This document consists of permit information and technical drawings for a state harbor improvement project in Eagle Harbor, Michigan, issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) Water Resources Division in coordination with the Michigan Department of Natural Resources (MDNR), Parks and Recreation Division. The primary project involves dredging, shoreline protection installation, and pier construction at Eagle Harbor State Harbor on Lake Superior. The scope includes dredging 4,060 cubic yards of material from Lake Superior bottomlands across three separate areas, installing 589 cubic yards of riprap shoreline protection in two areas (105 feet and 165 feet in length), constructing 290 linear feet of new steel sheet pile seawall, placing 16 cubic yards of clean backfill, and installing five filled sheet pile piers (four at 80 feet long by 10 feet wide by 12 feet deep, and one at 45 feet long by 10 feet wide by 12 feet deep). A subsequent permit amendment authorizes placement of 245 cubic yards of riprap toe stone protection, dredging of 145 additional cubic yards, and installation of two spring piles for vessel mooring. Work is subject to environmental restrictions, including a prohibition on work from November 1 to December 15 due to fish spawning and migration periods, and must include turbidity curtain installation to prevent siltation.
The permits, issued September 20, 2021 (Permit WRP030756 v.1, expiring September 20, 2026) and March 1, 2022 (Permit WRP032627 v.1, expiring March 1, 2027), are issued to Eric Cadeau of the Michigan DNR, Parks and Recreation Division. The project is located in Keweenaw County, Eagle Harbor Township, on Lake Superior. Technical specifications require all dredged material disposal in approved upland sites outside floodplains and wetlands, use of clean washed rock free of contaminants for fill, placement of turbidity curtains extending from waterbody bed to above water surface, and compliance with Part 91 Soil Erosion and Sedimentation Control requirements. The permits do not waive U.S. Army Corps of Engineers jurisdiction or federal permit requirements. Michael G. Gotham, an Environmental Scientist with Coleman Engineering Company holding certifications in Lead Sampling Technician and Asbestos Containing Materials Inspector, is identified as a qualified project inspector with experience in environmental investigations and construction inspection.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lead and Asbestos Inspection
Eagle Harbor Marina Office Building
CEC Project #EC-17585
Photo 9 – View of the Southern corner of the Well Pump Room
Photo 10 – View of the eastern corner of the Well Pump Room
Photo 11 – View of the tan painted floor in the Well Pump Room
Photo 12 – View of the groundwater well in the Well Pump Room
Photo 13 – View of the scuttle hole in the Well Pump Room
Photo 14 – View of the Women’s Bathroom
Photo 15 – Sewer vent stack in wall between Men’s and Women’s Bathrooms
Photo 16 – BP-1 sample location on northeast wall in the Marina Office
Photo 17 – WP-1 sample location on door frame between the Marina Office and Well Pump
Room
Photo 18 – DW-1 sample location on door frame between the Marina Office and Well Pump
Room
Photo 19 – TP-1 sample location on floor in southern corner of the Marina Office
Photo 20 – TP-2 sample location on floor in the center of the Well Pump Room
Photo 21 – WP-2 sample location ceiling in southern corner of the Well Pump Room
Photo 22 – BP-2 sample location on southeastern wall in Well Pump Room
Photo 23 – DW-2 sample location on southwest wall in Well Pump Room
Photo 24 – AT-1 sample location near the southeastern wall in attic above Well Pump Room
Photo 25 – AT-2 sample location near southwest edge of scuttle hole in attic above the Well
Pump Room
Photo 26 – VB-1 sample location in eastern corner of the Women’s Bathroom
Photo 27 – SC-1 sample location along southwest wall in the Men’s Bathroom
Photo 28 – DC-1 sample location in void between door frame and northwest wall in the Men’s
Bathroom
Photo 29 – WG-1 sample location on the exterior, northeast window of the Well Pump Room
Photo 30 – WG-2 sample location on exterior, southeast window the Well Pump Room
Photo 31 – WG-3 sample location on exterior, southwest window of the Marina Office
Photo 32 – GP-1 sample location on northwest fascia board of the roof eave
Photo 33 – GYP-1 sample location on the northwest sidewalk and stoop to the Women’s
Bathroom
APPENDIX E
QUALIFICATIONS
MICHAEL G. GOTHAM, Environmental Scientist
Education:
U.W. Stevens Point – B.S. Soil and Waste Resource Management, 2015
Experience: 2015 – Present Coleman Engineering Company
Certifications: 40-hour Hazwoper & 8-hour Annual Refreshers
2017 Enbridge Environmental Orientation US MLP Liquid Pipelines Safety, US MLP Ground Disturbance Awareness Confined Space Training
2017 OQ Pipeline Training Lead Sampling Technician Asbestos Containing Materials Inspector 2017 MSHA 24 Hour New Miner Training (Surface Mining)
Mr. Gotham’s experience with Coleman Engineering Company includes road construction projects, specifically Wisconsin Department of Transportation projects, as well as geotechnical drilling, soil investigation, and environmental projects. His roles have included Road Construction Inspector, Driller’s Assistant, Environmental Sampling Technician, and Project Manager’s Assistant on Environmental Projects. As a Construction Inspector, he was responsible for recording all pay items as well inspecting all traffic control and erosion control items for Wisconsin Department of Transportation projects. As a Driller’s Assistant, Mr. Gotham assisted in geotechnical investigation borings, environmental borings, sediment borings, and boring ratio tests. As an Environmental Sampling Technician, Mr. Gotham’s roles included sediment sampling, providing sediment descriptions, and proper procurement of samples for laboratory analysis. As an Environmental Scientist, Mr. Gotham’s responsibilities have included investigating the cause and magnitude of releases, oversight of Trade Contractors for site construction activities, soil and groundwater sampling, and site safety. He has also conducted subsurface investigations which are included, but not limited to, stratigraphic descriptions, aquifer analysis through hydraulic conductivity testing (slug and pump tests), and well logging. Mr. Gotham has managed a Phase I environmental site assessment and assisted the Project Manager in Phase II environmental site assessments. He has been responsible for managing budgets for private clients. Mr. Gotham’s responsibilities involve planning, analysis, cost tracking, and project management.
