IndianMtn_SitePlan.pdf

PDF 358 KB Posted

Attached to
Indian Mountain SP Lake Trail Repaving - UPDATED
Solicitation number
Event 32701-13997
Issued by
Carter County, Kingston Springs Town, Tennessee

About this file

This is a preliminary site plan document for the State of Tennessee's Indian Mountain State Park, detailing a lake trail repaving project. The project scope includes removing and replacing approximately 1.1 miles of existing asphalt trail while widening it to six feet in width, establishing flush tie-end joints to meet existing asphalt surfacing at the parking lot, adding 120 feet of new asphalt trail from accessible parking areas, and removing 135 feet of existing asphalt while connecting the trail as a loop with 35 feet of new asphalt. The site plan indicates the project encompasses modifications to existing park infrastructure, including coordination with playground, picnic shelter and tables, basketball court, and ADA parking facilities within Indian Mountain State Park.

The document provides visual representation through a site plan diagram identifying the specific areas for trail removal (marked in red), new trail paths (marked in yellow), and existing park amenities. No specific pricing information, funding sources, contract award dates, bid response deadlines, or contract term details are provided within this preliminary site plan document. The plan serves as the foundational design specification for the repaving initiative and appears to be in preliminary stages, requiring further development for bidding and procurement purposes.

View the file

Other files

File Type Posted
ITB_32701-13997_Amd_1.pdf PDF
IMSP_Trail_Repaving_Specifications.pdf PDF
FHWA_Form.pdf PDF
Indian_Mountain_SP_Lake_Trail_Repaving.pdf PDF
32701-13997_T_Cs.pdf PDF
Certification_of_Contractor.pdf PDF
ITB_32701-13997_Pre-Response_Conf_Memo.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Indian Mountain State Park Re-Paving the Lake Trail

Preliminary Site Plan

• Remove and replace approximately one and one tenth (1.1) miles of asphalt trail, widening to six (6) feet width

• Establish flush tie-end joints to meet existing asphalt surfacing at parking lot

• Add one hundred twenty (120) feet new asphalt trail from accessible parking spots (yellow)

• Remove one hundred thirty-five (135) feet asphalt (red) and connect trail as loop with thirty-five (35) feet new asphalt (yellow)

6’ wide

Playground

Picnic shelter & tables

Basketball court

ADA parking

New trail path 120’

New trail path 35’

Remove path 135’

File details come from the government source that posted it. Updated .