Revised Appendix 9 Safety and Enviro MGT - See yellow highlighted changes

View the file

Other files

File Type Posted
SF_30_Amendment_9.pdf PDF
Fort_Wainwright_CDC_equipment_list_(1).pdf PDF
SF_30_Amendment_10.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r6.xlsx XLSX spreadsheet
Solicitation_Questions_combined_round_7_amend_ready.pdf PDF
SF_30_Amendment_6.pdf PDF
SF_30_Amendment_7.pdf PDF
SF_30_Amendment_8.pdf PDF
Request_for_Proposal_with_PWS_r4.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r5.xlsx XLSX spreadsheet
Attachment_7-SubContractingPlanForm.doc DOC document
Attachment_10_-_Refrigerant_Usage.pdf PDF
Solicitation_Questions_combined_round_6_amend_ready.pdf PDF
Request_for_Proposal_with_PWS_r3.pdf PDF
Attachment_9_-_CEIP_Vendor_List.pdf PDF
SF_30_Amendment_5.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r4.xlsx XLSX spreadsheet
Solicitation_Questions_combined_round_5_amend_ready.pdf PDF
Appendix_2__Commissary_Equipment_r3.pdf PDF
Appendix_3_PMTasks_V2.pdf PDF
Solicitation_Questions_combined_round_4_amend_ready.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r4.xlsx XLSX spreadsheet
Appendix_2__Commissary_Equipment_r2.pdf PDF
Attachment_4__-_Refridge_Alarm_Monitor_v2.pdf PDF
SF_30_Amendment_4.pdf PDF
Request_for_Proposal_with_PWS_r1.pdf PDF
Attachment_8_-_DeCA_Past_TI_data_v2.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r3.xlsx XLSX spreadsheet
SF_30_Amendment_3.pdf PDF
Solicitation_Questions_ _answer-_amendment_3.docx DOCX document
Appendix_17_CEIP_PM_Tasks_r1.pdf PDF
Appendix_3_PMTasks.pdf PDF
Questions-answer_round_1-_amendment_2.pdf PDF
SF_30_Amendment_2.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r2.xlsx XLSX spreadsheet
SF_30_Amendment_1.pdf PDF
Appendix_3_PMTasks.pdf PDF
2014_PENSACOLA_NAS_FL_027-Fac_Equip_APP_02_ _APP_20_CEIP.xlsx XLSX spreadsheet
047-2014_MCCONNELL_AFB_KS_Fac_Equip_APP_02_ _APP_20_CEIP.xlsx XLSX spreadsheet
Appendix_17_Baler_PM_Tasks.pdf PDF
Attachment_1_-Price_Schedule_for_RFP.xlsx XLSX spreadsheet
GUAM_CDC.xlsx XLSX spreadsheet
Attachment_2_-_SCA_Wage_Determination.pdf PDF
Appendix_16_-_Financial_Reports.pdf PDF
Appendix_6_Temp_Standards.pdf PDF
Attachment_1_-Price_Schedule_for_RFP.xlsx XLSX spreadsheet
Attachment_2_-_SCA_Wage_Determination.pdf PDF
Appendix_2__Commissary_Equipment.pdf PDF
Appendix_12_Sample_Roof_Report.pdf PDF
Appendix_13_Yr_Built.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e 1 1

Appendix 9 Safety and Environmental Management

1.1 General

The Contractor must comply with all Federal, State, local laws and base regulations that relate to the maintenance and operation of equipment and systems within the scope of this contract, to include permitting, inspection, and personnel safety, control of hazardous substances, certification, and recordkeeping.

1.2 Scheduling and Recordkeeping

The Contractor must maintain copies of all such tests, certifications, permits and other required records, and provide copies to the COR. In addition, all required safety and environmental tests; certifications, permits, and other procedures required in this document must be scheduled in the CMMS work order system and documented in the CMMS.

1.3 Refrigerant Control and Certification

The Contractor must control refrigerants and maintain records in accordance with EPA, GSA, and air quality management district standards. The Contractor must take appropriate immediate action and report leaks to the COR.

The Contractor must maintain and test refrigerant monitors and alarms and purge ventilation systems as part of the maintenance program. Testing must use appropriate media to test sensors as well as alarm circuitry.

Refrigerant control logs must be updated as required, and a copy sent to the COR. The Contractor must also maintain a set of logs onsite and make this set of logs available to Government inspection.