More recently, Mr. Gotham was certified as an Asbestos and Lead Inspector and performed inspections on numerous buildings, houses, vault toilets and lodges.
This notice must be displayed at the site of work.
Laminating this notice or utilizing sheet protectors is recommended.
Please refer to the above permit number with any questions or concerns.
NOTICE OF AUTHORIZATION
Permit Number: WRP030756 v. 1 Date Issued: September 20, 2021 Site Name: 42-Eagle Harbor State Harbor-Eagle Harbor Twp Expiration Date: September 20, 2026
The Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, P.O. Box 30458, Lansing, Michigan 48909-7958, under provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended; specifically:
Part 31, Floodplain Regulatory Authority of the Water Resources Protection.
Part 301, Inland Lakes and Streams.
Part 303, Wetlands Protection.
Part 315, Dam Safety.
Part 323, Shorelands Protection and Management.
Part 325, Great Lakes Submerged Lands.
Part 353, Sand Dunes Protection and Management.
Authorized activity:
Dredge the bottomland, install riprap shoreline protection, install steel sheet pile shoreline protection, and install 5 filled piers on the bottomlands of Lake Superior in Eagle Harbor. The land-based and barge-based dredging will be broken down into three separate areas with a total of 4,060 cubic yards of material removed and deposited in an upland location.
Install riprap in two areas. One area will have a length of 105 feet, and the other will have a length of 165 feet. The total volume of riprap to be installed will be up to 589 cubic yards. The applicant will then install 290 linear feet of new steel seawall and place up to 16 cubic yards of clean backfill landward of the new seawall. Once the seawall is installed, four 80-foot-long by 10-foot-wide by 12-foot-deep filled sheet pile piers and one pier that is 45 feet long by 10 feet wide by 12 feet deep will be installed.
To be conducted at property located in Keweenaw County, Eagle Harbor Township, TRS 58N 30W Sec 05 Waterbody: Lake Superior
Permittee:
Michigan DNR, Parks and Recreation Division Attn: Eric Cadeau 427 U.S. Highway 41 North Baraga, MI 49908
Hunter King Marquette District Office Water Resources Division 906-235-4537
EGLE-WRD
WRP030756 v1.0
Approved Issued On:09/20/2021
Expires On:09/20/2026
MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT LAKES, AND ENERGY
WATER RESOURCES DIVISION
PERMIT
Issued To:
Eric Cadeau, Michigan DNR, Parks and Recreation Division 427 U.S. Highway 41 North Baraga, MI 49908
Permit No: WRP030756 v.1 Submission No.: HP9-VTX0-EWHER Site Name: 42-Eagle Harbor State Harbor-Eagle Harbor Twp Issued: September 20, 2021 Expires: September 20, 2026
This permit is being issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, under the provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA); specifically:
Part 301, Inland Lakes and Streams Part 323, Shorelands Protection and Management Part 303, Wetlands Protection Part 325, Great Lakes Submerged Lands Part 315, Dam Safety Part 353, Sand Dunes Protection and Management Part 31, Water Resources Protection (Floodplain Regulatory Authority)
Permission is hereby granted, based on permittee assurance of adherence to State of Michigan requirements and permit conditions, to:
Authorized Activity:
Dredge the bottomland, install riprap shoreline protection, install steel sheet pile shoreline protection, and install 5 filled piers on the bottomlands of Lake Superior in Eagle Harbor. The land-based and barge-based dredging will be broken down into three separate areas with a total of 4,060 cubic yards of material removed and deposited in an upland location.
Install riprap in two areas. One area will have a length of 105 feet, and the other will have a length of 165 feet. The total volume of riprap to be installed will be up to 589 cubic yards. The applicant will then install 290 linear feet of new steel seawall and place up to 16 cubic yards of clean backfill landward of the new seawall. Once the seawall is installed, four 80-foot-long by 10-foot-wide by 12-foot-deep filled sheet pile piers and one pier that is 45 feet long by 10 feet wide by 12 feet deep will be installed.
All work shall be completed in accordance with the attached modified plans and the terms and conditions of this permit. Authority granted by this permit does not waive any jurisdiction of the United States Army Corps of Engineers or the need for a federal permit.
Waterbody Affected: Lake Superior Property Location: Keweenaw County, Eagle Harbor Township, TRS 58N 30W Sec 05
EGLE-WRD
WRP030756 v1.0
Approved
Eric Cadeau, Michigan DNR, Parks and Recreation Division 2 WRP030756 v.1
Authority granted by this permit is subject to the following limitations:
A. Initiation of any work on the permitted project confirms the permittee's acceptance and agreement to comply with all terms and conditions of this permit.
B. The permittee, in exercising the authority granted by this permit, shall not cause unlawful pollution as defined by Part 31 of the NREPA.
C. This permit shall be kept at the site of the work and available for inspection at all times during the duration of the project or until its date of expiration.
D. All work shall be completed in accordance with the approved plans and specifications submitted with the application and/or plans and specifications attached to this permit.
E. No attempt shall be made by the permittee to forbid the full and free use by the public of public waters at or adjacent to the structure or work approved.
F. It is made a requirement of this permit that the permittee give notice to public utilities in accordance with
2013 PA 174 (Act 174) and comply with each of the requirements of Act 174.
G. This permit does not convey property rights in either real estate or material, nor does it authorize any injury to private property or invasion of public or private rights, nor does it waive the necessity of seeking federal assent, all local permits, or complying with other state statutes.
H. This permit does not prejudice or limit the right of a riparian owner or other person to institute proceedings in any circuit court of this state when necessary to protect his rights.
I. This permit shall not be assigned or transferred without the written approval of EGLE.
J. Failure to comply with conditions of this permit may subject the permittee to revocation of permit and criminal and/or civil action as cited by the specific state act, federal act, and/or rule under which this permit is granted.
K. All dredged or excavated materials shall be disposed of in an upland site (outside of floodplains, unless exempt under Part 31 of the NREPA, and wetlands).
