(Identifiable Offeror Name)_RoadIDIQMisawa ExhibitA-C.xlsx

XLSX spreadsheet 53 KB Posted

Attached to
Roads/Pavements & Misc. Civil Work Indefinite- Delivery/Indefinite-Quantity (IDIQ) Contract, Misawa Air Base, Japan
Solicitation number
FA520526R0001
Issued by

About this file

This file contains three identical pricing exhibits (Exhibits A, B, and C) for a Road Identification IQ contract at Misawa Air Base, Japan under RFP No. FA520526R0001. The exhibits are formatted as line-item pricing templates with estimated quantities and unit prices in Japanese Yen but contain no actual unit prices or estimated amounts filled in by offerors.

The contract scope encompasses 159 line items organized across multiple work categories: survey and testing preparation; general construction and concrete work; asphalt paving work; geotextile installation; curbs and sidewalk construction; pavement markings and traffic safety work; earthwork, sodding, and planting; sanitary sewer and drainage work; water line work; and removal and disposal work. Specific deliverables include GPS surveys of existing points, topographic surveys (100,000 SM), road center surveys (200 LOT), pavement condition quantity surveys (200 LOT), core drilling and sampling (40 EA), asphalt and concrete paving in various quantities (ranging from 5-1,000 MTON depending on type and location), concrete curb and sidewalk installation, drainage pipe installation (50-20 LM), manhole and catch basin installation, pavement marking removal and installation (2,000-8,000 LM), embankment construction, traffic regulation, and disposal of removed materials including asphalt, concrete, and soil (up to 4,000 MTON for asphalt disposal). The three exhibits appear to represent three separate contract line items or separate IDIQ task orders with identical scopes, allowing for competitive pricing alternatives.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A

EXHIBIT A

MISAWA AB, JAPAN
REQUEST FOR PROPOSAL No. FA520526R0001
CONTRACT No.

Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)