Contractor employees who come into contact with refrigerants in the course of their duties must be certified to handle such refrigerants. If equipment containing chlorofluorocarbon (CFC) or hydro chlorofluorocarbon (HCFC) refrigerants is removed from operation under this contract, the Contractor must recover all refrigerant in the equipment, seal it in appropriate storage containers, reclaim and reuse it as directed by the COR, or dispose of it within EPA guidelines.

In the event of fines or penalties levied by the EPA or an Air Quality Management District, the Contractor may be charged the cost as a performance deduction under the Quality Assurance Surveillance Plan clauses; see Appendix 4 and Contractor Discrepancy Report

(CDR).

2 | P a g e 1 1

1.4 Air Quality Management District (AQMD) Operating Permits

The Contractor must be familiar with the requirements of the local AQMD, and shall be responsible for obtaining operating permits for boilers, generators and other emissions-producing equipment regulated by the district and making copies available to the COR or designee. In the event of fines or penalties levied by an AQMD, the Contractor may be charged the cost as a performance deduction under the Quality Assurance Surveillance Plan clauses; see Appendix 4 and Contractor Discrepancy Report (CDR).

1.5 Underground Storage Tanks

The Contractor is responsible for complying with all Federal, State, local and base requirements for the periodic inspection, monitoring, permitting, certification and maintenance of underground storage tanks.

1.6 Polychlorinated Biphenyl (PCB) Control

The Contractor must inspect all transformers containing polychlorinated biphenyls (PCBs) and maintain records of such inspections in accordance with State, local, and EPA regulations.

The COR or designee must be notified immediately if any such equipment is found to contain PCBs, or suspected to contain PCBs. Equipment verified to contain PCBs, except lighting ballasts, must be labeled as containing PCBs.

Any transformer leaks of PCBs must be reported immediately to the COR or designee.

The Contractor must inspect all leaks in accordance with State, local, and EPA regulations. The Contractor must take immediate action to contain all leaks.

There may be light ballasts containing PCBs in the buildings covered by this contract.

Replacement and proper disposal of all burned-out ballasts, including PCB ballasts, shall be the responsibility of the Contractor.

1.7 Hazardous Waste

The Contractor must be cognizant of, and comply with, all Federal, State, and local laws and regulations related to the disposal (landfill, sewer discharge, etc.) of hazardous waste and materials used or removed in the performance of the contract or discharged by the building, and must comply with all such requirements, including record keeping requirements.

Fluorescent lamps, batteries, and other items in any quantity subject to the Universal Waste rules for hazardous waste management and disposal must be recycled or disposed of properly.

1.8 Facility Hazards

The Contractor must assist in identifying facility health and safety hazards and report all hazards immediately in writing to the COR on GSA Form 3614, GSA Notice of

3 | P a g e 1 1

Unsafe/Unhealthful Workplace Conditions. The Contractor must take immediate action (within one hour or less) to control hazards that present an imminent danger.

1.9 Workplace Safety

The Contractor must develop a site-specific occupational safety and health program specifically addressing applicable components of 29 CFR 1910 and 29 CFR 1926. The safety and health program must be submitted to the COR or designee for review and approval 30 days after award. By approving the program, GSA assumes no responsibility for the Contractor’s occupational safety and health program.

1.10 Electrical Safety

The Contractor must comply with NFPA 70 and 70E when working on or around electrical equipment or systems and must use International Electrical Testing Association (NETA) certified employees when working on switchgear equipment. The Contractor will ensure that areas restricted to qualified personnel are secured and properly labeled. The Contractor must ensure that employees who work on electrical equipment or systems are qualified for such work.

1.11 Fall Protection

The Contractor must develop specific fall protection procedures for work on roofs, equipment, and other areas at elevation. The Contractor must ensure fall protection equipment is provided to their employees and that employees are adequately trained.

1.12 Powered Platforms

The contractor must inspect, test, and maintain all permanently installed powered platforms in accordance with 29 CFR 1910.66, and provide copies of such certifications to the COR.

1.13 Lockout/Tagout

The Contractor must develop a lockout/Tagout program in accordance with 29 CFR 1910.147.

The program must include all anticipated energy sources, including but not limited to, electricity, steam, pressurized fluids, and mechanical energy. The Contractor must communicate the lockout/Tagout program to all other affected contractors.