L. In issuing this permit, EGLE has relied on the information and data that the permittee has provided in connection with the submitted application for permit. If, subsequent to the issuance of a permit, such information and data prove to be false, incomplete, or inaccurate, EGLE may modify, revoke, or suspend the permit, in whole or in part, in accordance with the new information.
M. The permittee shall indemnify and hold harmless the State of Michigan and its departments, agencies, officials, employees, agents, and representatives for any and all claims or causes of action arising from acts or omissions of the permittee, or employees, agents, or representative of the permittee, undertaken in connection with this permit. The permittee's obligation to indemnify the State of Michigan applies only if the state: (1) provides the permittee or its designated representative written notice of the claim or cause of action within 30 days after it is received by the state, and (2) consents to the permittee's participation in the proceeding on the claim or cause of action. It does not apply to contested case proceedings under the Administrative Procedures Act, 1969 PA 306, as amended, challenging the permit. This permit shall not be construed as an indemnity by the State of Michigan for the benefit of the permittee or any other person.
N. Noncompliance with these terms and conditions and/or the initiation of other regulated activities not specifically authorized shall be cause for the modification, suspension, or revocation of this permit, in whole or in part. Further, EGLE may initiate criminal and/or civil proceedings as may be deemed necessary to correct project deficiencies, protect natural resource values, and secure compliance with statutes.
O. If any change or deviation from the permitted activity becomes necessary, the permittee shall request, in writing, a revision of the permitted activity from EGLE. Such revision request shall include complete documentation supporting the modification and revised plans detailing the proposed modification.
Proposed modifications must be approved, in writing, by EGLE prior to being implemented.
P. This permit may be transferred to another person upon written approval of EGLE. The permittee must submit a written request to EGLE to transfer the permit to the new owner. The new owner must also submit a written request to EGLE to accept transfer. The new owner must agree, in writing, to accept all conditions of the permit. A single letter signed by both parties that includes all the above information may be provided to EGLE. EGLE will review the request and, if approved, will provide written notification to the new owner.
Q. Prior to initiating permitted construction, the permittee is required to provide a copy of the permit to the contractor(s) for review. The property owner, contractor(s), and any agent involved in exercising the permit
EGLE-WRD
WRP030756 v1.0
Approved
Eric Cadeau, Michigan DNR, Parks and Recreation Division 3 WRP030756 v.1 are held responsible to ensure that the project is constructed in accordance with all drawings and specifications. The contractor is required to provide a copy of the permit to all subcontractors doing work authorized by the permit.
R. Construction must be undertaken and completed during the dry period of the wetland. If the area does not dry out, construction shall be done on equipment mats to prevent compaction of the soil.
S. Authority granted by this permit does not waive permit requirements under Part 91, Soil Erosion and Sedimentation Control, of the NREPA, or the need to acquire applicable permits from the County Enforcing Agent (CEA).
T. Authority granted by this permit does not waive permit requirements under the authority of Part 305, Natural Rivers, of the NREPA. A Natural Rivers Zoning Permit may be required for construction, land alteration, streambank stabilization, or vegetation removal along or near a natural river.
U. The permittee is cautioned that grade changes resulting in increased runoff onto adjacent property is subject to civil damage litigation.
V. Unless specifically stated in this permit, construction pads, haul roads, temporary structures, or other structural appurtenances to be placed in a wetland or on bottomland of the water body are not authorized and shall not be constructed unless authorized by a separate permit or permit revision granted in accordance with the applicable law.
W. For projects with potential impacts to fish spawning or migration, no work shall occur within fish spawning or migration timelines (i.e., windows) unless otherwise approved in writing by the Michigan Department of Natural Resources, Fisheries Division.
X. Work to be done under authority of this permit is further subject to the following special instructions and specifications:
1. Authority granted by this permit does not waive permit or program requirements under Part 91 of the
NREPA or the need to acquire applicable permits from the CEA. To locate the Soil Erosion Program Administrator for your county, visit www.mi.gov/eglestormwater and select "Soil Erosion and Sedimentation Control Program" under "Related Links."
2. The authority to conduct the activity as authorized by this permit is granted solely under the provisions of the governing act as identified above. This permit does not convey, provide, or otherwise imply approval of any other governing act, ordinance, or regulation, nor does it waive the permittee's obligation to acquire any local, county, state, or federal approval or authorization necessary to conduct the activity.
3. No fill, excess soil, or other material shall be placed in any wetland, floodplain, or surface water area not specifically authorized by this permit, its plans, and specifications.
4. This permit does not authorize or sanction work that has been completed in violation of applicable federal, state, or local statutes.
5. Prior to commencement of any dredging authorized by this permit, the entire work and dredged area shall be enclosed with a turbidity curtain to prevent off-site siltation. The turbidity curtain shall be installed to extend from the bed of the waterbody to a point above the existing water's surface. The turbidity curtain shall be maintained for the duration of the project and shall be left in place after completion of dredging until all disturbed sediments have settled.
6. No work or dredging within the water authorized by this permit is allowed from November 1 to December 15 due to critical spawning, migration, and/or recreational use periods.
7. The permittee is cautioned that excessive dredging resulting in the impairment of the structural integrity of seawalls on neighboring riparian properties is subject to civil damage litigation.
8. All slurry resulting from any dewatering operation shall be discharged through a filter bag or pumped to a sump located away from wetlands and surface waters and allowed to filter through natural upland vegetation, gravel filters, or other engineered devices for a sufficient distance and/or period of time necessary to remove sediment or suspended particles. The discharge of slurry water resulting from the hydrodemolition of concrete is not allowed to enter a lake, stream, or wetland.
9. All dredge/excavated material shall be immediately placed into trucks or barges and taken to an approved upland disposal site. Placement of dredge/excavated material into open water, onto ice, or onto exposed bottomland is not authorized by this permit.
EGLE-WRD
WRP030756 v1.0
Approved Issued On:09/20/2021 www.mi.gov/eglestormwater
Eric Cadeau, Michigan DNR, Parks and Recreation Division 4 WRP030756 v.1
10. The permittee acknowledges that the dredged material has not been classified as to contaminant status. Disposal of the dredged sediments is to uplands. If the dredged sediments are determined to be contaminated at a future date, permittee and dredge sediments disposal location landowner are considered potentially responsible parties and remain liable for any and all necessary site restoration and clean up under Part 115, Solid Waste Management, and Part 201, Environmental Remediation, of the NREPA. If the permittee is not the dredge sediments disposal location landowner, permittee is responsible for notifying landowner of this condition.
