Technical Design Guideline 17020
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Results.pdf | ||
| Amendment 5.pdf | ||
| Amendment 4.pdf | ||
| Final Questions and Answers.pdf | ||
| 17100.pdf | ||
| 17200.pdf | ||
| 17260.pdf | ||
| 17050.pdf | ||
| Amendment 3.pdf | ||
| 17180.pdf | ||
| 17040.pdf | ||
| scan0020.pdf | ||
| MDC Guaynabo - Upgrade Control Center Site Visit Meeting Minutes.pdf | ||
| 17300.pdf | ||
| 17220.pdf | ||
| 17120.pdf | ||
| Amendment 1.pdf | ||
| 17165.pdf | ||
| 17900.pdf | ||
| A - Cover Letter.pdf | ||
| C - Attachment 1 | — | |
| E - Attachment 3 | — | |
| F - Attachment 4 | — | |
| B - Solicitation.pdf | ||
| D - Attachment 2 | — |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FBOP TECHNICAL DESIGN GUIDELINES ISSUE DATE: DECEMBER 10, 2004
SENSITIVE - LOU
CONDUCTORS 17020 - 1
SECTION 17020 - CONDUCTORS
PART 1 - GENERAL
1.1 SUMMARY
A. This section covers all electrical cable and wiring system as shown on the drawings or as required to support the systems defined in these specifications.
The work under this section consists of furnishing materials and equipment, performing labor and services necessary for the installation of the electrical cable and wiring system required for the security electronics, communications, and fire alarm system.
B. Related Work Specified Elsewhere: Refer to all other Division 17 specification sections and drawings, and to the specifications and drawings under the General Construction Contract to ascertain the extent of work included.
1. Unless otherwise specified in this and other sections of Division 17, all conductors required by the Division 17 Plans and Specifications that are not defined or described in Article 725 of the NEC shall be furnished and installed in conformance with Section 16120 WIRES AND CABLES.
The Conductors that are covered in Article 725 of the NEC shall be furnished and installed in conformance with article 725 of the NEC.
1.2 SUBMITTALS
A. Since the Division 17 systems must be reviewed by the Contracting Officer as a system, no individual, specific submittal shall be made for this section.
Submittals shall be packaged in groups and shall be made in accordance with the General Provisions (Section 17000) of these specifications.
B. Unless specifically specified in this section, do not submit cut sheets for wire and cable in the 17020 binder. Include wire and cable cut sheets in the binder associated with the specification section that the wire and cable is specified.
1.3 QUALITY ASSURANCE
A. The following specifications and standards, except as hereinafter modified, are incorporated herein by reference and form a part of this specification to the extent indicated by the references thereto. Except where a specific date is given, the issue in effect (including amendments, addenda, revisions, supplements, and
CONDUCTORS 17020 - 2
errata) on the date of Invitation for Bids shall be applicable. In text such specifications and standards are referred to by basic designation only.
1. Applicable National Fire Protection Association (NFPA) Publications, including:
No. 70 National Electrical Code (NEC)
2. Underwriters' Laboratories, Inc. (UL) Publications:
No. 83 Thermoplastic-Insulated Wires
No. 493 Thermoplastic-Insulated Underground Feeder and Branch Circuit Cables
No. 486 Wire Connectors and Soldering Lugs
3. Insulated Cable Engineers Association (ICEA)
PART 2 - PRODUCTS
2.1 MATERIALS
A. Cable Tags:
1. Cable tags shall be pre-typed, self-adhesive, wraparound, self-laminating Panduit brand or equivalent.
B. Cable
1. All Division 17 cable shall be as specified in the appropriated section and as recommended by the equipment manufacturer. Unless noted otherwise, Class 1 circuits shall be a minimum of 18 AWG, Class 2 circuits outside of the SCC shall be a minimum of 22 AWG. Increase conductor size as required for circuit ampacities.
2. Unless noted otherwise, cable installed in exterior duct bank shall be gel filled, direct burial type rated for wet locations.
3. Unless noted otherwise, conductors installed in exterior duct bank shall be direct burial type rated for wet locations.
CONDUCTORS 17020 - 3
PART 3 - EXECUTION
3.1 EXECUTION
A. Identify each conductor by its system and circuit designation. Use a consistent system of tags, color coding and cable tag.
B. All cables shall be marked and labeled prior to final testing.
C. Cables installed in cable tray shall be of the type listed for that application.
THWN conductors shall not be installed in cable tray.
D. Unless specifically identified in Division 17, execution shall be in conformance with Section 16120 Wire and Cable.
3.2 COMPLETION
A. General: Upon completion of the work, remove excess debris, materials, equipment, apparatus, tools and the like and leave the premises clean, neat and orderly.
B. Testing: The completed system shall be tested by the Contractor prior to the acceptance test.
END OF SECTION