1.14 Confined Spaces

The Contractor must identify and label all confined spaces in accordance with OSHA requirements.

The Contractor must develop a confined space entry permit system for all permit-required confined spaces from all state and local authorities having jurisdiction for each location within 60 calendar days of commencement of the contract.

4 | P a g e 1 1

1.15 Asbestos Management

The Contractor shall be expected to occasionally perform Class III and Class IV asbestos work as defined in 29 CFR 1926.1101. The Contractor must be prepared to deal with asbestos on a small-scale, short-duration basis to effect emergency repairs and to clean up small spills. The Contractor must protect building tenants, visitors, and employees from asbestos exposure.

The Contractor must comply with applicable OSHA regulations and all applicable Federal, State, and local asbestos regulations. The Contractor must immediately become familiar with, comply with, and recommend any appropriate changes to the Government Asbestos Management Plan for the building. Contractor personnel who perform the abovementioned work must have been appropriately trained in accordance with 40 CFR Part 763.

1.16 Hazardous Materials

The Contractor must make Material Safety Data Sheets (MSDS) available to their employees in accordance with 29 CFR 1910.1200. MSDS must also be made available to the COR or designee on request.

The Contractor must prepare and submit a hazardous materials inventory. This must itemize all materials of a type with an MSDS and approximate quantities stored or to be stored as well as the exact locations where hazardous materials are to be stored. The inventory must be kept current and resubmitted annually by September 30 of each year.

1.17 PRESSURE VESSEL OPERATION AND INSPECTION STANDARDS

Inspections must be in accordance with applicable codes and regulations including but not limited to:

(1) ASME Boiler and Pressure Vessel Code.

(2) National Board Inspection Code.

(3) Environmental Protection Agency and local AQMD requirements.

(4) ASME CSD-1, Control & Safety Devices for Automatically Fired Boilers.

(5) NFPA 85, Boiler and Combustible Systems Hazards Code.

The Contractor must have unfired pressure vessels with design operating pressure in excess of 60 pounds per square inch (psi) and a capacity in excess of 15 gallons inspected annually.

The Contractor must complete GSA Form 350 (Inspection Report of Unfired Pressure Vessels) or an equivalent approved form for each unfired pressure vessel inspected. A GSA Form 1034 (Certificate of Inspection) or an equivalent approved form must be completed and posted on or near the equipment. Inspections must be made by inspectors certified by the National Board of Boiler and Pressure Vessel Inspectors, who must be employed by an independent firm specializing in boiler and unfired pressure vessel inspections.

5 | P a g e 1 1

1.18 Backflow Prevention Devices

The Contractor must maintain all existing backflow prevention devices and certify them as prescribed by Federal, State, and local laws, ordinances, and regulations. If no local requirement exists, a certified inspector must inspect all existing backflow prevention devices on an annual basis and provide certification of proper operation to the COR or designee.

While the Government will generally pass on to the Contractor backflow testing notices received from local water districts or other local authorities, the Contractor is responsible for timely completion and submission of such test results regardless of receipt of such notices.

In addition to other requirements, backflow prevention devices used on water-based fire suppression systems must be inspected, tested, and maintained in accordance with NFPA 25.

1.19 Potable Water Systems

The Contractor must comply with The Safe Drinking Water Act, PL 99-339, as amended, and the Environmental Protection Agency Safe Drinking Water regulations (40 CFR 141.43, sections A and D), which address the quantity of lead allowable in new installations or repairs to existing drinking water systems and or plumbing. Potable water systems that are repaired, modified, serviced, or breeched in any way must be disinfected and flushed as needed prior to returning the system to service.

1.20 Labeling and Signage

The Contractor must maintain the labeling of existing equipment, pipes, storage areas, containers, confined space, and workspaces as well as associated signage, in accordance with OSHA standards to ensure labels are visible and not obliterated. Any equipment, pipes, etc., newly installed by the Contractor require labeling and signage per OSHA standards must be labeled immediately upon completion of the installation and maintained throughout the contract period.

1.21 Roof Anchorage Points

The Contractor must provide for an annual inspection of designated roof anchorage points by qualified personnel. Anchorages must be inspected in accordance with the anchor manufacturer’s requirements and additional requirements contained in the installation certification. Copies of the inspection reports must be provided to the COR. If an area of suspicion is identified, the anchorage must be tagged “out of service” and immediately reported to the COR. ANSI/IWCA I-14 may be consulted for further guidance.