11. All fill shall consist of clean, washed rock or stone that is free of fines, other soil materials, any contaminants, or pollutants.
12. Unless authorized by the attached plans, the seawall, bulkhead, or revetment structure shall be placed at or above (landward) of the Ordinary High Water Mark in the location shown on the attached approved plans. Any variation from the approved location must be authorized in writing by the Water Resources Division prior to the initiation of these activities.
13. On a project requiring backfilling, the seawall shall be in place prior to placing any fill.
14. The permit placard shall be kept posted at the work site in a prominent location at all times for the duration of the project or until permit expiration.
15. This permit is being issued for the maximum time allowed and no extensions of this permit will be granted. Initiation of the construction work authorized by this permit indicates the permittee's acceptance of this condition. The permit, when signed by EGLE, will be for a five-year period beginning on the date of issuance. If the project is not completed by the expiration date, a new permit must be sought.
Issued By:
Hunter King Marquette District Office Water Resources Division 906-235-4537 cc: Eagle Harbor Township Clerk Keweenaw CEA Jean Battle, U.S. Army Corps of Engineers Lindsey Mathus, Edgewater Resources
EGLE-WRD
WRP030756 v1.0
Approved
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
518 BROAD STREET, SUITE 200
ST. JOSEPH, MI 49085
P: 269 932 4502
F: 269 932 3542 SHEET: OF 11
06/15/21
IGLD85
KEWEENAW
EAGLE HARBOR, MI
LAKE SUPERIOR
MDNR, PARKS & RECREATION
LOCATION MAP
MICHIGAN
WISCONSIN
MICHIGAN
LAKE HURON
LAKE SUPERIOR
LAKE ERIE
LAKE
PROJECT
LOCATION
SUPERIOR
LAKE
FR
O
N T
ST
R
EE
T
MARINA ROAD
EAGLE
HARBOR 26
PINE STREET
EAGLE HARBOR
LIFESAVING
STATION
EGLE-WRD
WRP030756 v1.0
Approved
N
AP
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/1
5/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
O
VE
R
AL
L
EX
IS
TI
N G
C O
N D
IT
IO
N S 2
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
SCALE: 1"=100'
0 50' 100'
LAKE SUPERIOR
EXISTING
EAGLE HARBOR
LIFESAVING STATION
AND LAUNCH WELL
EXISTING
GRAVEL
PARKING
LOT/ROAD
USACE NAVIGATION
CHANNEL LIMIT (TYP.)
EXISTING BOATER
SERVICES BUILDING
EXISTING STEEL
SHEET PILE WALL
EXISTING SEASONAL
SKID PIER
EXISTING
BOAT
LAUNCH
EXISTING
MOORING AREA
(ALONG SEAWALL)
EXISTING
WATER'S EDGE
SEE PAGE 3
EXISTING
STONE ARMOR
EXISTING PROPERTY
LINES (TYP.)
EGLE-WRD
WRP030756 v1.0
Approved
N
AP
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/1
5/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
EA
ST
S H
O R
EL
IN
E
EX
IS
TI
N G
C O
N D
IT
IO
N S
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
SCALE: 1"=50'
0 25' 50'
LAKE SUPERIOR / EAGLE HARBOR
EXISTING
GRAVEL
PARKING
LOT/ROAD
USACE NAVIGATION
CHANNEL LIMIT (TYP.)
EXISTING STEEL
SHEET PILE WALL
TO REMAIN
EXISTING SEASONAL
SKID PIER TO REMAIN
EXISTING BOAT
LAUNCH TO REMAIN
EXISTING
WATER'S EDGE
EGLE-WRD
WRP030756 v1.0
Approved
N
AP
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/1
5/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
PR
O
PO
SE
D O
VE
R
AL
L
SI
TE
P
LA
N 4
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
SCALE: 1"=100'
0 50' 100'
EXISTING AIR
MONIROTING TO REMAIN
PROPOSED DREDGE
AREA C @ LWD -8
(ELEV. = 593.1')
PROPOSED CRIB
SYSTEM FIXED
PIERS (TYP.)
PROPOSED ROAD
AND GRAVEL
PARKING LOTS
REHABILITATE EXISTING
TIMBER FENDERING
PROPOSED ARMOR STONE
REVETMENT AREA A
IMPROVED GRAVEL
TRAILER PARKING
TURF OVERFLOW
PARKING
PROPOSED STEEL
SEAWALL (290 LF)
PG. 6
PG. 8
PG. 9
1 & 2
PG. 7
PG. 10
45'
80' TYP.
105'
160'
PROPOSED DREDGE
AREA B @ LWD -6
(ELEV. = 595.1')
PROPOSED DREDGE
AREA A @ LWD -8
(ELEV. = 593.1')
CRIB PIERS 10'
WIDE (TYP.)
RIPRAP SCOUR
PROTECTION AT
END OF WALL
100 SF
PROPOSED ARMOR STONE
REVETMENT AREA B
EGLE-WRD
WRP030756 v1.0
Approved
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/1
5/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
SI
TE
D R
ED
G
E
PL
AN
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
SCALE: 1"=80'
0 40' 80'
DREDGE AREA C
DREDGE SUMMARY
AREA A AREA B AREA C
LWD-8' (593.1') LWD-6' (595.1') LWD-8' (593.1')
7,000 SF 2,400 SF 34,000 SF
150 CY 260 CY 3650 CY
385'
325'
DREDGE AREA B
DREDGE AREA A
195'
EGLE-WRD
WRP030756 v1.0
Approved
0 200-20-40
AP
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/1
5/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
EA
ST
S H
O R
EL
IN
E C
R O
SS
S
EC
TI
O N
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
SCALE: 1"=10'
0 5' 10'
PROPOSED SAND FILL BEHIND SHEET
WALL TO SIDEWALK ELEVATION
BACKFILL TO MATCH
EXISTING GRADE
PROPOSED 6' WIDE
CONCRETE SIDEWALK
(ELEV=605.3')
PROPOSED
DREDGE AREA
PROPOSED NEW
SHEET PILE WALL
FINAL DREDGE DEPTH
LWD -8' (593.1')
1 PROPOSED EAST SHORELINE SECTION
SCALE: 1"=10'
PROPOSED SHEET PILE
WALL TIEBACK
BOTTOM OF SHEET PILE
WALL AT ELEV.= 581.3'
325 CY OF FILL ALONG
NEW SHEET PILE WALL
(16 CY BELOW USACE OHWM)
LWD
EGLE-WRD
WRP030756 v1.0
Approved
0 200-20
1.5
1.5
AP
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/1
5/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
W
ES
T R
U
BB
LE
M
O U
N T
C R
O
SS
S
EC
TI
O
N
NOTES:
1. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
2. RUBBLEMOUND SHORE PROTECTION TO BE ADDED TO THE NORTH AND SOUTH OF THE EXISTING RUBBLEMOUND
PROTECTION CURRENTLY PRESENT.
