than precipitation, the City may, in its sole discretion, consider on a case-by-case basis other abnormal weather conditions (e.g., temperature, tropical storm activity) that the Contractor can affirmatively demonstrate have had an impact on construction. If the Contractor believes such an event has occurred, the Contractor may submit a claim for additional delay in accordance with the time-frames delineated in paragraph 11.06 of the Standard General Conditions of the Construction Contract. The City will review any such timely filed claim and determine (at the City’s sole discretion) if an equitable Contract Time extension is warranted. A decision by the City of such adjustments will occur within a reasonable time of the submission of the claim; the City will not wait until Substantial Completion of the project as described in Item G above.

25570.06 SPECIAL CONDITIONS 00702-4

ADDENDUM 5

4 YEAR HISTORICAL RECORD OF RAINFALL FOR MILTON WWTF (SEPTEMBER 2021 THROUGH AUGUST 2025)

Number of days in each month receiving 0.1 inches or more of rainfall Updated: 12/15/2025

Source of Information:

Operational Records on File at the Milton

WWTF

Recording Location:

Milton

WWTF

Chart Prepared by:

Richard W. Delp, Water Resource Director/VP

Baskerville-Donovan, Inc.

Year Month Yearly

Total Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 13 6 1 4 24 2022 8 5 8 5 10 10 18 13 7 6 6 6 102 2023 7 4 5 6 9 7 12 5 6 2 9 6 78 2024 9 8 6 3 6 11 18 5 9 2 6 4 87 2025 1 4 9 4 8 12 5 13 56

Totals: 25 21 28 18 33 40 53 36 35 16 22 20

Monthly Averages: 6 5 7 5 8 10 13 9 9 4 6 5

02/18/2026

25570.06 SITE CLEARING 31 10 00 - 1

ADDENDUM 5

SECTION 31 10 00 - SITE CLEARING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Protecting existing vegetation to remain.

2. Removing existing vegetation.

3. Clearing and grubbing.

4. Stripping and stockpiling topsoil.

5. Temporary erosion and sedimentation control.

1.3 DEFINITIONS

A. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.

B. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil," but in disturbed areas such as urban environments, the surface soil can be subsoil.

C. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil; the zone where plant roots grow. Its appearance is generally friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and other objects larger than 2 inches (50 mm) in diameter; and free of weeds, roots, toxic materials, or other nonsoil materials.

D. Plant-Protection Zone: Area surrounding individual shrubs or other vegetation to be protected during construction and indicated on Drawings.

E. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction and indicated on Drawings.

F. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.

1.4 MATERIAL OWNERSHIP

A. Except for materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.

02/18/2026

25570.06 SITE CLEARING 31 10 00 - 2

ADDENDUM 5

1.5 INFORMATIONAL SUBMITTALS

A. Existing Conditions: Documentation of existing trees and plantings, adjoining construction, and site improvements that establishes preconstruction conditions that might be misconstrued as damage caused by site clearing.

1. Use sufficiently detailed photographs or video recordings.

2. Include plans and notations to indicate specific wounds and damage conditions of each tree or other plant designated to remain.

1.6 FIELD CONDITIONS

A. Traffic: Minimize interference with access road.

1. Do not close or obstruct access road without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed access ways if required by Owner or authorities having jurisdiction.

B. Utility Locator Service: Notify Sunshine One Call for area where Project is located before site clearing.

C. Do not commence site clearing operations until temporary erosion- and sedimentation-control are in place.

D. Soil Stripping and Handling: Perform only when the soil is dry or slightly moist.

PART 2 - PRODUCTS

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect and maintain benchmarks and survey control points from disturbance during construction.

B. Verify that trees, shrubs, and other vegetation to remain or to be relocated have been flagged and that protection zones have been identified and enclosed.

3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL

A. Provide temporary erosion- and sedimentation-control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties, according to erosion- and sedimentation-control Drawings and requirements of authorities having jurisdiction.

02/18/2026

25570.06 SITE CLEARING 31 10 00 - 3

ADDENDUM 5

B. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.

C. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction until permanent vegetation has been established.

D. Remove erosion and sedimentation controls, and restore and stabilize areas disturbed during removal.

3.3 TREE AND PLANT PROTECTION

A. Protect trees and plants remaining on-site.

B. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations.

3.4 CLEARING AND GRUBBING

A. Remove obstructions, trees, shrubs, and other vegetation.

1. Grind down stumps and remove roots larger than 2 inches in diameter, obstructions, and debris to a depth of 6 inches below exposed subgrade.

2. Use only hand methods or air spade for grubbing within protection zones.

3. Chip removed tree branches and dispose of off-site, or burn as approved by the Division of Forestry .

B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.

3.5 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.

B. Burning tree, shrub, and other vegetation waste is permitted according to burning requirements and permitting of authorities having jurisdiction. Control such burning to produce the least smoke or air pollutants and minimum annoyance to surrounding properties. Burning of other waste and debris is prohibited.

END OF SECTION 31 10 00

543544

EN

GI

NE

ER

IN

G

BU

SI

NE

SS

: E B-

Pe ns ac ol a

- P an am a C ity

Ta lla ha ss ee

M ob ile

9 W

. M

AI

N

ST

., P

EN

SA

CO

LA

, F

L 3

(8

)4

-9

B A

S K

E R

V

IL

LE

-D

O N

O V

A N

, I N

C

EN

GI

NE

ER

IN

G

TH

E

SO

UT

H

SI

NC

E

N

Point Northing Easting Elev Desc

535 614034.7988' 1199637.2395' 0.00' SILT

536 613396.6110' 1199585.4253' 0.00' SILT

537 613402.2337' 1199516.1712' 0.00' SILT

538 614085.0422' 1198886.1918' 0.00' SILT

539 614131.2593' 1197762.8603' 0.00' SILT

540 613955.3905' 1197787.6092' 0.00' SILT

541 613708.1815' 1197938.3020' 0.00' SILT

542 613218.5303' 1198156.4333' 0.00' SILT

543 612875.0095' 1198058.8168' 0.00' SILT

544 612890.1139' 1197730.4795' 0.00' SILT

545 612812.1636' 1198041.5347' 0.00' SILT

546 612755.2009' 1199508.8773' 0.00' SILT

Point Northing Easting Elev Desc 824 612799.189' 1198123.143' 0.00' Red Capped Rebar (0340) 822 612750.969' 1199512.847' 0.00' Yellow Capped Rebar (Unknown Number) 1003 614055.381' 1199619.115' 0.00' 3" Concrete Monument

CONTROL

SILT FENCE

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

CLEARING LIMITS (TYP.)

