IFB 27011 Addendum 6.pdf
PDF 302 KB Posted
- Attached to
- 27011-JS Godwin - Pilot Building Renovation
- Solicitation number
- IFB-123940
- Issued by
- Suffolk City, Virginia
About this file
This Addendum 6 document addresses Requests for Information (RFIs) submitted by bidders for IFB 27011, the Godwin-Virginian Pilot Building Renovation project administered by the City of Suffolk, Virginia. The project encompasses a comprehensive renovation of the Godwin Building, a two-story structure, including interior finishes, mechanical and electrical systems upgrades, security improvements, parking lot modifications on Saratoga Street, exterior brick preparation and repainting, and associated site work. The bid submission deadline and award date are not specified in this addendum. Key project requirements include 304 calendar days for completion, with the city permitting a Limited NTP for permits and submittals prior to full mobilization. Bidders must submit the entire Section A of the IFB (pages 5-29) and may submit bids either as hard copies or electronically through eVA, with no city preference stated. A revised bid form will be provided to include a separate line item for Alternate No. 1, which involves stripping existing paint before repainting the north, south, and west exterior brick walls.
The project includes specific technical clarifications regarding fire alarm systems (Johnson Controls/Simplex), building automation systems (Trane Controls only), electrical specifications, ceiling tile replacements, window film applications, and shade systems. The City of Suffolk will assume costs for commissioning, provide the attorney's and police department logos for installation, and pay only the building permit fee, with all other trade permits and utility tap fees remaining the contractor's responsibility. The contractor is responsible for builders' risk insurance and parking arrangements, which may include off-site public parking or phased on-site improvements. Significant scope clarifications confirm that the Saratoga Street Parking Lot is included in the project, no Davis-Bacon wages apply, no project trailer is required, and a Clerk of the Works is not required. Revised demolition, new work, and detail drawings for all disciplines are under revision and will be issued upon completion, which will impact final pricing and scheduling.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI # Date Received RFI Description Discipline Assigned to GC Questions Responses
Q1 Addendum
#2
Q1 Bid Submittal Owner Owner
Pg 8 of the IFB PDF states that the bid can either be delivered hard copy or submitted electronically through eVA. Does the City have a preference for method of submission?
The City does not have a perference.
Addendum
#2
Q2 Bid Submittal Owner Owner
Pg. 9 of the IFB PDF states "Bidders are to submit entire Section A" as their bid". Please confirm if the City truly wants all of 'Section A' (pgs 5-29 of the IFB) or just the forms the require contractor input: Bid Form, Non-Collusion affidavit, etc.
Bidders are to submit all of Section A (pgs. 5-29)
Addendum
#2
Q3 Insurance Owner Owner Who is responsible for builders' risk insurance?
The contractor.
1 7/21/2026 Site Parking Civil Robyn Niss
Will there be contractor parking available on site or will we have to look for pay parking near the site?
No designated contractor parking is available. The Contractor can use off-site public parking or phase improvements to allow parking/staging on site.
2 7/21/2026 Ceiling Tiles - Second Floor Architect Nick Dunlevy
For 2nd floor ceiling tile replacement, we will need to know the tile type and a quantity/percentage of the tiles needing replaced?
Most ceiling tiles being removed on second floor for roofing/mechanical demo and new work should be carefully removed and reinstalled in place.
AD112 shows every anticipated area where ceiling tile will need to be removed. The only room that will need new ceiling tile is where the lightwell and chimney flue were demolished. Product can be the same as ACT1 in finish schedule but 2x4 instead of 2x2.
3 7/21/2026 Insurance Owner Jay Smigelski Who is responsible for builders risk insurance. Answered in Addendum #2, Q3.
4 7/22/2026 Specifications Owner
Wayne Rhoads
Jay Smigelski Provide specification 012100 allowances
Please disregard references to spec section 012100 allowances.
5 7/22/2026 Specifications Owner
Wayne Rhoads
Jay Smigelski
The Units of Measure in specification 012200 appear to be missing from the section. Please disregard references to spec section 012200 units of measure.
6 7/22/2026 Base Bid Owner
Wayne Rhoads
Jay Smigelski
Once the Units of Measure are provided, will the costs carried for these unit price be required to be added to the Total Base Bid?