3. CROSS-SECTION IS REPRESENTATIVE OF WHAT THE SHORE PROTECTION WILL LOOK LIKE. STONE SIZE AND
PLACEMENT MAY VARY SLIGHTLY.
PROPOSED 1-2 TON
ARMOR STONE REVETMENT
AREA A (260 CY)
EXISTING PIER
STRUCTURE (TYP.)
1 PROPOSED ARMOR STONE REVETMENT
SCALE: 1"=8'
PROPOSED CORE STONE
AREA A (75 CY)
PROPOSED GEOTEXTILE FABRIC
CREST ELEVATION = 606'
CREST WIDTH = 6'
TOE ELEVATION VARIES
WITH EXISTING GRADE
LWD
USACE OHWM
EGLE-WRD
WRP030756 v1.0
Approved
0 200-20
1.5
1.5
AP
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/1
5/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
W
ES
T R
U
BB
LE
M
O U
N T
C R
O
SS
S
EC
TI
O
N
NOTES:
1. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
2. RUBBLEMOUND SHORE PROTECTION TO BE ADDED TO THE NORTH AND SOUTH OF THE EXISTING RUBBLEMOUND
PROTECTION CURRENTLY PRESENT.
3. CROSS-SECTION IS REPRESENTATIVE OF WHAT THE SHORE PROTECTION WILL LOOK LIKE. STONE SIZE AND
PLACEMENT MAY VARY SLIGHTLY.
PROPOSED 1-2 TON
ARMOR STONE REVETMENT
AREA B (640 CY)
EXISTING GRADE (TYP.)
1 PROPOSED ARMOR STONE REVETMENT
SCALE: 1"=8'
PROPOSED CORE STONE
AREA B (400 CY)
PROPOSED GEOTEXTILE FABRIC
CREST ELEVATION = 612'
TO MATCH EXISTING REVETMENT
TOE ELEVATION VARIES
WITH EXISTING GRADE
CREST WIDTH = 6'
LWD
USACE OHWM
EGLE-WRD
WRP030756 v1.0
Approved
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/1
5/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
EX
IS
TI
N
G S
H
EE
T
PI
LE
W
AL
L
D
ET
AI
LS
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
1 TYPICAL SHEET PILE WALL SECTION
SCALE: NOT TO SCALE 2 TYPICAL SHEET PILE WALL ELEVATION
SCALE: NOT TO SCALE
PROPOSED
TIMBER FENDERING (TYP.)
REPLACEMENT
CONCRETE SIDEWALK
@ ELEV=604.8'
EXISTING
STEEL SHEET
PILE WALL
TREATED 6X6 TIMBER POSTS
@ ELEV=610.3'
PROPOSED DREDGE DEPTH (593.1')
EXISTING SHEET PILE WALL
TO REMAIN
TREATED 6X6 TIMBER POSTS
@ ELEV=610.3'
12'
6'
4'
8' O.C.
MAINTENANCE DREDGING
EXISTING SIDEWALK
ELEVATION @ 604.8'
EGLE-WRD
WRP030756 v1.0
Approved
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/1
5/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
C R
IB
S
YS
TE
M P
IE
R
S
EC
TI
O
N 10
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
SCALE: 1"=10'
0 5' 10'
CONCRETE SIDEWALK
ELEVATION @ 605.3'
GALVANIZED STEEL BIN
WALL PIER WITH INTERNAL BULKHEADS
CONCRETE PIER DECK
FINAL LENGTH OF PIER VARIES
(SEE SHEET 4)
FINAL DREDGE DEPTH LWD-8' (593.1')
CONNECT TO SHEET PILE WALL
GRAVEL FILL IN PIER
1 PROPOSED CRIB PIER SYSTEM
SCALE: 1"=8'
EXISTING WATER
ELEVATION (602.15')
BOTTOM OF SHEET PILE WALL AT
ELEVATION = 581.3'
TIMBER FENDERING
ATTACHED TO PIER PIER ELEVATION
AT 605.3'
.2'
EGLE-WRD
WRP030756 v1.0
Approved
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/1
5/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
C R
IB
S
YS
TE
M P
IE
R
P
LA
N V
IE
W 11
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
SCALE: 1"=8'
0 4' 8'
CONCRETE PIER DECK ABOVE
AT ELEVATION = 605.3'
FINAL LENGTH OF PIER VARIES
(45'-80' SEE SHEET 4)
CONNECT TO SHEET PILE WALL
GALVANIZED STEEL BIN
WALL PIER WITH
INTERNAL BULKHEADS
1 PROPOSED CRIB PIER SYSTEM
SCALE: 1"=8'
PROPOSED 6' CONCRETE
SIDEWALK
PROPOSED SHEET PILE WALL
4" - 6" DIAMETER GRANULAR GRAVEL FILL
WITH GEOTEXTILE LINER AT BOTTOM
TIMBER FENDERING
ATTACHED TO PIER
EGLE-WRD
WRP030756 v1.0
Approved
This notice must be displayed at the site of work.
Laminating this notice or utilizing sheet protectors is recommended.
Please refer to the above permit number with any questions or concerns.