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

JAW

AutoCAD SHX Text

RGG

AutoCAD SHX Text

JEA

AutoCAD SHX Text

CLEARING & GRUBBING

AutoCAD SHX Text

SITE 3

AutoCAD SHX Text

PLAN

AutoCAD SHX Text C-203

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EAST MILTON EFFLUENT SYSTEM CLEARING AND GRUBBING

AutoCAD SHX Text 25570.06

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CHK'D BY:

AutoCAD SHX Text

PROJ. MGR:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text This drawing is the property of BASKERVILLE-DONOVAN, INC. and is not to be reproduced in whole or in part. It is not to be used on any other project and is to be returned upon request.

AutoCAD SHX Text

RWD

AutoCAD SHX Text

DECEMBER 2025

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR.

AutoCAD SHX Text

REVISION/ACTION TAKEN

AutoCAD SHX Text

NOT RELEASED FOR CONSTRUCTION BY DATE

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

CLEARING LIMITS

AutoCAD SHX Text

EXTENT OF CLEARING AND GRUBBING

AutoCAD SHX Text

SITE 3 (40.85 ACRES)

AutoCAD SHX Text 21-2N-27-0000-00300-0000

AutoCAD SHX Text

21-2N-27-0000-00301-0000 (NO WORK ON THIS PARCEL)

AutoCAD SHX Text 21-2N-27-0000-00100-0000

AutoCAD SHX Text 21-2N-27-0000-00200-0000

AutoCAD SHX Text

MATCHLINE-SEE SHEET C-202

AutoCAD SHX Text

MATCHLINE-SEE SHEET C-205

AutoCAD SHX Text

SITE 3 CLEARING PLAN

AutoCAD SHX Text A1

AutoCAD SHX Text

SCALE: 1" = 100'

AutoCAD SHX Text

AutoCAD SHX Text 200'

AutoCAD SHX Text 100'

AutoCAD SHX Text 50'

AutoCAD SHX Text FL Reg. Engineer #102156

AutoCAD SHX Text

JAKE A. WIESNER, P.E.

AutoCAD SHX Text

ADDENDUM 2

AutoCAD SHX Text

JAW

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 01/2026

AutoCAD SHX Text

ADDENDUM 5

AutoCAD SHX Text

RWD

AutoCAD SHX Text 02/17/26

AutoCAD SHX Text

AutoCAD SHX Text

501 1003

EN

GI

NE

ER

IN

G

BU

SI

NE

SS

: E B-

Pe ns ac ol a

- P an am a C ity

Ta lla ha ss ee

M ob ile

9 W

. M

AI

N

ST

., P

EN

SA

CO

LA

, F

L 3

(8

)4

-9

B A

S K

E R

V

IL

LE

-D

O N

O V

A N

, I N

C

EN

GI

NE

ER

IN

G

TH

E

SO

UT

H

SI

NC

E

N

Point Northing Easting Elev Desc

501 614176.5910' 1197595.4459' 0.00' SILT

502 614316.2589' 1197416.9611' 0.00' SILT

503 614481.7123' 1197243.3856' 0.00' SILT

504 614759.7600' 1196941.1834' 0.00' SILT

505 614866.7198' 1196805.3754' 0.00' SILT

506 615019.7963' 1196714.3040' 0.00' SILT

507 615280.6357' 1196653.3241' 0.00' SILT

508 615634.0117' 1196568.8348' 0.00' SILT

509 615867.0692' 1196544.6785' 0.00' SILT

510 616015.5793' 1196561.8290' 0.00' SILT

511 616075.3441' 1196697.2217' 0.00' SILT

512 616053.3105' 1196894.4796' 0.00' SILT

513 615950.4204' 1197072.8972' 0.00' SILT

514 615826.1467' 1197229.8280' 0.00' SILT

515 615865.8739' 1197339.3123' 0.00' SILT

516 615999.1357' 1197398.6831' 0.00' SILT

517 616264.9345' 1197434.3129' 0.00' SILT

518 616396.2497' 1197601.1384' 0.00' SILT

519 616322.8956' 1197817.4722' 0.00' SILT

520 616146.7753' 1197936.1864' 0.00' SILT

521 615976.3122' 1198085.1480' 0.00' SILT

522 615919.2685' 1198156.3519' 0.00' SILT

523 615903.9567' 1198333.3181' 0.00' SILT

524 615906.7215' 1198436.0749' 0.00' SILT

525 615937.3870' 1198545.1026' 0.00' SILT

526 615975.3493' 1198550.2168' 0.00' SILT

527 616083.5748' 1198548.7657' 0.00' SILT

528 616172.7209' 1198536.4801' 0.00' SILT

529 616283.9457' 1198447.2886' 0.00' SILT

530 616517.6079' 1198426.4758' 0.00' SILT

531 616672.0249' 1198489.1038' 0.00' SILT

532 616716.5379' 1198562.1338' 0.00' SILT

533 616722.3407' 1198647.5642' 0.00' SILT

534 616635.9974' 1199851.0602' 0.00' SILT

Point Northing Easting Elev Desc 1003 614055.381' 1199619.115' 0.00' 3" Concrete Monument 1004 615111.103' 1199844.461' 0.00' Red Capped Rebar 0340 2004 615196.878' 1198048.741' 0.00' Red Capped Rebar 0340 2005 615297.324' 1195737.431' 0.00' Red Capped Rebar 0340 2006 616487.917' 1198893.334' 0.00' Red Capped Rebar 0340 2007 615113.675' 1199016.795' 0.00' Red Capped Rebar 0340 2008 615135.075' 1196770.185' 0.00' Red Capped Rebar 0340 2009 616370.793' 1196189.205' 0.00' Red Capped Rebar 0340