Units of measure and unit prices do not apply. Please provide a single lump sum bid and a cost for the one add alternative bid item.
7 7/22/2026 Specifications Owner
Wayne Rhoads
Jay Smigelski
Per specification section 012300 there is one alternate bid.
The bid form does not have a line item for the alternative bid.
A revised bid form will be provided that includes the one add alternative bid item.
8 7/22/2026 Earth Moving Civil Robyn Niss
Provide the specifications for Division 31 Site clearing and earth moving.
All clearing and earthmoving shall be in accordance with notes on the drawings, VDOT Road and Bridge Specifications, and the City of Suffolk Public
Facilities Manual. No supplemental spec information is provided.
9 7/28/2026 TV Mounts Owner Wayne Rhoads Who is supplying and installing TV mounts in Room 170 (total of 4) Owner will supply and install TV mounts and brackets.
10 7/28/2026 TV Brackets Owner Wayne Rhoads Who is supplying and installing the brackets for the wall mounted TV’s (total of 6) Owner will supply and install TV mounts and brackets.
11 7/28/2026 Electrical CT cabinets Electrical Pace
On page E-001 the note states that all electrical items are to be removed by others. In the electrical room 2 CT cabinets, meter sockets and main wireway are to be removed.
Who is responsible for removing these items?
PACE Reponse: The only reference to the term "OTHERS" is in the Demolition notes under "ASSOCIATED APPURTENANCES" where it is stated to remove electrical appurtenances (Disconnects, wiring, conduit, etc) that are associated with equipment being removed by others. Not that the electrical elements are being removed by others. Electrical Service Equipment being removed must be coordinated between the electrical contractor and
Dominion Energy.
12 7/28/2026 Electrical/Security Doors Electrical Pace/Wayne Rhoads
On the special systems plan, is power needed for the (26) security doors? Nothing is shown on E201 or E505
PACE Response: The power requirements for door hardware are determined by the product selection performed by the security integrator.
13 7/28/2026 Security Cameras Owner Wayne Rhoads What roughing is required for security cameras?
Pathways, boxes, conduit/cable supports, low voltage wiring, service loop at camera location, adequate slack at head end. Security Integrator will coordinate and consult with GC prior to install.
14 7/28/2026 Fire Alarm Vendor Owner Wayne Rhoads Who is the existing fire alarm vendor? Johnson Controls (JCI) / Simplex Alarm Panel
15 7/28/2026 Fire Alarm Wiring Owner Wayne Rhoads Is the fire alarm wiring allowed to be run free air above ceiling? Yes, above ceiling only.
16 7/28/2026 Generator Owner Wayne Rhoads Is a generator needed?
Contractor should assume need for generator power, as building electrical may not always be available.
17 7/28/2026 Lightning Protection Electrical Pace
On page 250500-2, 1.4 note 10 has lightning protection in the scope of work, but it is not included in the drawing set. Please advise if it is needed.
PACE Response: The building does not have an existing lightning protection system and one is not required to be provided.
18 7/27/2026 Va Dept. of Labor Hazmat Nelson Adcock
Has the project notification been submitted to VA Department of Labor and
Industry about Hazardous Abatement on this project?
The Abatement Contractor is required to provide the notification.
19 7/27/2026 EPA NESHAP Hazmat
Nelson Adcock
Has the project been filled for EPA NESHAP notification with the VA Department of Environmental Quality? If not, please submit prior to award so that the 20-business day delay will not impact our completion schedule.
The Abatement Contractor is required to provide the notification.
20 7/27/2026 Transformer Application Electrical
Pace Has an early application (Load Letter) been submitted to Dominion Energy about the new transformer?
PACE Response: The electrical drawings do not indicate a new transformer.
The intent was to extend the existing service conductors as required as indicated on the Riser Diagram.
21 7/27/2026 Limited NTP Owner
Wayne Rhoads
Jay Smigelski
Will a Limited NTP allowed and issued, so that we can secure permits, approvals, and long lead submittals approval items before we mobilize on site, so not to impact the 304 Calendar Day schedule.
Owner does not have an issue with a Limited NTP for permits and submittals.
22 7/27/2026 Signage Architect Nick Dunlevy
Is the signage in detail C1 on sheet A-406 in the scope of work. If so, can details be provided for said signage.
