These are design and construction plans for the City of Austin FM 812 Landfill Leachate Tank Connection project (C.I.P. No. 5698.017, Solicitation No. CLMC1077), prepared by APTIM Environmental & Infrastructure LLC under the authority of Edward A. Shepard, Jr., P.E. The project involves installing approximately 41 stations of proposed 3-inch by 6-inch high-density polyethylene (HDPE) pipeline connecting leachate storage tanks at the FM 812 Landfill in Travis County, Texas. The work includes connecting Tank A (Outfall 01) to Tank B (Outfall 02) via Line A, connecting Tank B to an existing manhole via Line B, installing expansion loops, monitoring stations, sample ports, guard posts, and high-point vents. The construction also requires transitioning from HDPE to PVC piping at the final connection, converting an existing manhole to a drop manhole configuration, and installing electrical conduit and control systems. The project incorporates multiple site features including groundwater monitoring wells, gas extraction wells, landfill gas condensate sumps, and existing utility easements that must be protected during construction.
The plans detail comprehensive construction requirements including erosion control measures, geotechnical considerations, temporary construction access roads, and vegetation management across the 293.94-acre landfill site. The contractor is responsible for locating all existing utilities prior to excavation, protecting monitoring wells and gas probes, and managing contaminated groundwater and leachate encountered during construction. Excavation by blasting is prohibited, and slopes must not exceed 3 horizontal to 1 vertical unless supported by geotechnical engineering reports. All disturbed areas must be restored with permanent vegetation coverage meeting or exceeding 70 percent, with specific seeding requirements depending on season and soil conditions. The contractor must install erosion controls prior to any site work and maintain them according to City of Austin environmental criteria, with inspections required weekly or bi-weekly by a certified erosion and sediment control professional. The plans were issued for bid as of August 8, 2025, and include 16 benchmark elevations based on GPS observations by the City of Austin Public Works Survey Group, accounting for known horizontal and vertical movement of control points due to landfill soil conditions and weather events.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C - 001
TITLE SHEET
SHEET TITLE
SHEET
NUMBER
DRAWING INDEX
VICINITY MAP
PROJECT LOCATION MAP
AUSTIN-BERGSTROM
INTERNATIONAL AIRPORT
S H
IG
H
W A
Y
PILOT
KNOB
MOORES
CROSSING
FM
S
FM 812
TE
X
A S
T O
LL
R
O A
D
FM 812
PROJECT INFORMATION
STREET ADDRESS
10108 FM 812
AUSTIN, TX 78719
OWNER
MR. DONALD HARDEE
AUSTIN RESOURCE RECOVERY
2514 BUSINESS CENTER DRIVE
AUSTIN, TX 78744
TEL: 512-974-4345
CONTACT
MR. EDWARD A. SHEPARD JR., P.E.
APTIM ENVIRONMENTAL & INFRASTRUCTURE LLC
12005 FORD ROAD, SUITE 600
DALLAS, TX 75234
TEL: 972-773-8400
SUBMITTAL PREPARED BY
APTIM ENVIRONMENTAL & INFRASTRUCTURE LLC
12005 FORD ROAD, SUITE 600
DALLAS, TX 75234
TEL: 972-773-8400
MAYOR
KIRK WATSON
COUNCIL MEMBER DISTRICT 1
NATASHA HARPER-MADISON
COUNCIL MEMBER DISTRICT 3
JOSÉ VELÁSQUEZ
COUNCIL MEMBER DISTRICT 5
RYAN ALTER
COUNCIL MEMBER DISTRICT 7
LESLIE POOL
COUNCIL MEMBER DISTRICT 9
ZOHAIB QADRI
COUNCIL MEMBER DISTRICT 2
VANESSA FUENTES
COUNCIL MEMBER DISTRICT 4
JOSÉ VELA
COUNCIL MEMBER DISTRICT 6
MACKENZIE KELLY
COUNCIL MEMBER DISTRICT 8
PAIGE ELLIS
COUNCIL MEMBER DISTRICT 10
ALISON ALTER
FM 812 LANDFILL
LEACHATE TANK CONNECTION
C.I.P. NO. 5698.017
SOLICITATION NO. CLMC1077
PROPOSED
PIPELINE
CITY OF AUSTIN - FM 812 LANDFILL
TRAVIS COUNTY, TEXASAPTIM Environmental
& Infrastructure, LLC This document, and the ideas and designs incorporated herein, as an instrument of professional services, is prepared by APTIM Environmental & Infrastructure, LLC and is not to be used, in whole or in part, for any other project without the written notice to APTIM Environmental & Infrastructure, LLC.
This document is released for the purpose of Bidding and Construction under the authority of Edward A.
Shepard, Jr, PE #133722. Texas Registered Engineering Firm F-5650.
C-001 TITLE SHEET
C-002 GENERAL NOTES
C-003 ENVIRONMENTAL NOTES
C-101 EXISTING SITE PLAN
C-102 EXISTING SITE PLAN AREAS A AND B
C-103 ENLARGED SITE PLAN WEST
C-104 ENLARGED SITE PLAN EAST
C-201 LINE A PLAN/PROFILE VIEWS STATIONS 0+00 TO 4+00
C-202 LINE A PLAN/PROFILE VIEWS STATIONS 4+00 TO 8+00
C-203 LINE A PLAN/PROFILE VIEWS STATIONS 8+00 TO 12+00
C-204 LINE A PLAN/PROFILE VIEWS STATIONS 12+00 TO 16+00
C-205 LINE A PLAN/PROFILE VIEWS STATIONS 16+00 TO 20+00
C-206 LINE A PLAN/PROFILE VIEWS STATIONS 20+00 TO 24+04
C-207 LINE B PLAN/PROFILE VIEWS STATIONS 24+38 TO 28+00
C-208 LINE B PLAN/PROFILE VIEWS STATIONS 28+00 TO 32+00
C-209 LINE B PLAN/PROFILE VIEWS STATIONS 32+00 TO 36+00
C-210 LINE B PLAN/PROFILE VIEWS STATIONS 36+00 TO 39+80
C-211 MANHOLE CONNECTION STATIONS 39+30 TO 41+00
C-301 TANK A DETAIL SHEET EXISTING AND PROPOSED
C-302 TANK B DETAIL SHEET EXISTING AND PROPOSED
C-303 TANK SECTION VIEWS, EXPANSION LOOPS, AND GUARD POSTS
C-304 GENERAL DETAILS I
C-305 GENERAL DETAILS II
C-306 PIPE SUPPORT DETAILS
C-307 MISCELLANEOUS DETAILS
C-308 PIPELINE ALIGNMENT POINTS AND GUIDE/RESTRAINT TABLE
C-401 TANK AREA A POWER AND CONTROL SUMMARY
C-402 TANK AREA B POWER AND CONTROL SUMMARY
C-403 TANK AREA A AND B CONDUIT LAYOUT
C-404 CONDUIT SCHEDULE
C-405 TANK AREA A AND B CONTROL PANEL
C-501 EROSION CONTROL SITE PLAN - WEST
C-502 EROSION CONTROL SITE PLAN - EAST
FLOOD HAZARD NOTE
PORTIONS OF THE SITE ARE IN THE 1% ANNUAL CHANCE FLOOD WITH AVERAGE DEPTH
LESS THAN ONE FOOT OR WITH DRAINAGE AREAS OF LESS THAN ONE SQUARE MILE. ZONE
AE. IN ACCORDANCE WITH FEDERAL EMERGENCY MANAGEMENT ADMINISTRATION (FEMA)
FLOOD INSURANCE RATE MAP (FIRM) NUMBER 48453C0620K EFFECTIVE DATE 22 JANUARY
2020. THE BASE FLOOD ELEVATIONS ARE BETWEEN 465.9 AND 470.3.
THE FLOOD HAZARD INFORMATION IS DERIVED DIRECTLY FROM THE AUTHORITATIVE NFHL
WEB SERVICES PROVIDED BY FEMA. THIS INFORMATION WAS EXPORTED ON 8/21/2025 AT
3:46 PM AND DOES NOT REFLECT CHANGES OR AMENDMENTS SUBSEQUENT TO THIS DATE
AND TIME. THE NFHL AND EFFECTIVE INFORMATION MAY CHANGE OR BECOME
SUPERSEDED BY NEW DATA OVER TIME.
AutoCAD SHX Text 631041722
AutoCAD SHX Text
AUGUST 2025
AutoCAD SHX Text
JB
AutoCAD SHX Text
TM
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJ. NO.:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AutoCAD SHX Text 08/08/25
AutoCAD SHX Text
ISSUE FOR BID
C - 002
GENERAL NOTES
SECTIONS AND DETAIL KEY
D#
GENERAL NOTES
1. ALL WORK UNDER THIS CONTRACT SHALL BE PERFORMED IN ACCORDANCE WITH THE PLANS AND PROJECT SPECIFICATIONS. IN THE EVENT OF A DISCREPANCY BETWEEN THE PLANS AND THE PROJECT SPECIFICATIONS, THE SPECIFICATIONS SHALL GOVERN SEE SECTION 00700 ARTICLE 6.2.4.
2. POINT CLOUD SURFACE FROM U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR POINT CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A3 LAS 2019: U.S. GEOLOGICAL SURVEY, AND U.S.
GEOLOGICAL SURVEY, 20191108, USGS LIDAR POINT CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A4 LAS 2019: U.S. GEOLOGICAL SURVEY. CURRENT TOPOGRAPHY MAY DIFFER FROM THAT SHOWN. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO THE START OF WORK.
3. GROUNDWATER AT THE SITE WILL VARY DEPENDING ON RAINFALL, AND SUBSURFACE CONDITIONS. THERE SHALL NOT BE ANY ADDITIONAL PAYMENT OR EXTENSION OF CONTRACT TIME FOR WORKING WITH SATURATED SOILS OR HANDLING GROUNDWATER SEEPAGE DUE TO RAINFALL, RUNOFF OR INFILTRATION.
4. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING ROADS, BENCHMARKS, GAS PROBES, GROUNDWATER MONITORING WELLS, AND OTHER SITE FEATURES DURING THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE SOLEY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE INCURRED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PROTECT EXISTING ROADS, BENCHMARKS, GAS PROBES, GROUNDWATER MONITORING WELLS, AND OTHER SITE FEATURES.
5. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES HAVE NOT BEEN ESTABLISHED BY THE OWNER OR HIS REPRESENTATIVES. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTORS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING PROPER SAFE WORKING
DISTANCE FROM ALL UTILITY EASEMENTS OR LINES.
6. EXCAVATION BY "BLASTING" IS NOT PERMITTED ON THIS PROJECT.
7. FINISHED GROUND ELEVATIONS SHALL MATCH EXISTING GROUND ELEVATIONS EXCEPT AS SHOWN ON THE PLANS. ALL EXCESS SOIL FROM THE EXCAVATION AND GRADING SHALL BE PLACED IN DESIGNATED STOCKPILE LOCATIONS AS SHOWN IN PLANS OR AS APPROVED BY THE OWNER. IF WASTE IS ENCOUNTERED DURING EXCAVATION, WORK SHALL STOP, THE OWNER SHALL BE NOTIFIED AND THE WASTE REMOVED AND PLACED IN AREAS DESIGNATED AS APPROVED BY THE OWNER. IN AREAS NOT OVER WASTE, THE EXISTING GROUND MAY BE GRADED TO EVEN OUT MINOR SURFACE IRREGULARITIES WITH OWNER’S APPROVAL. ALL DISTURBED SURFACES MUST BE RESTORED WITH THE SAME OR SIMILAR MATERIAL AS
APPROVED BY THE OWNER.
8. GEOTECHNICAL INVESTIGATION REPORTS FOR THE LANDFILL ARE AVAILABLE FOR REVIEW AT OWNER'S OFFICE. THE CONTRACTOR MAY PERFORM ADDITIONAL GEOTECHNICAL INVESTIGATIONS, AS HE DEEMS NECESSARY FOR CONSTRUCTION ACTIVITIES, PROVIDED ALL NECESSARY PERMITS AND APPROVALS ARE OBTAINED FROM OWNER PRIOR TO INITIATING SUCH WORK. HOWEVER, THERE SHALL BE NO ADDITIONAL PAYMENT TO THE CONTRACTOR FOR ADDITIONAL GEOTECHNICAL INVESTIGATIONS.
9. THE CONTRACTOR SHALL CONSTRUCT, AND UPON COMPLETION OF THE PROJECT, REMOVE TEMPORARY CONSTRUCTION ACCESS ROADS. SUCH ROADS SHALL BE LOCATED AS APPROVED BY THE OWNER. DRAINAGE PATTERNS AT THE SITE SHALL NOT BE ALTERED BY CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION AND MAINTENANCE OF TEMPORARY DRAINAGE STRUCTURES, INCLUDING CULVERTS, AT NO ADDITIONAL COST TO THE OWNER.
10. TEMPORARY CONSTRUCTION SLOPES SHALL NOT BE GREATER THAN 3H:1V. STEEPER SLOPES WILL ONLY BE ALLOWED IF THE CONTRACTOR PROVIDES A GEOTECHNICAL ENGINEERING REPORT SPECIFYING MAXIMUM SLOPES AND THE DURATION FOR WHICH SUCH SLOPES SHALL REMAIN IN PLACE.
11. THE CONTRACTOR SHALL REMOVE ALL VEGETATION WITHIN THE CONSTRUCTION EXCAVATION LIMITS AS REQUIRED TO CONSTRUCT THE PROJECT. ALL VEGETATION SHALL BE SEGREGATED AND STOCKPILED BY CONTRACTOR AT NO ADDITIONAL EXPENSE TO OWNER. CONTRACTOR TO MOW THE PIPELINE ALIGNMENT PRIOR TO PLACING THE PIPE AND SLEEPERS. WHERE SLEEPERS ARE PLACED ON THE GROUND, ALL VEGETATION MUST BE REMOVED SO THE WOOD IS IN CONTACT WITH THE UNDERLYING SOIL.
12. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE ENGINEER ANY ERROR OR DISCREPANCY FOUND ONCE THE CONTRACT DOCUMENT IS CAREFULLY REVIEWED AND ALL
ASPECTS OF FIELD WORK HAVE BEEN VERIFIED.
13. THE DRAWINGS AND SPECIFICATIONS SHOULD AGREE WITH EACH OTHER, AND WORK CALLED FOR BY DRAWINGS AND NOT MENTIONED IN SPECIFICATION, OR VICE VERSA, SHALL BE FURNISHED BY BOTH. WHEN DISCREPANCIES EXIST BETWEEN SCALE AND DIMENSIONS, THE DIMENSIONED FIGURE SHALL BE USED.
14. CONTRACTORS AND EACH SUB CONTRACTOR SHALL VERIFY ALL GRADES, LINES, LEVELS, AND DIMENSIONS AS INDICATED ON DRAWINGS, AND SHALL REPORT ERRORS TO THE ENGINEER BEFORE COMMENCING WORK. THE CONTRACTOR SHALL ESTABLISH ADDITIONAL BENCHMARKS AS NEEDED TO EXECUTE THE WORK, AND AS WORK PROGRESSES THE
CONTRACTOR WILL MAINTAIN ADEQUATE HORIZONTAL AND VERTICAL CONTROL.
15. STORMWATER AND GROUNDWATER WHICH HAS COME INTO CONTACT WITH WASTE IS TO BE CONSIDERED CONTAMINATED. CONTRACTOR WILL CONTROL THE WATER ON-SITE.
16. CONTRACTOR SHALL PROVIDE EROSION CONTROL BY SEEDING FOR ALL AREAS DISTURBED BY CONTRACTOR DURING THE CONSTRUCTION OF THIS PROJECT. THE CONTRACTOR SHALL NOT DISTURB ANY AREA WITHOUT THE APPROVAL OF THE ENGINEER. EROSION CONTROL BY SEEDING SHALL CONFORM TO STANDARD SPECIFICATION 604S. USE NON-NATIVE
SEED BY THE BROADCAST METHOD WITH STRAW MULCH.
17. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING WORK.
18. HORIZONTAL AND VERTICAL CONTROL IS BASED ON DATA FROM THE CITY OF AUSTIN PROJECT: FM 812 LANDFILL / ECO-INDUSTRIAL PARK, DRAWING:FM812 LANDFILL REMAINDER
(2013).DWG, DATED AUGUST 16, 2013 AS FOLLOWS:
BEARINGS SHOWN HEREON ARE BASED ON THE TEXAS STATE PLANE COORDINATE SYSTEM, CENTRAL ZONE, NAD 83. THE CONTROLLING MONUMENTS FOR THIS PROJECT WERE ESTABLISHED UTILIZING MULTIPLE VRS GPS OBSERVATIONS AND ARE A COTTON SPINDLE FOUND IN ASPHALT AT THE INTERSECTION OF MOORE'S BRIDGE ROAD AND F.M. 973 HAVING GRID COORDINATE VALUES OF N=10,034,381.64, E=3,141,102.59 AND A 1/2" REBAR W/CAP STAMPED "COA PUBLIC WORKS" SET ALONG THE WESTERLY INTERIOR OF THE CITY OF AUSTIN
293.94 ACRE LANDFILL TRACT HAVING GRID COORDINATE VALUES OF N=10,032,847.01, E=3,137,395.06. THE DISTANCES SHOWN ARE SURFACE DISTANCES. THE COMBINED SCALE
FACTOR IS 0.99996749
19. LEACHATE SHALL REFER TO ALL CONTAMINATED WATER, GAS CONDENSATE AND ANY WATER THAT HAS BEEN IN CONTACT WITH WASTE, LEACHATE OR GAS CONDENSATE.
20. NOT ALL FITTINGS ARE SHOWN OR ANTICIPATED ALONG THE PIPELINE ALIGNMENT. CONTRACTOR TO PROVIDE FITTINGS AS NEEDED FOR A PROPER INSTALLATION AND MUST PRESENT ANY CHANGES OR ADDITIONS TO THE OWNER FOR APPROVAL. HDPE PIPE MAY BE LAID IN A MINIMUM 100-FOOT RADIUS IN LIEU OF ANGLE FITTINGS WITH OWNER'S
PERMISSION.
21. CONTRACTOR TO PROVIDE INITIAL ALIGNMENT SURVEY PRIOR TO DETAILED CONSTRUCTION SURVEY IN ACCORDANCE WITH SPECIFICATION 01050.
BENCHMARKS:
BENCHMARK #1: MAP COORDINATE N=10029588.21, E=3138251.73
A 1/2" REBAR WITH CAP STAMPED "MM TRAV" FOUND (MM PNT #23).
REFERENCED ON McGRAY & McGRAY F.M. 812 LANDFILL PRIMARY CONTROL LIST ELEVATION = 541.90' - DATUM UNKNOWN.