CONTROL

SILT FENCE

AutoCAD SHX Text

LIMITS OF CLEARING

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

JAW

AutoCAD SHX Text

RGG

AutoCAD SHX Text

JEA

AutoCAD SHX Text

CLEARING & GRUBBING

AutoCAD SHX Text

SITE 4

AutoCAD SHX Text

PLAN

AutoCAD SHX Text C-204

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EAST MILTON EFFLUENT SYSTEM CLEARING AND GRUBBING

AutoCAD SHX Text 25570.06

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CHK'D BY:

AutoCAD SHX Text

PROJ. MGR:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text This drawing is the property of BASKERVILLE-DONOVAN, INC. and is not to be reproduced in whole or in part. It is not to be used on any other project and is to be returned upon request.

AutoCAD SHX Text

RWD

AutoCAD SHX Text

DECEMBER 2025

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR.

AutoCAD SHX Text

REVISION/ACTION TAKEN

AutoCAD SHX Text

NOT RELEASED FOR CONSTRUCTION BY DATE

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

CLEARING LIMITS

AutoCAD SHX Text

EXTENT OF CLEARING AND GRUBBING

AutoCAD SHX Text

SITE 4 (145.45 ACRES)

AutoCAD SHX Text 21-2N-27-0000-00100-0000

AutoCAD SHX Text 21-2N-27-0000-00100-0000

AutoCAD SHX Text 22-2N-27-0000-00100-0000

AutoCAD SHX Text

MATCHLINE-SEE SHEET C-203

AutoCAD SHX Text

SITE 4 CLEARING PLAN

AutoCAD SHX Text A1

AutoCAD SHX Text

SCALE: 1" = 150'

AutoCAD SHX Text

AutoCAD SHX Text 300'

AutoCAD SHX Text 150'

AutoCAD SHX Text 75'

AutoCAD SHX Text FL Reg. Engineer #102156

AutoCAD SHX Text

JAKE A. WIESNER, P.E.

AutoCAD SHX Text 21-2N-27-0000-00300-0000

AutoCAD SHX Text 28-2N-27-0000-00200-0000

AutoCAD SHX Text

ADDENDUM 2

AutoCAD SHX Text

JAW

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 01/2026

AutoCAD SHX Text

ADDENDUM 5

AutoCAD SHX Text

RWD

AutoCAD SHX Text 02/17/26

AutoCAD SHX Text

EN

GI

NE

ER

IN

G

BU

SI

NE

SS

: E B-

Pe ns ac ol a

- P an am a C ity

Ta lla ha ss ee

M ob ile

9 W

. M

AI

N

ST

., P

EN

SA

CO

LA

, F

L 3

(8

)4

-9

B A

S K

E R

V

IL

LE

-D

O N

O V

A N

, I N

C

EN

GI

NE

ER

IN

G

TH

E

SO

UT

H

SI

NC

E

N

Point Northing Easting Elev Desc

535 614034.7988' 1199637.2395' 0.00' SILT

536 613396.6110' 1199585.4253' 0.00' SILT

537 613402.2337' 1199516.1712' 0.00' SILT

Point Northing Easting Elev Desc 822 612750.969' 1199512.847' 0.00' Yellow Capped Rebar (Unknown Number) 1003 614055.381' 1199619.115' 0.00' 3" Concrete Monument

CONTROL

SILT FENCE

AutoCAD SHX Text

PROPERTY BOUNDARY

AutoCAD SHX Text

25' BUFFER

AutoCAD SHX Text

CLEARING LIMITS (TYP.)

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

80' FPL EASEMENT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EAST MILTON EFFLUENT SYSTEM CLEARING AND GRUBBING

AutoCAD SHX Text 25570.06

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CHK'D BY:

AutoCAD SHX Text

PROJ. MGR:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text This drawing is the property of BASKERVILLE-DONOVAN, INC. and is not to be reproduced in whole or in part. It is not to be used on any other project and is to be returned upon request.

AutoCAD SHX Text

RWD

AutoCAD SHX Text

DECEMBER 2025

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR.

AutoCAD SHX Text

REVISION/ACTION TAKEN

AutoCAD SHX Text

NOT RELEASED FOR CONSTRUCTION BY DATE

AutoCAD SHX Text

JAW

AutoCAD SHX Text

THO

AutoCAD SHX Text

JEA

AutoCAD SHX Text

CLEARING & GRUBBING

AutoCAD SHX Text

SITE 2

AutoCAD SHX Text

PLAN

AutoCAD SHX Text C-205

AutoCAD SHX Text

SITE 2 CLEARING PLAN

AutoCAD SHX Text A1

AutoCAD SHX Text

MATCHLINE-SEE SHEET C-203

AutoCAD SHX Text

SITE 2 (110.43 ACRES)

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

CLEARING LIMITS

AutoCAD SHX Text 22-2N-27-0000-00200-0000

AutoCAD SHX Text

22-2N-27-0000-00201-0000 (NO WORK ON THIS PARCEL)

AutoCAD SHX Text

22-2N-27-0000-00300-0000 (NO WORK ON THIS PARCEL)

AutoCAD SHX Text

22-2N-27-0000-00301-0000 (NO WORK ON THIS PARCEL)

AutoCAD SHX Text

22-2N-27-0000-00100-0000 (NO WORK ON THIS PARCEL)

AutoCAD SHX Text

SCALE: 1" = 150'

AutoCAD SHX Text

AutoCAD SHX Text 300'

AutoCAD SHX Text 150'

AutoCAD SHX Text 75'

AutoCAD SHX Text FL Reg. Engineer #102156

AutoCAD SHX Text

JAKE A. WIESNER, P.E.