Yes, the letters are S2 in finish legend on A-701. Confirming logos with owner and will provide details on those.
23 7/27/2026 RCP plans Architect Nick Dunlevy
For RCP A-111, will the architect be providing details for soffits in lobby/101, 104, 129,150,144,148.
Revised demolition, new work, and detail drawings sheets for all disciplines are under revision now and will be issued when complete.
24 7/27/2026 Wall Types Architect Nick Dunlevy
On A-101, please confirm partition 4SC is between rooms 117 - 125 per General
Note 3 - unmarked partitions are 4SC. Please use 4SA.
25 7/27/2026 RCP plans Architect Nick Dunlevy
On RCP A-111 at room 146 and surrounding, there is an overlap of the ACT and speckling indicating GWB. Can we assume this is all ACT?
Revised demolition, new work, and detail drawings sheets for all disciplines are under revision now and will be issued when complete.
26 7/27/2026 RCP plans Architect Nick Dunlevy
What is the height of the Woodworks ceiling at the Lobby? (This may get answered by my previous Woodworks soffit question.)
Yes, to separate the two ceilings as the ceiling in corridor 143 is to be centered.
27 7/27/2026 RCP plans Architect Nick Dunlevy Is there a bulkhead at the South end of Corridor 143 by rooms 139 & 146? Provide bulkhead. Ceilings are at the same height.
28 7/27/2026 RCP plans Architect Nick Dunlevy
At Corridor 105 by room 108, there is a mismatch of the ACT grid. Is there a bulkhead or Axiom transition here?
Carefully remove ceiling tiles for reinstallation. If too damaged to re-install, use product ACT1 from finish schedule but 2x4 instead of 2x2 to match surrounding tile.
29 7/27/2026 RCP plans Architect Nick Dunlevy
On AD-112, there are several areas marked for ceiling demo (i.e. near column lines A & 1, above column line B). What is the type of replacement tile and grid? This area is also marked on A-112
Revised demolition, new work, and detail drawings sheets for all disciplines are under revision now and will be issued when complete.
30 7/30/2026 Specifications - Bid Form Architect
Nick Dunlevy
Lauren Daniels
Specification 122113
a. 2.3.B.1. specifies, “1 inch.” A-701, Finish Legend, MB1, states, “2 inch.” Which is correct?
b. 2.3.B.5.a. is discontinued.
c. 2.3.E. is discontinued.
d. 2.3.E.6.b. is discontinued.
e. 2.3.J. is discontinued.
f. 2.3.K. is discontinued.
• (a) Provide 1-inch horizontal aluminum blinds as specified in Section
122113. The “2-inch” designation in Finish Legend A-701 is incorrect and shall be revised to 1-inch to match the specification.
• (b) Manufacturer's current equivalent product meeting the design intent and performance requirements is acceptable.
• (c) Manufacturer's current equivalent option meeting the design intent and performance requirements is acceptable.
• (d) Manufacturer's current equivalent feature complying with applicable safety requirements is acceptable.
• (e) Manufacturer's current equivalent accessory/component meeting the design intent and performance requirements is acceptable.
• (f) Manufacturer's current equivalent accessory/component meeting the design intent and performance requirements is acceptable.
31 7/30/2026 Specifications Architect
Nick Dunlevy
Lauren Daniels
Specification 122413
a. 2.1.A.1. specifies, “Mecho or approved equal.” Are equals permitted?
b. 2.3.A.5.b. specifies, “Exposed Headbox.” Mecho only offers front and rear fascia, with no top. Is this required?
c. 2.3.A.5.c.-d. specify, “Side/sill Channels.” May we exclude side channels with light-filtering shades?
d. 2.3.A.5.e., 2.3.(A.)1.c.. 2.3.(A.)7.d. specify, “Match storefront finish.” May we include manufacturer’s Standard colors, and exclude Premium/Custom/3rd-Party colors/finishes?
e. 2.3.(A.)1. specifies, “Chelsea to the room side and SoHo to the window side.” Mecho recommends the reverse. Please clarify intent.
f. 2.3.(A.)5.b.1) specifies, “Exposed.” This is atypical for the Solar shade. Please clarify intent.
g. 2.3.(A.)7.b.-c. specify, “Side/sill channels.” May we exclude side/sill channels with light-filtering shades? May we exclude side/sill channels with light-blocking shades?