Company Name and Address

CategoryELIN ADescriptionEstimated QuantityUnit of IssueUnit Price ¥Estimated Amount ¥
001GPS Survey for Existing Survey Point (The second grade survey point)4EA
Survey,002Existing Topographic Survey100,000SM
Test and003Survey for Road Center, Detailed Road Profile and Cross Section200LOT
Preparation004Quantity Survey of Current Condition for Pavement and Construction Area (Standard length of 20m per extension)200LOT
005Quantity Survey of Current Condition for Road Paint Markings3,000LM
006Core Drilling and Sampling of AC or Concrete Pavement of Roads, Parking Lots, and Other Surfaces40EA
007Test Digging of AC Pavement, not to exceed within 1m square x 1.5m depth includes temporary pavement restoration20EA
008Field CBR and Laboratory Test of Roads, Parking Lots and Other Surfaces1EA
009Test Sampling and Site Preparation for Base Stabilization Mixture1SET
010Transportation of Removed Soil, Concrete, AC, Concrete products and Miscellaneous Material from Construction Site to Stock Yard/on Base1,000CM
General011Construct Formwork for General Civil Concrete Work40SM
Construction012Install Bollard Sleeve7EA
and Other Work013Construct Steel Reinforcement Bar1MTON
014Construct Basis Crushed Stone (RC-40), 150mm Thick10CM
015Place Concrete (21-8-25)5CM
016Place Concrete (24-8-25)5CMERROR:#REF!
017Install Joint Filler200SM
018Install Sealant (10mm x 5mm)1,800LM
019Contraction Joint with Concrete Saw Cutter1,100LM
020Traffic Regulator (Flag Man)800MAN/DAY
021Placing and Removing Steel Plate, Size 1.5m x 3.0m200EA/DAY
022Construct Subbase Course (RC-40), Max Thickness 400mm100CM
Asphalt023Construct Base Course (M-25), Max Thickness 150mm300CM
Paving Work024Leveling Base Course (M-25, Within 50mm)500CM
025Base Stabilization for Pavement, Mix 150mm Thick3,000SM
026Base Stabilization for Pavement, Mix 200mm Thick2,000SM
027Prime Coat (PK-3)16,000SM
028Tack Coat (PK-4)2,000SMERROR:#REF!
029Tack Coat (PKM-T)10,000SM
030Construct Recycled AC Intermediate Course (AC No.2) with Man Power Paving30MTON
031Construct Recycled AC Intermediate Course (AC No.2), Road Width 1.4m- 3.0m200MTON
032Construct Recycled AC Intermediate Course (AC No.2), Road Width 3.0m Or More1,000MTON
033Construct Recycled AC Wearing Course (AC No.5) with Man Power Paving50MTON
034Construct Recycled AC Wearing Course (AC No.5), Road Width 1.4m- 3.0m300MTON
035Construct Recycled AC Wearing Course (AC No.5), Road Width 3.0m Or More1,000MTON
036Construct AC Surface by Modified Asphalt (AC No.5 Type 2) with Man Power Paving20MTON
037Construct AC Surface by Modified Asphalt (AC No.5 Type 2), Road Width 1.4m- 3.0m80MTON
038Construct AC Surface by Modified Asphalt (AC No.5 Type 2), Road Width 3.0m Or More300MTON
039Construct AC Clack Suppression Layer, (Special Modified Hot Mix AC), 15mm thick, Road Width 3.0m Or More2,000SM
Geotextiel Work040Install Geotextile sheets for pavements200SM
041Digging and Grading for Curbs Work240CM
Curbs and042Leveling Basis Crushed Stone for Curbs (RC-40, Average thickness 50mm)60CM
Sidewalk Work043Form Work for Curbs100SM
044Form Work for Curbs & Gutter800SM
045Place Concrete (24-8-25) for Concrete Curbs50CM
046Place Concrete (24-8-25) for Concrete Curbs & Gutter150CM
047Install Precast Type A Block500LM
048Install Precast Type C Block200LM
049Backfill with Excavated Soil100CM
050Backfill with New Soil50CM
051Base Course Restoration for Road (M-25)100CM
052Base Course Restoration (RC-40), 100mm Thick60CM
053Frost Inhibition Course Restoration (RC-40),250mm Thick70CM
054Core Drilling for Snow Pole Hole, 45mm Dia100EA
055Construct Base Course for Sidewalk, (RC-40 100mm Thick)300SM
056Leveling Base Course for Sidewalk (RC-40, Within 50mm)100CM
057Frost Inhibition Course (Sand Pit), 250mm Thick30CM
058Form Work for Sidewalk250SM
059Place Concrete (24-8-25) for Concrete Sidewalk100CM
060Removal and Disposal of Existing Pavement Markings with Griding or Scarifying2,000LM
Paveyment061Removal and Disposal Existing Pavement Markings with Water Pressure500LM
Markings,062Install Reflective Marking, White (W=15cm)3,000LM
Traffic Safety063Install Hot Applied Reflective Markings, White (W=15cm)2,000LM
Work064Install Temporary Pavement Striping8,000LM
065Alphanumeric Concrete Curb Marking10EA
066Install Handicap Symbol Marking, White2EA
067Relocate Traffic Sign & Post4EA
068Removal of Existing Grass100CM
Earth Work,069Road Excavation, less than 5,000m3100CMERROR:#REF!
Sodding, Planting Work070Construct Embankment for Roadbed with New Soil, Road Width 4.0m or more, 20,000m3 less100CM
071Construct Embankment for Roadbed with New Soil, Road Width 2.5m- 4.0m150CM
072Construct Embankment for Roadbed with New Soil, Road Width 2.5m less50CM
073Construct Embankment for Roadbed with Excavated Soil, Backhoe 0.25m3200CM
074Slope Surfacing200SM