AutoCAD SHX Text

ADDENDUM 2

AutoCAD SHX Text

JAW

AutoCAD SHX Text 01/2026

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ADDENDUM 5

AutoCAD SHX Text

RWD

AutoCAD SHX Text 02/17/26

AutoCAD SHX Text

EN

GI

NE

ER

IN

G

BU

SI

NE

SS

: E B-

Pe ns ac ol a

- P an am a C ity

Ta lla ha ss ee

M ob ile

9 W

. M

AI

N

ST

., P

EN

SA

CO

LA

, F

L 3

(8

)4

-9

B A

S K

E R

V

IL

LE

-D

O N

O V

A N

, I N

C

EN

GI

NE

ER

IN

G

TH

E

SO

UT

H

SI

NC

E

AutoCAD SHX Text

5.0 INSPECTIONS: QUALIFIED PERSONNEL SHALL INSPECT THE FOLLOWING ITEMS AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM THAT IS 0.5 INCHES PRECIPITATION OR GREATER. TO COMPLY THE CONTRACTOR SHALL INSTALL AND MAINTAIN RAIN GAUGES AND RECORD THE DAILY RAINFALL. WHERE SITES HAVE BEEN PERMANENTLY STABILIZED INSPECTIONS SHALL BE CONDUCTED AT LEAST ONCE EVERY MONTH. THE CONTRACTOR SHALL ALSO INSPECT THAT CONTROLS INSTALLED IN THE FIELD AGREE WITH THE LATEST STORMWATER POLLUTION PREVENTION PLAN. THE CONTRACTOR SHALL INITIATE REPAIRS WITHIN 24 HOURS OF INSPECTIONS THAT INDICATE ITEMS ARE NOT IN GOOD WORKING ORDER. IF INSPECTIONS INDICATE THAT THE INSTALLED STABILIZATION AND STRUCTURAL PRACTICES ARE NOT SUFFICIENT TO MINIMIZE EROSION, RETAIN SEDIMENT, AND PREVENT DISCHARGING POLLUTANTS, THE CONTRACTOR SHALL PROVIDE ADDITIONAL MEASURES, AS APPROVED BY THE ENGINEER.

AutoCAD SHX Text

7.1 RECORDS:

AutoCAD SHX Text

6.0 NON-STORMWATER DISCHARGES:

AutoCAD SHX Text

7.2 INSPECTION REPORTS:

AutoCAD SHX Text

7.0 IMPLEMENTATION CHECKLIST:

AutoCAD SHX Text DATES WHEN MAJOR GRADING ACTIVITIES OCCUR. DATES WHEN CONSTRUCTION ACTIVITIES TEMPORARILY CEASE ON A PORTION OF THE SITE. DATES WHEN CONSTRUCTION ACTIVITIES PERMANENTLY CEASE ON A PORTION OF THE SITE. DATES WHEN STABILIZATION MEASURES ARE INITIATED ON THE SITE.

AutoCAD SHX Text THE CONTRACTOR SHALL PREPARE INSPECTION REPORTS SUMMARIZING THE FOLLOWING, BUT NOT LIMITED TO:

AutoCAD SHX Text THE CONTRACTOR SHALL MAINTAIN RECORDS OF CONSTRUCTION ACTIVITIES INCLUDING, BUT NOT LIMITED TO:

AutoCAD SHX Text

7.4 SWPPP MODIFICATION:

AutoCAD SHX Text

THE CONTRACTOR SHALL MODIFY THE SWPPP AS NECESSARY TO:

AutoCAD SHX Text

7.3 RELEASES OF REPORTABLE QUANTITIES OF OIL OR HAZARDOUS MATERIALS:

AutoCAD SHX Text

THE FOLLOWING ITEMS SHALL BE COMPLETE BEFORE SUBMITTING THE NOT:

AutoCAD SHX Text

8.0 TERMINATION CHECKLIST:

AutoCAD SHX Text THE CONTRACTOR SHALL REPORT ANY RELEASES OF REPORTABLE QUANTITIES OF OIL OR HAZARDOUS MATERIALS IF THEY OCCUR AS PER THE MEASURES OUTLINED IN SECTION 6.0 OF THE SWPPP.

AutoCAD SHX Text NAME OF INSPECTOR. QUALIFICATIONS OF INSPECTOR. MEASURES/AREAS INSPECTED. OBSERVED CONDITIONS. CHANGES NECESSARY TO THE SWPPP.

AutoCAD SHX Text THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPORTING ANY HAZARDOUS SUBSTANCE SPILLS THAT MAY EQUAL OR EXCEED A REPORTABLE QUANTITY (RQ). REFER TO EPA'S LIST OF HAZARDOUS SUBSTANCES AND REPORTABLE QUANTITIES (EPA 40 CFR 302.4 & 117). THIS LIST CAN BE OBTAINED FROM EPA'S WEBSITE (WWW.EPA.GOV) OR BY CONTACTING EPA. IF AN RQ RELEASE WWW.EPA.GOV) OR BY CONTACTING EPA. IF AN RQ RELEASE ) OR BY CONTACTING EPA. IF AN RQ RELEASE DOES OCCUR THE CONTRACTOR SHALL PERFORM THE FOLLOWING PROCEDURES:

AutoCAD SHX Text NOTIFY THE NATIONAL RESPONSE CENTER IMMEDIATELY AT 800-424-8802. PROVIDE WRITTEN DESCRIPTION OF THE RELEASE WITHIN 14 DAYS PROVIDING DATES, CAUSE AND PREVENTION METHODS TO THE REGIONAL EPA OFFICE. MODIFY THE SWPPP AS NECESSARY TO ADDRESS ADDED PREVENTION METHODS.