COA PNT #111 NAVD 88, GEOID 03 ELEVATION = 542.34'
BENCHMARK #2: GRID COORDINATE N=10031603.78, E=3139571.64
BOLT FOUND w/WASHER "MW-19 TOC 536.44" IN CONCRETE PAD OF MONITORING WELL #19 - COA PNT #9684 NAVD 88, GEOID 03 ELEVATION = 534.07'
BENCHMARK #3: GRID COORDINATE N=10033477.92, E=3140510.98
BOLT FOUND w/WASHER "MW-21 TOC 512.47" IN CONCRETE PAD OF MONITORING WELL #21 - COA PNT #21591 NAVD 88, GEOID 03 ELEVATION = 510.68'
BENCHMARK #4: GRID COORDINATE N=10032609.78, E=3140099.50
BOLT FOUND w/WASHER "MW-16 TOC 537.32" IN CONCRETE PAD OF MONITORING WELL #16 - COA PNT #9759 NAVD 88, GEOID 03 ELEVATION = 535.93'
BENCHMARK #5: GRID COORDINATE N=10034381.64, E=3141102.59
COTTON SPINDLE SET IN ASPHALT ON SOUTH SIDE OF MOORE'S BRIDGE ROAD NEAR ITS INTERSECTION WITH F.M 973 (NE COR OF LANDFILL SITE) - COA
PNT #21 NAVD 88, GEOID 03 ELEVATION = 473.25'
BENCHMARK #6: GRID COORDINATE N=10031080.89, E=3139300.15
BOLT FOUND w/WASHER "MW-20 TOC 560.79" IN CONCRETE PAD OF MONITORING WELL #20 - COA PNT #9642 NAVD 88, GEOID 03 ELEVATION = 558.93'
BENCHMARK #7: GRID COORDINATE N=10033825.80, E=3140718.14
BOLT FOUND w/WASHER "MW-13 TOC 485.07" IN CONCRETE PAD OF MONITORING WELL #13 - COA PNT # 10598 NAVD 88, GEOID 03 ELEVATION = 483.25'
BENCHMARK #8: GRID COORDINATE N=10034624.97, E=3140524.64
BOLT FOUND w/WASHER "MW-12 TOC 476.80" IN CONCRETE PAD OF MONITORING WELL #12 - COA PNT # 10599 NAVD 88, GEOID 03 ELEVATION = 475.29'
BENCHMARK #9: GRID COORDINATE N=10034762.05, E=3140024.69
BOLT FOUND w/WASHER "MW-17 TOC 479.89" IN CONCRETE PAD OF MONITORING WELL #17 - COA PNT # 9440 NAVD 88, GEOID 03 ELEVATION = 478.37'
BENCHMARK #10: GRID COORDINATE N=10034947.57, E=3139266.35
BOLT FOUND w/WASHER "MW-18 TOC 500.35" INCONCRETE PAD OF MONITORING WELL #18 - COA PNT #9425 NAVD 88, GEOID 03 ELEVATION = 498.60'
BENCHMARK #11: GRID COORDINATE N=10035211.82, E=3138817.09
BOLT FOUND w/WASHER "MW-10R TOC 453.85" IN CONCRETE PAD OF MONITORING WELL #10R - COA PNT # 21704 NAVD 88, GEOID 03 ELEVATION = 452.93'
BENCHMARK #12: GRID COORDINATE N=10035216.66, E=3137083.14
BOLT FOUND w/WASHER "MW-3R TOC 521.66" IN CONCRETE PAD OF MONITORING WELL #3R - COA PNT # 9400 NAVD 88, GEOID 03 ELEVATION = 519.84'
BENCHMARK #13: GRID COORDINATE N=10034470.27, E=3136727.32
2.5 " BRASS DISK FOUND "GP-05" IN CONCRETE PAD - COA PNT # 9373 NAVD 88, GEOID 03 ELEVATION = 521.08'
BENCHMARK #14: GRID COORDINATE N=10033477.92, E=3140510.98
2.5" BRASS DISK FOUND "GP-04R" IN CONCRETE PAD - COA PNT # 9362 NAVD 88, GEOID 03 ELEVATION = 538.92'
BENCHMARK #15: GRID COORDINATE N=10035139.64, E=3137673.45
BOLT FOUND w/WASHER "MW-8R TOC 480.00" IN CONCRETE PAD OF MONITORING WELL #8R - COA PNT # 9402 NAVD 88, GEOID 03 ELEVATION = 477.84'
BENCHMARK #16: GRID COORDINATE N=10032108.86, E=3139831.62
2.5" BRASS DISK FOUND "GP-11" IN CONCRETE PAD - COA PNT # 9694 NAVD 88, GEOID 03 ELEVATION = 515.37'
BENCHMARK ELEVATIONS SHOWN ARE BASED ON GPS VRS OBSERVATIONS PERFORMED BY THE CITY OF AUSTIN PUBLIC WORKS DEPARTMENT SURVEY GROUP. VARIOUS BOUNDARY AND TOPOGRAPHIC SURVEY PROJECTS WERE PERFORMED ON THIS SITE FROM 2012-2016. DUE TO THE SOIL CONDITIONS AT THIS LANDFILL SITE AND COMPOUNDED BY PERIODS OF DROUGHT AND HEAVY RAIN THAT WERE EXPERIENCED DURING THIS PERIOD OF TIME IT HAS CAUSE NOTICEABLE HORIZONTAL AND VERTICAL MOVEMENT OF CONTROL POINTS AND BENCHMARKS AND SHOULD BE TAKEN INTO ACCOUNT WHEN USING THIS DATA. HORIZONTAL ACCURACY CAN BE EXPECTED TO BE WITHIN APPROXIMATELY 0.05' WHILE VERTICAL ACCURACY MAY
BE IN THE RANGE OF 010' - 0.15'.
SECTION OR
DETAIL LABEL
DRAWING ON WHICH
SECTION OR DETAIL
IS SHOWN
CITY OF AUSTIN - FM 812 LANDFILL
TRAVIS COUNTY, TEXASAPTIM Environmental
& Infrastructure, LLC This document, and the ideas and designs incorporated herein, as an instrument of professional services, is prepared by APTIM Environmental & Infrastructure, LLC and is not to be used, in whole or in part, for any other project without the written notice to APTIM Environmental & Infrastructure, LLC.
This document is released for the purpose of Bidding and Construction under the authority of Edward A.
Shepard, Jr, PE #133722. Texas Registered Engineering Firm F-5650.
AutoCAD SHX Text 631041722
AutoCAD SHX Text
AUGUST 2025
AutoCAD SHX Text
JB
AutoCAD SHX Text
TM
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJ. NO.:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AutoCAD SHX Text 08/08/25
EROSION CONTROL NOTES
1. InsTALL EROSION/SEDIMENTATION CONTROLS, PRIOR TO ANY SITE WORK INCLUDING CLEARING, GRUBBING AND/OR
EXCAVATION.
2. PLACE EROSION/SEDIMENTATION CONTROLS IN ACCORDANCE WITH THE ENVIRONMENTAL CRITERIA MANUAL AND THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE COA ESC PLAN MUST BE CONSULTED AND USED AS THE BASIS FOR A TPDES REQUIRED SWPPP. IF A SWPPP IS REQUIRED, IT MUST BE AVAILABLE FOR REVIEW BY THE CITY OF AUSTIN ENVIRONMENTAL INSPECTOR DURING CONSTRUCTION, INCLUDING AT THE PRE-CONSTRUCTION MEETING.
· INSTALL PERIMETER CONTROLS, THEN TEMPORARY STABILIZATION, AND THEN PERMANENT STABILIZATION.
· EXCAVATION CANNOT START UNTIL UTILITY LOCATES ARE COMPLETE AND EROSION/SEDIMENT CONTROLS ARE
INSTALLED.
· REMOVE EROSION CONTROLS AFTER PERMANENT MEASURES ARE ESTABLISHED. PERMANENT VEGETATION COVERAGE
MUST MEET OR EXCEED 70%.
· TEMPORARY EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED AFTER EACH RAINFALL EVENT AND
WEEKLY DURING DRY CONDITIONS.
3. THE PLACEMENT OF TREE/NATURAL AREA PROTECTIVE FENCING SHALL BE IN ACCORDANCE WITH THE CITY OF AUSTIN STANDARD NOTES FOR TREE AND NATURAL AREA PROTECTION AND THE APPROVED GRADING/TREE AND NATURAL AREA
PLAN.
4. A PRE-CONSTRUCTION CONFERENCE SHALL BE HELD ON-SITE WITH THE CONTRACTOR, DESIGN ENGINEER/PERMIT APPLICANT AND ENVIRONMENTAL INSPECTOR AFTER INSTALLATION OF THE EROSION/SEDIMENTATION CONTROLS, TREE/NATURAL AREA PROTECTION MEASURES AND "PRE-CONSTRUCTION" TREE FERTILIZATION (IF APPLICABLE) PRIOR TO BEGINNING ANY SITE PREPARATION WORK. THE OWNER OR OWNER'S REPRESENTATIVE SHALL NOTIFY THE DEVELOPMENT SERVICES DEPARTMENT, 512-974-2278 OR BY EMAIL AT ENVIRONMENTAL.INSPECTIONS@AUSTINTEXAS.GOV, AT LEAST THREE DAYS PRIOR TO THE MEETING DATE. COA APPROVED ESC PLAN AND TPDES SWPPP (IF REQUIRED) SHOULD BE
REVIEWED BY COA EV INSPECTOR AT THIS TIME.
5. ANY MAJOR VARIATION IN MATERIALS OR LOCATIONS OF CONTROLS OR FENCES FROM THOSE SHOWN ON THE APPROVED PLANS WILL REQUIRE A REVISION AND MUST BE APPROVED BY THE REVIEWING ENGINEER, ENVIRONMENTAL SPECIALIST OR CITY ARBORIST AS APPROPRIATE. MAJOR REVISIONS MUST BE APPROVED BY AUTHORIZED COA STAFF. MINOR CHANGES TO BE MADE AS FIELD REVISIONS TO THE EROSION AND SEDIMENTATION CONTROL PLAN MAY BE REQUIRED BY
THE ENVIRONMENTAL INSPECTOR DURING CONSTRUCTION TO CORRECT CONTROL INADEQUACIES.