075Place New Top Soil, 100mm Thick100CM
076Place Sod (Noshiba)1,000SM
077Excavation for Underground Utilities150CM
Sanitary Sewer,078Install 200mm VU Rib Pipe50LM
Drainage Work079Install 300mm VU Rib Pipe20LM
080Install Precast Box Culvert 300mm8LM
081Install Precast Box Culvert 400mm6LM
082Install Mechanical Pipe Joint (CP to VU)10EA
083Backfill with Excavated Soil60CM
084Backfill with New Soil50CM
085Sub Base Course Restoration (RC-40), 400mm Thick40SM
086Base Course Restoration (M-25), 150mm Thick20SM
087Raise/Lower Existing Concrete Frame and Grating Cover of Gutter Inlet10EA
088Install New Concrete Frame and Grating Cover (T-20) of Gutter Inlet20EA
089Install New Gutter Inlet with Pre-cast Concrete Structures, Inlet Height 1.3m10EA
090Install New Frame and Grating Cover (T-25) for Catch Basin, 600 mm square3EA
091Install New Frame and Grating Cover (T-25) for Catch Basin, 900 mm square3EA
092Install Precast Catch Basin (600x600x1200) with Grating Cover (T-25)3EA
093Install Precast Catch Basin (900x900x1200) with Grating Cover (T-25)3EA
094Raise/Lower Existing Manhole Frame and Cover6EA
095Install New Manhole Frame and Cover (T-25)4EA
096Install New Manhole with Pre-cast Concrete Structures, Height 1.5m x 900mm Dia1EA
097Install New Manhole with Pre-cast Concrete Structures, Height 1.5m x 1,200mm Dia1EA
Water Line098Raise/Lower Existing Water Gate Valve Box2EA
Work099Replace Water Gate Valve Box2EA
100Saw Cutting of Existing AC Pavement, less than 15cm3,000LM
Removal and101Saw Cutting of Existing AC Pavement, T=15cm - 30cm300LM
Disposal Work102Saw Cutting of Existing Concrete Pavement, less than 15cm50LM
103Cold Milling of AC Pavement, less than 6cm1,500SM
104Removal of AC Pavements with Soil Stabilizer, less than 30cm2,000SM
105Removal of AC Pavement, less than 10cm15,000SM
106Removal of AC Pavement, T=10cm - 20cm1,000SM
107Removal of Existing Curbs100LM
108Removal of Existing Curbs & Gutter1,500LM
109Removal of Existing Concrete Sidewalks2,000SM
110Removal of Existing Precast Drain Inlet30EA
111Removal of Existing Precast Inlet Frame and Cover10EA
112Existing Concrete Structure Breaking and Chipping5CM
113Removal of Reinforced Concrete by Labor5CM
114Removal of Concrete Pipe40LM
115Removal of PVC Pipe20LM
116Removal of Existing Manhole Frame and Cover10EA
117Removal of Existing Catch Basin (H= 1.5m less)6EA
118Removal of Existing Manhole (H= 1.5m less)6EA
119Removal of Existing Tree and Stump, Circumference of tree less than 20cm10EA
120Removal of Existing Tree and Stump, Circumference of tree 21~30cm5EA
121Hauling and Disposal of Extra Soils/Gravels to Off Base300CM
122Hauling and Disposal of Asphalt Concrete and Cold Milling AC to Off Base4,000MTON
123Hauling and Disposal of Plain Concrete to Off Base1,000MTON
124Hauling and Disposal of Reinforced Concrete to Off Base30MTON
125Hauling and Disposal of Precast Concrete Product to Off Base100MTON
126Hauling and Disposal of Plastics to Off Base2MTON
127Hauling and Disposal of Trees and stump to Off Base20MTON
128Excavation and Grading for Parking Lot50CM
Asphalt Paving129Leveling Base Course (M-25, Within 50mm)30CM
Work for MFH130Prime Coat (PK-3)800SM
Carport Area131Tack Coat (PK-4)800SM
132Construct Recycled AC Intermediate Course (AC No.2)100MTON
133Construct Recycled AC Wearing Course (AC No.5)80MTON
134Digging for Curbs Work30CM
Curbs and135Leveling Basis Crushed Stone (RC-40, Within 50mm)30CM
Sidewalk for136Place Concrete (24-8-25) for Concrete Curbs5CM
MFH Carport137Place Concrete (24-8-25) for Concrete Curbs & Gutter20CM
Area138Install Precast Type A Block50LM
139Install Precast Type C Block30LMERROR:#REF!
140Backfill with Excavated Soil50CM
141Backfill with New Soil50CM
142Base Course Restoration (M-25) , 150mm Thick20CM
143Base Course Restoration (RC-40,) 100mm Thick20CM
144Frost Inhibition Course Restoration (RC-40), 250mm Thick10CM
145Construct Base Course for Sidewalk, (RC-40 100mm Thick)300SM
146Leveling Base Course for Sidewalk (RC-40, Within 50mm)50CM
147Frost Inhibition Course (Sand Pit), 250mm Thick50CM
148Place Concrete (24-8-25) for Concrete Sidewalk80CM
Sanitary Sewer,149Excavation for Underground Utilities50CM
Drainage Work150Backfill with Excavated Soil50CM
for MFH151Backfill with New Soil30CM
Carport Area152Sub Base Course Restoration (RC-40), 400mm Thick80SM
153Base Course Restoration (M-25), 150mm Thick80SM
154Transportation of Removed Soil, Concrete, AC, Concrete Products and Miscellaneous Material from Construction Site to Stock Yard/on Base200CM
Removal and155Removal of AC Pavement, less than 10cm900SMERROR:#REF!
Disposal Work156Removal of Existing Curbs50LM
for MFH157Removal of Existing Curbs & Gutter200LM
Carport Area158Removal of Existing Concrete Sidewalks800SM
159Removal of Existing Precast Drain Inlet10EA
TOTAL ESTIMATED AMOUNT OF ELINs (Yen)0