AutoCAD SHX Text ALL SOIL DISTURBING ACTIVITIES ARE COMPLETE. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN REMOVED OR WILL BE REMOVED AT AN APPROPRIATE TIME. ALL AREAS OF THE CONSTRUCTION SITE NOT OTHERWISE COVERED BY PERMANENT PAVEMENT OR STRUCTURE HAVE BEEN STABILIZED WITH UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70% OR EQUIVALENT MEASURES HAVE BEEN EMPLOYED.

AutoCAD SHX Text COMPLY WITH MINIMUM PERMIT REQUIREMENTS WHEN NOTIFIED BY FDEP THAT THE PLAN DOES NOT COMPLY. ADDRESS ANY CHANGES IN DESIGN, CONSTRUCTION OPERATIONS OR MAINTENANCE, WHICH HAS AN EFFECT ON THE POTENTIAL FOR DISCHARGE OF POLLUTANTS. PREVENT REOCCURRENCE OF REPORTABLE QUANTITY RELEASES OF HAZARDOUS MATERIAL OR OIL.

AutoCAD SHX Text

2.5 SITE MAP: THE CONSTRUCTION PLANS ARE BEING UTILIZED AS THE SITE MAP. TEMPORARY EROSION CONTROL IS SHOWN ON THE PLAN.

AutoCAD SHX Text

1.0 BACKGROUND & REQUIREMENTS:

AutoCAD SHX Text

1.1 INTRODUCTION:

AutoCAD SHX Text

STORM WATER POLLUTION PREVENTION PLAN

AutoCAD SHX Text THE REFERENCED SUPPORT DOCUMENTATION FOR THIS STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY'S (EPA) STORM WATER MANAGEMENT FOR CONSTRUCTION ACTIVITIES, DEVELOPING POLLUTION PREVENTION PLANS AND BEST MANAGEMENT PRACTICES SUMMARY GUIDANCE (EPA 833-R-92-001) AND STORM WATER MANAGEMENT FOR CONSTRUCTION ACTIVITIES, DEVELOPING POLLUTION PREVENTION PLANS AND BEST MANAGEMENT PRACTICES (EPA 832-R-92-005). THIS SWPPP IS DESIGNED TO PROTECT ONSITE AND ADJACENT NATURAL RESOURCES, INCLUDING BUT NOT LIMITED TO, WETLANDS, MARSHES, BAYOUS AND BAYS, WHILE PRESERVING WILDLIFE AND ARCHEOLOGICAL RESOURCES.

AutoCAD SHX Text

PROJECT ADDRESS:

AutoCAD SHX Text

1.6 APPLICATION INFORMATION:

AutoCAD SHX Text

3.0 CONTROLS:

AutoCAD SHX Text

2.6 RECEIVING WATERS:

AutoCAD SHX Text

3.1 EROSION AND SEDIMENT CONTROLS:

AutoCAD SHX Text N 30° 39' 52.00" W 86° 56' 44.38"

AutoCAD SHX Text

3.3 OTHER CONTROLS: 3.3.1 WASTE DISPOSAL IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED METHODS TO PREVENT THE DISCHARGE OF SOLID MATERIAL, INCLUDING BUILDING MATERIALS, TO WATERS OF THE STATE. THE PROPOSED METHODS SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS APPROVED BY THE ENGINEER: PROVIDING LITTER CONTROL AND COLLECTION WITHIN THE PROJECT DURING CONSTRUCTION ACTIVITIES. DISPOSING OF ALL FERTILIZER OR OTHER CHEMICAL CONTAINERS ACCORDING TO EPA'S STANDARD PRACTICES AS DETAILED BY THE MANUFACTURER. 3.3.2 OFF-SITE VEHICLE TRACKING & DUST CONTROL. IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED METHODS FOR MINIMIZING OFF-SITE VEHICLE TRACKING OF SEDIMENTS AND GENERATING DUST. THE PROPOSED METHODS SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS APPROVED BY THE ENGINEER. COVERING LOADED HAUL TRUCKS WITH TARPAULINS. REMOVING EXCESS DIRT FROM ROADS DAILY. PROVIDING A STABILIZED CONSTRUCTION ENTRANCE ACCORDING TO THE FLORIDA EROSION AND SEDIMENT CONTROL MANUAL. USING ROADWAY SWEEPERS DURING DUST GENERATING ACTIVITIES SUCH AS EXCAVATION. 3.3.3 STATE AND LOCAL REGULATIONS FOR WASTE DISPOSAL, SANITARY SEWER, OR SEPTIC TANK REGULATIONS: IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED PROCEDURES TO COMPLY WITH APPLICABLE STATE AND LOCAL REGULATION FOR WASTE DISPOSAL, AND SANITARY SEWER, OR SEPTIC SYSTEMS. 3.3.4 FERTILIZERS AND PESTICIDES: N/A 3.3.5 TOXIC SUBSTANCES: N/A 3.3.6 APPROVED STATE AND LOCAL PLANS AND PERMITS. CONTRACTOR SHALL ADHERE TO SANTA ROSA COUNTY AND NWFWMD PERMITS ISSUED FOR THIS PROJECT, IF ANY, AS WELL AS ANY ADDITIONAL FEDERAL, STATE, OR LOCAL PERMITS/ORDINANCES THAT ARE APPLICABLE TO THIS PROJECT. 4.0 MAINTENANCE IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A PLAN FOR MAINTAINING ALL EROSION AND SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. THE MAINTENANCE PLAN SHALL AT A MINIMUM COMPLY WITH THE FOLLOWING: SILT FENCE: MAINTAIN PER FDOT SECTION 104 OF THE SPECIFICATIONS. THE CONTRACTOR SHOULD ANTICIPATE REPLACING SILT FENCE ON 6 MONTH INTERVALS. SEDIMENT BARRIERS: REMOVE SEDIMENT AS PER MANUFACTURER'S RECOMMENDATIONS OR WHEN WATER PONDS IN UNACCEPTABLE AMOUNTS OR AREAS.

