Drawings 17185_Part1.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ 171 220000000407 4
- Issued by
- Kent County, Douglas City, Michigan
About this file
This is a drawing set and design document for the Eagle Harbor State Harbor Upgrades project, a waterfront and marina renovation project in Eagle Harbor, Michigan, developed by the State of Michigan Department of Natural Resources (MDNR) in coordination with the Department of Technology, Management and Budget (DTMB). The project encompasses comprehensive harbor improvements including marina construction with crib pier systems, dredging operations, seawall rehabilitation, water and sanitary infrastructure installation, electrical system upgrades, and associated site work. The scope includes furnishing and installing complete marina systems with docks, utility pedestals, water distribution systems, fire protection systems, electrical service to pedestals, and navigation aids. Significant site work involves removal of existing structures (light poles, septic tanks, pumpout facilities, concrete sidewalks and promenades totaling approximately 2,190 square feet), replacement of gravel parking areas and roadways, relocation of signage, and installation of 265 linear feet of timber fendering on existing seawalls. The project requires approximately 295 cubic yards of riprap armoring stone, with detailed specifications for demolition, erosion and sediment control, site utilities, and dredging per the drawing set dated June 10, 2022.
The contractor bears full responsibility for obtaining all permits including LARA permits for building, electrical, mechanical, and plumbing work, as well as DTMB Soil Erosion and Sediment Control (SESC) permits prior to construction. Utility coordination is mandatory with Upper Peninsula Power Company, AT&T, Keweenaw County Road Commission, and Eagle Harbor Township Fire Department. The contractor must verify existing site conditions, utility locations, and equipment access clearances prior to bidding and assume all costs associated with utility locating services and any resulting delays or damages. Structural calculations for marina components must be provided by a Michigan-licensed professional engineer with minimum ten years of waterfront engineering experience. The project is federally funded through the Federal Aid in Sport Fish Restoration Program, supported by fishing equipment and motorboat fuel purchases. The contractor is responsible for maintaining continuous access to fire hydrants, public streets, private driveways, the boat launch ramp, and existing buildings throughout construction, with coordination required for any temporary road closures involving local and state police notification.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EDGEWATER RESOURCES, LLC
518 BROAD ST.
ST. JOSEPH, MI 49085
CONTACT:
COLIN HASSENGER, P.E., PROJECT MANAGER
(269) 625 - 4869
UTILITY CONTACTS
UTILITY
SERVICE
AGENCY CONTACT
WATER &
SEWER
N/A N/A
ELECTRIC UPPER PENINSULA POWER CO. (906) 449-2014
GAS N/A N/A
TELEPHONE
& INTERNET
AT&T (800) 288-2020
ROADS KEWEENAW COUNTY ROAD
COMMISSION
(906) 337-1610
FIRE DEPT EAGLE HARBOR TOWNSHIP (906) 289-4407
PERMIT INFORMATION
AGENCY PERMIT NO DATE
AUTHORIZED EXPIRATION DATE
EGLE WRP030756 V.1 09/20/2021 02/20/2026
USACE PENDING
WUPHD
SEPTIC PENDING
KEWEENAW COUNTY, MI
Sheet List Table Sheet Number Sheet Title
G-1.01 COVER SHEET
G-1.02 GENERAL NOTES
V-1.01 EXISTING CONDITIONS
V-1.02 EXISTING CONDITIONS -
WEST
V-1.03 EXISTING CONDITIONS -
EAST
D-1.01 DEMOLITION & SESC
CM-1.01 OVERALL SITE PLAN
CM-1.02 SITE PLAN - WEST
CM-1.03 SITE PLAN - EAST
CM-1.04 DREDGE PLAN
CM-1.05 SITE UTILITY PLAN
CM-1.06 SITE SEPTIC PLAN
CM-4.01 EAST SSP WALL
ENLARGEMENT
CM-5.01 SANITARY FIELD DETAILS
CM-5.02 MARINA DETAILS
CM-5.03 MARINA DETAILS
CONTINUED
CM-5.04 SSP WALL DETAILS
CM-5.05 DREDGING DETAILS
CM-5.06 GENERAL DETAILS
CM-5.07 GENERAL DETAILS
CONTINUED
CM-5.08 GENERAL DETAILS
CONTINUED
E-6.01 ELECTRICAL SCHEDULE
E-6.02 ELECTRICAL ONE-LINE
DIAGRAM
A-1.01 ARCHITECTURAL SHEET
A-4.01 ARCHITECTURAL DETAILS
EAGLE HARBOR STATE HARBOR
HARBOR UPGRADES
MARINA ROAD, EAGLE HARBOR, MI
DRAWING SET FOR BID
HA
RB
OR
U
PG
RA
DE
S -
DA
TE
: 6/
/2
ED
GE
W
AT
ER
R
ES
OU
RC
ES
P
RO
JE
CT
-3
P:\2017\17-37 MDNR - EAGLE HARBOR\CAD\SHEETS\G-X.XX.DWG
SUPERIOR
LAKE
FR
O
N T
ST
R
EE
T
MARINA ROAD
EAGLE
HARBOR 26
PINE STREET
EAGLE HARBOR
STATE HARBOR
MISS DIG
CALL AT LEAST 3 FULL WORKING DAYS (72 HRS)
BEFORE YOU DIG
STATE OF MICHIGAN
DEPARTMENT OF NATURAL RESOURCES
DANIEL EICHINGER, DIRECTOR
CONTACT:
JEFF BARSCH, PROJECT DIRECTOR
(906) 251-0727
THE FEDERAL AID IN SPORT FISH RESTORATION PROGRAM IS FUNDING
THIS CONSTRUCTION THANKS TO YOUR PURCHASE OF FISHING
EQUIPMENT AND MOTORBOAT FUELS.