NOTICE OF AUTHORIZATION
Permit Number: WRP032627 v. 1 Date Issued: March 1, 2022 Site Name: 42-Eagle Harbor State Harbor-Eagle Harbor Twp Expiration Date: March 1, 2027
The Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, P.O. Box 30458, Lansing, Michigan 48909-7958, under provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended; specifically:
Part 31, Floodplain Regulatory Authority of the Water Resources Protection.
Part 301, Inland Lakes and Streams.
Part 303, Wetlands Protection.
Part 315, Dam Safety.
Part 323, Shorelands Protection and Management.
Part 325, Great Lakes Submerged Lands.
Part 353, Sand Dunes Protection and Management.
Authorized activity:
Place up to 245 cubic yards of riprap toe stone protection along the lakeward face of the previously permitted crib piers and sheet pile seawall. Dredge up to 145 cubic yards of material from an area 70 feet by 60 feet to an average depth of 2 feet by mecahnical means from Lake Superior bottomlands. All dredge material shall be disposed of offsite in a non-regulated area. Install two spring piles to aid in water-going vessel mooring.
Waterbody Affected: Lake Superior Property Location: Keweenaw County, Eagle Harbor Township, TRS 58N 30W Sec 05
Permittee:
Eric Cadeau, Michigan DNR, Parks and Recreation Division 427 U.S. Highway 41 North Baraga, MI 49908
Hunter King Marquette District Office Water Resources Division 906-235-4537
EGLE-WRD
WRP032627 v1.0
Approved Issued On:03/01/2022
Expires On:03/01/2027
MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT LAKES, AND ENERGY
WATER RESOURCES DIVISION
PERMIT
Issued To:
Eric Cadeau, Michigan DNR, Parks and Recreation Division 427 U.S. Highway 41 North Baraga, MI 49908
Permit No: WRP032627 v.1 Submission No.: HPF-PXEE-5CNS6 Site Name: 42-Eagle Harbor State Harbor-Eagle Harbor Twp Issued: March 1, 2022 Expires: March 1, 2027
This permit is being issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, under the provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA); specifically:
Part 301, Inland Lakes and Streams Part 323, Shorelands Protection and Management Part 303, Wetlands Protection Part 325, Great Lakes Submerged Lands Part 315, Dam Safety Part 353, Sand Dunes Protection and Management Part 31, Water Resources Protection (Floodplain Regulatory Authority)
EGLE certifies that the activities authorized under this permit are in compliance with the State Coastal Zone Management Program and certifies under the Federal Clean Water Act, Section 401 that the discharge from the activities authorized under this permit will comply with Michigan’s water quality requirements in Part 31, Water Resources Protection, of the NREPA and associated administrative rules, where applicable.
Permission is hereby granted, based on permittee assurance of adherence to State of Michigan requirements and permit conditions, to:
Authorized Activity:
Place up to 245 cubic yards of riprap toe stone protection along the lakeward face of the previously permitted crib piers and sheet pile seawall. Dredge up to 145 cubic yards of material from an area 70 feet by 60 feet to an average depth of 2 feet by mecahnical means from Lake Superior bottomlands. All dredge material shall be disposed of offsite in a non-regulated area. Install two spring piles to aid in water-going vessel mooring.
All work shall be completed in accordance with the approved plans and specifications of this permit.
Authority granted by this permit does not waive any jurisdiction of the United States Army Corps of Engineers or the need for a federal permit.
Authorized Under Permit Category: MP 30. Maintenance Dredging on the Great Lakes and Section 10 Waters MP 46. Riprap Shoreline Protection GP Y. Spring Piles and Spring
Waterbody Affected: Lake Superior Property Location: Keweenaw County, Eagle Harbor Township, TRS 58N 30W Sec 05
EGLE-WRD
WRP032627 v1.0
Approved
Eric Cadeau, Michigan DNR, Parks and Recreation Division 2 WRP032627 v.1
Authority granted by this permit is subject to the following limitations:
A. Initiation of any work on the permitted project confirms the permittee's acceptance and agreement to comply with all terms and conditions of this permit.
B. The permittee, in exercising the authority granted by this permit, shall not cause unlawful pollution as defined by Part 31 of the NREPA.
C. This permit shall be kept at the site of the work and available for inspection at all times during the duration of the project or until its date of expiration.
D. All work shall be completed in accordance with the approved plans and specifications submitted with the application and/or plans and specifications attached to this permit.
E. No attempt shall be made by the permittee to forbid the full and free use by the public of public waters at or adjacent to the structure or work approved.
F. It is made a requirement of this permit that the permittee give notice to public utilities in accordance with
2013 PA 174 (Act 174) and comply with each of the requirements of Act 174.
G. This permit does not convey property rights in either real estate or material, nor does it authorize any injury to private property or invasion of public or private rights, nor does it waive the necessity of seeking federal assent, all local permits, or complying with other state statutes.
H. This permit does not prejudice or limit the right of a riparian owner or other person to institute proceedings in any circuit court of this state when necessary to protect his rights.
I. This permit shall not be assigned or transferred without the written approval of EGLE.
J. Failure to comply with conditions of this permit may subject the permittee to revocation of permit and criminal and/or civil action as cited by the specific state act, federal act, and/or rule under which this permit is granted.
K. All dredged or excavated materials shall be disposed of in an upland site (outside of floodplains, unless exempt under Part 31 of the NREPA, and wetlands).
L. In issuing this permit, EGLE has relied on the information and data that the permittee has provided in connection with the submitted application for permit. If, subsequent to the issuance of a permit, such information and data prove to be false, incomplete, or inaccurate, EGLE may modify, revoke, or suspend the permit, in whole or in part, in accordance with the new information.
M. The permittee shall indemnify and hold harmless the State of Michigan and its departments, agencies, officials, employees, agents, and representatives for any and all claims or causes of action arising from acts or omissions of the permittee, or employees, agents, or representative of the permittee, undertaken in connection with this permit. The permittee's obligation to indemnify the State of Michigan applies only if the state: (1) provides the permittee or its designated representative written notice of the claim or cause of action within 30 days after it is received by the state, and (2) consents to the permittee's participation in the proceeding on the claim or cause of action. It does not apply to contested case proceedings under the Administrative Procedures Act, 1969 PA 306, as amended, challenging the permit. This permit shall not be construed as an indemnity by the State of Michigan for the benefit of the permittee or any other person.