AutoCAD SHX Text

3.2 STORMWATER MANAGEMENT:

AutoCAD SHX Text

LATITUDE: LONGITUDE:

AutoCAD SHX Text

1.2 NOTICE OF INTENT (NOI):

AutoCAD SHX Text THE CONTRACTOR SHALL VERIFY IF AN NPDES PERMIT IS REQUIRED. IF SO, RULE 62-621.300(4), FAC REQUIRES THE CONSTRUCTION OPERATOR OF A SITE THAT DISTURBS ONE OR MORE ACRES TO OBTAIN COVERAGE FROM THE GENERIC PERMIT FOR STORMWATER DISCHARGE FROM CONSTRUCTION ACTIVITIES. THE CONTRACTOR IS REQUIRED TO SUBMIT A NOTICE OF INTENT TO USE GENERIC PERMIT FOR STORMWATER DISCHARGE FROM CONSTRUCTION ACTIVITIES THAT DISTURB ONE OR MORE ACRES (FDEP FORM 62-621.300) ALONG WITH THE APPROPRIATE APPLICATION FEE TO THE FOLLOWING ADDRESS 48 HOURS PRIOR TO COMMENCING CONSTRUCTION:

AutoCAD SHX Text

1.3 STORMWATER POLLUTION PREVENTION PLAN (SWPPP):

AutoCAD SHX Text THE CONTRACTOR IS REQUIRED TO CERTIFY THIS STORMWATER POLLUTION PREVENTION PLAN (SWPPP) BELOW PRIOR TO SUBMITTING THE NOI. THIS SWPPP IS NOT REQUIRED TO BE SUBMITTED WITH THE NOI, BUT IS REQUIRED TO BE KEPT ON SITE DURING ALL PHASES OF CONSTRUCTION. BECAUSE EROSION AND SEDIMENT CONTROLS AND CONSTRUCTION METHODS VARY SIGNIFICANTLY FROM CONTRACTOR TO CONTRACTOR, THE CONTRACTOR CAN PROPOSE ALTERNATIVE METHODS TO THIS SWPPP THAT ARE EQUAL OR BETTER AT CONTROLLING EROSION AND SEDIMENTATION. AT A MINIMUM, THE CONTRACTOR MUST FOLLOW THE EROSION CONTROL PLAN SPECIFIED IN THE CONSTRUCTION PLANS AND DOCUMENTS. ANY MODIFICATIONS TO THIS SWPPP MUST BE DOCUMENTED AND KEPT WITH THE PLAN AS PART OF THE RECORDS KEEPING PROCESS TO BE IN FULL COMPLIANCE WITH THE CGP.

AutoCAD SHX Text THIS FORM CAN BE OBTAINED FROM FDEP'S WEBSITE (WWW.DEP.STATE.FL.US) OR WWW.DEP.STATE.FL.US) OR ) OR BY CONTACTING FDEP. PLEASE NOTE THAT THE CURRENT APPLICATION FEE IS $400(> 5 ACRES) OR $250 (1-4.99 ACRES); HOWEVER, THIS FEE IS SUBJECT TO CHANGE WITHOUT NOTICE. ALWAYS REFER TO THE MOST CURRENT VERSION OF RULE 62-4.050(4)(D), FAC TO CONFIRM THE AMOUNT BEFORE SUBMITTING PAYMENT. IF CONSTRUCTION ACTIVITY EXCEEDS FIVE YEARS, THE CONTRACTOR MUST RE-APPLY FOR COVERAGE.

AutoCAD SHX Text NPDES STORMWATER NOTICES CENTER, MS # 2510 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION 2600 BLAIR STONE ROAD TALLAHASSEE, FLORIDA 32399-2400

AutoCAD SHX Text

COMPANY & ADDRESS

AutoCAD SHX Text

NAME & TITLE (PRINT)

AutoCAD SHX Text

1.5 NOTICE OF TERMINATION (NOT):

AutoCAD SHX Text

SIGNATURE DATE

AutoCAD SHX Text

PRINT & SIGN NAME

AutoCAD SHX Text NPDES STORMWATER NOTICES CENTER, MS # 2510 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION 2600 BLAIR STONE ROAD TALLAHASSEE, FLORIDA 32399-2400

AutoCAD SHX Text THIS FORM CAN BE OBTAINED FROM FDEP'S WEBSITE (WWW.DEP.STATE.FL.US) OR WWW.DEP.STATE.FL.US) OR ) OR BY CONTACTING FDEP. THE NOT CAN NOT BE SUBMITTED UNTIL ALL DISTURBED SOILS AT THE CONSTRUCTION SITE HAVE BEEN FINALLY STABILIZED AND TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN REMOVED OR WILL BE REMOVED AT AN APPROPRIATE TIME. FINAL STABILIZATION MEANS THAT ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED AND THAT A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70 PERCENT OF THE COVER FOR UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES HAS BEEN ESTABLISHED, OR EQUIVALENT STABILIZATION MEASURES HAVE BEEN EMPLOYED. IF CONSTRUCTION ACTIVITY EXCEEDS FIVE YEARS, THE CONTRACTOR MUST RE-APPLY FOR COVERAGE.