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ARCHITECTURAL
I CERTIFY THAT THESE DRAWINGS WERE PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION AND CONTROL.
SEAL NAME: DATE:
Michelle M Rumsa, RA
CIVIL ENGINEER
I CERTIFY THAT THESE DRAWINGS WERE PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION AND CONTROL.
SEAL NAME: DATE:
Colin D Hassenger, PE 06.10.2022
06.10.2022
751/17185.JBB
NOTE: CONTRACTOR IS RESPONSIBLE FOR LARA: BUILDING, ELECTRICAL, MECHANICAL, AND PLUMBING
PERMITS AND DTMB: SESC PERMIT PRIOR TO CONSTRUCTION
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text B
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text Q
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
1. ATTENTION IS DIRECTED TO THE FACT THAT THE WORK ASSOCIATED WITH THIS CONTRACT WILL OCCUR AT AN
ACTIVE AND FUNCTIONAL FACILITY. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER'S
REPRESENTATIVE AND PROJECT MANAGER TO MINIMIZE DISRUPTION TO THE OPERATIONS OF THE FACILITY.
THE CONTRACTOR IS SOLELY RESPONSIBLE TO PROVIDE A SAFE WORK SITE AND TO PROTECT THE PUBLIC, VISITORS AND EMPLOYEES OF THE FACILITY, FROM HARM AS A RESULT OF HIS CONSTRUCTION ACTIVITIES.
2. THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING ABOVE GROUND AND BELOW GROUND UTILITIES, STRUCTURES, AND APPURTENANCES SHOWN ON THE PLANS ARE APPROXIMATE AND ARE NOT GUARANTEED.
THE CONTRACTOR ALONE SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES, STRUCTURES, AND APPURTENANCES IN THE PATH OF THE ADJACENT TO THE
PROPOSED WORK.
3. EXISTING CONDITIONS ARE TAKEN FROM FIELD OBSERVATIONS AND PRIOR CONSTRUCTION DOCUMENTS WHEN AVAILABLE AND ARE NOT GUARANTEED. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO ALLOWANCE WILL BE MADE FOR ADDITIONAL COST DUE TO CONTRACTORS FAILURE TO VERIFY EXISTING
CONDITIONS AND DIMENSIONS.
4. CONTRACTORS ARE RESPONSIBLE FOR VERIFYING SITE ACCESS INCLUDING, BUT NOT LIMITED TO, EXISTING ACCESS ROADWAYS FOR SUITABILITY OF CONSTRUCTION EQUIPMENT ACCESS AND CLEARANCES PRIOR TO
BIDDING.
5. PRIOR TO THE START OF MEANINGFUL CONSTRUCTION, THE CONTRACTOR SHALL DETERMINE PRECISE LOCATIONS AND DEPTH OF ANY UNDERGROUND UTILITY IN QUESTION AND IMPACTED BY THE WORK.
IMMEDIATELY REPORT RESULTS TO THE ARCHITECT/ENGINEER OF ANY SIGNIFICANT DISCREPANCIES BETWEEN THE PLANS AND ACTUAL LOCATIONS OF SAID STRUCTURES. TEST PITS AND ASSOCIATED REPORTING SHALL BE
INCLUDED IN THE PRICE BID AS PART OF GENERAL CONDITIONS.
6. WHEN EXISTING CONSTRUCTION, WHICH IS TO REMAIN, IS DAMAGED DURING THE COURSE OF CONSTRUCTION AS A RESULT OF CONTRACTORS WORK, IT SHALL BE REPAIRED AND/OR REPLACED WITH SIMILAR OR LIKE MATERIALS AS MUCH AS POSSIBLE, SUBJECT TO OWNERS APPROVAL AND AT NO ADDITIONAL COST TO OWNER.
7. ANY AND ALL PROPERTY LINES AND RIGHTS-OF-WAY LINES SHOWN ARE APPROXIMATE AND INTENDED FOR GENERAL INFORMATION. NO WARRANTY IS PROPOSED OR IMPLIED AS TO THE ACCURACY OF SAID LINES.
8. THE OWNERS OF THE VARIOUS UTILITIES WITHIN THE RIGHTS-OF-WAY OR ADJACENT EASEMENTS, IF ANY, WILL FIELD LOCATE AND MARK THE LOCATION OF THEIR FACILITIES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITY OWNERS IN AMPLE TIME FOR THEM TO LOCATE THEIR FACILITIES.
9. SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
10. THE CONTRACTOR IS RESPONSIBLE FOR SUPPLYING ALL MATERIALS, TOOLS AND EQUIPMENT, INCLUDING SPECIAL CUTTING DEVICES, NECESSARY TO PERFORM THE WORK CONTAINED IN THIS CONTRACT.