&10Exhibit A RFP No. FA520526R0001 &10Page &P of &N

Exhibit B

EXHIBIT B

MISAWA AB, JAPAN
REQUEST FOR PROPOSAL No. FA520526R0001
CONTRACT No.

Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)

Company Name and Address

CategoryELIN BDescriptionEstimated QuantityUnit of IssueUnit Price ¥Estimated Amount ¥
001GPS Survey for Existing Survey Point (The second grade survey point)4EA
Survey,002Existing Topographic Survey100,000SM
Test and003Survey for Road Center, Detailed Road Profile and Cross Section200LOT
Preparation004Quantity Survey of Current Condition for Pavement and Construction Area (Standard length of 20m per extension)200LOT
005Quantity Survey of Current Condition for Road Paint Markings3,000LM
006Core Drilling and Sampling of AC or Concrete Pavement of Roads, Parking Lots, and Other Surfaces40EA
007Test Digging of AC Pavement, not to exceed within 1m square x 1.5m depth includes temporary pavement restoration20EA
008Field CBR and Laboratory Test of Roads, Parking Lots and Other Surfaces1EA
009Test Sampling and Site Preparation for Base Stabilization Mixture1SET
010Transportation of Removed Soil, Concrete, AC, Concrete products and Miscellaneous Material from Construction Site to Stock Yard/on Base1,000CM
General011Construct Formwork for General Civil Concrete Work40SM
Construction012Install Bollard Sleeve7EA
and Other Work013Construct Steel Reinforcement Bar1MTON
014Construct Basis Crushed Stone (RC-40), 150mm Thick10CM
015Place Concrete (21-8-25)5CM
016Place Concrete (24-8-25)5CMERROR:#REF!
017Install Joint Filler200SM
018Install Sealant (10mm x 5mm)1,800LM
019Contraction Joint with Concrete Saw Cutter1,100LM
020Traffic Regulator (Flag Man)800MAN/DAY
021Placing and Removing Steel Plate, Size 1.5m x 3.0m200EA/DAY
022Construct Subbase Course (RC-40), Max Thickness 400mm100CM
Asphalt023Construct Base Course (M-25), Max Thickness 150mm300CM
Paving Work024Leveling Base Course (M-25, Within 50mm)500CM
025Base Stabilization for Pavement, Mix 150mm Thick3,000SM
026Base Stabilization for Pavement, Mix 200mm Thick2,000SM
027Prime Coat (PK-3)16,000SM
028Tack Coat (PK-4)2,000SMERROR:#REF!
029Tack Coat (PKM-T)10,000SM
030Construct Recycled AC Intermediate Course (AC No.2) with Man Power Paving30MTON
031Construct Recycled AC Intermediate Course (AC No.2), Road Width 1.4m- 3.0m200MTON
032Construct Recycled AC Intermediate Course (AC No.2), Road Width 3.0m Or More1,000MTON
033Construct Recycled AC Wearing Course (AC No.5) with Man Power Paving50MTON
034Construct Recycled AC Wearing Course (AC No.5), Road Width 1.4m- 3.0m300MTON
035Construct Recycled AC Wearing Course (AC No.5), Road Width 3.0m Or More1,000MTON
036Construct AC Surface by Modified Asphalt (AC No.5 Type 2) with Man Power Paving20MTON
037Construct AC Surface by Modified Asphalt (AC No.5 Type 2), Road Width 1.4m- 3.0m80MTON
038Construct AC Surface by Modified Asphalt (AC No.5 Type 2), Road Width 3.0m Or More300MTON
039Construct AC Clack Suppression Layer, (Special Modified Hot Mix AC), 15mm thick, Road Width 3.0m Or More2,000SM
Geotextiel Work040Install Geotextile sheets for pavements200SM
041Digging and Grading for Curbs Work240CM
Curbs and042Leveling Basis Crushed Stone for Curbs (RC-40, Average thickness 50mm)60CM
Sidewalk Work043Form Work for Curbs100SM