Typically, the side/sill channels are only utilized on the window side of the dual shade system. Please clarify intent.
• (a) Approved equal manufacturers may be submitted for review, provided they meet all performance, material, operational, and aesthetic requirements of the specification and are approved through the project substitution/equality review process.
• (b) Standard fascia system is acceptable in lieu of a fully enclosed headbox.
• (c) Side and sill channels for light-filtering shades can be omitted.
• (d) Unless a manufacturer's standard finish already matches the storefront finish, compliance would require the matching finish. Designer approval would be required to substitute standard finishes in lieu of storefront-matched finishes.
• (e) The intent is for the inside (room-facing) shadeband to be SoHo 1100
Series (1% openness) solar fabric and the outside (window-facing) shadeband to be Chelsea 0250 Series opaque/blackout fabric. Revise the specification accordingly.
• (f) See response (b) above for clarification.
• (g) See response (c) above for clarification.
32 7/30/2026 Fire Sprinkler Modifications Fire Protection Pace
Existing Fire Sprinkler Modifications
At the pre-bid meeting, we observed that numerous existing sprinkler heads within the renovated rooms may require relocation or reconfiguration to accommodate the proposed work. Please provide a sprinkler head count and/or a drawing identifying all locations requiring modification so this work can be accurately priced.
Sprinkler system design is performance specification/delegated design.
Contractor shall evaluate existing sprinkler piping and head layout, and modify as required to suit renovation.
33 7/30/2026 Specifications - Bid Form Owner
Wayne Rhoads
Jay Smigelski
Alternate No. 1 Bid Form Line Item
Please revise the bid form to include a separate line item for Alternate No. 1, as indicated on Drawing A201.
A revised bid form will be provided that includes the one add alternative bid item.
34 7/30/2026 Alternative 1 - Brick painting Architect Nick Dunlevy
Alternate No. 1 – Exterior Brick Scope
The base bid notes the following:
“Prep, repoint brick and fill cracks, repaint plan north, south and west exterior walls, leaving east wall facing Main Street existing blonde brick color. Paint color as selected by Owner.”
Alternate No. 1 notes the following:
“Strip all paint, repoint brick and fill cracks, repaint plan north, south and west exterior walls, leaving east wall facing Main Street existing blonde brick color. Paint color as selected by Owner.”
Since brick repointing, crack filling, and repainting of the north, south, and west exterior walls are already included in the base bid, please confirm that the only additional work included in Alternate No. 1 is stripping the existing paint before repainting. Please also confirm whether the alternate includes any additional wall area or quantities beyond those included in the base bid.
Correct, stripping before painting is the only difference between the two. No additional wall areas other than base bid (plan north, south and west walls)
35 7/30/2026 Signage Owner
Wayne Rhoads
Attorney’s Logo – Drawing C1/A-406
Drawing C1/A-406 depicts an Attorney’s logo. Please provide the required materials, dimensions, mounting method, fabrication requirements, illumination requirements, and other construction details necessary for bidding. Attorney Logo / signage will be provided and installed by COS
36 7/30/2026 Signage Owner
Wayne Rhoads
Police Department Logo – Drawing C1/A-406
Drawing C1/A-406 depicts a Police Department logo. Please provide the required materials, dimensions, mounting method, fabrication requirements, illumination requirements, and other construction details necessary for bidding. Police Department Logo / signage will be provided and installed by COS
37 7/30/2026 Electrical Handholds Electrical Pace
Electrical Handholes
Drawing E201 in the building drawing set and Drawing E501 in the parking lot drawing set each depict a handhole outside the building. Please confirm whether these represent two separate handholes or the same handhole shown on both drawings.
Please also provide the required handhole size and specifications.
PACE Repsonse: the handhole shown in the electrical documents (E201) is the same handhole as shown on the site drawings (ES003). The purpose of showing the handhole on both drawings it to depict the conduit runs required to feed the cameras in the parking lot and to also show the penetration from the handhole into the building.
38 7/30/2026 Saratoga Street Parking Lot Civil Robyn Niss
Saratoga Street Parking Lot
Please confirm whether the Saratoga Street parking lot is included in this project’s scope of work or will be bid and constructed under a separate project. Yes, the Saratoga Street Parking Lot is part of this project's scope.
