About this file

Sample Roof Report

View the file

Other files

File Type Posted
SF_30_Amendment_9.pdf PDF
Fort_Wainwright_CDC_equipment_list_(1).pdf PDF
SF_30_Amendment_10.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r6.xlsx XLSX spreadsheet
Solicitation_Questions_combined_round_7_amend_ready.pdf PDF
SF_30_Amendment_6.pdf PDF
SF_30_Amendment_7.pdf PDF
SF_30_Amendment_8.pdf PDF
Request_for_Proposal_with_PWS_r4.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r5.xlsx XLSX spreadsheet
Attachment_7-SubContractingPlanForm.doc DOC document
Attachment_10_-_Refrigerant_Usage.pdf PDF
Solicitation_Questions_combined_round_6_amend_ready.pdf PDF
Request_for_Proposal_with_PWS_r3.pdf PDF
Appendix_9_Safety_Enviro_Mgmt.pdf PDF
Attachment_9_-_CEIP_Vendor_List.pdf PDF
SF_30_Amendment_5.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r4.xlsx XLSX spreadsheet
Solicitation_Questions_combined_round_5_amend_ready.pdf PDF
Appendix_2__Commissary_Equipment_r3.pdf PDF
Appendix_3_PMTasks_V2.pdf PDF
Solicitation_Questions_combined_round_4_amend_ready.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r4.xlsx XLSX spreadsheet
Appendix_2__Commissary_Equipment_r2.pdf PDF
Attachment_4__-_Refridge_Alarm_Monitor_v2.pdf PDF
SF_30_Amendment_4.pdf PDF
Request_for_Proposal_with_PWS_r1.pdf PDF
Attachment_8_-_DeCA_Past_TI_data_v2.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r3.xlsx XLSX spreadsheet
SF_30_Amendment_3.pdf PDF
Solicitation_Questions_ _answer-_amendment_3.docx DOCX document
Appendix_17_CEIP_PM_Tasks_r1.pdf PDF
Appendix_3_PMTasks.pdf PDF
Questions-answer_round_1-_amendment_2.pdf PDF
SF_30_Amendment_2.pdf PDF
Attachment_1_-Price_Schedule_for_RFP_r2.xlsx XLSX spreadsheet
SF_30_Amendment_1.pdf PDF
Appendix_3_PMTasks.pdf PDF
2014_PENSACOLA_NAS_FL_027-Fac_Equip_APP_02_ _APP_20_CEIP.xlsx XLSX spreadsheet
047-2014_MCCONNELL_AFB_KS_Fac_Equip_APP_02_ _APP_20_CEIP.xlsx XLSX spreadsheet
Appendix_17_Baler_PM_Tasks.pdf PDF
Attachment_1_-Price_Schedule_for_RFP.xlsx XLSX spreadsheet
GUAM_CDC.xlsx XLSX spreadsheet
Attachment_2_-_SCA_Wage_Determination.pdf PDF
Appendix_16_-_Financial_Reports.pdf PDF
Appendix_6_Temp_Standards.pdf PDF
Attachment_1_-Price_Schedule_for_RFP.xlsx XLSX spreadsheet
Attachment_2_-_SCA_Wage_Determination.pdf PDF
Appendix_2__Commissary_Equipment.pdf PDF
Appendix_13_Yr_Built.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e 4

Roof Plan Inspection and Repair (Appendix 12)

1. Project Summary

1.1. Description: Provide a viable roof inspection program that includes visual inspections of the roof system surface condition. Perform complete diagnostics of the roof system by a competent qualified inspector. Inspect flashings including, but not limited to, the metal edge system, base flashings on equipment and adjacent/adjoining walls, counter flashings and termination details, soil sacks, and vents, and inspection of roof top projections and equipment, but not limited to pitch pans, HVAC equipment, skylights and access hatches.

Provide roof inspection reports based upon regular and scheduled roof inspections. Develop a roof plan detailing the entire roof system, equipment, utilities, smoke stacks, vents, drains, etc. Use the standardized symbols and plan as provided per attachment (See Figure 1, Roofing Symbols and photos as needed).

Note: The preference is for the Roof Plan to be on an 8”x11” sheet of paper

1.2. Perform preventive maintenance on metal flashings components. Repairs are to include, but not limited to, incidental tears, splits and breaks in membrane flashings.

Contractor will repair all tears and splits with appropriate repair mastics and membranes. Open split flashings strip-ins will be repaired with appropriate repair mastics and membranes. Roof membrane repairs such as tears, breaks, splits, breaks, blisters, which threaten the roof integrity, will be cleaned, primed, and repaired with appropriate repair mastics and membranes. Voids in metal projections, i.e.

hoods/clamps shall be sealed. Unsecured rooftop equipment will be secured.