044Form Work for Curbs & Gutter800SM
045Place Concrete (24-8-25) for Concrete Curbs50CM
046Place Concrete (24-8-25) for Concrete Curbs & Gutter150CM
047Install Precast Type A Block500LM
048Install Precast Type C Block200LM
049Backfill with Excavated Soil100CM
050Backfill with New Soil50CM
051Base Course Restoration for Road (M-25)100CM
052Base Course Restoration (RC-40), 100mm Thick60CM
053Frost Inhibition Course Restoration (RC-40),250mm Thick70CM
054Core Drilling for Snow Pole Hole, 45mm Dia100EA
055Construct Base Course for Sidewalk, (RC-40 100mm Thick)300SM
056Leveling Base Course for Sidewalk (RC-40, Within 50mm)100CM
057Frost Inhibition Course (Sand Pit), 250mm Thick30CM
058Form Work for Sidewalk250SM
059Place Concrete (24-8-25) for Concrete Sidewalk100CM
060Removal and Disposal of Existing Pavement Markings with Griding or Scarifying2,000LM
Paveyment061Removal and Disposal Existing Pavement Markings with Water Pressure500LM
Markings,062Install Reflective Marking, White (W=15cm)3,000LM
Traffic Safety063Install Hot Applied Reflective Markings, White (W=15cm)2,000LM
Work064Install Temporary Pavement Striping8,000LM
065Alphanumeric Concrete Curb Marking10EA
066Install Handicap Symbol Marking, White2EA
067Relocate Traffic Sign & Post4EA
068Removal of Existing Grass100CM
Earth Work,069Road Excavation, less than 5,000m3100CMERROR:#REF!
Sodding, Planting Work070Construct Embankment for Roadbed with New Soil, Road Width 4.0m or more, 20,000m3 less100CM
071Construct Embankment for Roadbed with New Soil, Road Width 2.5m- 4.0m150CM
072Construct Embankment for Roadbed with New Soil, Road Width 2.5m less50CM
073Construct Embankment for Roadbed with Excavated Soil, Backhoe 0.25m3200CM
074Slope Surfacing200SM
075Place New Top Soil, 100mm Thick100CM
076Place Sod (Noshiba)1,000SM
077Excavation for Underground Utilities150CM
Sanitary Sewer,078Install 200mm VU Rib Pipe50LM
Drainage Work079Install 300mm VU Rib Pipe20LM
080Install Precast Box Culvert 300mm8LM
081Install Precast Box Culvert 400mm6LM
082Install Mechanical Pipe Joint (CP to VU)10EA
083Backfill with Excavated Soil60CM
084Backfill with New Soil50CM
085Sub Base Course Restoration (RC-40), 400mm Thick40SM
086Base Course Restoration (M-25), 150mm Thick20SM
087Raise/Lower Existing Concrete Frame and Grating Cover of Gutter Inlet10EA
088Install New Concrete Frame and Grating Cover (T-20) of Gutter Inlet20EA
089Install New Gutter Inlet with Pre-cast Concrete Structures, Inlet Height 1.3m10EA
090Install New Frame and Grating Cover (T-25) for Catch Basin, 600 mm square3EA
091Install New Frame and Grating Cover (T-25) for Catch Basin, 900 mm square3EA
092Install Precast Catch Basin (600x600x1200) with Grating Cover (T-25)3EA
093Install Precast Catch Basin (900x900x1200) with Grating Cover (T-25)3EA
094Raise/Lower Existing Manhole Frame and Cover6EA
095Install New Manhole Frame and Cover (T-25)4EA
096Install New Manhole with Pre-cast Concrete Structures, Height 1.5m x 900mm Dia1EA
097Install New Manhole with Pre-cast Concrete Structures, Height 1.5m x 1,200mm Dia1EA
Water Line098Raise/Lower Existing Water Gate Valve Box2EA
Work099Replace Water Gate Valve Box2EA
100Saw Cutting of Existing AC Pavement, less than 15cm3,000LM
Removal and101Saw Cutting of Existing AC Pavement, T=15cm - 30cm300LM
