IFB Lump Sum Division Spreadsheet.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Y1AZ--825CM3013 Alexandria NC Roads and Restroom
- Solicitation number
- 36C78623B0010
About this file
This document contains a bid sheet template for solicitation number 36C78623B0010 to renovate the maintenance facility and roads at Alexandria National Cemetery.
The bid sheet template lists construction divisions from the NCA Master Construction Specifications and includes columns for lump sum pricing for each division to be used on the project, as well as columns for total pricing of the base bid and eight bid options. Relevant divisions include general requirements, concrete, masonry, metals, doors and windows, finishes, plumbing, HVAC, electrical, earthwork, exterior improvements, and utilities. Bidders are to provide lump sum pricing for each included division and totals for the base bid and all options. The total potential contract value will be determined by the sums of the base bid and any awarded bid options. The soliciting agency is the Department of Veterans Affairs National Cemetery Administration for Project 825CM3013 at the Alexandria National Cemetery location specified.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| Solicitation Number | 36C78623B0010 |
| Project Number | 825CM3013 |
| Project Name | Renovate Maintenance Facility & Roads at Alexandria National Cemetery |
| Division | CLIN1 | CLIN 2 | TOTAL CLIN 0001 & 0002 | BID OPTION 1 | BID OPTION 2 | BID OPTION 3 | BID OPTION 4 | BID OPTION 5 | BID OPTION 6 | BID OPTION 7 | BID OPTION 8 | GRAND TOTAL CLIN 0001, 0002, and BID OPTIONS 1-8 |
| Division 0 | ||||||||||||
| Special Sections | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 1 | ||||||||||||
| General Requirements | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 2 | ||||||||||||
| Existing Conditions | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 3 | ||||||||||||
| Concrete | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 4 | ||||||||||||
| Masonry | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 5 | ||||||||||||
| Metals | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 6 | ||||||||||||
| Wood and Plastic | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 7 | ||||||||||||
| Thermal and Moisture | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 8 | ||||||||||||
| Doors and Windows | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 9 | ||||||||||||
| Finishes | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 10 | ||||||||||||
| Specialties | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 11 | ||||||||||||
| Equipment | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 12 | ||||||||||||
| Furnishings | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 13 | ||||||||||||
| Special Construction | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 22 | ||||||||||||
| Plumbing | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 23 | ||||||||||||
| Heat, Ventilating, and Air Conditioning | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 25 | ||||||||||||
| Integrated Automation | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 26 | ||||||||||||
| Electrical | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 27 | ||||||||||||
| Communications | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 28 | ||||||||||||
| Electronic Safety and Security | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 31 | ||||||||||||
| Earthwork | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 32 | ||||||||||||
| Exterior Improvements | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 33 | ||||||||||||
| Utilities | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Bonds | ||||||||||||
| $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| TOTAL PRICE | CLIN1 | CLIN 2 | TOTAL CLIN 0001 & 0002 | BID OPTION 1 | BID OPTION 2 | BID OPTION 3 | BID OPTION 4 | BID OPTION 5 | BID OPTION 6 | BID OPTION 7 | BID OPTION 8 | |
| $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
TOTAL CONTRACT PRICE (CLINS 0001 & 0002 PLUS ADD ALTERNATE OPTIONS 0001 THROUGH 0008): $
File details come from the government source that posted it. Updated .