6. THE CONTRACTOR IS REQUIRED TO PROVIDE A CERTIFIED INSPECTOR THAT IS EITHER A LICENSED ENGINEER (OR PERSON DIRECTLY SUPERVISED BY THE LICENSED ENGINEER) OR CERTIFIED PROFESSIONAL IN EROSION AND SEDIMENT CONTROL (CPESC OR CPESC - IT), CERTIFIED EROSION, SEDIMENT AND STORMWATER - INSPECTOR (CESSWI OR CESSWI - IT) OR CERTIFIED INSPECTOR OF SEDIMENTATION AND EROSION CONTROLS (CISEC OR CISEC - IT) CERTIFICATION TO INSPECT THE CONTROLS AND FENCES AT WEEKLY OR BI-WEEKLY INTERVALS AND AFTER ONE-HALF (½) INCH OR GREATER RAINFALL EVENTS TO INSURE THAT THEY ARE FUNCTIONING PROPERLY. THE PERSON(S) RESPONSIBLE FOR MAINTENANCE OF CONTROLS AND FENCES SHALL IMMEDIATELY MAKE ANY NECESSARY REPAIRS TO DAMAGED AREAS. SILT ACCUMULATION AT CONTROLS MUST BE REMOVED WHEN THE DEPTH REACHES SIX (6) INCHES OR ONE-THIRD (⅓) OF THE INSTALLED
HEIGHT OF THE CONTROL WHICHEVER IS LESS.
7. PRIOR TO FINAL ACCEPTANCE BY THE CITY, HAUL ROADS AND WATERWAY CROSSINGS CONSTRUCTED FOR TEMPORARY CONTRACTOR ACCESS MUST BE REMOVED, ACCUMULATED SEDIMENT REMOVED FROM THE WATERWAY AND THE AREA RESTORED TO THE ORIGINAL GRADE AND REVEGETATED. ALL LAND CLEARING DEBRIS SHALL BE DISPOSED OF IN
APPROVED SPOIL DISPOSAL SITES.
8. ALL WORK MUST STOP IF A VOID IN THE ROCK SUBSTRATE IS DISCOVERED WHICH IS; ONE SQUARE FOOT IN TOTAL AREA;
BLOWS AIR FROM WITHIN THE SUBSTRATE AND/OR CONSISTENTLY RECEIVES WATER DURING ANY RAIN EVENT. AT THIS TIME IT IS THE RESPONSIBILITY OF THE PROJECT MANAGER TO IMMEDIATELY CONTACT A CITY OF AUSTIN ENVIRONMENTAL INSPECTOR FOR FURTHER INVESTIGATION. IN ADDITION, IF THE PROJECT SITE IS LOCATED WITHIN THE EDWARDS AQUIFER, THE PROJECT MANAGER MUST NOTIFY THE TRAVIS COUNTY BALCONES CANYONLANDS CONSERVATION PRESERVE (BCCP) BY EMAIL AT BCCP@TRAVISCOUNTYTX.GOV. CONSTRUCTION ACTIVITIES WITHIN 50 FEET OF THE VOID MUST STOP.
9. TEMPORARY AND PERMANENT EROSION CONTROL: ALL DISTURBED AREAS SHALL BE RESTORED AS NOTED BELOW:
A. ALL DISTURBED AREAS TO BE REVEGETATED ARE REQUIRED TO PLACE A MINIMUM OF SIX (6) INCHES OF TOPSOIL [SEE
STANDARD SPECIFICATION ITEM NO. 601S.3(A)]. DO NOT ADD TOPSOIL WITHIN THE CRITICAL ROOT ZONE OF EXISTING
TREES.
TOPSOIL SALVAGED FROM THE EXISTING SITE IS ENCOURAGED FOR USE, BUT IT SHOULD MEET THE STANDARDS SET
FORTH IN 601S.
AN OWNER/ENGINEER MAY PROPOSE USE OF ONSITE SALVAGED TOPSOIL WHICH DOES NOT MEET THE CRITERIA OF STANDARD SPECIFICATION 601S BY PROVIDING A SOIL ANALYSIS AND A WRITTEN STATEMENT FROM A QUALIFIED PROFESSIONAL IN SOILS, LANDSCAPE ARCHITECTURE, OR AGRONOMY INDICATING THE ONSITE TOPSOIL WILL PROVIDE AN EQUIVALENT GROWTH MEDIA AND SPECIFYING WHAT, IF ANY, SOIL AMENDMENTS ARE REQUIRED.
SOIL AMENDMENTS SHALL BE WORKED INTO THE EXISTING ONSITE TOPSOIL WITH A DISC OR TILLER TO CREATE A
WELL-BLENDED MATERIAL.
THE VEGETATIVE STABILIZATION OF AREAS DISTURBED BY CONSTRUCTION SHALL BE AS FOLLOWS:
TEMPORARY VEGETATIVE STABILIZATION:
1. FROM SEPTEMBER 15 TO MARCH 1, SEEDING SHALL BE WITH OR INCLUDE A COOL SEASON COVER CROP: (WESTERN
WHEATGRASS (PASCOPYRUM SMITHII) AT 5.6 POUNDS PER ACRE, OATS (AVENA SATIVA) AT 4.0 POUNDS PER ACRE, CEREAL RYE GRAIN (SECALE CEREALE) AT 45 POUNDS PER ACRE. CONTRACTOR MUST ENSURE THAT ANY SEED APPLICATION REQUIRING A COOL SEASON COVER CROP DOES NOT UTILIZE ANNUAL RYEGRASS (LOLIUM MULTIFLORUM) OR PERENNIAL RYEGRASS (LOLIUM PERENNE). COOL SEASON COVER CROPS ARE NOT PERMANENT EROSION CONTROL.
2. FROM MARCH 2 TO SEPTEMBER 14, SEEDING SHALL BE WITH HULLED BERMUDA AT A RATE OF 45 POUNDS PER ACRE OR A
NATIVE PLANT SEED MIX CONFORMING TO ITEM 604S OR 609S.
A. FERTILIZER SHALL BE APPLIED ONLY IF WARRANTED BY A SOIL TEST AND SHALL CONFORM TO ITEM NO. 606S, FERTILIZER.
FERTILIZATION SHOULD NOT OCCUR WHEN RAINFALL IS EXPECTED OR DURING SLOW PLANT GROWTH OR DORMANCY.
CHEMICAL FERTILIZER MAY NOT BE APPLIED IN THE CRITICAL WATER QUALITY ZONE.
B. HYDROMULCH SHALL COMPLY WITH TABLE 1, BELOW.
C. TEMPORARY EROSION CONTROL SHALL BE ACCEPTABLE WHEN THE GRASS HAS GROWN AT LEAST 1½ INCHES HIGH WITH
A MINIMUM OF 95% TOTAL COVERAGE SO THAT ALL AREAS OF A SITE THAT RELY ON VEGETATION FOR TEMPORARY STABILIZATION ARE UNIFORMLY VEGETATED, AND PROVIDED THERE ARE NO BARE SPOTS LARGER THAN 10 SQUARE
FEET.
D. WHEN REQUIRED, NATIVE PLANT SEEDING SHALL COMPLY WITH REQUIREMENTS OF THE CITY OF AUSTIN
ENVIRONMENTAL CRITERIA MANUAL, AND STANDARD SPECIFICATION 604S OR 609S.
PERMANENT VEGETATIVE STABILIZATION:
1. FROM SEPTEMBER 15 TO MARCH 1, SEEDING IS TEMPORARY STABILIZATION ONLY. IF COOL SEASON COVER CROPS EXIST WHERE PERMANENT VEGETATIVE STABILIZATION IS DESIRED, THE GRASSES SHALL BE MOWED TO A HEIGHT OF LESS THAN ONE-HALF (½) INCH AND THE AREA SHALL BE RE-SEEDED IN ACCORDANCE WITH TABLE 2 BELOW. ALTERNATIVELY, THE COOL SEASON COVER CROP CAN BE MIXED WITH BERMUDAGRASS OR NATIVE SEED AND INSTALLED TOGETHER, UNDERSTANDING THAT GERMINATION OF WARM-SEASON SEED TYPICALLY REQUIRES SOIL TEMPERATURES OF 60 TO 70
DEGREES.
2. FROM MARCH 2 TO SEPTEMBER 14, SEEDING SHALL BE WITH HULLED BERMUDA AT A RATE OF 45 POUNDS PER ACRE WITH A PURITY OF 95% AND A MINIMUM PURE LIVE SEED (PLS) OF 0.83. BERMUDA GRASS IS A WARM SEASON GRASS AND IS CONSIDERED PERMANENT EROSION CONTROL. PERMANENT VEGETATIVE STABILIZATION CAN ALSO BE ACCOMPLISHED
WITH A NATIVE PLANT SEED MIX CONFORMING TO ITEM 604S OR 609S.
A. FERTILIZER USE SHALL FOLLOW THE RECOMMENDATION OF A SOIL TEST. SEE ITEM 606S, FERTILIZER. APPLICATIONS OF FERTILIZER (AND PESTICIDE) ON CITY-OWNED AND MANAGED PROPERTY REQUIRES THE YEARLY SUBMITTAL OF A PESTICIDE AND FERTILIZER APPLICATION RECORD, ALONG WITH A CURRENT COPY OF THE APPLICATOR'S LICENSE. FOR CURRENT COPY OF THE RECORD TEMPLATE CONTACT THE CITY OF AUSTIN'S IPM COORDINATOR.
B. HYDROMULCH SHALL COMPLY WITH TABLE 2, BELOW.
C. WATER THE SEEDED AREAS IMMEDIATELY AFTER INSTALLATION TO ACHIEVE GERMINATION AND A HEALTHY STAND OF PLANTS THAT CAN ULTIMATELY SURVIVE WITHOUT SUPPLEMENTAL WATER. APPLY THE WATER UNIFORMLY TO THE PLANTED AREAS WITHOUT CAUSING DISPLACEMENT OR EROSION OF THE MATERIALS OR SOIL. MAINTAIN THE SEEDBED IN A MOIST CONDITION FAVORABLE FOR PLANT GROWTH. ALL WATERING SHALL COMPLY WITH CITY CODE CHAPTER 6-4 (WATER CONSERVATION), AT RATES AND FREQUENCIES DETERMINED BY A LICENSED IRRIGATOR OR OTHER QUALIFIED PROFESSIONAL, AND AS ALLOWED BY THE AUSTIN WATER UTILITY AND CURRENT WATER RESTRICTIONS AND WATER
CONSERVATION INITIATIVES.