Disposal Work102Saw Cutting of Existing Concrete Pavement, less than 15cm50LM
103Cold Milling of AC Pavement, less than 6cm1,500SM
104Removal of AC Pavements with Soil Stabilizer, less than 30cm2,000SM
105Removal of AC Pavement, less than 10cm15,000SM
106Removal of AC Pavement, T=10cm - 20cm1,000SM
107Removal of Existing Curbs100LM
108Removal of Existing Curbs & Gutter1,500LM
109Removal of Existing Concrete Sidewalks2,000SM
110Removal of Existing Precast Drain Inlet30EA
111Removal of Existing Precast Inlet Frame and Cover10EA
112Existing Concrete Structure Breaking and Chipping5CM
113Removal of Reinforced Concrete by Labor5CM
114Removal of Concrete Pipe40LM
115Removal of PVC Pipe20LM
116Removal of Existing Manhole Frame and Cover10EA
117Removal of Existing Catch Basin (H= 1.5m less)6EA
118Removal of Existing Manhole (H= 1.5m less)6EA
119Removal of Existing Tree and Stump, Circumference of tree less than 20cm10EA
120Removal of Existing Tree and Stump, Circumference of tree 21~30cm5EA
121Hauling and Disposal of Extra Soils/Gravels to Off Base300CM
122Hauling and Disposal of Asphalt Concrete and Cold Milling AC to Off Base4,000MTON
123Hauling and Disposal of Plain Concrete to Off Base1,000MTON
124Hauling and Disposal of Reinforced Concrete to Off Base30MTON
125Hauling and Disposal of Precast Concrete Product to Off Base100MTON
126Hauling and Disposal of Plastics to Off Base2MTON
127Hauling and Disposal of Trees and stump to Off Base20MTON
128Excavation and Grading for Parking Lot50CM
Asphalt Paving129Leveling Base Course (M-25, Within 50mm)30CM
Work for MFH130Prime Coat (PK-3)800SM
Carport Area131Tack Coat (PK-4)800SM
132Construct Recycled AC Intermediate Course (AC No.2)100MTON
133Construct Recycled AC Wearing Course (AC No.5)80MTON
134Digging for Curbs Work30CM
Curbs and135Leveling Basis Crushed Stone (RC-40, Within 50mm)30CM
Sidewalk for136Place Concrete (24-8-25) for Concrete Curbs5CM
MFH Carport137Place Concrete (24-8-25) for Concrete Curbs & Gutter20CM
Area138Install Precast Type A Block50LM
139Install Precast Type C Block30LMERROR:#REF!
140Backfill with Excavated Soil50CM
141Backfill with New Soil50CM
142Base Course Restoration (M-25) , 150mm Thick20CM
143Base Course Restoration (RC-40,) 100mm Thick20CM
144Frost Inhibition Course Restoration (RC-40), 250mm Thick10CM
145Construct Base Course for Sidewalk, (RC-40 100mm Thick)300SM
146Leveling Base Course for Sidewalk (RC-40, Within 50mm)50CM
147Frost Inhibition Course (Sand Pit), 250mm Thick50CM
148Place Concrete (24-8-25) for Concrete Sidewalk80CM
Sanitary Sewer,149Excavation for Underground Utilities50CM
Drainage Work150Backfill with Excavated Soil50CM
for MFH151Backfill with New Soil30CM
Carport Area152Sub Base Course Restoration (RC-40), 400mm Thick80SM
153Base Course Restoration (M-25), 150mm Thick80SM
154Transportation of Removed Soil, Concrete, AC, Concrete Products and Miscellaneous Material from Construction Site to Stock Yard/on Base200CM
Removal and155Removal of AC Pavement, less than 10cm900SMERROR:#REF!
Disposal Work156Removal of Existing Curbs50LM
for MFH157Removal of Existing Curbs & Gutter200LM
Carport Area158Removal of Existing Concrete Sidewalks800SM
159Removal of Existing Precast Drain Inlet10EA
TOTAL ESTIMATED AMOUNT OF ELINs (Yen)0