11. CONTRACTOR STAGING AREAS AND CONSTRUCTION ENTRANCE LOCATIONS SHALL BE COORDINATED WITH THE OWNERS DESIGNATED REPRESENTATIVE PRIOR TO START OF CONSTRUCTION, AS REQUIRED, AND RESTORE ALL DISTURBED AREAS. PROPER SIGNAGE, FENCING AND BARRICADES SHALL BE PROVIDED TO LIMIT PEDESTRIAN ACCESS TO THE CONSTRUCTION SITE INCLUDING SITE ACCESS AREAS, STAGING AREAS, AREAS OF FRESHLY PLACED OR UN-CURED CONCRETE OR ANY OTHER AREAS UNDER DISTURBANCE BOTH LANDSIDE
AND WATERWARD.
12. PROTECT ALL EXISTING SITE AMENITIES NOT DESIGNATED FOR REMOVAL. ANY SITE AMENITY, UTILITY, STREET APPURTENANCE, OR OTHER ITEM WHICH BECOMES DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR REPLACED IN-KIND BY THE CONTRACTOR AS DETERMINED BY THE OWNER'S DESIGNATED REPRESENTATIVE OR ARCHITECT/ENGINEER AND AT NO ADDITIONAL COST TO THE
OWNER.
13. PRIOR TO THE START OF CONSTRUCTION, NOTIFY MISS DIG THREE (3) FULL WORK DAYS (NOT COUNTING THE DAY OF THE CALL, WEEKENDS, OR HOLIDAYS) AT 811 TO REQUEST UTILITY STAKEOUT OF ALL PUBLIC UTILITIES.
14. PROVIDE PROTECTION FOR ALL SITE AMENITIES, SCHEDULED TO REMAIN, WITHIN THE IMMEDIATE PROJECT PROJECT FOR THE DURATION OF THE PROJECT TO MINIMIZE ANY DAMAGE AS A RESULT OF CONSTRUCTION ACTIVITIES. PLACE PROTECTION BEFORE AND WORK IS STARTED AND IS TO BE IN THE FORM OF FLUORESCENT
ORANGE SNOW FENCING OR WOOD RAIL AND POSTS PLACED AROUND EACH SITE AMENITY.
15. NOTIFY PROPERTY OWNERS PRIOR TO ANY REMOVAL OR RECONSTRUCTION WORK EITHER ON THEIR
PROPERTY OF ALONG THE RIGHT-OF-WAY IN FRONT OF THEIR PROPERTY.
16. MAINTAIN SAFE AND CONTINUOUS ACCESS TO ALL ACTIVE FIRE HYDRANTS THROUGHOUT THE PERIOD OF
CONSTRUCTION.
17. MAINTAIN SAFE AND CONTINUOUS THROUGH TRAFFIC AND INGRESS AND EGRESS FOR ADJACENT PRIVATE DRIVEWAYS, SERVICE ROADS, PARKING AREAS, BOAT LAUNCH RAMP, AND PUBLIC STREETS THROUGHOUT THE PERIOD OF CONSTRUCTION. IF, BY AN AGREEMENT WITH THE OWNER'S REPRESENTATIVE AND JURISDICTION AGENCY, A STREET, ROAD, DRIVE OR PARKING WILL REQUIRE TEMPORARY CLOSING DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY IN WRITING THE LOCAL AND STATE POLICE, AND LOCAL FIRE DEPARTMENT
REGARDING THE CLOSING.
18. MAINTAIN SAFE VEHICULAR AND PEDESTRIAN ACCESS TO THE EXISTING BUILDINGS AND TOILET FACILITIES FOR
THE DURATION OF THE CONTRACT.
19. MAINTAIN THE CONSTRUCTION SITE IN A SAFE AND ORDERLY FASHION THROUGHOUT THE PERIOD OF
CONSTRUCTION WITH MINIMAL DISRUPTION OF THROUGH TRAFFIC AND INGRESS AND EGRESS FOR PRIVATE DRIVEWAYS, PUBLIC STREETS AND ENTRANCES TO BUSINESSES ALONG THE ROUTE OF CONSTRUCTION.
20. CONFORM TO THE CONDITIONS OF ALL EASEMENTS. RESTORATION OF INDIVIDUAL EASEMENT AREAS IS
SUBJECT TO APPROVALS OF THE PROPERTY OWNERS.
21. PROTECT AND PRESERVE ALL RIGHTS-OF-WAY MONUMENTS, SURVEY MARKERS, AND PROPERTY CORNER MARKERS. ANY MARKERS DISTRIBUTED BY THE CONTRACTOR SHALL BE REPLACED BY A LICENSED SURVEYOR
AT THE CONTRACTOR'S EXPENSE.
22. PROVIDE ADEQUATE TEMPORARY SANITARY FACILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE WITH THE PROJECT MANAGER FOR USE OF TEMPORARY ON-SITE UTILITIES SUCH AS WATER AND ELECTRICITY. THE CONTRACTOR SHALL BE RESPONSIBLE TO REIMBURSE THE OWNER FOR USE OF SUCH
FACILITIES.
23. RESEARCH, SECURE, COMPLY WITH ALL PERMIT REQUIREMENTS, AND PAY FOR ALL PERMITS AND FEES.
PERMITS REQUIRED INCLUDE, BUT ARE NOT LIMITED TO: A LARA PERMIT FOR BUILDING, ELECTRICAL, MECHANICAL, AND PLUMBING.
GENERAL NOTES:
1. ESTABLISH AND MAINTAIN COMMUNICATION WITH AND COORDINATE WORK WITH APPROPRIATE UTILITY
COMPANIES FOR THE DURATION OF THE PROJECT. SEE COVER SHEET FOR UTILITY CONTACT INFORMATION.
