This document is Addendum 3 to ITB-2026-01 for the City of Milton, Florida's Effluent Sprayfields and Pipeline Route Clearing Grubbing project, specifically addressing Section 01 57 23 on Temporary Storm Water Pollution Control. The addendum establishes requirements for implementing a Stormwater Pollution Prevention Plan (SWPPP) throughout the clearing and grubbing work on approximately 350 wooded acres. The contractor must conduct a preinstallation conference with the Owner, Engineer, and earthwork subcontractor to review SWPPP requirements, permitting processes, worker training, and inspection and maintenance protocols. The contractor is required to designate a SWPPP Coordinator—an experienced employee with a documented record of successful water pollution control management—who shall complete and finalize the SWPPP form and assume responsibility for all inspections and maintenance of SWPPP requirements throughout construction. All workers performing work under the SWPPP must receive appropriate training as outlined in the plan.
The contractor must comply with all best management practices and performance requirements specified in the SWPPP, including locating stormwater pollution controls according to the plan and conducting construction to minimize contamination and pollution. Inspection, repair, and maintenance of all SWPPP controls are mandatory, with inspections required at minimum every seven days and after each storm event as detailed in the SWPPP. The contractor must remove all SWPPP controls upon construction completion and restore and stabilize all disturbed areas. Informational submittals include the SWPPP itself, EPA authorization under the 2017 Construction General Permit, a Stormwater Pollution Prevention Training Log for each individual involved in SWPPP work, and inspection reports. This addendum incorporates the SWPPP as part of the contract documents and applies the EPA's Construction General Permit requirements to ensure environmental compliance throughout the project.
View the file
Other files for this state and local contract opportunity
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J. Wiesner, P.E.
BDI/PNS
01/28/2026
25570.06 TEMPORARY STORM WATER POLLUTION CONTROL 01 57 23 - 1
ADDENDUM 3
SECTION 01 57 23 - TEMPORARY STORM WATER POLLUTION CONTROL
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Temporary stormwater pollution controls.
1.3 STORMWATER POLLUTION PREVENTION PLAN
A. The Stormwater Pollution Prevention Plan (SWPPP) is part of the Contract Documents and is bound into this Project Manual.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Meet with Owner, Engineer, and earthwork subcontractor.
2. Review requirements of the SWPPP, including permitting process, worker training, and inspection and maintenance requirements.
1.5 INFORMATIONAL SUBMITTALS
A. Stormwater Pollution Prevention Plan (SWPP): SWPPP is included in the drawings.
B. EPA authorization under the EPA's "2017 Construction General Permit (CGP)."
C. Stormwater Pollution Prevention (SWPP) Training Log: For each individual performing Work under the SWPPP.
D. Inspection reports.
1.6 QUALITY ASSURANCE
A. Stormwater Pollution Prevention Plan (SWPPP) Coordinator: Contractor’s employee who is experienced with a record of successful water pollution control management coordination of projects with similar requirements.
J. Wiesner, P.E.
BDI/PNS
01/28/2026
25570.06 TEMPORARY STORM WATER POLLUTION CONTROL 01 57 23 - 2
ADDENDUM 3
1. SWPPP Coordinator shall complete and finalize the SWPPP form.
2. SWPPP Coordinator shall be responsible for inspections and maintaining of all requirements of the SWPPP.
B. Installers: Trained as indicated in the SWPPP.
PART 2 - PRODUCTS
2.1 TEMPORARY STORMWATER POLLUTION CONTROLS
A. Provide temporary stormwater pollution controls as required by the SWPPP.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Comply with all best management practices, general requirements, performance requirements, reporting requirements, and all other requirements included in the SWPPP.
B. Locate stormwater pollution controls in accordance with the SWPPP.
C. Conduct construction as required to comply with the SWPPP and that minimize possible contamination or pollution or other undesirable effects.
1. Inspect, repair, and maintain SWPPP controls during construction.
a. Inspect all SWPPP controls not less than every seven days, and after each occurrence of a storm event, as outlined in the SWPPP.
D. Remove SWPPP controls at completion of construction and restore and stabilize areas disturbed during construction.
END OF SECTION 01 57 23