D. PERMANENT EROSION CONTROL SHALL BE ACCEPTABLE WHEN THE GRASS HAS GROWN AT LEAST 1½ INCHES HIGH WITH A MINIMUM OF 95 PERCENT FOR THE NON-NATIVE MIX, AND 95 PERCENT COVERAGE FOR THE NATIVE MIX SO THAT ALL AREAS OF A SITE THAT RELY ON VEGETATION FOR STABILITY MUST BE UNIFORMLY VEGETATED, AND PROVIDED THERE
ARE NO BARE SPOTS LARGER THAN 10 SQUARE FEET.
E. WHEN REQUIRED, NATIVE PLANT SEEDING SHALL COMPLY WITH REQUIREMENTS OF THE CITY OF AUSTIN
ENVIRONMENTAL CRITERIA MANUAL, ITEMS 604S AND 609S.
10. DEVELOPER INFORMATION:
OWNER: MR. DONALD HARDEE
AUSTIN RESOURCE RECOVERY (CITY OF AUSTIN)
2514 BUSINESS CENTER DRIVE
AUSTIN, TX 78744
PHONE # 512-974-4345
OWNER'S REPRESENTATIVE RESPONSIBLE FOR PLAN ALTERATIONS: CHRISTINE WHITNEY
PHONE # 512-974-6085
PERSON OR FIRM RESPONSIBLE FOR EROSION/SEDIMENTATION CONTROL MAINTENANCE: _______
PHONE # _______
11. THE CONTRACTOR SHALL NOT DISPOSE OF SURPLUS EXCAVATED MATERIAL FROM THE SITE WITHOUT NOTIFYING THE DEVELOPMENT SERVICES DEPARTMENT AT 512-974-2278 AT LEAST 48 HOURS PRIOR WITH THE LOCATION AND A COPY OF
THE PERMIT ISSUED TO RECEIVE THE MATERIAL.
CITY OF AUSTIN - FM 812 LANDFILL
TRAVIS COUNTY, TEXASAPTIM Environmental
& Infrastructure, LLC This document, and the ideas and designs incorporated herein, as an instrument of professional services, is prepared by APTIM Environmental & Infrastructure, LLC and is not to be used, in whole or in part, for any other project without the written notice to APTIM Environmental & Infrastructure, LLC.
This document is released for the purpose of Bidding and Construction under the authority of Edward A.
Shepard, Jr, PE #133722. Texas Registered Engineering Firm F-5650.
TABLE 1: HYDROMULCHING FOR TEMPORARY VEGETATIVE STABILIZATION
MATERIAL DESCRIPTION LONGEVITY TYPICAL
APPLICATIONS
APPLICATION
RATES
100% OR ANY BLEND
OF WOOD,
CELLULOSE, STRAW,
AND/OR COTTON
PLANT MATERIAL
(EXCEPT NO MULCH
SHALL EXCEED 30%
PAPER)
70% OR GREATER
WOOD/STRAW 30%
OR LESS PAPER OR
NATURAL FIBERS
0--3 MONTHS MODERATE SLOPES;
FROM FLAT TO 3:1
1,500 TO 2,000 LBS
PER ACRE
TABLE2: HYDROMULCHING FOR TEMPORARY VEGETATIVE STABILIZATION
MATERIAL DESCRIPTION LONGEVITY TYPICAL
APPLICATIONS
APPLICATION
RATES
BONDED FIBER
MATRIX (BFM)
80% ORGANIC
DEFIBRATED FIBERS
10% TACKIFIER 6 MONTHS
ON SLOPES UP TO 2:1
AND EROSIVE SOIL
CONDITIONS
2,500 TO 4,000 LBS PER
ACRE (SEE
MANUFACTURES
RECOMMENDATIONS)
FIBER REINFORCED
MATRIX (FRM)
65% ORGANIC
DEFIBRATED FIBERS
25% REINFORCING
UP TO 12 MONTHS
ON SLOPES UP TO 1:1
AND EROSIVE SOIL
CONDITIONS
3,000 TO 4,500 LBS
PER ACRE (SEE
MANUFACTURES
RECOMMENDATIONS)
C - 003
ENVIRONMENTAL NOTES
AutoCAD SHX Text 631041722
AutoCAD SHX Text
AUGUST 2025
AutoCAD SHX Text
JB
AutoCAD SHX Text
TM
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJ. NO.:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AutoCAD SHX Text 08/08/25
(V E
N T
G G G G
G G
G
G G
G G
G
G G
G G
G
G G
G
GG G
G G
G G
G G
G
G
G
G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G G
G G
G
G G
G G
G
G
G
G
G
G
G
G G
G G
G G
G G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G
G G
G G
G G
G
G
G
G
G
G
G G G G G G
G
G
G G
G G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G G
G G
E T
T T
T E
E
E
E
P
E
E
E
C-305
G
C-306
G G
G
G
G G
G G
G
470.3 FEET
469.3 FEET 467.6 FEET
465.9 FEET
1%-FLOOD LIMIT
GRAPHIC SCALE
0 400'
C - 102
EXISTING SITE PLAN
AREAS A AND B
EXPANSION
LOOP A2
ONION CREEK
FM
BURLESON ROAD
AREA A
AREA B
UTILITY EASEMENT
WATER LINE EASEMENT
EXISTING
WWMH-273234
TANK B
(OUTFALL 02)
12,000 gal
GAS CONDENSATE
COLLECTION LINES
8" PVC
#2016-0019
W-124
WELL11
MW-9
MW-10R
MW-17
MW-18
WELL02
WELL01
WELL03
WELL04
WELL05
WELL14
WELL12
WELL17
WELL15
WELL18
WELL16
WELL10
WELL09
WELL08
WELL07
WELL06
GP-4R
GP-21
GP-5
GP-6
MW-7
MW-8R
GP-09A/09B
GP-010
MW-14
MW-16
GP-17
MW-21
MW-22
MW-23
W-1
W-2 W-3
W-4
W-5 W-6
W-7
W-8 W-9
W-10
W-11 W-12
W-13
W-14
W-17
W-18
W-19
W-20 W-21
W-22
W-23W-24
W-25 W-26
W-27
W-28
W-29
W-30
W-31
W-32
W-37
W-40 W-44
W-46W-47
W-49
W-52
W-54W-57
W-59
W-63 W-65
W-68 W-70
W-73
W-77 W-78
W-79
W-90 W-91
W-103
W-116
W-121
W-122
W-123
W-125
W-126
W-127
W-128
W-A W-B
W-C W-D
W-E W-F W-G
W-H W-I W-J W-K
MW-12
LCR-03
MW-11
MW-3R
MS-A1
MS-A3
MS-B1
MS-01
EXISTING
CS-01
WELL13
CS-04
EXPANSION
LOOP A6
EXPANSION
LOOP B1
EXPANSION
LOOP B2
CS-02
CS-03
NOTES
1. POINT CLOUD SURFACE FROM U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR
POINT CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A3 LAS 2019: U.S.
GEOLOGICAL SURVEY, AND U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR POINT
CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A4 LAS 2019: U.S.
GEOLOGICAL SURVEY. CURRENT TOPOGRAPHY MAY DIFFER FROM THAT SHOWN.
THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO THE START OF
WORK.
2. FOR CLARITY, NOT ALL SITE FEATURES MAY BE SHOWN.
3. THE LIMITS OF WASTE WERE SURVEYED BASED ON FIELD MONUMENTS IN
APRIL 2021 AS PART OF THE FM 812 CLOSURE CERTIFICATION.
4. LANDFILL GAS AND GAS CONDENSATE IS CONVEYED BY GRAVITY IN EXISTING
PIPES TO EXISTING CONDENSATE SUMPS (CS-1 THROUGH CS-4). FROM
THERE IT IS PUMPED TO THE EXISTING LEACHATE STORAGE TANKS FOR
DISPOSAL.
LEGEND
APPROXIMATE PERMIT BOUNDARY
APPROXIMATE EXISTING WASTE BOUNDARY
GAS PIPELINE WITH CONDENSATE FLOW DIRECTION
EXISTING SITE TOPOGRAPHY
SITE ACCESS ROAD
ELECTRIC LINE
LEACHATE PIPING
PROPOSED PIPING
CONDENSATE PIPING
LEACHATE TRENCH
OVERHEAD ELECTRIC LINE
EASEMENT BOUNDARY
SLURRY WALL
GROUNDWATER MONITORING WELL
LANDFILL GAS PROBE
LEACHATE EXTRACTION WELL/TRENCH
LEACHATE SUMP RISER TIE-IN
GAS EXTRACTION WELL
SANITARY SEWER MANHOLE
CONDENSATE SUMP
MONITORING STATION
UTILITY POLE NUMBER
E E
T
G
T
G
W WELL 11
MW
LCR-02
LCR-01
CITY OF AUSTIN - FM 812 LANDFILL
TRAVIS COUNTY, TEXASAPTIM Environmental
& Infrastructure, LLC This document, and the ideas and designs incorporated herein, as an instrument of professional services, is prepared by APTIM Environmental & Infrastructure, LLC and is not to be used, in whole or in part, for any other project without the written notice to APTIM Environmental & Infrastructure, LLC.
This document is released for the purpose of Bidding and Construction under the authority of Edward A.
Shepard, Jr, PE #133722. Texas Registered Engineering Firm F-5650.