2. THE ADJUSTMENT, RELOCATION OR REPLACEMENT OF EXISTING TELEPHONE, ELECTRIC MAINS, CABLE TV OR GAS FACILITIES SHALL BE PERFORMED BY THE UTILITY COMPANIES. THE UTILITY COMPANIES MUST BE INFORMED BY THE CONTRACTOR BEFORE CONSTRUCTION IS STARTED TO DETERMINE THE EXACT LOCATION OF ANY UTILITIES THAT ARE TO BE ADJUSTED, RELOCATED OR REPLACED. THE CONTRACTOR SHALL COORDINATE ANY WORK TO BE PERFORMED BY THE UTILITY COMPANIES THAT IS TO BE DONE DURING THE
CONSTRUCTION OF A PROJECT.
3. TAKE ALL PRECAUTIONS NECESSARY TO PRESERVE THE INTEGRITY OF EXISTING UTILITIES TO REMAIN AND PROVIDE UNINTERRUPTED SERVICE TO ALL USERS OF THE EXISTING UTILITIES, EXISTING UTILITIES (TO REMAIN) ENCOUNTERED IN TRENCH OR PAVEMENT EXCAVATIONS SHALL BE SUPPORTED AS ORDERED BY THE ENGINEER IN CHARGE OR AS DIRECTED BY THE UTILITY COMPANY, THE COST FOR SUPPORTING UTILITIES
SHALL BE INCLUDED IN THE PRICE BID FOR EXCAVATION.
4. EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROM FIELD SURVEYS AND RECORD MAPS AND ARE NOT CERTIFIED AS TO THE ACCURACY OF THEIR LOCATOR OR COMPLETENESS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION AND DEPTHS OF ALL UTILITIES AND STRUCTURES IN THE PATH OF, CLOSELY PARALLEL TO, OR UNDER THE PROPOSED CONSTRUCTION. THE CONTRACTOR SHALL INCLUDE THE COST OF PRIVATE UTILITY LOCATE SERVICES IN THEIR BID. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND DELAYS OR DAMAGES OCCURRING AS A RESULT OF INCORRECTLY LOCATED UTILITIES, NO EXTENSIONS OF CONTRACT TIME AND NO MONETARY DAMAGE CLAIMS SHALL BE ALLOWED AS A RESULT OF REVISED DESIGN LOCATIONS OR TIME ALLOWED TO DO SAME WHICH WOULD RESULT FROM EXISTING UTILITIES BEING FOUND IN DIFFERENT LOCATIONS OTHER THAN SHOWN ON THESE DRAWINGS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITY OWNERS IN
AMPLE TIME FOR THEM TO LOCATE AND MARK THEIR FACILITIES.
UTILITY NOTES:
MARINA GENERAL NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL MARINA CONSTRUCTION ADHERE TO PROJECT
SPECIFICATIONS, PROJECT DOCUMENTS, PROJECT DRAWINGS, PERMITS, APPLICABLE LOCAL, STATE, AND
FEDERAL CODES.
2. THE CONTRACTOR SHALL SUPPLY COMPLETE STRUCTURAL CALCULATIONS TO ACCOMPANY THE SHOP DRAWINGS AND SUBMITTALS WERE NOTED. THESE STRUCTURAL CALCULATIONS SHALL INCLUDE SYSTEM ANCHORAGE, STRUCTURAL DESIGN, AND FLOATATION. ALL STRUCTURAL CALCULATIONS SHALL BEAR THE SIGNATURE AND SEAL OF A STATE OF MICHIGAN LICENSED PROFESSIONAL ENGINEER. THE ENGINEER PROVIDING THE STRUCTURAL CERTIFICATION SHALL HAVE A MINIMUM OF 10 YEARS EXPERIENCE AS A
PROFESSIONAL ENGINEER SPECIALIZING IN MARINA-WATERFRONT ENGINEERING.
3. THE PROPOSED DOCKS AND OTHER NECESSARY MATERIALS WILL BE CONFINED TO AN OWNER APPROVED STAGING AREA CONFIRMED PRIOR TO CONSTRUCTION. THE CONTRACTOR TRAILER WILL ALSO BE LOCATED
IN THIS AREA.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING TEMPORARY UTILITY SERVICES, AS NEEDED FOR
CONSTRUCTION.
5. CRIB PIER SYSTEM SHALL BE PAID AT THE GENERAL CONTRACTOR'S BID PRICE PER LUMP SUM TO FURNISH AND INSTALL A COMPLETE SYSTEM, INCLUDING, BUT NOT LIMITED TO, CLEATS, FENDER AND SUPPORT PILES, WALKWAYS, PIERS, UTILITY PEDESTALS (INCLUDING ELECTRICAL WIRING AND POTABLE WATER PIPING WITHIN THE PEDESTALS), ANCHORAGE SYSTEM, LADDERS, WITH ALL ASSOCIATED MARINE HARDWARE DESIGNED IN ACCORDANCE WITH PROJECT DOCUMENTS, AND THE FOLLOWING DOCK UTILITY SYSTEMS:
A. WATER DISTRIBUTION SYSTEM INCLUDES ALL PIPE, VALVES, FITTINGS, AND SERVICE CONNECTIONS TO THE UTILITY PEDESTALS (INCLUDING CONNECTION AND PLUMBING WITHIN THE PEDESTAL). THIS ITEM SHALL ALSO INCLUDE ALL DISINFECTION AND TESTING NECESSARY TO PLACE THE POTABLE
WATER DISTRIBUTION SYSTEM IN SERVICE.