AutoCAD SHX Text THE CONTRACTOR IS REQUIRED TO SUBMIT A NOTICE OF TERMINATION OF GENERIC PERMIT COVERAGE (FDEP FORM 62-621.300(6)) UPON CONSTRUCTION COMPLETION TO DISCONTINUE PERMIT COVERAGE. THE NOT IS TO BE SUBMITTED TO THE FOLLOWING ADDRESS:

AutoCAD SHX Text

RESPONSIBILITIES (GENERAL CONTRACTOR, SITE CONTRACTOR, SUBCONTRACTOR, OTHER):

AutoCAD SHX Text I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND THE TERMS AND CONDITIONS OF THE GENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT THAT AUTHORIZES THE STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY FROM THE CONSTRUCTION SITE IDENTIFIED AS PART OF THIS CERTIFICATION.

AutoCAD SHX Text

1.4 CONTRACTOR'S CERTIFICATION: IF REQUIRED

AutoCAD SHX Text

2.1 NATURE OF CONSTRUCTION ACTIVITIES: THE PROPOSED IMPROVEMENTS CONSIST OF CLEARING AND GRUBBING APPROXIMATELY 350 ACRES OF TIMBERLAND FOR SOD FARMING.

AutoCAD SHX Text

2.0 SITE DESCRIPTION:

AutoCAD SHX Text ERP PERMIT NO.: NOT REQUIRED FOR SITES 2, 4 AND PIPELINE NOT REQUIRED FOR SITES 2, 4 AND PIPELINE

AutoCAD SHX Text

RECEIVING WATER NAME: BLACKWATER RIVER

AutoCAD SHX Text

MS4 OPERATOR NAME: N/A

AutoCAD SHX Text

2.2 SEQUENCE OF MAJOR SOIL DISTURBING ACTIVITIES: EROSION CONTROL MEASURES CLEARING AND GRUBBING EARTHWORK- BORROW STOCKPILE MATERIAL WILL BE SORTED AND USED BORROW STOCKPILE MATERIAL WILL BE SORTED AND USED AS ON-SITE EARTH FILL EARTHWORK- STORMWATER CONVEYANCE CONSTRUCTION STORMWATER CONVEYANCE CONSTRUCTION

AutoCAD SHX Text

2.4 RUNOFF COEFICIENTS: PRE-CONSTRUCTION- 0.2 DURING CONSTRUCTION- 0.4 - 0.5 POST CONSTRUCTION- 0.6

AutoCAD SHX Text

2.3 AREA ESTIMATES: TOTAL PROJECT AREA: ±350 ACRES

AutoCAD SHX Text

SOILS DATA: SEE SITE SPECIFIC SURVEY FOR SOILS ADDITIONAL INFORMATION

AutoCAD SHX Text

WATER MANAGEMENT DISTRICT: NORTHWEST FLORIDA (NWFWMD)

AutoCAD SHX Text THE FOLLOWING SEQUENCE OF MAJOR ACTIVITIES SHALL BE FOLLOWED UNLESS THE CONTRACTOR CAN PROPOSE AN ALTERNATIVE THAT IS EQUAL TO OR BETTER AT CONTROLLING EROSION AND SEDIMENTATION. THE DETAILED SEQUENCE FOR THE ENTIRE PROJECT CAN VARY SIGNIFICANTLY FROM CONTRACTOR TO CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING ANY CHANGES. SITE 2 PIPELINE ROUTE SITE 4 SITE 3

AutoCAD SHX Text ALL EROSION AND SEDIMENT CONTROLS SPECIFIED ON THESE PLANS (LIMITS OF SOIL EROSION AND SEDIMENTATION CONTROL MEASURES) SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION OR DEMOLITION. SILT FENCING AND STAKED HAY BALES SHALL BE INSTALLED ALONG DOWN-GRADIENT LIMITS TO PROTECT EXISTING DRAINAGE STRUCTURES AND/OR DRAINAGE SYSTEMS FROM EROSION AND SEDIMENTATION.

AutoCAD SHX Text BLACKWATER RIVER IS THE RECEIVING WATERS OF THE STORMWATER RUNOFF FROM THIS PROJECT.

AutoCAD SHX Text STORMWATER MANAGEMENT WILL BE ACHIEVED THROUGH THE USE OF BERMS, SWALES, SEDIMENTATION BASINS, OR ANY OTHER MEANS NECESSARY TO ENSURE SITE COMPLIANCE.

AutoCAD SHX Text SECTION 29, TOWNSHIP 2N, RANGE 27W, SANTA ROSA COUNTY, FL. LOCATED NORTH OF HWY 90 AND SOUTH OF THE BLACKWATER RIVER.

AutoCAD SHX Text

JAW

AutoCAD SHX Text

RGG

AutoCAD SHX Text

TTL

AutoCAD SHX Text

SWPPP PLAN

AutoCAD SHX Text C-900

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EAST MILTON EFFLUENT SYSTEM CLEARING AND GRUBBING

AutoCAD SHX Text 25570.06

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CHK'D BY:

AutoCAD SHX Text

PROJ. MGR:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text This drawing is the property of BASKERVILLE-DONOVAN, INC. and is not to be reproduced in whole or in part. It is not to be used on any other project and is to be returned upon request.

AutoCAD SHX Text

RWD

AutoCAD SHX Text

DECEMBER 2025

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR.

AutoCAD SHX Text

REVISION/ACTION TAKEN

AutoCAD SHX Text

NOT RELEASED FOR CONSTRUCTION BY DATE

AutoCAD SHX Text FL Reg. Engineer #102156

AutoCAD SHX Text

JAKE A. WIESNER, P.E.