MS-03
EXISTING PROPOSED HDPE
TO PVC TRANSITION
TANK A
(OUTFALL 01)
12,000 gal
EXPANSION
LOOP A1
EXPANSION
LOOP A3
EXPANSION
LOOP A5
EXPANSION
LOOP A4
MS-A2
1%-FLOOD LIMIT
ZONE AE
ZONE X
204031
203965
204043 379097
204063 379096 204112
204011
204114
204119
204117
204062
402010
342503 & 416074
204103
204103 204076
204037 203995
MOORE'S
CROSSING
203954
203943
203954
O N
IO
N
C R
EE
K
50' CREEK
SETBACK
AutoCAD SHX Text 631041722
AutoCAD SHX Text
AUGUST 2025
AutoCAD SHX Text
JB
AutoCAD SHX Text
TM
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJ. NO.:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AutoCAD SHX Text 08/08/25
G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G G
G G
G G
G
GG
G
G G
G G
G
G
G
G
G
G
G
GG
G G
G
G
G G
G G
G G
G G
G G
G G
G G
G
G
G
G
G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G G G G G G G G G G
G
E
E
E
T T
T T T
T
T
T
E
E
E
E
E
E
E
P
P
P
E
EE
E
E
E E
W
W W W W
W W W W
W
W W
W W
W
WW
W
R10 0.0
°' 45
R
0.
0'
R 100.0'
0+00
5+00 10+00 15+00
20+00
C-303
470.3 FEET
469.3 FEET
GRAPHIC SCALE
0 200'
C - 103
ENLARGED SITE PLAN
WEST
TANK A
(OUTFALL 01)
(SEE SHEET
C-301)
BURIED PIPES
AREA A
AREA B
ONION CREEK
C O
N
TI
N U
ED
S
H
EE
T C
-1
EXISTING
CONDENSATE
COLLECTION LINES
(TYPICAL)
WELL13
WELL11
MW-9
MW-10R
WELL02
WELL01
WELL03
WELL04
WELL05
WELL14
WELL12
WELL17
WELL15
WELL18
WELL16
WELL10
WELL09
WELL08
WELL07
WELL06
MW-3R
MW-8R
W-8 W-9
W-10
W-11 W-12
W-13
W-14
W-27
W-28
W-30
W-31
W-32
W-57 W-59
W-63
W-65
W-68 W-70
W-73
W-77
W-78 W-79
W-103
W-A
W-B
W-C
W-D
W-E W-F
W-G
W-H
W-I
W-J
W-K
MS-A1
CS-01
MS-A3
NOTES
1. POINT CLOUD SURFACE FROM U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR
POINT CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A3 LAS 2019: U.S.
GEOLOGICAL SURVEY, AND U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR POINT
CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A4 LAS 2019: U.S.
GEOLOGICAL SURVEY. CURRENT TOPOGRAPHY MAY DIFFER FROM THAT SHOWN.
THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO THE START OF
WORK.
2. FOR CLARITY, NOT ALL SITE FEATURES MAY BE SHOWN.
3. THE LIMITS OF WASTE WERE SURVEYED BASED ON FIELD MONUMENTS IN
APRIL 2021 AS PART OF THE FM 812 CLOSURE CERTIFICATION.
4. LANDFILL GAS AND GAS CONDENSATE IS CONVEYED BY GRAVITY IN EXISTING
PIPES TO EXISTING CONDENSATE SUMPS (CS-1 THROUGH CS-4). FROM
THERE IT IS PUMPED TO THE EXISTING LEACHATE STORAGE TANKS FOR
DISPOSAL.
LEGEND
APPROXIMATE PERMIT BOUNDARY
APPROXIMATE EXISTING WASTE BOUNDARY
GAS PIPELINE WITH CONDENSATE FLOW DIRECTION
EXISTING SITE TOPOGRAPHY
SITE ACCESS ROAD
ELECTRIC LINE
LEACHATE PIPING
PROPOSED PIPING
CONDENSATE PIPING
LEACHATE TRENCH
OVERHEAD ELECTRIC LINE
EASEMENT BOUNDARY
SLURRY WALL
GROUNDWATER MONITORING WELL
LANDFILL GAS PROBE
LEACHATE EXTRACTION WELL/TRENCH
LEACHATE SUMP RISER TIE-IN
GAS EXTRACTION WELL
SANITARY SEWER MANHOLE
CONDENSATE SUMP
MONITORING STATION
UTILITY POLE NUMBER
E E
T
G
T
G
SEE DETAIL C-304
W WELL 11
MW
CITY OF AUSTIN - FM 812 LANDFILL
TRAVIS COUNTY, TEXASAPTIM Environmental
& Infrastructure, LLC This document, and the ideas and designs incorporated herein, as an instrument of professional services, is prepared by APTIM Environmental & Infrastructure, LLC and is not to be used, in whole or in part, for any other project without the written notice to APTIM Environmental & Infrastructure, LLC.
This document is released for the purpose of Bidding and Construction under the authority of Edward A.
Shepard, Jr, PE #133722. Texas Registered Engineering Firm F-5650.
EXPANSION LOOP A1
EXPANSION LOOP A2
EXPANSION LOOP A3
EXPANSION LOOP A4
EXPANSION LOOP A5
EXPANSION LOOP A6
MS-A2
204031
203965 204011 204043 204063
379097
1%-FLOOD LIMIT
204011
50' CREEK
SETBACK
AutoCAD SHX Text 631041722
AutoCAD SHX Text
AUGUST 2025
AutoCAD SHX Text
JB
AutoCAD SHX Text
TM
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJ. NO.:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AutoCAD SHX Text 08/08/25
G G
G G
G G
G G
G G
G
G
G
G
G
G
G
G G
G G
G G
G G
G G
G
G
G
G
G
G
G
G G
G G
G G
G G
G G
G
G
G
G G
GGG
G
G G
G G
G G G
T
T
E
E
E
E
E
E
E
G
G
G G G
G
G
G
G
G
G
G G
G G
G G
G G
G
W W
W
W
20+00
25+00
30+00 35+00
40+00 40+89
469.3 FEET 467.6 FEET
465.9 FEET
GRAPHIC SCALE
0 200'
C - 104
ENLARGED SITE PLAN
EAST
TANK B
(OUTFALL 02)
(SEE SHEET
C-302)
MOORE'S CROSSING
ONION CREEK
FM
UTILITY EASEMENT
WATER LINE
EASEMENT
EXISTING
WWMH-273234
C O
N
TI
N U
ED
S
H
EE
T C
-1
8" PVC PIPELINE
#2016-0019
MW-17
MW-18
WELL18
WELL16
WELL10
WELL09
LCR-2
LCR-03
GP-6
GP-17
MW-22
MW-23
W-23
W-25 W-26
W-28
W-29
W-31
W-116
W-125
W-126
W-127
MW-12
MW-11
CS-04
MS-A3
EXPANSION
LOOP A6 EXPANSION
LOOP B1
EXPANSION
LOOP B2
NOTES
1. POINT CLOUD SURFACE FROM U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR
POINT CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A3 LAS 2019: U.S.
GEOLOGICAL SURVEY, AND U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR POINT
CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A4 LAS 2019: U.S.
GEOLOGICAL SURVEY. CURRENT TOPOGRAPHY MAY DIFFER FROM THAT SHOWN.
THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO THE START OF
WORK.
2. FOR CLARITY, NOT ALL SITE FEATURES MAY BE SHOWN.
3. THE LIMITS OF WASTE WERE SURVEYED BASED ON FIELD MONUMENTS IN
APRIL 2021 AS PART OF THE FM 812 CLOSURE CERTIFICATION.
4. LANDFILL GAS AND GAS CONDENSATE IS CONVEYED BY GRAVITY IN EXISTING
PIPES TO EXISTING CONDENSATE SUMPS (CS-1 THROUGH CS-4). FROM
THERE IT IS PUMPED TO THE EXISTING LEACHATE STORAGE TANKS FOR
DISPOSAL.
LEGEND
APPROXIMATE PERMIT BOUNDARY
APPROXIMATE EXISTING WASTE BOUNDARY
GAS PIPELINE WITH CONDENSATE FLOW DIRECTION
EXISTING SITE TOPOGRAPHY
SITE ACCESS ROAD
ELECTRIC LINE
LEACHATE PIPING
PROPOSED PIPING
CONDENSATE PIPING
LEACHATE TRENCH
OVERHEAD ELECTRIC LINE
EASEMENT BOUNDARY
SLURRY WALL
GROUNDWATER MONITORING WELL
LANDFILL GAS PROBE
LEACHATE EXTRACTION WELL/TRENCH
LEACHATE SUMP RISER TIE-IN
GAS EXTRACTION WELL
SANITARY SEWER MANHOLE
CONDENSATE SUMP
MONITORING STATION
E E
T
G
T
G
W WELL 11
MW
CITY OF AUSTIN - FM 812 LANDFILL
TRAVIS COUNTY, TEXASAPTIM Environmental
& Infrastructure, LLC This document, and the ideas and designs incorporated herein, as an instrument of professional services, is prepared by APTIM Environmental & Infrastructure, LLC and is not to be used, in whole or in part, for any other project without the written notice to APTIM Environmental & Infrastructure, LLC.
This document is released for the purpose of Bidding and Construction under the authority of Edward A.
Shepard, Jr, PE #133722. Texas Registered Engineering Firm F-5650.
EXISTING
MS-03
PROPOSED HDPE TO
PVC TRANSITION
PROPOSED SAMPLE
PORT (OUTFALL 003)
MS-B1
1%-FLOOD LIMIT
50' CREEK
SETBACK
AutoCAD SHX Text 631041722
AutoCAD SHX Text
AUGUST 2025
AutoCAD SHX Text
JB
AutoCAD SHX Text
TM
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJ. NO.:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AutoCAD SHX Text 08/08/25
EL
EV
AT
IO
N
STATION
0+00 1+00 2+00 3+00 4+00
0+00 1+00 2+00 3+00 4+00
EDGE OF ROAD
STA:0+08.23
STA:0+91.34
EXISTING
GROUND
PROPOSED LINE A
3" x 6" HDPE
BURIED
PIPE
ARR’S PRIVATE
LANDFILL
AGGREGATE ROAD
APPROXIMATE
LIMITS OF WASTE
BEGIN LINE A
TANK A
CONTAINMENT
SEE C-301
STA:1+96.34
REPLACE WITH 0.5'
COMPACTED ASPHALT
MILLINGS AND SELECT SOIL
BACKFILL. PLACE TRACER
TAPE 3" ABOVE PIPE.