B. MARINE ELECTRICAL SYSTEM INCLUDES ALL CABLE, WIRING, CONDUITS (AS NEEDED FOR
ELECTRICAL FACILITIES), DOCK-BASED DISTRIBUTION EQUIPMENT, UTILITY PEDESTALS (INCLUDING
ELECTRICAL WIRING WITHIN THE PEDESTAL), AND ELECTRICAL SERVICES TO PEDESTALS.
C. FIRE PROTECTION SYSTEM INCLUDES ALL PIPES, VALVES, FITTINGS, HANGERS, FIRE PROTECTION
CONNECTIONS FROM BOTH LAND AND WATER, STANDPIPES, MOUNTING SYSTEMS, HOSE
CONNECTIONS, AND ALL OTHER REQUIRED APPURTENANCES. THIS ITEM SHALL INCLUDE ALL
TESTING NECESSARY TO PLACE THE FIRE PROTECTION SYSTEM IN SERVICE.
6. ALL PROPOSED CLEATS SHALL BE PER THE DETAILS AND SPECIFICATIONS.
7. CONTRACTOR TO CO-ORDINATE AND SCHEDULE MEETINGS BETWEEN ALL OTHER CONTRACTORS WORKING
ONSITE TO ENSURE COORDINATION.
8. CONTRACTOR TO DEMONSTRATE ALL UTILITY SYSTEMS OPERATIONS AND SYSTEMS BY INSTALLERS AT A
SCHEDULED DEMONSTRATION MEETING WITH THE OWNER PRIOR TO ACCEPTANCE.
9. CONTRACTOR TO ENSURE MARKING OF ALL PIPING FOR CONTENT IN DOCKS AND ON SHORE MANHOLES, ETC.
WHERE EXPOSED.
10. EXISTING BOAT LAUNCH RAMP TO REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION.
WATER SERVICE NOTES:
1. THE CONTRACTOR SHALL VERIFY THE LOCATION AND DISPOSITION OF ALL WATER SERVICES. THE
CONSEQUENCES OF THE CONTRACTOR'S FAILURE TO DO THIS SHALL BE BORNE SOLELY BY THE
CONTRACTOR. ALL WATER SERVICE WORK SHALL BE COORDINATED WITH THE DESIGNATED
REPRESENTATIVE OF THE OWNER.
2. THE CONTRACTOR IS RESPONSIBLE FOR TESTING AND DISINFECTING THE POTABLE WATER SYSTEM AFTER IMPROVEMENTS ARE COMPLETE. ALL WATER SERVICE PIPE AND APPURTENANCES SHALL BE MADE WATER TIGHT PRIOR TO ACCEPTANCE. CONTRACTOR RESPONSIBLE FOR COLLECTING SAMPLES AND RECEIVING
APPROVAL FROM LOCAL HEALTH DEPARTMENT PRIOR TO ACCEPTANCE AND USAGE.
SURVEY NOTES:
ELECTRICAL SYSTEM NOTES:
1. FURNISH AND INSTALL PULL AND JUNCTION BOXES, EXPANSION JOINTS, WIRING, CABLING
AND CONDUITS, AND ALL OTHER EQUIPMENT AND MATERIALS AS INDICATED AND AS
REQUIRED FOR PROPER INSTALLATION. ALL ELECTRICAL WORK SHALL CONFORM TO THE
NATIONAL ELECTRIC CODE (N.E.C.). SIZES INDICATED ON THE DRAWINGS SHALL BE
MINIMUM SIZES TO BE INSTALLED. ALL MATERIALS SHALL BE U.L. LISTED.
2. ELECTRICAL EQUIPMENT, MATERIALS, AND FOR OTHER ELECTRICAL SYSTEMS WITHIN
INFLUENCED AREA SHALL BE IN ACCORDANCE WITH N.E.C ., STATE FIRE MARSHALL, AND
STATE AGENCIES RULES AND REGULATIONS.
3. ELECTRICAL EQUIPMENT, MATERIALS, AND INSTALLATION FOR ELECTRICAL SYSTEM SHALL
BE IN ACCORDANCE WITH THE CURRENT EDITION OF THE NATIONAL ELECTRIC CODE
(N.E.C.) AND LOCAL CODES.
4. THE CONTRACTOR SHALL PROVIDE EASY REMOVAL ACCESS HATCHES AT ALL PULL BOXES,
EXPANSIONS, SENSORS, AND ALL OTHER LOCATIONS WHICH WILL REQUIRE OPERATIONAL
MAINTENANCE INSPECTION, AND/OR YEARLY SHUTDOWN AND START UP.
5. ENTIRE ELECTRICAL SYSTEM TO INCLUDE GROUND FAULT PROTECTION PER N.E.C.
REQUIREMENTS AND PER SPECIFICATIONS. ALL GROUND FAULT CONTROLS SHALL BE
INDIVIDUALLY TESTED AND DOCUMENTED BY THE CONTRACTOR PRIOR TO ACCEPTANCE.