N. Noncompliance with these terms and conditions and/or the initiation of other regulated activities not specifically authorized shall be cause for the modification, suspension, or revocation of this permit, in whole or in part. Further, EGLE may initiate criminal and/or civil proceedings as may be deemed necessary to correct project deficiencies, protect natural resource values, and secure compliance with statutes.
O. If any change or deviation from the permitted activity becomes necessary, the permittee shall request, in writing, a revision of the permitted activity from EGLE. Such revision request shall include complete documentation supporting the modification and revised plans detailing the proposed modification.
Proposed modifications must be approved, in writing, by EGLE prior to being implemented.
P. This permit may be transferred to another person upon written approval of EGLE. The permittee must submit a written request to EGLE to transfer the permit to the new owner. The new owner must also submit a written request to EGLE to accept transfer. The new owner must agree, in writing, to accept all conditions of the permit. A single letter signed by both parties that includes all the above information may be provided to EGLE. EGLE will review the request and, if approved, will provide written notification to the new owner.
Q. Prior to initiating permitted construction, the permittee is required to provide a copy of the permit to the contractor(s) for review. The property owner, contractor(s), and any agent involved in exercising the permit
EGLE-WRD
WRP032627 v1.0
Approved
Eric Cadeau, Michigan DNR, Parks and Recreation Division 3 are held responsible to ensure that the project is constructed in accordance with all drawings and specifications. The contractor is required to provide a copy of the permit to all subcontractors doing work authorized by the permit.
R. Construction must be undertaken and completed during the dry period of the wetland. If the area does not dry out, construction shall be done on equipment mats to prevent compaction of the soil.
S. Authority granted by this permit does not waive permit requirements under Part 91, Soil Erosion and Sedimentation Control, of the NREPA, or the need to acquire applicable permits from the County Enforcing Agent (CEA).
T. Authority granted by this permit does not waive permit requirements under the authority of Part 305, Natural Rivers, of the NREPA. A Natural Rivers Zoning Permit may be required for construction, land alteration, streambank stabilization, or vegetation removal along or near a natural river.
U. The permittee is cautioned that grade changes resulting in increased runoff onto adjacent property is subject to civil damage litigation.
V. Unless specifically stated in this permit, construction pads, haul roads, temporary structures, or other structural appurtenances to be placed in a wetland or on bottomland of the water body are not authorized and shall not be constructed unless authorized by a separate permit or permit revision granted in accordance with the applicable law.
W. For projects with potential impacts to fish spawning or migration, no work shall occur within fish spawning or migration timelines (i.e., windows) unless otherwise approved in writing by the Michigan Department of Natural Resources, Fisheries Division.
X. Work to be done under authority of this permit is further subject to the following special instructions and specifications:
1. Authority granted by this permit does not waive permit or program requirements under Part 91 of the
NREPA or the need to acquire applicable permits from the CEA. To locate the Soil Erosion Program Administrator for your county, visit www.mi.gov/eglestormwater and select "Soil Erosion and Sedimentation Control Program" under "Related Links."
2. The authority to conduct the activity as authorized by this permit is granted solely under the provisions of the governing act as identified above. This permit does not convey, provide, or otherwise imply approval of any other governing act, ordinance, or regulation, nor does it waive the permittee's obligation to acquire any local, county, state, or federal approval or authorization necessary to conduct the activity.
3. No fill, excess soil, or other material shall be placed in any wetland, floodplain, or surface water area not specifically authorized by this permit, its plans, and specifications.
4. This permit does not authorize or sanction work that has been completed in violation of applicable federal, state, or local statutes.
5. Prior to commencing dredging and installation of the riprap, the entire waterward perimeter of project site shall be isolated with a turbidity curtain to prevent movement of suspended sediments. The turbidity curtain shall be installed to extend from the bed of the waterbody to a point above the existing water’s surface. The turbidity curtain shall be maintained for the duration of the project and shall be left in place after completion until all disturbed sediments have settled.
6. All raw areas in uplands resulting from the permitted construction activity shall be effectively stabilized with sod and/or seed and mulch (or other technology specified by this permit or project plans) in a sufficient quantity and manner to prevent erosion and any potential siltation to surface waters or wetlands. Temporary stabilization measures shall be installed before or upon commencement of the permitted activity and shall be maintained until permanent measures are in place. Permanent measures shall be in place within five (5) days of achieving final grade.
7. All riprap shall be properly sized based on wave action and velocity, and shall consist of natural field stone or rock (free of paint, soil or other fines, asphalt, soluble chemicals, or organic material). Broken concrete is not allowed.
8. The permittee is cautioned that excessive dredging resulting in the impairment of the structural integrity of seawalls on neighboring riparian properties is subject to civil damage litigation.
9. All dredge/excavated spoils including organic and inorganic soils, vegetation, and other material removed shall be placed on upland (non-wetland, non-floodplain or non-bottomland), prepared for
EGLE-WRD
WRP032627 v1.0
Approved Issued On:03/01/2022 www.mi.gov/eglestormwater
Eric Cadeau, Michigan DNR, Parks and Recreation Division 4 stabilization, and stabilized with sod and/or seed and mulch in such a manner to prevent and ensure against erosion of any material into any waterbody, wetland, or floodplain.
10. It is advised that proper caution signs and/or buoys be placed at or near the spring piles to prevent endangerment of recreational users.
11. The permit placard shall be kept posted at the work site in a prominent location at all times for the duration of the project or until permit expiration.
12. This permit is being issued for the maximum time allowed and no extensions of this permit will be granted. Initiation of the construction work authorized by this permit indicates the permittee's acceptance of this condition. The permit, when signed by EGLE, will be for a five-year period beginning on the date of issuance. If the project is not completed by the expiration date, a new permit must be sought.
Issued By:
Hunter King Marquette District Office Water Resources Division 906-235-4537
THIS PERMIT MUST BE SIGNED BY THE PERMITTEE TO BE VALID.