STA:1+08.88
EXISTING CONDENSATE
PIPELINE. DEPTH UNKNOWN.
DETECTABLE
MARKER TAPE
EXISTING ELECTRICAL.
DEPTH UNKNOWN.
EXISTING ELECTRICAL,
GAS, AND LEACHATE
PIPING. VERIFY DEPTH
BEFORE EXCAVATION
STA:1+28.40
STA:3+06.34
STA:3+24.79
STA:3+48.55
STA:3+86.72
EXISTING CONDENSATE
PIPELINE. DEPTH UNKNOWN.
EXISTING
ELECTRICAL.
DEPTH
UNKNOWN.
EXISTING GAS
PIPELINE.
DEPTH
UNKNOWN.
EXISTING
ELECTRICAL&
GAS PIPELINE.
DEPTH
UNKNOWN.
PROPOSED LINE A
3" x 6" HDPE
EXPANSION LOOP A1
STA:2+60.00
STA:1+51.07
MONITOR STATION A1
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
G
E E
E E
E E
E E E E E
E E
E E
E
E
E
E
P
P
P
E
E
E
E
E
E
PROPOSED LINE A
3" x 6" HDPE
BEGIN
LINE A
CAUTION BURIED
ELECTRICAL AND
PIPING. VERIFY
LOCATION BEFORE
EXCAVATION
CAUTION BURIED
ELECTRICAL AND
PIPING
CAUTION BURIED
ELECTRICAL AND PIPING
LINE A
BURIED
TANK A
CONTAINMENT
CS-01
W-A
W-C W-D
GUARD POSTS (3)
AVOID EXISTING
UTILITIES
MONITORING STATION A1
ARR’S PRIVATE LANDFILL
AGGREGATE ROAD CONC PAD
R
0.
0'
0+00
EXPANSION LOOP
A1 3 EACH SIDE OF
BEND
PIPELINE
MARKER
STA:3+54.65
NOTES
1. POINT CLOUD SURFACE FROM U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR
POINT CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A3 LAS 2019: U.S.
GEOLOGICAL SURVEY, AND U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR POINT
CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A4 LAS 2019: U.S.
GEOLOGICAL SURVEY. CURRENT TOPOGRAPHY MAY DIFFER FROM THAT SHOWN.
THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO THE START OF
WORK.
2. FOR CLARITY, NOT ALL SITE FEATURES MAY BE SHOWN.
3. THE LIMITS OF WASTE WERE SURVEYED BASED ON FIELD MONUMENTS IN
APRIL 2021 AS PART OF THE FM 812 CLOSURE CERTIFICATION.
4. PROPOSED PIPE TO LAY ON TOP OF GROUND EXCEPT WHERE NOTED.
PROVIDE ALL FITTINGS NEEDED TO TRANSITION FROM BURIED TO ABOVE
GROUND INSTALLATION. PLACE PIPELINE MARKERS EVERY 50 FEET WHERE
PIPE IS BURIED
HORIZONTAL
VE
R
TI
C
AL
GRAPHIC SCALE
4'
40'
LEGEND
APPROXIMATE PERMIT BOUNDARY
APPROXIMATE EXISTING WASTE BOUNDARY
GAS PIPELINE WITH CONDENSATE FLOW DIRECTION
EXISTING SITE TOPOGRAPHY
ARR’S PRIVATE LANDFILL AGGREGATE ROAD
ELECTRIC LINE
LEACHATE PIPING
PROPOSED PIPING
CONDENSATE PIPING
LEACHATE TRENCH
OVERHEAD ELECTRIC LINE
EASEMENT BOUNDARY
SLURRY WALL
GROUNDWATER MONITORING WELL
LANDFILL GAS PROBE
LEACHATE EXTRACTION WELL/TRENCH
LEACHATE SUMP RISER TIE-IN
GAS EXTRACTION WELL
SANITARY SEWER MANHOLE
CONDENSATE SUMP
MONITORING STATION
UTILITY CROSSING
E E
T
W
G
T
G
WELL 11
MW
C - 201
LINE A PLAN/PROFILE VIEWS
STATIONS 0+00 TO 4+00
TANK A
(OUTFALL 01)
PROFILE VIEW LINE A
C O
N
TI
N U
ED
S
H
EE
T C
-2
C-301
C-304
CITY OF AUSTIN - FM 812 LANDFILL
TRAVIS COUNTY, TEXASAPTIM Environmental
& Infrastructure, LLC This document, and the ideas and designs incorporated herein, as an instrument of professional services, is prepared by APTIM Environmental & Infrastructure, LLC and is not to be used, in whole or in part, for any other project without the written notice to APTIM Environmental & Infrastructure, LLC.
This document is released for the purpose of Bidding and Construction under the authority of Edward A.
Shepard, Jr, PE #133722. Texas Registered Engineering Firm F-5650.
C-303
C-303
C-303 3 C-306
C-307
AutoCAD SHX Text 631041722
AutoCAD SHX Text
AUGUST 2025
AutoCAD SHX Text
JB
AutoCAD SHX Text
TM
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJ. NO.:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AutoCAD SHX Text 08/08/25
AT
IO
N
STATION
4+00 5+00 6+00 7+00 8+00
4+00 5+00 6+00 7+00 8+00
EXISTING GROUND
PROPOSED LINE A
3" x 6" HDPE
EXPANSION LOOP A2
STA:6+75.00
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
T
T
T
PROPOSED LINE A
3" x 6" HDPE
CAUTION BURIED
GAS PIPELINE CAUTION
OVERHEAD
ELECTRICAL
EXPANSION
LOOP A2
CS-01
W-D
W-E
W-F
WELL14
5+00
NOTES
1. POINT CLOUD SURFACE FROM U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR
POINT CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A3 LAS 2019: U.S.
GEOLOGICAL SURVEY, AND U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR POINT
CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A4 LAS 2019: U.S.
GEOLOGICAL SURVEY. CURRENT TOPOGRAPHY MAY DIFFER FROM THAT SHOWN.
THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO THE START OF
WORK.
2. FOR CLARITY, NOT ALL SITE FEATURES MAY BE SHOWN.
3. THE LIMITS OF WASTE WERE SURVEYED BASED ON FIELD MONUMENTS IN
APRIL 2021 AS PART OF THE FM 812 CLOSURE CERTIFICATION.
4. PROPOSED PIPE TO LAY ON TOP OF GROUND EXCEPT WHERE NOTED.
PROVIDE ALL FITTINGS NEEDED TO TRANSITION FROM BURIED TO ABOVE
GROUND INSTALLATION. PLACE PIPELINE MARKERS EVERY 50 FEET WHERE
PIPE IS BURIED
HORIZONTAL
VE
R
TI
C
AL
GRAPHIC SCALE
4'
40'
LEGEND
APPROXIMATE PERMIT BOUNDARY
APPROXIMATE EXISTING WASTE BOUNDARY
GAS PIPELINE WITH CONDENSATE FLOW DIRECTION
EXISTING SITE TOPOGRAPHY
ARR’S PRIVATE LANDFILL AGGREGATE ROAD
ELECTRIC LINE
LEACHATE PIPING
PROPOSED PIPING
CONDENSATE PIPING
LEACHATE TRENCH
OVERHEAD ELECTRIC LINE
EASEMENT BOUNDARY
SLURRY WALL
GROUNDWATER MONITORING WELL
LANDFILL GAS PROBE
LEACHATE EXTRACTION WELL/TRENCH
LEACHATE SUMP RISER TIE-IN
GAS EXTRACTION WELL
SANITARY SEWER MANHOLE
CONDENSATE SUMP
MONITORING STATION
UTILITY CROSSING
E E
T
W
G
T
G
WELL 11
MW
C - 202
LINE A PLAN/PROFILE VIEWS
STATIONS 4+00 TO 8+00
PROFILE VIEW LINE A
C O
N
TI
N U
ED
S
H
EE
T C
-2
C O
N
TI
N U
ED
S
H
EE
T C
-2
C-303
CITY OF AUSTIN - FM 812 LANDFILL
TRAVIS COUNTY, TEXASAPTIM Environmental
& Infrastructure, LLC This document, and the ideas and designs incorporated herein, as an instrument of professional services, is prepared by APTIM Environmental & Infrastructure, LLC and is not to be used, in whole or in part, for any other project without the written notice to APTIM Environmental & Infrastructure, LLC.
This document is released for the purpose of Bidding and Construction under the authority of Edward A.
Shepard, Jr, PE #133722. Texas Registered Engineering Firm F-5650.
AutoCAD SHX Text 631041722
AutoCAD SHX Text
AUGUST 2025
AutoCAD SHX Text
JB
AutoCAD SHX Text
TM
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJ. NO.:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AutoCAD SHX Text 08/08/25
AT
IO
N
STATION
8+00 9+00 10+00 11+00 12+00
8+00 9+00 10+00 11+00 12+00
STA:10+15.70
EXISTING
GROUND
PROPOSED LINE A
3" x 6" HDPE
PIPE COVERED WITH 12"
SELECT SOIL BACKFILL AND 6"
ASPHALT MILLINGS FOR
ACCESS. COORDINATE WITH
OWNER FOR EXACT LOCATION.
HIGH POINT
VENT A1
1TYP
STA:12+05.00
EXPANSION LOOP A3
G
G G
G G
G G
G G
G G
G G
G
G
G
G G G G G G G G G G
PROPOSED LINE A
PROPOSED LINE A
3" x 6" HDPE
ACCESS CROSSING
WITH SOIL AND
ASPHALT MILLINGS HIGH POINT
VENT A1
30.0' TYP
10+00
POWER POLE
EXPANSION
LOOP A3
NOTES
1. POINT CLOUD SURFACE FROM U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR
POINT CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A3 LAS 2019: U.S.