39 7/30/2026 Ballistic Window Film Architect
Nick Dunlevy
Lauren Daniels
Ballistic Window Film GL3
Please provide the product and installation specifications for the ballistic window film designated GL3, including the required manufacturer, performance rating, thickness, attachment system, testing standards, and acceptable products.
This is listed on A-701 in the finish legend after GF3. It states manufacturer, thickness, installation. For additional information, refer to manufacturers website.
40 7/30/2026 Davis-Bacon Wage Owner
Wayne Rhoads
Jay Smigelski
Davis-Bacon Wage Requirements
Please confirm whether this project is subject to Davis-Bacon or any other prevailing-wage requirements. If applicable, please provide the current wage determination. This project does not require Davis-Bacon wages
41 7/30/2026 Permit Fees Owner
Wayne Rhoads
Building Permit Fees
Please confirm whether the General Contractor is responsible for obtaining and paying for the building permit, or whether the permit fees will be paid directly by the Owner.
Owner will cover the Building Permit Only. All other trade permits must be obtained and paid by contractor.
23 Mil. Security Film - Armoured One https://armouredone.com/security-film/
42 7/30/2026 Job Trailer Owner Wayne Rhoads
Job Trailer
Please confirm whether a job trailer or temporary field office is required for this project. If required, please provide any minimum size, utility, location, or facility requirements. Project trailer is NOT required.
43 7/30/2026 Utility Tap and Impact Fees Owner Wayne Rhoads
Utility Tap and Impact Fees
Please clarify responsibility for all utility tap fees, connection fees, meter fees, capacity fees, and impact fees. Are these costs to be included in the General Contractor’s bid or paid directly by the Owner? Utility Tap and Impact Fees should be included in General Contractor's bid.
44 7/30/2026 Testing and Inspection Reqs Owner/Structural
Wayne Rhoads /
Marcos Freeman
Testing and Inspection Requirements
Please clarify what project testing and special inspections, if any, are required to be included within the General Contractor’s scope. Please identify the required testing agencies or services and confirm whether payment is the responsibility of the General
Contractor or the Owner.
Please see attached inspections form covered by the Owner's structural engineer (Agent #1). Other required special inspections should be included in the General Contractor's scope.
45 7/25/2026 PV Solar system MEP Mike Ciuppa Please advise if this project includes the installation of a solar PV system. There will be no installation of a PV system.
46 8/3/2026 Doors Architect Nick Dulevy
Door #’s 3014.1, 3116, and 3130 – The door schedule states these doors and frames are existing -- Are we just replacing the glass in the door and sidelight?
There are no doors that start with 300 in our project. All doors start with a 1 as its only the first floor getting re-done and is only a two-story building so all our doors would only start with 1 or 2. We don't have any doors with .1 or any decimals, rooms with two or more doors have letters like 110A and
110B.
47 8/3/2026 Demolition Plans Architect
Will revised demolition plans and scope of work be provided since a majority of the demolition work has been completed? This affects plumbing, HVAC, and electrical also
Yes, revised demolition, new work, and detail drawings sheets for all disciplines are under revision now and will be issued when complete.
48 8/3/2026 Fencing Civil Robyn Niss Please provide fencing types and details No new fencing is proposed for this project.
49 8/3/2026 Fencing Civil Robyn Niss Does the existing fence remain or to be removed/replaced? Existing 5' fence to the north is to remain.
50 8/3/2026 Fencing Civil Robyn Niss Is the chain link fencing 5’ or 6’ tall? No new fencing is proposed for this project.
51 8/3/2026 Fencing Civil Robyn Niss
Are a temporary construction fence and gates required? If so, should it follow the limits of disturbance? Should it include privacy panels?
There has been no indication that a temporary construction fence will be required.
52 8/5/2026 Controls MEP
Pace
Jhonathan Zapata
Section 23 09 00 identifies available manufacturers and states that manufacturers offering products may be incorporated into the Work and 'include, but are not limited to' those specified. Please confirm whether Distech Controls, furnished by an authorized
Distech systems integrator, is an acceptable manufacturer for the Building Automation
System provided the proposed system fully complies with all requirements of the
Contract Documents.
The City of Suffolk indicated that their existing front-end system is provided by Trane Controls as the City has a direct contract with Trane for their HVAC and Controls system. Specification section 230900
2.2 indicates the available manufacturer is Trane. Diestech Controls is not acceptable.