6. ALL BONDING OF SERVICE EQUIPMENT, RACEWAYS, SEPARATELY DERIVED SYSTEMS,
EXPOSED INTERIOR STRUCTURAL STEEL, AND OTHER ENCLOSURES SHALL COMPLY WITH
NEC REQUIREMENTS, IN PARTICULAR, THOSE FOUND IN ARTICLE 250, PART V.
SANITARY SYSTEM NOTES:
1. ALL PIPE SHALL BE CERTIFIED BY THE MANUFACTURER TO MEET THE APPLICABLE ASTM
SPECIFICATION REQUIREMENTS, CERTIFICATION FORMS, TOGETHER WITH A REPORT OF
THE TEST RESULTS, SHALL BE PROVIDED TO THE CONSTRUCTION INSPECTOR/ENGINEER.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL UNDERGROUND
OR SURFACE UTILITIES EVEN THOUGH THEY MAY NOT BE SHOWN ON THE PLANS. ANY
UTILITY THAT IS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED
TO THE SATISFACTION OF THE OWNER AND OPERATOR OF THE DAMAGED UTILITY. THIS
WORK SHALL BE AT THE CONTRACTOR'S EXPENSE.
3. CONTRACTOR IS RESPONSIBLE FOR CONFORMANCE WITH SEPTIC PERMIT AND FOR
COORDINATION WITH LOCAL HEALTH DEPARTMENT ON INSPECTIONS AND APPROVALS.
1. VERTICAL DATUM IS INTERNATIONAL GREAT LAKES DATUM OF 1985 (IGLD85). IGLD'85 = NAVD88 + 0.04'.
2. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANES, NORTH ZONE, INTERNATIONAL FOOT.
3. SITE SURVEY PERFORMED BY EDGEWATER RESOURCES ON 4/27/17. BATHYMETRIC SURVEY PERFORMED BY
EDGEWATER RESOURCES ON 4/27/17.
4. AVERAGE WATER LEVEL ON 4/27/17 WAS 602.15' IGLD85.
5. ANY SURVEY MONUMENTS REMOVED DURING THE COURSE OF CONSTRUCTION ACTIVITIES MUST BE WITNESSED, RESURVEYED, REPLACED, AND CERTIFIED FOLLOWING COMPLETION BY A MI LICENSED SURVEYOR IN COMPLIANCE WITH THE CORNER RECORDATION ACT [1970 PA 74, MCL 54.201-210(D)].
6. BENCHMARK #1 (NORTHING, EASTING) = 978153.05, 25962764.60
7. BENCHMARK #2 (NORTHING, EASTING) = 978220.64, 25962982.88
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
751/17185.JBB
DTMB PROJ. NO.
NORTH
G
EN
ER
AL
N O
TE
S
EA
G
LE
H
AR
BO
R , M
I H
AR
BO
R U
PG
R
AD
ES
EA
GL
E
HA
RB
OR
S
TA
TE
H
AR
BO
R
G-1.02
17-37
6/10/2022
NONE
BID
SESC NOTES:
1. A SOIL EROSION AND SEDIMENT CONTROL (SESC) PERMT IS REQUIREDFROM THE MIGHIGAN DEPARTMENT OF
TECHNOLOGY, MANAGEMENT, AND BUDGET (DTMB). CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH
CHRISTOPHER MCGARRY: MCGARRYC@MICHIGAN.GOV
SCALE:
601 600 599
58959
594593
591590
604603
607606
593 592
NORTH
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
751/17185.JBB
DTMB PROJ. NO.
100'50'0
SCALE: 1" = (AT 24"x36")
P:\2017\17-37 MDNR - EAGLE HARBOR\CAD\SHEETS\V-X.XX.DWG
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE,
INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 + 0.04').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
ENLA
RGEMENT -
SEE SHEET V
-1.
ENLA
RGEMENT -
SEE SHEET V
-1.
LAKE SUPERIOR/EAGLE HARBOR
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
EA
G
LE
H
AR
BO
R , M
I H
AR
BO
R U
PG
R
AD
ES
EA
GL
E
HA
RB
OR
S
TA
TE
H
AR
BO
R
V-1.01
17-37
6/10/2022
50'
BID
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
FLAG
AutoCAD SHX Text
UTL
AutoCAD SHX Text
UTL
AutoCAD SHX Text
UTL
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text S
S
590589
601600
597596
NORTH
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
751/17185.JBB
DTMB PROJ. NO.
40'20'0
SCALE: 1" = (AT 24"x36")
P:\2017\17-37 MDNR - EAGLE HARBOR\CAD\SHEETS\V-X.XX.DWG
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE,
INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 + 0.04').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
EXISTING USACE NAVIGATION
CHANNEL LIMITS (TYP.)
EXISTING GRAVEL PARKING LOT
AND ROAD WAY (TYP.) - TO BE REPLACED
EXISTING WATER VALVE (TYP.)
