Hydrologic-Hidraulic Analysis Report - AC-830579_Hwy-108_Appendix C.pdf

PDF 58 KB Posted

Attached to
Landslide Repairs in Lares, Puerto Rico
Solicitation number
693C73-24-B-000011
Issued by

About this file

This document is a Hydrologic-Hydraulic Analysis Report for a road repair project in Lares, Puerto Rico. The report includes computations and analysis related to the design of drainage structures, including curb and gutter, inlets, and riprap erosion control, for a section of PR-124 highway. The analysis covers peak flow estimates, spread width, inlet capacity, and design criteria for a 25-year and 50-year recurrence interval. The report provides detailed calculations and specifications for the proposed drainage structures. This report appears to be an appendix or supporting document for the federal contract opportunity to repair landslides and washout damages on several sections of highways in the Lares, Puerto Rico area. The contract opportunity has an estimated value between $5,000,000 to $10,000,000 and is set aside for certified Small Business Concerns. Bids are expected to be due around May 9, 2024.

View the file

Other files

File Type Posted
Results of Bid Opening - PR ER DOT PRMNT RPR(21).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(21).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(21).pdf PDF
Amendment 0002 - PR ER DOT PRMNT RPR(21).pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR(21).pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
Technical Report - AC-831579_HWY-136.pdf PDF
Hydrologic-Hidraulic Analysis Report - AC-831579.pdf PDF
Lead Report - AC-901579_Hwy-107.pdf PDF
Lead Report - AC-901579_Hwy-107_Certification.pdf PDF
Utility Status Report - AC-901579.pdf PDF
Technical Report - AC-831579_HWY-134.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
Technical Report - AC-831579_HWY-135.pdf PDF
Geotechnical Report - AC-831579_Hwy-137.pdf PDF
Categorical Exclusion Form (NEPA) - Sch A_AC-831579_Hwy-133-140.pdf PDF
Hydrologic-Hidraulic Analysis Report - AC-830579_Hwy-106_Appendix B.pdf PDF
Plans - PR ER DOT PRMNT RPR(21) - Set_Sch B_AC-830579_Hwy-106_108.pdf PDF
Utility Status Report - AC-831579.pdf PDF
Geotechnical Report - AC-830579_Hwy-106.pdf PDF
PRHTAs Standard Specifications for Road and Bridge Construction.pdf PDF
PRHTAs Standard Drawings.pdf PDF
Plans - PR ER DOT PRMNT RPR(21) - Set_Sch A_AC-831579_Hwy-133-140_part 1 of 3.pdf PDF
Geotechnical Report - AC-831579_Hwy-136.pdf PDF
Asbestos Report - AC-901579_Hwy-107.pdf PDF
Geotechnical Report - AC-831579_Hwy-134.pdf PDF
Lead and Asbestos Report - AC-831579.pdf PDF
Technical Report - AC-830579_HWY-108.pdf PDF
USFWS Conservation Measures.pdf PDF
VETS-4212 Form.pdf PDF
Technical Report - AC-831579_HWY-133.pdf PDF
Asbestos Report - AC-901579_Hwy-107_Certification.pdf PDF
Technical Report - AC-830579_HWY-106.pdf PDF
Hydrologic-Hidraulic Analysis Report - AC-830579.pdf PDF
Geotechnical Report - AC-831579_Hwy-140.pdf PDF
Technical Report - AC-831579_HWY-140.pdf PDF
AC-901579_ LUMA Letter and Conctruction.pdf PDF
Utility Status Report - AC-830579.pdf PDF
Plans - PR ER DOT PRMNT RPR(21) - Set_Sch A_AC-831579_Hwy-133-140_part 2 of 3.pdf PDF
Lead and Asbestos Report - AC-830579.pdf PDF
Technical Report - AC-901579_HWY-107.pdf PDF
Geotechnical Report - AC-831579_Hwy-135.pdf PDF
Categorical Exclusion Form (NEPA) - Sch B_AC-830579_Hwy-106_108.pdf PDF
Geotechnical Report - AC-831579_Hwy-133.pdf PDF
IFB Solicitation - PR ER DOT PRMNT RPR(21).pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
PRHTAs Standard Drawings_Revised GABI Drawings_GABI 9-10.pdf PDF
Geotechnical Report - AC-830579_Hwy-108.pdf PDF
Plans - PR ER DOT PRMNT RPR(21) - Set_Sch A_AC-831579_Hwy-133-140_part 3 of 3.pdf PDF
Plans - PR ER DOT PRMNT RPR(21) - Set_Sch B_AC-901579_Hwy-107.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX -C:

HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES

LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,

ROAD PR-124, LARES, PR

Designer: JOSE A BATLLE & ASSOCIATES

Answer to Comments: ER-HWY-108

Discussion of Results:

Included are the computations requested in response to the comments in the case. The computations include estimating peak design flow (25-yr) for the half road of State Road PR-124 (outside lane) using the rational method. In this computation, a drainage area of 0.047 acres was estimated, and a time of concentration of 5.0 minutes was assumed for a rainfall intensity estimate of 9.34 in/hr and a runoff coefficient (C) of 0.90 (pavements). The peak flow estimate was 0.42 cfs. Peak flow estimates for the basin that drains its runoff to the inside lane of PR-124 were presented in the original report.

Computations related to the dimensions of the following drainage structures: curb & gutter, inlet capacity, pavement spread, and Rip-rap are included in this appendix. The estimated spread width is

3.32 feet (1.01 meters) for a lane width of 3.15 meters.

On the other hand, inlet capacity was evaluated to handle runoff from the 25- and 50-year design rainfall events. These structures will have the following dimensions:

Inlet located outside lane PR-124: length 3.0 ft x width 2.0 ft, Inlet located inside lane PR-124: length 6.0 ft x width 2.0 ft.

In summary, the civil design of the drainage structures meets the design criteria. Lastly, erosion control system dimensions are included. This system uses riprap (grouted) with a minimum size of d50 = 1.0 ft (Class III -FHWA) and an estimated apron length of 7.75 meters. These calculations were performed for a peak flow design (100-year).

Hydraulic Analysis Report

Project Data Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES

LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,

ROAD PR-124, LARES, PR

Designer: JOSE A BATLLE & ASSOCIATES

Project Date: Monday, June 7, 2022

Project Units: U.S. Customary Units

Notes: SITE: ER-HWY-108 // RECURRENCE PERIOD 25-YR

Rational Analysis: Rational Method Analysis - ER-HWY-108 - HalfRoad Notes: PRECIPITATION DATA SOURCE: NOAA ATLAS 14

Rational Method Input Parameters Runoff Coefficient: 0.90

Basin Area: 0.0500 acres

Rainfall Intensity: 9.34 in/hr

Time of Concentration: 5.00 minutes

Recurrence Year: 25 year

Rational Method Results Flowrate: 0.4 cfs

IDF Input Parameters User Supplied Data

25 year Recurrence, 5 min duration: 9.73 in/hr

25 year Recurrence, 10 min duration: 6.65 in/hr

25 year Recurrence, 15 min duration: 5.69 in/hr

25 year Recurrence, 30 min duration: 4.55 in/hr

25 year Recurrence, 60 min duration: 3.38 in/hr

IDF Results 25 year IDF equation: i = 16.9602 / (Tc + -0.5)^0.396608

Intensity: 9.3403 in/hr

Time of Concentration Input Parameters Specified Time of Concentration

Time of Concentration: 5.00 min

Hydrograph - Rational Method Analysis - ER-HWY-108 - HalfRoad - Rational Hydrograph Method

25 year recurrence Interval, Peak Discharge: 0.424 cfs, Time to Peak: 5.00 (min), Total Volume:

127.15 ft^3

Time (minutes) Flow cfs

0.00 0.00

1.00 0.08

2.00 0.17

3.00 0.25

4.00 0.34

5.00 0.42

6.00 0.34

7.00 0.25

8.00 0.17

9.00 0.08

10.00 0.00

Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES

LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,

ROAD PR-124, LARES, PR

Designer: JOSE A BATLLE & ASSOCIATES

Project Date: Monday, June 7, 2022

Curb and Gutter Analysis: Curb and Gutter Analysis - ER-HWY-108 - HalfRoad Notes: PEAK FLOW DESIGN 25YR