53 8/11/2026 Commissioning Owner Wayne Rhoads
There is mention of Commissioning in the Division 23 specifications. Is the
Commissioning Agent costs carried by the Owner or the General Contractor? City of Suffolk will assume costs.
54 8/11/2026 Masonry Wall Details Structural Marcos Freeman
Drawing S-002, Typical Opening at Masonry Wall Details: There is a section through the slab-on-grade area and it shows us infilling in with concrete where the 1st course of CMU foundation block is removed. Can the location (or locations) for this work be shown?
The detail only occurs at new exterior door or new storefront openings where block is removed down to slab level.
55 8/11/2026 Exterior Light Poles Civil/Electrial Pace/Kimley Horn
Drawing CD100 shows at least three (3) "Light Poles are to be relocated, see lighting plan". The lighting plans (E003 & E501) allude to all poles and lights to be new. Please confirm which plan is correct.
All lights are to be new per sheet E003.
56 8/14/2026 Fire Alarm Panel Owner
Wayne Rhoads
Steve Small
Can you provide the model of the existing Fire Alarm Panel inside of the building?
The fire sprinkler alarm panel is a Fire Watch 411UDAC fire alarm communicator.
Please remember though we want a Simplex system to be installed to cover both the fire alarm and the sprinkler system. The Simplex type system is used as we have JCI as our annual contract for inspections and repairs on both fire alarm and sprinkler systems.
57 8/14/2026 Clerk of the Works Owner
Wayne Rhoads
Steve Small Will the Suffolk need a Clerk of the Works for this project?
Clerk of the Works is not required.
58 8/28/2026 General Owner Wayne Rhoads May we exclude BIM? We can provide AutoCAD 2D. AutoCAD 2D is acceptable.
59 8/28/2026 Specification 122113 Architect
Specification 122113
a. 2.3.B.1. specifies, “1 inch.” A-701, Finish Legend, MB1, states, “2 inch.” Which is correct?
b. 2.3.B.5.a. is discontinued.
c. 2.3.E. is discontinued.
d. 2.3.E.6.b. is discontinued.
e. 2.3.J. is discontinued.
f. 2.3.K. is discontinued. See response to question # 30
60 8/28/2026 Specification 122413 Architect
a. 2.1.A.1. specifies, “Mecho or approved equal.” Are equals permitted?
b. 2.3.A.5.b. specifies, “Exposed Headbox.” Mecho only offers front and rear fascia, with no top. Is this required?
c. 2.3.A.5.c.-d. specify, “Side/sill Channels.” May we exclude side channels with light-filtering shades?
d. 2.3.A.5.e., 2.3.(A.)1.c.. 2.3.(A.)7.d. specify, “Match storefront finish.” May we include manufacturer’s Standard colors, and exclude Premium/Custom/3rd-Party colors/finishes?
e. 2.3.(A.)1. specifies, “Chelsea to the room side and SoHo to the window side.” Mecho recommends the reverse. Please clarify intent.
f. 2.3.(A.)5.b.1) specifies, “Exposed.” This is atypical for the Solar shade. Please clarify intent.
g. 2.3.(A.)7.b.-c. specify, “Side/sill channels.” May we exclude side/sill channels with light-filtering shades? May we exclude side/sill channels with light-blocking shades?
Typically, the side/sill channels are only utilized on the window side of the dual shade system. Please clarify intent. See response to question # 31
61 8/28/2026 Drawings D3/A-604 Architect
May we exclude installation of roller shades into concrete/masonry/steel substrates? Provide roller shades at all locations indicated on the drawings.
62 9/2/2026 E603 Electrical Who is installing the J Hooks shown on E603? Installation of the J-hooks is within the scope of the electrical contractor.
63 9/2/2026 E603 Electrical Are there any other drawings that show location of the J Hooks other than E603?
No, the layout of the pathway infrastructure is not typically provided.
It is a means-and-method during the installation of the cabling. The detail is provided to demonstrate the supporting method.
64 9/2/2026 Bolts Electrical The details show 2 ¼” Lag Threaded bolts. Are toggle bolts ok? The walls are drywall.
Toggle bolts for the drywall are acceptable as long as they are rated for the weight of the cabling to be supported.