&10Exhibit B RFP No. FA520526R0001 &10Page &P of &N

Exhibit C

EXHIBIT C

MISAWA AB, JAPAN
REQUEST FOR PROPOSAL No. FA520526R0001
CONTRACT No.

Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)

Company Name and Address

CategoryELIN CDescriptionEstimated QuantityUnit of IssueUnit Price ¥Estimated Amount ¥
001GPS Survey for Existing Survey Point (The second grade survey point)4EA
Survey,002Existing Topographic Survey100,000SM
Test and003Survey for Road Center, Detailed Road Profile and Cross Section200LOT
Preparation004Quantity Survey of Current Condition for Pavement and Construction Area (Standard length of 20m per extension)200LOT
005Quantity Survey of Current Condition for Road Paint Markings3,000LM
006Core Drilling and Sampling of AC or Concrete Pavement of Roads, Parking Lots, and Other Surfaces40EA
007Test Digging of AC Pavement, not to exceed within 1m square x 1.5m depth includes temporary pavement restoration20EA
008Field CBR and Laboratory Test of Roads, Parking Lots and Other Surfaces1EA
009Test Sampling and Site Preparation for Base Stabilization Mixture1SET
010Transportation of Removed Soil, Concrete, AC, Concrete products and Miscellaneous Material from Construction Site to Stock Yard/on Base1,000CM
General011Construct Formwork for General Civil Concrete Work40SM
Construction012Install Bollard Sleeve7EA
and Other Work013Construct Steel Reinforcement Bar1MTON
014Construct Basis Crushed Stone (RC-40), 150mm Thick10CM
015Place Concrete (21-8-25)5CM
016Place Concrete (24-8-25)5CMERROR:#REF!
017Install Joint Filler200SM
018Install Sealant (10mm x 5mm)1,800LM
019Contraction Joint with Concrete Saw Cutter1,100LM
020Traffic Regulator (Flag Man)800MAN/DAY
021Placing and Removing Steel Plate, Size 1.5m x 3.0m200EA/DAY
022Construct Subbase Course (RC-40), Max Thickness 400mm100CM
Asphalt023Construct Base Course (M-25), Max Thickness 150mm300CM
Paving Work024Leveling Base Course (M-25, Within 50mm)500CM
025Base Stabilization for Pavement, Mix 150mm Thick3,000SM
026Base Stabilization for Pavement, Mix 200mm Thick2,000SM
027Prime Coat (PK-3)16,000SM
028Tack Coat (PK-4)2,000SMERROR:#REF!
029Tack Coat (PKM-T)10,000SM
030Construct Recycled AC Intermediate Course (AC No.2) with Man Power Paving30MTON
031Construct Recycled AC Intermediate Course (AC No.2), Road Width 1.4m- 3.0m200MTON
032Construct Recycled AC Intermediate Course (AC No.2), Road Width 3.0m Or More1,000MTON
033Construct Recycled AC Wearing Course (AC No.5) with Man Power Paving50MTON
034Construct Recycled AC Wearing Course (AC No.5), Road Width 1.4m- 3.0m300MTON
035Construct Recycled AC Wearing Course (AC No.5), Road Width 3.0m Or More1,000MTON
036Construct AC Surface by Modified Asphalt (AC No.5 Type 2) with Man Power Paving20MTON
037Construct AC Surface by Modified Asphalt (AC No.5 Type 2), Road Width 1.4m- 3.0m80MTON
038Construct AC Surface by Modified Asphalt (AC No.5 Type 2), Road Width 3.0m Or More300MTON
039Construct AC Clack Suppression Layer, (Special Modified Hot Mix AC), 15mm thick, Road Width 3.0m Or More2,000SM
Geotextiel Work040Install Geotextile sheets for pavements200SM
041Digging and Grading for Curbs Work240CM
Curbs and042Leveling Basis Crushed Stone for Curbs (RC-40, Average thickness 50mm)60CM
Sidewalk Work043Form Work for Curbs100SM
044Form Work for Curbs & Gutter800SM
045Place Concrete (24-8-25) for Concrete Curbs50CM
046Place Concrete (24-8-25) for Concrete Curbs & Gutter150CM
047Install Precast Type A Block500LM
048Install Precast Type C Block200LM
049Backfill with Excavated Soil100CM
050Backfill with New Soil50CM
051Base Course Restoration for Road (M-25)100CM
052Base Course Restoration (RC-40), 100mm Thick60CM
053Frost Inhibition Course Restoration (RC-40),250mm Thick70CM
054Core Drilling for Snow Pole Hole, 45mm Dia100EA
055Construct Base Course for Sidewalk, (RC-40 100mm Thick)300SM
056Leveling Base Course for Sidewalk (RC-40, Within 50mm)100CM
057Frost Inhibition Course (Sand Pit), 250mm Thick30CM
058Form Work for Sidewalk250SM
059Place Concrete (24-8-25) for Concrete Sidewalk100CM
060Removal and Disposal of Existing Pavement Markings with Griding or Scarifying2,000LM
Paveyment061Removal and Disposal Existing Pavement Markings with Water Pressure500LM
Markings,062Install Reflective Marking, White (W=15cm)3,000LM
Traffic Safety063Install Hot Applied Reflective Markings, White (W=15cm)2,000LM
Work064Install Temporary Pavement Striping8,000LM
065Alphanumeric Concrete Curb Marking10EA
066Install Handicap Symbol Marking, White2EA
067Relocate Traffic Sign & Post4EA
068Removal of Existing Grass100CM
Earth Work,069Road Excavation, less than 5,000m3100CMERROR:#REF!
Sodding, Planting Work070Construct Embankment for Roadbed with New Soil, Road Width 4.0m or more, 20,000m3 less100CM
071Construct Embankment for Roadbed with New Soil, Road Width 2.5m- 4.0m150CM
072Construct Embankment for Roadbed with New Soil, Road Width 2.5m less50CM