6 | P a g e 1 1

2. FIRE PROTECTION AND LIFE SAFETY EQUIPMENT AND SYSTEMS

2.1 General

All fire protection and life safety systems and equipment must be kept fully functional at all times, except for limited periods for maintenance with the COR’s approval. The inspection, testing, repairs, and maintenance of all fire protection and life safety equipment and systems must be in accordance with the requirements in the applicable NFPA code or standard.

2.2 Fire Alarm System

Services include, but are not limited to, the performance inspection, testing, and preventive maintenance or repair of a variety of fire alarm and notification systems, equipment and components such as manual alarm devices, smoke and heat detectors, tamper switches, pressure switches, water flow switches, remote and graphic annunciators, main fire alarm panel and components, voice alarm systems, speakers, horns, and other audible and visual devices, wiring circuits and junctions, all other alarm, detection and control and ancillary devices, and emergency power operations.

The Contractor must comply with all appropriate safety code requirements. If the Contractor encounters equipment that is in a condition that may endanger life or property, the Contractor must immediately notify the COR of the condition requiring immediate action. Within 24 hours the Contractor must provide to the COR a written report of the hazardous condition and recommended corrective action.

The Contractor must provide all tools and supplies necessary to properly perform inspections, tests, and maintenance in accordance with the current edition of NFPA 72.

All fire alarm system, inspections, tests, maintenance, alterations, and repairs performed under this contract must comply with the current edition of the NFPA 72 National Fire Alarm Code including all appendices. Anywhere NFPA 72 states "should," it shall be taken to mean, "shall." The Contractor is responsible for meeting the inspection, maintenance, testing frequencies and testing methods outlined in NFPA 72. Documentation of the above mentioned inspection, maintenance, and testing results must be recorded on the applicable Inspection and Testing Form from NFPA 72.

All fire alarms testing, with the exception of interconnected building functions, must be performed after normal working hours. Testing of the interconnected building functions, including, but not limited to, air handler shutdown, damper control, elevator recall, egress door unlocking, etc., must be performed during hours the interconnected equipment is active.

The testing of the fire alarm system shall not be considered complete without the testing of interconnected equipment. The Contractor must provide a fire watch in areas left unprotected until the fire alarm system is completely restored during the performance of routine service and testing procedures. If the system cannot be restored through no fault of the Contractor’s, a fire watch still must be provided until the system is restored, however the Contactor may seek reimbursement for the fire watch with the COR or designee, through the TI process. The Contractor must leave areas where they perform work neat, clean, and orderly.

7 | P a g e 1 1

IN NO CASE SHALL THE FIRE ALARM SYSTEMS BE LEFT IN A

DISABLED CONDITION WITHOUT NOTIFYING THE COR!

Fire alarm system maintenance and repair may impact asbestos containing material (ACM).

ACM is often found in sprayed-on fireproofing (on ceiling slabs and support beams), insulation (on pipes, valves, boilers), and within wall materials. The Government must inform the Contractor of any known ACM in an individual building. If the Contractor must disturb materials he suspects may contain ACM, the Contractor must immediately report it to the COR. The COR will investigate and instruct the Contractor on how to avoid an airborne asbestos exposure. Fire alarm system maintenance and repair may impact lead-based paint.

The Government must inform the Contractor of any known lead-based paint in an individual building. If the Contractor must disturb materials he suspects may contain lead-based paint, the Contractor must immediately report it to the COR. The COR will investigate and instruct the Contractor on how to avoid lead-based paint contamination.

The Contractor must ensure that the fire alarm system is maintained and operable at all times except while being tested or repaired. It is essential that the Contractor carefully schedule with the building manager all non-emergency shutdowns of the fire alarm system and that back up protection be provided by the Contractor (arrangement of additional personnel stationed in the areas affected and at the fire alarm system control panel) any time that the fire alarm system is out of service for more than 4 hours. In addition, regardless of the duration of the shutdown, the affected portion of the system must be tested to ensure that the protection has been restored.

The Government reserves the right to make any test or inspection it deems necessary to make sure that all performance requirements are being maintained.

The Contractor must employ fire alarm system technicians who are certified by the National Institute for Certification in Engineering Technologies (NICET) or the equivalent from State and Local authorities having jurisdiction. Fire alarm system technicians performing contract work must meet the service personnel qualification requirements in the current edition of NFPA 72 and also hold at least a NICET Level 2 (Associate Engineering Technician) or equivalent from State and Local authorities having jurisdiction in Fire Protection Engineering Technology Fire Alarm Systems.