I hereby assure that I have read, am familiar with, and agree to adhere to the terms and conditions of this permit.
Permittee Signature Date cc: Eagle Harbor Township Clerk Keweenaw CEA Jean Battle, U.S. Army Corps of Engineers Sam Henley, Edgewater Resources
EGLE-WRD
WRP032627 v1.0
Approved
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
518 BROAD STREET, SUITE 200
ST. JOSEPH, MI 49085
P: 269 932 4502
F: 269 932 3542 SHEET: OF 9
02/02/2022
IGLD85
KEWEENAW
EAGLE HARBOR, MI
LAKE SUPERIOR
MDNR, PARKS & RECREATION
LOCATION MAP
MICHIGAN
WISCONSIN
MICHIGAN
LAKE HURON
LAKE SUPERIOR
LAKE ERIE
LAKE
PROJECT
LOCATION
SUPERIOR
LAKE
FR
O
N T
ST
R
EE
T
MARINA ROAD
EAGLE
HARBOR 26
PINE STREET
EAGLE HARBOR
LIFESAVING
STATION
EGLE-WRD
WRP032627 v1.0
Approved
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/0
2/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
PR
O
PO
SE
D O
VE
R
AL
L
SI
TE
P
LA
N 2
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
SCALE: 1"=100'
0 50' 100'
PREVIOUSLY AUTHORIZED STEEL
SEAWALL (215 LF) W/ PROPOSED
TOE STONE (225 CY TOTAL)
PROPOSED TOE STONE SURROUNDING
PREVIOUSLY AUTHORIZED CRIB PIERS ON
ALL SIDES (5,040 SF, 460 LF, 225 CY TOTAL)
RIPRAP SCOUR
PROTECTION AT
END OF WALL
10 CY (MDOT PLAIN)
(SEE PG. 9)
RIPRAP SCOUR
PROTECTION AT
END OF WALL
18 CY (MDOT PLAIN)
(SEE PG. 9)
PROPOSED STEEL PIPE SPRING
PILES @ 45' L x 10.75" Ø (QTY. = 2)
NOTE: LABELED ELEMENTS ARE THE ONLY ITEMS PROPOSED AS
PART OF THIS PERMIT APPLICATION UNLESS NOTED OTHERWISE.
ALL OTHER ELEMENTS SHOWN ALREADY EXIST OR HAVE BEEN
PREVIOUSLY AUTHORIZED IN OTHER EGLE/USACE PERMITS
EGLE-WRD
WRP032627 v1.0
Approved
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/0
2/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
SI
TE
D R
ED
G
E
PL
AN
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
SCALE: 1"=80'
0 40' 80'
PREVIOUSLY AUTHORIZED
DREDGE AREA C
DREDGE
SUMMARY
AREA D
TO EXISTING
CONCRETE OR LWD-8'
(593.1')
3,600 SF
145 CY
PREVIOUSLY AUTHORIZED
DREDGE AREA B
PREVIOUSLY AUTHORIZED
DREDGE AREA A
DREDGE AREA D
(70'X59' APPROX.)
(SEE PG. 14)
PROPOSED TURBIDITY
CURTAIN
NOTE: LABELED ELEMENTS ARE THE ONLY ITEMS PROPOSED AS
PART OF THIS PERMIT APPLICATION UNLESS NOTED OTHERWISE.
ALL OTHER ELEMENTS SHOWN ALREADY EXIST OR HAVE BEEN
PREVIOUSLY AUTHORIZED IN OTHER EGLE/USACE PERMITS
EGLE-WRD
WRP032627 v1.0
Approved
0 200-20-40
AP
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/0
2/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
SS
P
TO
E
ST
O
N E
C R
O
SS
S
EC
TI
O
N
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
SCALE: 1"=10'
0 5' 10'
PREVIOUSLY AUTHORIZED
SHEET PILE WALL
1 PROPOSED SSP TOE STONE SECTION
SCALE: 1"=10'
LWD
PROPOSED MDOT PLAIN RIPRAP
TOE STONE AT 1:2 SLOPE FROM WALL
(TYP., 225 CY TOTAL)
3'
TY
P.
6' TYP.
NOTE: LABELED ELEMENTS ARE THE ONLY ITEMS PROPOSED AS
PART OF THIS PERMIT APPLICATION UNLESS NOTED OTHERWISE.
ALL OTHER ELEMENTS SHOWN ALREADY EXIST OR HAVE BEEN
PREVIOUSLY AUTHORIZED IN OTHER EGLE/USACE PERMITS
EGLE-WRD
WRP032627 v1.0
Approved
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/0
2/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
NOTES:
1. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
2. CROSS-SECTION IS REPRESENTATIVE OF WHAT THE SHORE PROTECTION WILL LOOK LIKE. STONE SIZE AND
PLACEMENT MAY VARY SLIGHTLY.
SS
P
W
AL
L R
IP
RA
P
SE
CT
IO
N
TOP OF WALL 605.3'
LWD 601.1'
MDOT PLAIN RIPRAP
8"-16" DIAMETER (TYP.)
7 CY TOTAL
PREVIOUSLY AUTHORIZED
STEEL SHEET PILE WALL (TYP.)
24" THICK COVER (TYP.) EXISTING GRADE
1 SSP RETURN WALL RIP RAP SECTION
SCALE: 1/4"=1'-0"
NOTE: LABELED ELEMENTS ARE THE ONLY ITEMS PROPOSED AS
PART OF THIS PERMIT APPLICATION UNLESS NOTED OTHERWISE.
ALL OTHER ELEMENTS SHOWN ALREADY EXIST OR HAVE BEEN
PREVIOUSLY AUTHORIZED IN OTHER EGLE/USACE PERMITS
EGLE-WRD
WRP032627 v1.0
Approved
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
F:
SH
EE
T:
O
F
/0
2/
IG
LD
KE
W
EE
N
AW
EA
G
LE
H
AR
BO
R
, M I
LA
KE
S U
PE
R
IO
R
M D
N R
, P
AR
KS
R
EC
R
EA
TI
O
N
NOTES:
1. VERTICAL DATUM IS…