GEOLOGICAL SURVEY, AND U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR POINT
CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A4 LAS 2019: U.S.
GEOLOGICAL SURVEY. CURRENT TOPOGRAPHY MAY DIFFER FROM THAT SHOWN.
THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO THE START OF
WORK.
2. FOR CLARITY, NOT ALL SITE FEATURES MAY BE SHOWN.
3. THE LIMITS OF WASTE WERE SURVEYED BASED ON FIELD MONUMENTS IN
APRIL 2021 AS PART OF THE FM 812 CLOSURE CERTIFICATION.
4. PROPOSED PIPE TO LAY ON TOP OF GROUND EXCEPT WHERE NOTED.
PROVIDE ALL FITTINGS NEEDED TO TRANSITION FROM BURIED TO ABOVE
GROUND INSTALLATION. PLACE PIPELINE MARKERS EVERY 50 FEET WHERE
PIPE IS BURIED
HORIZONTAL
VE
R
TI
C
AL
GRAPHIC SCALE
4'
40'
LEGEND
APPROXIMATE PERMIT BOUNDARY
APPROXIMATE EXISTING WASTE BOUNDARY
GAS PIPELINE WITH CONDENSATE FLOW DIRECTION
EXISTING SITE TOPOGRAPHY
ARR’S PRIVATE LANDFILL AGGREGATE ROAD
ELECTRIC LINE
LEACHATE PIPING
PROPOSED PIPING
CONDENSATE PIPING
LEACHATE TRENCH
OVERHEAD ELECTRIC LINE
EASEMENT BOUNDARY
SLURRY WALL
GROUNDWATER MONITORING WELL
LANDFILL GAS PROBE
LEACHATE EXTRACTION WELL/TRENCH
LEACHATE SUMP RISER TIE-IN
GAS EXTRACTION WELL
SANITARY SEWER MANHOLE
CONDENSATE SUMP
MONITORING STATION
UTILITY CROSSING
E E
T
W
G
T
G
WELL 11
MW
C - 203
LINE A PLAN/PROFILE VIEWS
STATIONS 8+00 TO 12+00
PROFILE VIEW LINE A
C O
N
TI
N U
ED
S
H
EE
T C
-2
C O
N
TI
N U
ED
S
H
EE
T C
-2
EXPANSION
LOOP A3C-304
C-304
CITY OF AUSTIN - FM 812 LANDFILL
TRAVIS COUNTY, TEXASAPTIM Environmental
& Infrastructure, LLC This document, and the ideas and designs incorporated herein, as an instrument of professional services, is prepared by APTIM Environmental & Infrastructure, LLC and is not to be used, in whole or in part, for any other project without the written notice to APTIM Environmental & Infrastructure, LLC.
This document is released for the purpose of Bidding and Construction under the authority of Edward A.
Shepard, Jr, PE #133722. Texas Registered Engineering Firm F-5650.
C-303
AutoCAD SHX Text 631041722
AutoCAD SHX Text
AUGUST 2025
AutoCAD SHX Text
JB
AutoCAD SHX Text
TM
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJ. NO.:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AutoCAD SHX Text 08/08/25
AT
IO
N
STATION
12+00 13+00 14+00 15+00 16+00
12+00 13+00 14+00 15+00 16+00
STA:13+90.54
STA:15+53.93
EXISTING GROUND
PROPOSED LINE A
3" x 6" HDPE
APPROXIMATE
LIMITS OF WASTE
APPROXIMATE
LIMITS OF WASTE
EXPANSION LOOP A3
GAS PIPELINE
DEPTH UNKNOWN
STA:12+05.00
STA:14+69.22
STA:15+00.00
EXPANSION LOOP A4
STA:15+38.00
MONITOR STATION A2
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G
G
PROPOSED LINE A
3" x 6" HDPE
CAUTION BURIED
GAS PIPELINE
MONITORING
STATON A2
R 100.0'
15+00
EXPANSION
LOOP A49 RESTRAINTS
CENTERED
ON RADIUS
EXPANSION
LOOP A3
STA:13+65.00
GUARD POSTS (3) AT
MONITOR STATION
NOTES
1. POINT CLOUD SURFACE FROM U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR
POINT CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A3 LAS 2019: U.S.
GEOLOGICAL SURVEY, AND U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR POINT
CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A4 LAS 2019: U.S.
GEOLOGICAL SURVEY. CURRENT TOPOGRAPHY MAY DIFFER FROM THAT SHOWN.
THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO THE START OF
WORK.
2. FOR CLARITY, NOT ALL SITE FEATURES MAY BE SHOWN.
3. THE LIMITS OF WASTE WERE SURVEYED BASED ON FIELD MONUMENTS IN
APRIL 2021 AS PART OF THE FM 812 CLOSURE CERTIFICATION.
4. PROPOSED PIPE TO LAY ON TOP OF GROUND EXCEPT WHERE NOTED.
PROVIDE ALL FITTINGS NEEDED TO TRANSITION FROM BURIED TO ABOVE
GROUND INSTALLATION. PLACE PIPELINE MARKERS EVERY 50 FEET WHERE
PIPE IS BURIED
HORIZONTAL
VE
R
TI
C
AL
GRAPHIC SCALE
4'
40'
LEGEND
APPROXIMATE PERMIT BOUNDARY
APPROXIMATE EXISTING WASTE BOUNDARY
GAS PIPELINE WITH CONDENSATE FLOW DIRECTION
EXISTING SITE TOPOGRAPHY
ARR’S PRIVATE LANDFILL AGGREGATE ROAD
ELECTRIC LINE
LEACHATE PIPING
PROPOSED PIPING
CONDENSATE PIPING
LEACHATE TRENCH
OVERHEAD ELECTRIC LINE
EASEMENT BOUNDARY
SLURRY WALL
GROUNDWATER MONITORING WELL
LANDFILL GAS PROBE
LEACHATE EXTRACTION WELL/TRENCH
LEACHATE SUMP RISER TIE-IN
GAS EXTRACTION WELL
SANITARY SEWER MANHOLE
CONDENSATE SUMP
MONITORING STATION
UTILITY CROSSING
E E
T
W
G
T
G
WELL 11
MW
C - 204
LINE A PLAN/PROFILE VIEWS
STATIONS 12+00 TO 16+00
PROFILE VIEW LINE A
C O
N
TI
N U
ED
S
H
EE
T C
-2
C O
N
TI
N U
ED
S
H
EE
T C
-2
C-303
CITY OF AUSTIN - FM 812 LANDFILL
TRAVIS COUNTY, TEXASAPTIM Environmental
& Infrastructure, LLC This document, and the ideas and designs incorporated herein, as an instrument of professional services, is prepared by APTIM Environmental & Infrastructure, LLC and is not to be used, in whole or in part, for any other project without the written notice to APTIM Environmental & Infrastructure, LLC.
This document is released for the purpose of Bidding and Construction under the authority of Edward A.
Shepard, Jr, PE #133722. Texas Registered Engineering Firm F-5650.
C-304
C-306
C-303
C-303
AutoCAD SHX Text 631041722
AutoCAD SHX Text
AUGUST 2025
AutoCAD SHX Text
JB
AutoCAD SHX Text
TM
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJ. NO.:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AutoCAD SHX Text 08/08/25
AT
IO
N
16+00 17+00 18+00
16+00 17+00 18+00
18+00 19+00
18+00 19+00
19+00 20+00
19+00 20+00
STATION
STA:19+67.00
EXISTING GROUND
PROPOSED LINE A
3" x 6" HDPE
APPROXIMATE
LIMITS OF WASTE
EXPANSION LOOP A5
STA:18+00.00 STA:18+30.00
HIGH POINT VENT A2
EXISTING AGGREGATE ROAD TO
BE REPLACED WITH COMPACTED
SELECT SOIL BACKFILL AND
ASPHALT MILLINGS
DETECTABLE MARKER TAPE
T
T
T
T
PROPOSED LINE A
3" x 6" HDPE
HIGH POINT
VENT A2
CAUTION
OVERHEAD
ELECTRIC
W-32
45°'
45°
R
0.
0'
20+00
9 RESTRAINTS
CENTERED
ON RADIUS
EXPANSION LOOP A5 3 RESTRAINTS
ON WEST SIDE
OF BEND
STA:19+60.00
PIPELINE
MARKERS
MONITORING
STATON A3
GUARD POSTS (2)
AT MONITOR
NOTES
1. POINT CLOUD SURFACE FROM U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR
POINT CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A3 LAS 2019: U.S.
GEOLOGICAL SURVEY, AND U.S. GEOLOGICAL SURVEY, 20191108, USGS LIDAR POINT
CLOUD TX CENTRAL B1 2017 STRATMAP17-50CM-3097514A4 LAS 2019: U.S.
GEOLOGICAL SURVEY. CURRENT TOPOGRAPHY MAY DIFFER FROM THAT SHOWN.
THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO THE START OF
WORK.
2. FOR CLARITY, NOT ALL SITE FEATURES MAY BE SHOWN.
3. THE LIMITS OF WASTE WERE SURVEYED BASED ON FIELD MONUMENTS IN
APRIL 2021 AS PART OF THE FM 812 CLOSURE CERTIFICATION.
4. PROPOSED PIPE TO LAY ON TOP OF GROUND EXCEPT WHERE NOTED.
PROVIDE ALL FITTINGS NEEDED TO TRANSITION FROM BURIED TO ABOVE
GROUND INSTALLATION. PLACE PIPELINE MARKERS EVERY 50 FEET WHERE
PIPE IS BURIED
HORIZONTAL
VE
R
TI
C
AL
GRAPHIC SCALE
4'
40'
LEGEND
APPROXIMATE PERMIT BOUNDARY
APPROXIMATE EXISTING WASTE BOUNDARY
GAS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .