Indian Lake Existing Flow.18Jan2022.pdf

PDF 90 KB Posted

Attached to
751/22021. JBB; Palms Book & Indian Lake SP - Park Imprvemnts
Solicitation number
RFP - 171 - 230000002322
Issued by
Schoolcraft County, Michigan

About this file

This document appears to be a Wastewater Study for the Twin Lakes State Park in Michigan, conducted by the Department of Technology, Management, and Budget (DTMB) and the Michigan Department of Natural Resources (MDNR). The study provides a detailed analysis of the existing and proposed sewage disposal system for the park, including the campground, beach house, contact station, and sanitation station sites. The study evaluates the wastewater flow based on fixture unit design, low flow fixture criteria, and the number of campsites, and estimates the total existing wastewater flow to be 9,352 gallons per day.

The related state and local contract opportunity is for park improvements at Palms Book and Indian Lake State Parks in Schoolcraft County, Michigan. The project scope, response dates, award information, and contract term are not included in the provided documentation.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB/MDNR Twin Lakes State Park On-Site Sewage Disposal Study File No. 751/20169.JBB, Index No. 5519

1/18/2022

A. Campground/Campsites

Number of Existing Campsites 145 Number of Proposed Campsites 0 Number of Mini-Cabins 2

Design Peak Day (hrs) 14

Fixture Unit Design Pk Total No. Flow (gph) Day (hrs) Flow (gpd)

SW Toilet/Shower Building Water Closets 8 36 14 4,032 Urinals 3 10 14 420 Lavatories 9 15 14 1,890 Slop Sink 1 3 14 42 Showers 4 100 14 5,600

SW Toilet/Shower Building Subtotal 11,984

Beach House Water Closets 6 36 14 3,024 Urinals 2 10 14 280 Lavatories 4 15 14 840 Janitors Sink 1 3 14 42

Beachouse Subtotal 4,186

Contact Station Water Closets 1 36 14 504 Lavatories 1 15 14 210 Janitors Sink 1 3 14 42 Drinking Fountain 2 2 14 56

Contact Station Subtotal 812

Sanitation Station Sites Sanitation Station Subtotal 147 20 2,940

Wastewater Flow Total 19,922

EVALUATION AND BASIS OF DESIGN FOR WASTEWATER CAPACITY

A. Based on Fixture Flow per Michigan Criteria for Subsurface Sewage Disposal

Flow/Site (gpd)

Existing Flow

F:\Data\200000\200692 - Sanders & Czapski - Indian Lake State Park\Wastewater Study\Design Info\Indian Lake Sewer Design.xlsx

DTMB/MDNR Twin Lakes State Park On-Site Sewage Disposal Study File No. 751/20169.JBB, Index No. 5519

1/18/2022

B. Based on Low Flow Fixture Criteria Fixture Unit Design Pk Total

No. Flow (gph) Day (hrs) Flow (gpd) SW Toilet/Shower Building Water Closets 8 10 14 1,120 Urinals 3 5 14 210 Lavatories 9 5 14 630 Slop Sink 1 3 14 42 Showers 4 50 14 2,800

SW Toilet/Shower Building 4,802

Beach House Water Closets 6 10 14 840 Urinals 2 5 14 140 Lavatories 4 5 14 280 Janitors Sink 1 3 14 42

Beachouse Subtotal 1,302

Contact Station Water Closets 1 10 14 140 Lavatories 1 5 14 70 Janitors Sink 1 3 14 42 Drinking Fountain 2 2 14 56

Contact Station Subtotal 308

Sanitation Station Sites Flow/Site (gpd) Sanitation Station Subtotal 147 20 2,940

Wastewater Flow Total 9,352

C. Based on Number of Sites EGLE Part 125 (R325.1561(b) Campgrounds Number of Campground Sites 145 75 10,875 Cabins 2 30 60

Wastewater Flow Total 10,935

D. Estimated Existing Flow 9,352

F:\Data\200000\200692 - Sanders & Czapski - Indian Lake State Park\Wastewater Study\Design Info\Indian Lake Sewer Design.xlsx

File details come from the government source that posted it. Updated .