The Contractor may be asked to remove persons who pose a threat to health, safety, or security of an installation. While onsite all Contractor personnel must possess current NICET certification or the equivalent from State and Local authorities having jurisdiction.

2.3 Fire Alarm System Central Station Monitoring

The Contractor must maintain a UL-listed central station monitoring service to monitor all fire alarm transmitters and related equipment. The Contractor must ensure all fire alarm systems are connected to the monitoring service. During any period when the central station monitoring is not operational, the Contractor must maintain a fire watch. If the Contractor believes the central station monitoring failure was through no fault of his own, the Contractor may request reimbursement for the fire watch from the COR or designee.

8 | P a g e 1 1

2.4 Water-Based Fire Suppression Systems

Services consist of, but are not limited to, the performance inspection, testing, and preventive maintenance or repair services of all mechanical devices, including valves, sprinklers, couplings, piping and connections, water motor gongs and alerting devices, tamper switches, pressure switches, water flow switches, standpipes, backflow preventers, private fire service mains, pumps, and test headers.

The Contractor must comply with all appropriate safety code requirements. If the Contractor encounters equipment that is in a condition that may endanger life or property, the Contractor must immediately notify the COR of the condition requiring immediate action. Within 24 hours the Contractor must provide to the COR a written report of the hazardous condition and recommended corrective action.

The Contractor must provide all tools and supplies necessary to properly perform inspections, tests, and maintenance, in accordance with the current edition of NFPA 25, Inspection, Testing, and Maintenance of Water-Based Fire Extinguishing Systems, including appendices. All water- based fire suppression system testing must be performed after normal working hours unless approved otherwise by the COR.

All water-based fire extinguishing system inspections, tests, and maintenance performed under this contract must comply with the current edition of NFPA 25. Anywhere NFPA 25 states "should," it shall be taken to mean "shall." The Contractor is responsible for meeting the inspection, maintenance, and testing frequencies and testing methods outlined in NFPA 25. Documentation of the above mentioned inspection, maintenance, and testing results must be recorded on the applicable suggested form, as found in the current edition of NFPA 25.

IN NO CASE SHALL ANY WATER BASED FIRE SUPPRESSION SYSTEM BE

LEFT IN A DISABLED CONDITION WITHOUT NOTIFYING THE COR!

Water-based fire extinguishing system maintenance and repair may impact ACM. ACM is often found in sprayed-on fireproofing (on ceiling slabs and support beams), insulation (on pipes, valves, boilers), and within wall materials. The Government shall inform the Contractor of any known ACM in an individual building. If the Contractor must disturb materials he suspects may contain ACM, the Contractor must immediately report it to the COR. The COR will investigate and instruct the Contractor on how to avoid an airborne asbestos exposure.

Water-based fire extinguishing system maintenance and repair may impact lead-based paint.

The Government shall inform the Contractor of any known lead-based paint in an individual building. If the Contractor must disturb materials he suspects may contain lead-based paint, the Contractor must immediately report it to the COR. The COR will investigate and instruct the Contractor on how to avoid lead-based paint contamination.

The Contractor must ensure that the sprinkler system is maintained and operable at all times except while being tested or repaired. It is essential that the Contractor carefully schedule with the building manager and COR all non-emergency shutdowns of the sprinkler system and that

9 | P a g e 1 1 back up protection be provided by the Contractor any time the sprinkler system is out of service for more than 4 hours. In addition, regardless of the duration of the shutdown, the affected portion of the system must be tested to ensure that the protection has been restored.

The Contractor must provide a fire watch in areas left unprotected until the water-based fire suppression system is completely restored to service during the performance of any routine service and testing procedures. If the Contractor believes they were not able to restore sprinkler service due to circumstance outside of their control, the Contractor may request reimbursement for that portion or the fire watch from the COR or designee, through the TI process.

The Contractor must leave areas where he performs work neat, clean and orderly.

The Government reserves the right to make any test or inspection it deems necessary to ensure all performance requirements are being met.

