Appendix_12_Sample_Roof_Report.pdf
PDF 4 MB Posted
- Attached to
- DeCA Facility and Equipment Maintenance
- Solicitation number
- ID08140013
- Issued by
-
GSA Federal Acquisition Service
About this file
Sample Roof Report
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e 4
Roof Plan Inspection and Repair (Appendix 12)
1. Project Summary
1.1. Description: Provide a viable roof inspection program that includes visual inspections of the roof system surface condition. Perform complete diagnostics of the roof system by a competent qualified inspector. Inspect flashings including, but not limited to, the metal edge system, base flashings on equipment and adjacent/adjoining walls, counter flashings and termination details, soil sacks, and vents, and inspection of roof top projections and equipment, but not limited to pitch pans, HVAC equipment, skylights and access hatches.
Provide roof inspection reports based upon regular and scheduled roof inspections. Develop a roof plan detailing the entire roof system, equipment, utilities, smoke stacks, vents, drains, etc. Use the standardized symbols and plan as provided per attachment (See Figure 1, Roofing Symbols and photos as needed).
Note: The preference is for the Roof Plan to be on an 8”x11” sheet of paper
1.2. Perform preventive maintenance on metal flashings components. Repairs are to include, but not limited to, incidental tears, splits and breaks in membrane flashings.
Contractor will repair all tears and splits with appropriate repair mastics and membranes. Open split flashings strip-ins will be repaired with appropriate repair mastics and membranes. Roof membrane repairs such as tears, breaks, splits, breaks, blisters, which threaten the roof integrity, will be cleaned, primed, and repaired with appropriate repair mastics and membranes. Voids in metal projections, i.e.
hoods/clamps shall be sealed. Unsecured rooftop equipment will be secured.
1.3. Leak response shall be performed on all repairs required to bring the roof system back to a watertight condition. It is desired that the leak response occur while it is still raining to determine the source of the leak. Leak response shall be within 24 hours of notification from any DeCA store listed.
1.4. Perform general housekeeping services. Remove debris, i.e. leaves branches, paper, etc. from the membrane. Remove debris from drains, gutters and scuppers.
Remove and lawfully dispose, in accordance with (IAW) federal, state, and military installation law/regulation all debris, excess materials, and discarded old roof system materials (trash).
2 | P a g e 4
2. Project Description
Contractor shall:
2.1Provide a viable roof inspection program that includes visual inspections of the roof system surface condition meeting the following criteria:
2.1.1 Perform diagnostics of the roof system.
2.1.2 Develop a roof plan detailing the entire roof system, equipment, utilities, smoke stacks, vents, drains, etc. Use the standardized symbols and plan as provided per attachment (See Figure 1, Roofing Symbols).
2.1.3 Inspect flashings including, but not limited to, the metal edge system, base flashings on equipment and adjacent/adjoining walls, counter flashings and termination details, soil sacks, and vents, and inspection of roof top projections and equipment, but not limited to pitch pans, HVAC equipment, skylights and access hatches.
2.1.4 Perform preventative maintenance on metal flashing components.
2.1.4.1 Repairs are to include, but are not limited to, incidental tears, splits, and breaks in membrane flashings. All tears and splits will be repaired with the appropriate mastics and membranes.
2.1.4.2 Open split flashings strip-ins will be repaired with appropriate repair mastics and membranes.
2.1.4.3 Roof membrane repairs such as tears, breaks, splits, blisters, which threaten the roof integrity, will be cleaned, primed, and repaired with appropriate repair mastics and membranes.
2.1.4.4 Repair walkways.
2.1.4.4.1 Adhere walkway pads to the membrane in accordance with (IAW) manufacturers’ specifications, and identify locations on all redline and final drawings.
2.1.4.5 Contractor shall seal voids in metal projections, i.e. hoods/clamps.
2.1.5 Leak response shall be performed on all repairs required to bring the rood system back to a watertight condition.
3 | P a g e 4
2.1.5.1 Leak response shall be within 24 hours of notification from any DeCA store listed in the task order.
2.1.6 Contractor shall provide roof inspection reports based upon regular and scheduled roof inspections.
2.1.7 Unsecured rooftop equipment will be secured.
2.1.8 Note placement and remove the lightning protection system (if applicable).
2.1.9 Remove equipment screen panels (if applicable).
2.1.10 Seal exposed fasteners.
2.1.11 Perform general housekeeping services.
2.1.11.1 Remove debris, i.e. branches, paper, etc. from the membrane.
2.1.11.2 Remove debris from drains, gutters, and scuppers.
2.1.11.3 Remove and lawfully dispose of IAW federal, state, and military installation laws and regulations all debris, excess materials, and discarded old roof system materials (trash).
4 | P a g e 4
Figure 1. Roofing Symbols.
TracieJGutierrez Text Box
SAMPLE ONLY
TracieJGutierrez Text Box
TracieJGutierrez Text Box
TracieJGutierrez Text Box
TracieJGutierrez Text Box
TracieJGutierrez
SAMPLE ONLY
TracieJGutierrez Text Box
TracieJGutierrez Text Box
TracieJGutierrez Text Box
TracieJGutierrez Text Box
RESERVED
TracieJGutierrez
TracieJGutierrez Text Box
TracieJGutierrez Text Box
RESERVED
TracieJGutierrez Text Box
TracieJGutierrez
TracieJGutierrez Text Box
TracieJGutierrez
TracieJGutierrez Text Box
TracieJGutierrez
TracieJGutierrez Text Box
TracieJGutierrez
TracieJGutierrez Text Box
TracieJGutierrez Text Box
RESERVED
TracieJGutierrez Text Box
RESERVED
TracieJGutierrez Text Box
TracieJGutierrez Text Box
TracieJGutierrez Text Box
RESERVED
TracieJGutierrez
TracieJGutierrez Text Box
TracieJGutierrez
TracieJGutierrez Text Box
TracieJGutierrez
TracieJGutierrez
| Appendix 13 Roof Plan 09242014 |
| Appendix 13.1 Sample Roof Report Part 1 09242014 |
| Appendix 13.2 Sample Roof Report Part 2 09242014 |
| Appendix 13.3 Sample of a roof leak for DeCa 09242014 |
File details come from the government source that posted it. Updated .