AutoCAD SHX Text

ADDENDUM 5

AutoCAD SHX Text

RWD

AutoCAD SHX Text 02/17/26

Milton WWTF Access Road Santa Rosa Co Site Specific Survey

SANTA ROSA COUNTY

SITE SPECIFIC SURVEY

REPORT

Property:

Milton WWTF Access Road Jeff Ates ROW & Easement Milton, FL 32583 Parcel Numbers: 27-2N-27-0000-00200-0000, 22-2N-27-0000-00202-0000, 22-2N-27- 0000-00203-0000, 22-2N-27-0000-00204-0000, and 22-2N-27-0000-00205-0000

Prepared for:

Baskerville-Donovan c/o Richard Delp 449 W Main Street Pensacola, FL 32502 850.438.9661

Prepared by:

UES

3298 Summit Boulevard, Suite 44 Pensacola, Florida 32503 850.435.9367 teamues.com

2050.058 December 2025

This report contains proprietary, business-confidential, and/or privileged material. The information transmitted by this document is intended only for the recipient and represents the work product of UES Professional Solutions, LLC (UES) who owns the information and has provided it to the recipient under terms and conditions. The recipient is authorized by UES to transmit this information to others as necessary to accomplish their objectives. That transmission, however, does not obligate UES to interpret or otherwise consult with additional recipients of the substance of this report.

INTRODUCTION

Applicants to Santa Rosa County for various development activities have numerous submittal requirements. As part of the county’s development review process, an applicant may be asked to provide specific information relating to “Environmentally Sensitive Lands” to assist county staff in determining if the proposed project complies with established development standards. The document conveying the requisite technical information is called a "Site Specific Survey for Environmentally Sensitive Lands.”

UES formulated this Site-Specific Survey report to identify features potentially subject to the protections articulated in Chapter 3 of Santa Rosa County’s Land Development Code (LDC). The current version of the LDC can be viewed online at Santa Rosa County LDC.

Per the objectives of the resource protection standards, the Site-Specific Survey report conveys the following as relates to the subject property:

• A site location map (Exhibit 1) for orientation and general reference;

• A reproduction of a portion of the U.S. Geological Survey (USGS) 7.5-minute topographic map for the appropriate quadrangle (Exhibit 2);

• A current aerial image of the site (Exhibit 3);

• Identification of the U.S. Department of Agriculture Natural Resource Conservation

Service (NRCS) soil series underlying the site (Exhibit 4);

• A map indicating the proximity of the subject property to known (mapped) environmentally sensitive lands (Exhibit 5), which may include any of the following:

o Aquatic preserves, including the Yellow River Marsh Aquatic Preserve and the

Escambia River Water Management Area o Outstanding Florida Waters o Essential Fish Habitat (including seagrass beds) o FEMA >1% flood hazard zone o Potable water wells and wellhead protection zones o Water Resource Concern Areas;

• Presentation of the results of a wetland jurisdictional determination and delineation (Exhibit 6), It is the City of Milton’s intent to establish the western property boundary to coincide with the wetlands boundary identified, to avoid impacts;

• Presentation of any present natural communities (Exhibit 7);

• Presentation of the results of an imperiled species survey, including a graphical depiction of habitat limits or population locations (Exhibit 8, if present);

• United States Fish and Wildlife Service (USFWS) Information for Planning and Consulting

(IPaC) on the federally threatened and endangered species likely to be found on the site (Attachment A)

• Florida Natural Areas Inventory (FNAI) Element Occurrence data on the state threatened and endangered species likely to be found on the site (Attachment B)

• Presentation of the results of a protected tree inventory (Exhibit 9, if present) will follow in a separate report.

https://www.santarosa.fl.gov/182/Land-Development-Code

• Information from the Florida Master Sites File relating to known archeological and cultural resources (Attachment C);

SITE LOCATION AND TOPOGRAPHY

A Site-Specific Survey for Environmentally Sensitive Lands was conducted on the approximately 7.58-acre corridor located approximately 1.1 miles north of Highway 90 in Milton, Florida (Exhibit 1). The site includes portions of five different parcels identified as parcel numbers 27-2N-27- 0000-00200-0000, 22-2N-27-0000-00202-0000, 22-2N-27-0000-00203-0000, 22-2N-27-0000- 00204-0000, and 22-2N-27-0000-00205-0000 by the Santa Rosa County Property Appraiser. It is approximately 200-foot wide and spans approximately 1,650 feet. According to the United States Geological Survey (USGS) Quadrangle topographical map, elevations onsite range between approximately 130 to 140 feet above sea level and gently slopes from south to north (Exhibit 2).

The site is primarily undeveloped and includes a portion of a powerline easement along the western boundary (Exhibit 3). Outside of the easement, the site consists primarily of successional uplands with a small man-made pond and depressional wetlands on the southern portion of the property. There are also several unpaved trails that transect through the property.

SOIL TAXONOMY

Applications for development approval for sites to be served by an onsite stormwater management system and located in a soil series that poses moderate to severe limitations to development require detailed soil analysis. To aid the applicant and staff in determining the suitability of proposed stormwater management systems, a map depicting the United States Department of Agriculture Natural Resource Conservation Service (NRCS) web soil survey results is included as Exhibit 4. The NRCS depicts the site as being underlain by the Lakeland, Troup, and Bonifay soil series.

Bonifay ST2 (non-hydric) The Bonifay series consists of very deep, well drained, moderately slowly permeable soils on ridges and side slopes in the Southern Coastal Plain. They formed in thick beds of sandy and loamy marine sediments. Near the type location, the mean annual temperature is about 68 degrees F., and the mean annual precipitation is about 55 inches. Slopes range from 0 to 12 percent. Taxonomic class: Loamy, siliceous, subactive, thermic Grossarenic Plinthic Paleudults.

Lakeland sand ST-21, ST-22 (non-hydric) The Lakeland series consists of very deep,…