The Contractor must utilize sprinkler system technicians who are certified by the National Institute for Certification in Engineering Technologies (NICET) or equivalent from State and Local authorities having jurisdiction. Technicians performing services for the inspection, testing, and maintenance of the building's water-based fire protection systems in accordance with the contract must hold at least a NICET Level 2 (Associate Engineering Technician) certification or the equivalent from State and Local authorities having jurisdictions, in Fire Protection Engineering Technology, Inspection and Testing of Water-Based Systems.

The Contractor may be asked to remove persons who pose a threat to health, safety, or security of an installation. While onsite, all contractor personnel must possess the current NICET certification, or equivalent from State and Local authorities having jurisdiction.

2.5 Fire Doors and Other Opening Protective

Services consist of, but are not limited to, the performance inspection, testing and preventive maintenance of all fire door assemblies and other opening protective.

The Contractor must provide all tools and supplies necessary to properly perform inspections, tests and maintenance or repairs in accordance with the current edition of NFPA 80, Standard for Fire Doors and Other Opening Protective, including appendices. Anywhere NFPA 80 states "should", it shall be taken to mean "shall." The Contractor is responsible for meeting the inspection, maintenance, testing frequencies, testing methods, and documentation requirements outlined in NFPA 80.

The Government reserves the right to make any test or inspection it deems necessary to ensure all performance requirements are being met.

10 | P a g e 1 1

2.6 Fire and Combination Fire/ Smoke Dampers

Services consist of but are not limited to, the inspection, testing, and preventive maintenance of all fire and combination fire/smoke dampers.

The Contractor must provide all tools and supplies necessary to properly perform inspections, tests, and maintenance or repairs in accordance with the current edition of NFPA 80, Standard for Fire Doors and Other Opening Protective’s, including appendices. Anywhere NFPA 80 states "should," it shall be taken to mean "shall." The Contractor is responsible for meeting the inspection, maintenance, testing frequencies, testing methods, and documentation requirements outlined in NFPA 80.

The Government reserves the right to make any test or inspection it deems necessary to ensure all performance requirements are being met.

2.7 Portable Fire Extinguishers

Services consist of, but are not limited to, the inspection, testing, and preventive maintenance of all portable fire extinguishers.

The Contractor must provide all tools and supplies necessary to properly perform inspections, tests, and maintenance or repairs in accordance with the current edition of NFPA 10, Standard for Portable Fire Extinguishers, including appendices. Anywhere NFPA 10 states "should," it shall be taken to mean "shall." The Contractor is responsible for meeting the inspection, maintenance, testing frequencies, testing methods, and documentation requirements outlined in NFPA 10.

The Government reserves the right to make any test or inspection it deems necessary to ensure all performance requirements are being met.

The Contractor must utilize technicians performing contract work involving the inspection, testing, and maintenance of portable fire extinguishers that meet the qualification requirements of the current edition of NFPA 10 and possess current training certification by the respective portable fire extinguisher manufacturers verifying competence to work on these units.

The Contractor may be asked to remove persons who pose a threat to the health, safety, or security of an installation.

2.8 Non-Water-Based Fire Extinguishing Systems

Services consist of, but are not limited to, the inspection, testing, and preventive maintenance of the following types of non-water-based fire extinguishing systems:

• Carbon dioxide extinguishing systems, NFPA 12, Standard on Carbon Dioxide Extinguishing

11 | P a g e 1 1

Systems

• Halogenated extinguishing systems, NFPA 12A, Standard on Halon 1301 Fire Extinguishing Systems

• Dry chemical extinguishing systems, NFPA 17, Standard for Dry Chemical Extinguishing

Systems

• Wet chemical extinguishing systems, NFPA 17A, Standard for Wet Chemical Extinguishing Systems

• Fire extinguishing systems, NFPA 96, Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations

• Clean agent fire extinguishing systems, NFPA 2001, Standard for Clean Agent Fire

Extinguishing Systems

The Contractor must provide all tools and supplies necessary to properly perform inspections, tests, and maintenance in accordance with the current edition of the applicable NFPA standards, including appendices. Anywhere an NFPA standard states "should," it shall be taken to mean "shall." The Contractor is responsible for meeting the inspection, maintenance, testing frequencies, testing methods, and documentation requirements outlined in the applicable NFPA standards.

The Government reserves the right to make any test or inspection it deems necessary to ensure all performance requirements are being met. The Contractor must utilize technicians performing contract work involving the inspection, testing, and maintenance of non-water-based extinguishing systems who meet the qualification requirements of the current editions of the respective NFPA code.