1.3. Leak response shall be performed on all repairs required to bring the roof system back to a watertight condition. It is desired that the leak response occur while it is still raining to determine the source of the leak. Leak response shall be within 24 hours of notification from any DeCA store listed.

1.4. Perform general housekeeping services. Remove debris, i.e. leaves branches, paper, etc. from the membrane. Remove debris from drains, gutters and scuppers.

Remove and lawfully dispose, in accordance with (IAW) federal, state, and military installation law/regulation all debris, excess materials, and discarded old roof system materials (trash).

2 | P a g e 4

2. Project Description

Contractor shall:

2.1Provide a viable roof inspection program that includes visual inspections of the roof system surface condition meeting the following criteria:

2.1.1 Perform diagnostics of the roof system.

2.1.2 Develop a roof plan detailing the entire roof system, equipment, utilities, smoke stacks, vents, drains, etc. Use the standardized symbols and plan as provided per attachment (See Figure 1, Roofing Symbols).

2.1.3 Inspect flashings including, but not limited to, the metal edge system, base flashings on equipment and adjacent/adjoining walls, counter flashings and termination details, soil sacks, and vents, and inspection of roof top projections and equipment, but not limited to pitch pans, HVAC equipment, skylights and access hatches.

2.1.4 Perform preventative maintenance on metal flashing components.

2.1.4.1 Repairs are to include, but are not limited to, incidental tears, splits, and breaks in membrane flashings. All tears and splits will be repaired with the appropriate mastics and membranes.

2.1.4.2 Open split flashings strip-ins will be repaired with appropriate repair mastics and membranes.

2.1.4.3 Roof membrane repairs such as tears, breaks, splits, blisters, which threaten the roof integrity, will be cleaned, primed, and repaired with appropriate repair mastics and membranes.

2.1.4.4 Repair walkways.

2.1.4.4.1 Adhere walkway pads to the membrane in accordance with (IAW) manufacturers’ specifications, and identify locations on all redline and final drawings.

2.1.4.5 Contractor shall seal voids in metal projections, i.e. hoods/clamps.

2.1.5 Leak response shall be performed on all repairs required to bring the rood system back to a watertight condition.

3 | P a g e 4

2.1.5.1 Leak response shall be within 24 hours of notification from any DeCA store listed in the task order.

2.1.6 Contractor shall provide roof inspection reports based upon regular and scheduled roof inspections.

2.1.7 Unsecured rooftop equipment will be secured.

2.1.8 Note placement and remove the lightning protection system (if applicable).

2.1.9 Remove equipment screen panels (if applicable).

2.1.10 Seal exposed fasteners.

2.1.11 Perform general housekeeping services.

2.1.11.1 Remove debris, i.e. branches, paper, etc. from the membrane.

2.1.11.2 Remove debris from drains, gutters, and scuppers.

2.1.11.3 Remove and lawfully dispose of IAW federal, state, and military installation laws and regulations all debris, excess materials, and discarded old roof system materials (trash).

4 | P a g e 4

Figure 1. Roofing Symbols.

TracieJGutierrez Text Box

SAMPLE ONLY

TracieJGutierrez Text Box

TracieJGutierrez Text Box

TracieJGutierrez Text Box

TracieJGutierrez Text Box

TracieJGutierrez

SAMPLE ONLY

TracieJGutierrez Text Box

TracieJGutierrez Text Box

TracieJGutierrez Text Box

TracieJGutierrez Text Box

RESERVED

TracieJGutierrez

TracieJGutierrez Text Box

TracieJGutierrez Text Box

RESERVED

TracieJGutierrez Text Box

TracieJGutierrez

TracieJGutierrez Text Box

TracieJGutierrez

TracieJGutierrez Text Box

TracieJGutierrez

TracieJGutierrez Text Box

TracieJGutierrez

TracieJGutierrez Text Box

TracieJGutierrez Text Box

RESERVED

TracieJGutierrez Text Box

RESERVED

TracieJGutierrez Text Box

TracieJGutierrez Text Box

TracieJGutierrez Text Box

RESERVED

TracieJGutierrez

TracieJGutierrez Text Box

TracieJGutierrez

TracieJGutierrez Text Box

TracieJGutierrez

TracieJGutierrez

Appendix 13 Roof Plan 09242014
Appendix 13.1 Sample Roof Report Part 1 09242014
Appendix 13.2 Sample Roof Report Part 2 09242014
Appendix 13.3 Sample of a roof leak for DeCa 09242014

File details come from the government source that posted it. Updated .