073Construct Embankment for Roadbed with Excavated Soil, Backhoe 0.25m3200CM
074Slope Surfacing200SM
075Place New Top Soil, 100mm Thick100CM
076Place Sod (Noshiba)1,000SM
077Excavation for Underground Utilities150CM
Sanitary Sewer,078Install 200mm VU Rib Pipe50LM
Drainage Work079Install 300mm VU Rib Pipe20LM
080Install Precast Box Culvert 300mm8LM
081Install Precast Box Culvert 400mm6LM
082Install Mechanical Pipe Joint (CP to VU)10EA
083Backfill with Excavated Soil60CM
084Backfill with New Soil50CM
085Sub Base Course Restoration (RC-40), 400mm Thick40SM
086Base Course Restoration (M-25), 150mm Thick20SM
087Raise/Lower Existing Concrete Frame and Grating Cover of Gutter Inlet10EA
088Install New Concrete Frame and Grating Cover (T-20) of Gutter Inlet20EA
089Install New Gutter Inlet with Pre-cast Concrete Structures, Inlet Height 1.3m10EA
090Install New Frame and Grating Cover (T-25) for Catch Basin, 600 mm square3EA
091Install New Frame and Grating Cover (T-25) for Catch Basin, 900 mm square3EA
092Install Precast Catch Basin (600x600x1200) with Grating Cover (T-25)3EA
093Install Precast Catch Basin (900x900x1200) with Grating Cover (T-25)3EA
094Raise/Lower Existing Manhole Frame and Cover6EA
095Install New Manhole Frame and Cover (T-25)4EA
096Install New Manhole with Pre-cast Concrete Structures, Height 1.5m x 900mm Dia1EA
097Install New Manhole with Pre-cast Concrete Structures, Height 1.5m x 1,200mm Dia1EA
Water Line098Raise/Lower Existing Water Gate Valve Box2EA
Work099Replace Water Gate Valve Box2EA
100Saw Cutting of Existing AC Pavement, less than 15cm3,000LM
Removal and101Saw Cutting of Existing AC Pavement, T=15cm - 30cm300LM
Disposal Work102Saw Cutting of Existing Concrete Pavement, less than 15cm50LM
103Cold Milling of AC Pavement, less than 6cm1,500SM
104Removal of AC Pavements with Soil Stabilizer, less than 30cm2,000SM
105Removal of AC Pavement, less than 10cm15,000SM
106Removal of AC Pavement, T=10cm - 20cm1,000SM
107Removal of Existing Curbs100LM
108Removal of Existing Curbs & Gutter1,500LM
109Removal of Existing Concrete Sidewalks2,000SM
110Removal of Existing Precast Drain Inlet30EA
111Removal of Existing Precast Inlet Frame and Cover10EA
112Existing Concrete Structure Breaking and Chipping5CM
113Removal of Reinforced Concrete by Labor5CM
114Removal of Concrete Pipe40LM
115Removal of PVC Pipe20LM
116Removal of Existing Manhole Frame and Cover10EA
117Removal of Existing Catch Basin (H= 1.5m less)6EA
118Removal of Existing Manhole (H= 1.5m less)6EA
119Removal of Existing Tree and Stump, Circumference of tree less than 20cm10EA
120Removal of Existing Tree and Stump, Circumference of tree 21~30cm5EA
121Hauling and Disposal of Extra Soils/Gravels to Off Base300CM
122Hauling and Disposal of Asphalt Concrete and Cold Milling AC to Off Base4,000MTON
123Hauling and Disposal of Plain Concrete to Off Base1,000MTON
124Hauling and Disposal of Reinforced Concrete to Off Base30MTON
125Hauling and Disposal of Precast Concrete Product to Off Base100MTON
126Hauling and Disposal of Plastics to Off Base2MTON
127Hauling and Disposal of Trees and stump to Off Base20MTON
128Excavation and Grading for Parking Lot50CM
Asphalt Paving129Leveling Base Course (M-25, Within 50mm)30CM
Work for MFH130Prime Coat (PK-3)800SM
Carport Area131Tack Coat (PK-4)800SM
132Construct Recycled AC Intermediate Course (AC No.2)100MTON
133Construct Recycled AC Wearing Course (AC No.5)80MTON
134Digging for Curbs Work30CM
Curbs and135Leveling Basis Crushed Stone (RC-40, Within 50mm)30CM
Sidewalk for136Place Concrete (24-8-25) for Concrete Curbs5CM
MFH Carport137Place Concrete (24-8-25) for Concrete Curbs & Gutter20CM
Area138Install Precast Type A Block50LM
139Install Precast Type C Block30LMERROR:#REF!
140Backfill with Excavated Soil50CM
141Backfill with New Soil50CM
142Base Course Restoration (M-25) , 150mm Thick20CM
143Base Course Restoration (RC-40,) 100mm Thick20CM
144Frost Inhibition Course Restoration (RC-40), 250mm Thick10CM
145Construct Base Course for Sidewalk, (RC-40 100mm Thick)300SM
146Leveling Base Course for Sidewalk (RC-40, Within 50mm)50CM
147Frost Inhibition Course (Sand Pit), 250mm Thick50CM
148Place Concrete (24-8-25) for Concrete Sidewalk80CM
Sanitary Sewer,149Excavation for Underground Utilities50CM
Drainage Work150Backfill with Excavated Soil50CM
for MFH151Backfill with New Soil30CM
Carport Area152Sub Base Course Restoration (RC-40), 400mm Thick80SM
153Base Course Restoration (M-25), 150mm Thick80SM
154Transportation of Removed Soil, Concrete, AC, Concrete Products and Miscellaneous Material from Construction Site to Stock Yard/on Base200CM
Removal and155Removal of AC Pavement, less than 10cm900SMERROR:#REF!
Disposal Work156Removal of Existing Curbs50LM
for MFH157Removal of Existing Curbs & Gutter200LM
Carport Area158Removal of Existing Concrete Sidewalks800SM
159Removal of Existing Precast Drain Inlet10EA
TOTAL ESTIMATED AMOUNT OF ELINs (Yen)0