Indian Lake SP WW_Concept basis of design Fixture Count.pdf
PDF 123 KB Posted
- Solicitation number
- RFP - 171 - 230000002322
- Issued by
- Schoolcraft County, Michigan
About this file
This document is a fixture count analysis for the Indian Lake State Park in Michigan. The analysis covers the existing toilet buildings and fixtures in the campground, as well as the required fixtures per EGLE Campground Rules. The document provides the peak flow and daily flow for each fixture type across the different toilet buildings. Additionally, it includes the proposed wastewater flows based on the number of campsites and the recommended wastewater treatment and disposal capacity for the design.
The related state and local contract opportunity is for park improvements at the Palms Book and Indian Lake State Parks in Schoolcraft County, Michigan. The scope of work likely includes upgrades or replacements to the wastewater infrastructure and toilet facilities based on the fixture count analysis provided.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Indian Lake State Park Existing Fixture County INVESTIGATION File No. 751/18092.TAP, Index No. 5200
Draft fixture count of existing buildings
1/10/2020 Concept basis of design at Pre-proposal addendum stage
A. Campground/Campsites
Number of Campsites 147 145 campsites and 2 mini cabins
Fixtures Required Per EGLE Campground Rules Mens Toilets 5 Womens Toilets 6 Mens Urinals 3 Men's Lavatories 6 Women's Lavatories 6 Men's Showers 4 Women's Showers 4 Unisex showers 7 Janitor's sink N/A
B. Existing east toilet building (1951)
Toilet Building Fixture Unit Design Pk Total No. Flow (gph) Day (hrs) Flow (gpd)
Mens toilets 3 Womens toilets 4 Mens urinals 2 Men's lavatories 2 Women's lavatories 2 Men's showers 1 Women's showers 1 Unisex showers 0 Janitor's sink 2
C. Existing Central Toilet Building (1952)
Toilet Building Fixture Unit Design Pk Total No. Flow (gph) Day (hrs) Flow (gpd)
Mens toilets 2 Womens toilets 4 Mens urinals 3 Men's lavatories 2 Women's lavatories 2 Men's showers 1 Women's showers 1 Unisex showers 0 Janitor's sink 1
D. Existing west toilet building (1974)
Toilet Building Fixture Unit Design Pk Total No. Flow (gph) Day (hrs) Flow (gpd)
Mens toilets 3 Womens toilets 4 Unisex toilets 1 Mens urinals 2 Men's lavatories 4 Women's lavatories 4 Unisex lavatories 1 Men's showers 0 Women's showers 0 Unisex showers 4 Janitor's sink 1
E. Existing Day use toilet Building (renovated 1991)
Toilet Building Fixture Unit Design Pk Total No. Flow (gph) Day (hrs) Flow (gpd)
Toilet Building Water Closets 6 Toilet Building Urinals 2 Toilet Building Sinks/Faucets 4 TB Janitors Sink 1 Showers 0 Drinking Fountain 1
F. Existing Contact Station (2010)
Toilet Building Fixture Unit Design Pk Total No. Flow (gph) Day (hrs) Flow (gpd)
Toilet Building Water Closets 1 Toilet Building Urinals 0 Toilet Building Sinks/Faucets 1 TB Janitors Sink 1 Showers 0 Drinking Fountain 2
D. Proposed Wastewater Flows on Number of Sites Basis
Number of Camground Sites 147
Wastewater Flow Per Site (Gpd per site, MDEQ Criteria)
Toilet Building Flow (Gpd)
Sanitation Station Sites Flow/Site (gpd)
Wastewater Flow Total 0
E. Recommended Wastewater Treatment and Disoposal Capacity For Design
Fixture count analysis
File details come from the government source that posted it. Updated .