This is a Bid Price Schedule (ITB-2019-0502) for the City of Casselberry's Howell Park Water Treatment Plant Rehabilitation project located at 720 Semoran Boulevard in Casselberry, Florida. The comprehensive project involves complete water treatment plant renovation, including demolition of existing structures, construction of new chemical and operations buildings, installation of new high service pumps, site piping, electrical systems, instrumentation, SCADA systems, and various infrastructure improvements. The project encompasses multiple groups of work including general conditions, demolition, structural and mechanical systems, and electrical and instrumentation components, with specific line items for tasks such as mobilization, equipment installation, site restoration, and system upgrades.

The total base bid is $50,000, with an additional bid alternate for supplemental fencing, tree removal, and water meter relocation. The bid schedule includes 25 distinct line items organized into four work groups, with most items priced as lump sum (LS) and some as per unit (EA). A specific allowance of $50,000 is included for Duke Energy of Florida service modifications. The bid document indicates that quantities are approximate and subject to field variations, and the City reserves the right to consider but not guarantee awarding alternate bid items. The procurement follows a formal invitation to bid (ITB) process, with bidders required to comprehensively understand project specifications, local conditions, and agree to perform work according to the detailed scope of services.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SOLICITATION No. and TITLE --->ITB-2019-0502 PW 1708 Howell Park Water Treatment Plant Rehab
BID PRICE SCHEDULE
ITEM NO.DESCRIPTIONUNITSQTYUNIT COSTTOTAL COST
GROUP 1GENERAL CONDITIONS
1Mobilization and DemobilizationLS1$ - 0
2Bonds, Insurance, and PermitsLS1$ - 0
3Pre-Construction Color Audio-Visual DocumentationLS1$ - 0
4Stormwater Pollution Prevention/NPDES Requirements & Erosion & Sedimentation ControlLS1$ - 0
5Project Record DocumentsLS1$ - 0
GROUP 2DEMOLITION
6Demolition - Including existing buildings and office, yard piping, pumps, chemical skids and tanks, flow meters, fuel tank and piping, fencing, landscaping, and electrical and instrumentation equipment.LS1$ - 0
7Removal and Salvage of HydrotankLS1$ - 0
GROUP 3STRUCTURAL AND MECHANICAL
8New Chemical Building - Including plumbing, lighting, HVAC, fixtures, roofing system, safety equipment, concrete formwork, and painting.LS1$ - 0
9New High Service Pump, Electrical, and Operations Building - Including plumbing, lighting, HVAC, cabinetry, bathroom fixtures, roofing system, safety equipment, concrete formwork, and painting.LS1$ - 0
10Furnish and Install Site Piping - Including installation of raw water mains, distribution water mains, flow meters, and all fittings, and valves.LS1$ - 0
11Site Restoration, Sodding, Fencing/Wall, Landscaping, Access Driveway, Access Gate, and Detector LoopLS1$ - 0
12Furnish and Install New HSP'sEA3$ - 0
13Furnish and Install New Orthopolyphosphate System - Including chemical skids, piping, and injection points.LS1$ - 0
14Furnish and Install Pre and Post Cl2 System - including chemical skids, piping, injection points, and storage tanks.LS1$ - 0
15Relocation of Fuel Tank from South WTPLS1$ - 0
16Furnish and Install Fuel Oil Piping for Relocated Fuel TankLS1$ - 0
17Furnish and Install grinder pump station and associated piping, including connection to off-site manhole.LS1$ - 0
18Furnish and Install Coating System - Including all piping, fittings, valves, and pumpsLS1$ - 0
19Furnish and Install Coating System for exterior of 0.25 MGD Ground Storage Tank and 0.5 MGD Ground Storage TankLS1$ - 0
20Rehabilitate 0.25 MGD Ground Storage Tank and 0.5 MGD Ground Storage Tank. Clean, furnish and install coating system for interiors of both ground storage tanks. Minor screen and level gauge.LS1$ - 0
GROUP 4ELECTRICAL AND INSTRUMENTATION
21Electrical System including main breaker, ATS, Panel P1, VFDs, MCCs, transformer, disconnect switches, circuit breaker enclosures, starters, panelboards, shunt trips, all conduits and wire for a complete electrical system, and electrical testing.LS1$ - 0
22Instrumentation and SCADA SystemLS1$ - 0
23Removal and salvage of existing control panel (return to owner)LS1$ - 0
24Duke Energy of Florida Allowance, including demolition of two existing services, installation of new permanent service, and installation of temporary service at the Fiber Building.LS1$ 50,000.00
25Electrical gear for temporary service for Fiber Building including installation, removal, and tree trimming.LS1$ - 0
TOTAL BASE BID$ 50,000.00
Please remember to double check your numbers.
(In Numbers):
TOTAL BASE BID
(In Words):

Bid Alternate #1 Additional Fencing Wall, Remove Trees, and Relocate Water Meter LS 1 $

All Bidders should provide pricing for bid Alternate #1. Alternate bid items are not included in the total Base Bid. The City may consider Alternates; however, there is not a guarantee that the City will award the Alternate.

NOTE: The Bidder agrees that the quantities shown for unit price items are approximate and are subject to variations in the field and further agrees to do the work at the unit bid price whether the quantities are increased or decreased.
I/we, the undersigned, as authorized signatory to commit the firm, do hereby accept in total all the terms and conditions stipulated and referenced in this ITB document and do hereby agree that if a contract is offered or negotiated it will abide by the terms and conditions presented in the ITB document or as negotiated pursuant thereto. The undersigned, having familiarized him/herself with the terms of the ITB documents, local conditions, and the cost of the work at the place(s) where the work is to be done, hereby proposes and agrees to perform within the time stipulated, all work required in accordance with the scope of services and other documents including Addenda, if any, on file at the City of Casselberry Procurement Division for the price set forth herein. The signature(s) below are an acknowledgment of my/our full understanding and acceptance of all the terms and conditions set forth in this ITB document or as otherwise agreed to between the parties in writing.
Bidder/Contractor:
Printed Name:
Title:
Signature:
Address:
City/State/Zip:
FEIN:
Phone:
Email:

File details come from the government source that posted it. Updated .