- TO BE REPLACED
EXISTING FLAG POLE - TO REMAIN
EXISTING UTILITY POLE - TO REMAIN
EXISTING ARMOR STONE RIPRAP - TO REMAIN
EXISTING USCG LIFE SAVING STATION
- TO REMAIN
EXISTING TREES - TO REMAIN
EXISTING CONCRETE SIDEWALK
- TO BE REPLACED
EXISTING STEEL SEAWALL - TO REMAIN
EXISTING MOORING AREA
- TO BE REPLACED
EXISTING BOATER SERVICES
BUILDING - TO REMAIN
EXISTING WATER'S EDGE
LAKE SUPERIOR/EAGLE HARBOR
EXISTING LIGHT POLE
- TO BE REMOVED
EXISTING PUMPOUT -
TO BE REMOVED
EXISTING POLE WITH TRANSFORMER
FOR ELECTRICAL POWER SUPPLY
EXISTING FUEL
- REMOVED BY OTHERS
EXISTING BOAT LAUNCH
SIGNAGE - TO REMAIN
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
- W
ES
T
EA
G
LE
H
AR
BO
R , M
I H
AR
BO
R U
PG
R
AD
ES
EA
GL
E
HA
RB
OR
S
TA
TE
H
AR
BO
R
V-1.02
17-37
6/10/2022
20'
BID
EXISTING SANITARY MANHOLE - TO REMAIN
EXISTING SEPTIC TANK TO BE REPLACED
EXISTING GRAVEL DRIVEWAY TO
BE PARTIALLY REPLACED
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
FLAG
AutoCAD SHX Text
UTL
AutoCAD SHX Text
UTL
AutoCAD SHX Text
UTL
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text S
590589
NORTH
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
751/17185.JBB
DTMB PROJ. NO.
40'20'0
SCALE: 1" = (AT 24"x36")
P:\2017\17-37 MDNR - EAGLE HARBOR\CAD\SHEETS\V-X.XX.DWG
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE,
INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 + 0.04').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
EXISTING USACE NAVIGATION
CHANNEL LIMITS
EXISTING GRAVEL PARKING LOT
AND ROAD WAY (TYP.) - PARTIALLY REPLACED
EXISTING WATER'S EDGE
EXISTING BOAT LAUNCH
- TO REMAIN
EXISTING SEASONAL SKID PIER
- TO REMAIN
LAKE SUPERIOR/EAGLE HARBOR EXISTING MDNR SIGN AND FOUNDATIONS
- TO BE RELOCATED
EXISTING VAULT TOILET
- TO REMAIN
SECTION LINE
PROPERTY LIN
E
EXISTING PROPERTY CORNER
(BENCHMARK 2) - TO REMAIN
EXISTING SURVEY MONUMENT
- TO BE REMOVED AND REPLACED
BY LICENSED SURVEYOR (SEE
SURVEY NOTE #5, PAGE G-1.02)
(BENCHMARK 1)
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
- E
AS
T
EA
G
LE
H
AR
BO
R , M
I H
AR
BO
R U
PG
R
AD
ES
EA
GL
E
HA
RB
OR
S
TA
TE
H
AR
BO
R
V-1.03
17-37
6/10/2022
20'
BID
EXISTING GRASS LAWN
- TO REMAINEXISTING GRAVEL DRIVEWAY
- TO REMAIN
CONTRACTOR RESPONSIBLE FOR CONFIRMING
SITE CONDITIONS AND EQUIPMENT CLEARANCES
TO SITE PRIOR TO CONSTRUCTION
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
UTL
600599
594593592591590589
601600599598597596595
589588
60860
NORTH
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
751/17185.JBB
DTMB PROJ. NO.
40'20'0
SCALE: 1" = (AT 24"x36")
D
EM
O
LI
TI
O
N
S
ES
C
EA
G
LE
H
AR
BO
R , M
I H
AR
BO
R U
PG
R
AD
ES
EA
GL
E
HA
RB
OR
S
TA
TE
H
AR
BO
R
D-1.01
CH
SH
CH
17-37
6/10/2022
30'
BID
P:\2017\17-37 MDNR - EAGLE HARBOR\CAD\SHEETS\V-X.XX.DWG
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, NORTH ZONE,
INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
HARBOR SIGN TO BE REMOVED
AND RELOCATED
REMOVE EXISTING TREES
IN AREA OF NEW DRIVEWAY
SEE DREDGE SHEETS FOR
IN-WATER REMOVALS
REMOVE SHEETPILE WALL AND CAP
TO 12" BELOW GRADE IN LOCATIONS
OF NEW SIDEWALK - SEE CM-1.02MARINA PUMP-OUT
TO BE REMOVEDTYPICAL LIGHTPOLE TO BE
REMOVED (QTY. = 5)
REMOVE ALL EXISTING
UTILITIES ALONG PROMENADE
SEE ARCHITECTURAL PLANS
FOR BUILDING REMOVALS
EXISTING CONCRETE SIDEWALK
- TO BE REMOVED (375 SF)
CONCRETE PROMENADE
- TO BE REMOVED (1,815 SF)
REMOVE EXISTING SEPTIC TANK
FOLLOWING REPLACEMENT
FUEL REMOVED BY OTHERS
EXISTING SURVEY MONUMENT
- TO BE REMOVED AND REPLACED
BY LICENSED SURVEYOR (SEE
SURVEY NOTE #5, PAGE G-1.02)
REMOVE EXISTING TIMBER
FENDERING, MOUNTS TO REMAIN
TEMPORARY EXCCAVATION/REMOVAL
FOR SHEET PILE TIEBACKS
SESC NOTES:
1. CONTRACTOR RESPONSIBLE FOR OBTAINING A DTMB SESC PERMIT PROR TO CONSTRUCTION
2. ALL IN-WATER WORK AREAS TO BE FULLY ENCAPSULATED BY TURBIDITY CURTAIN TO PREVENT
SILTATION
3. CONTRACTOR RESPONSIBLE FOR MAINTAINING SESC MEASURES THROUGHOUT CONSTRUCTION.
CONTRACTOR RESPONSIBLE FOR REMOVING ALL SESC MEASURES UPON COMPLETION AND
APPROVAL BY DTMB.
SILT FENCE AND STRAW BALES
AT DEWATERING AREACM-1.04
SILT FENCE AROUND
RAISED SEPTIC FIELD
TURBIDITY CURTAIN TO ENCAPSULATE
AREAS OF DREDGING AND SEAWALL/DOCK
CONSTRUCTION
CM-5.05
INSTALL 30 LF OF SILT FENCE ALONG
EASTERN LIMIT OF PROPOSED
GROUND DISTURBANCE CM-5.05
CM-1.06
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
FLAG
AutoCAD SHX Text
UTL
AutoCAD SHX Text
UTL
AutoCAD SHX Text
UTL
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text S
601 600 599
58959
594593
591590
604603
607606
593 592
NORTH
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
751/17185.JBB
DTMB PROJ. NO.
100'50'0
SCALE: 1" = (AT 24"x36")
P:\2017\17-37 MDNR - EAGLE HARBOR\CAD\SHEETS\CM-X.XX.DWG
SITE
PLA
N W
EST -
SEE SHEET C
M-1.
SITE
PLA
N EAST-
SEE SHEET C
M-1.
SITE
UTIL
ITI
ES - S
EE SHEET C
M-1.
DREDGE PLA
N - S
EE SHEET C
M-1.
O
VE
R
AL
L
SI
TE
P
LA
N
EA
G
LE
H
AR
BO
R , M
I H
AR
BO
R U
PG
R
AD
ES
EA
GL
E
HA
RB
OR
S
TA
TE
H
AR
BO
R
CM-1.01
CH
SH
CH
17-37
6/10/2022
50'
BID
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES,
NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
590589
601600
597596
NORTH
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
751/17185.JBB
DTMB PROJ. NO.
40'20'0
SCALE: 1" = (AT 24"x36")
SI
TE
P
LA
N
W
ES
T
EA
G
LE
H
AR
BO
R , M
I H
AR
BO
R U
PG
R
AD
ES
EA
GL
E
HA
RB
OR
S
TA
TE
H
AR
BO
R
CM-1.02
CH
SH
CH
17-37
6/10/2022
20'
BID
P:\2017\17-37 MDNR - EAGLE HARBOR\CAD\SHEETS\CM-X.XX.DWG
CM-5.07
265'-0"
'-4
8'- 0"
5'-0" (TYP.)
45'-0"
PIER ARMORING STONE AREA A (APPROX. 280 CY
OF MDOT HEAVY RIPRAP) - ALTERNATE #1
EXISTING ARMOR STONE REVETMENT
-TO REMAIN
8' WIDE CONCRETE SIDEWALK,
MATCH EXISTING WALL CAP
EXISTING SSP WALL TO RECEIVE TIMBER FENDERING FOR WHOLE
LENGTH AND 6"X6" TIMBER POSTS @ 8' O.C. (SEE ELEVATION VIEW)
ARMORING STONE - AREA B, MDOT
PLAIN RIPRAP (APPROX. 15 CY)
SSP RETURN WALL TO EXTEND 24'-1.5" MIN.
TO MATCH EXISTING GRADE ELEVATION = 605.3'
RELOCATED EAGLE HARBOR MDNR
SIGN LOCATION
605.56'
606.46'
606.40'
604.70'
604.36'
605.66'
SCALE:
WEST SIDEWALK ENLARGEMENT
3/8"=1'-0" DT-WEST SIDEWALK ENLARGEMENT
7'-6" TYP.
4.9% 1.5%
604.33'
604.70'
4.9% 1.5%
4.5%
5'-0"
604.21'
604.58'
1.5%
8'- 0"
1.1%
2.25%
1.2%
606.40'
EXISTING BOATER SIGNAGE
TO BE REPLACED AFTER
CONSTRUCTION
2% MAX.
60"
1 ADA PARKING ENLARGEMENT
SCALE: 1"=10'
ROLL CURB AT ENTRANCE
TO ADA SPACE
606.60'
606.00'
CM-5.07
NOTES:
1. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES,
NORTH ZONE, INTERNATIONAL FT.
2. VERTICAL DATUM IS IGLD'85 (IGLD'85 = NAVD88 - 0.05').
3. TOPOGRAPHIC AND BATHYMETRIC SURVEY PERFORMED ON 4/27/2017.
4. WATER ELEVATION ON DAY OF SURVEY WAS 602.15' (IGLD'85).
5. USACE OHWM = 603.1' (IGLD'85); USACE LWD = 601.1' (IGLD'85)
CM-5.06
CM-5.08
1 REPLACEMENT TIMBER FENDERING
ON EXISTING SEAWALL (265 LF)
SEE SHEET CM-1.04
FOR PROPOSED DREDGING
384"
57'-0"
6'-0"
6'- 0"
SLIP #1 SLIP #2 SLIP #3 SLIP #4 SLIP #5 SLIP #6
ADA PARKING SIGN AND POST
CP1
CP2
CONTROL POINT TABLE
POINT # NORTHING EASTING
CP1 977843.26 25962421.32
CP2 977875.05 25962427.61
L L
SWING TYPE LADDER (TYP.)CM-5.04
File details come from the government source that posted it. Updated .