Gutter Input Parameters Longitudinal Slope of Road: 0.0693 ft/ft

Cross-Slope of Pavement: 0.0222 ft/ft

Uniform Gutter Geometry

Manning's n: 0.0150

Gutter Width: 1.0000 ft

Design Flow: 0.4240 cfs

Gutter Result Parameters Width of Spread: 3.3237 ft

Gutter Depression: 0.0000 in

Area of Flow: 0.1226 ft^2

Eo (Gutter Flow to Total Flow): 0.6154

Gutter Depth at Curb: 0.8854 in

Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES

LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,

ROAD PR-124, LARES, PR

Designer: JOSE A BATLLE & ASSOCIATES

Project Date: Monday, June 7, 2022

Median/Ditch Drop-Inlet Analysis: Median/Ditch Drop-Inlet Analysis - ER-HWY-108 -HalfRoad

Notes: Inlet Capacity

Channel Analysis: Channel Analysis Notes: Curb & Gutter Structure

Input Parameters Channel Type: Triangular

Side Slope 1 (Z1): 1.0000 ft/ft

Side Slope 2 (Z2): 4.0000 ft/ft

Longitudinal Slope: 0.0693 ft/ft

Manning's n: 0.0150

Flow: 0.4240 cfs

Result Parameters Depth: 0.1846 ft

Area of Flow: 0.0852 ft^2

Wetted Perimeter: 1.0223 ft

Hydraulic Radius: 0.0833 ft

Average Velocity: 4.9762 ft/s

Top Width: 0.9231 ft

Froude Number: 2.8864

Critical Depth: 0.3084 ft

Critical Velocity: 1.7827 ft/s

Critical Slope: 0.0045 ft/ft

Critical Top Width: 2.41 ft

Calculated Max Shear Stress: 0.7983 lb/ft^2

Calculated Avg Shear Stress: 0.3604 lb/ft^2

Inlet Data:

Grate Width: 2.0000 ft

Grate Length: 3.0000 ft

Computed Data:

Intercepted flow: 0.4240 cfs

Bypass flow: 0.0000 cfs

Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES

LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,

ROAD PR-124, LARES, PR

Designer: JOSE A BATLLE & ASSOCIATES

Project Date: Monday, June 7, 2022

Notes: SITE: ER-HWY-108 // RECURRENCE PERIOD 50-YR

Channel Analysis: Channel Analysis-OutsideBasin-ER-HWY-108 Notes: Trapezoidal Channel // Outside Basin

Input Parameters Channel Type: Trapezoidal

Side Slope 1 (Z1): 1.5000 ft/ft

Side Slope 2 (Z2): 3.0000 ft/ft

Channel Width: 1.0000 ft

Longitudinal Slope: 0.0640 ft/ft

Manning's n: 0.0150

Flow: 16.3000 cfs

Result Parameters Depth: 0.5773 ft

Area of Flow: 1.3270 ft^2

Wetted Perimeter: 3.8661 ft

Hydraulic Radius: 0.3432 ft

Average Velocity: 12.2833 ft/s

Top Width: 3.5976 ft

Froude Number: 3.5642

Critical Depth: 1.0677 ft

Critical Velocity: 4.4874 ft/s

Critical Slope: 0.0043 ft/ft

Critical Top Width: 5.80 ft

Calculated Max Shear Stress: 2.3053 lb/ft^2

Calculated Avg Shear Stress: 1.3708 lb/ft^2

Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES

LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,

ROAD PR-124, LARES, PR

Designer: JOSE A BATLLE & ASSOCIATES

Project Date: Monday, June 7, 2022

Notes: SITE: ER-HWY-108 // RECURRENCE PERIOD 50-YR

Median/Ditch Drop-Inlet Analysis: Median/Ditch Drop-Inlet Analysis-OutsideBasin-ER-HWY-108

Notes: Peak Flow Design – 50YR

Using the following channel: Channel Analysis-OutsideBasin-ER-HWY-108

Channel Analysis: Channel Analysis-OutsideBasin-ER-HWY-108 Notes: Trapezoidal Channel

Input Parameters Channel Type: Trapezoidal

Side Slope 1 (Z1): 1.5000 ft/ft

Side Slope 2 (Z2): 3.0000 ft/ft

Channel Width: 1.0000 ft

Longitudinal Slope: 0.0640 ft/ft

Manning's n: 0.0150

Flow: 16.3000 cfs

Result Parameters Depth: 0.5773 ft

Area of Flow: 1.3270 ft^2

Wetted Perimeter: 3.8661 ft

Hydraulic Radius: 0.3432 ft

Average Velocity: 12.2833 ft/s

Top Width: 3.5976 ft

Froude Number: 3.5642

Critical Depth: 1.0677 ft

Critical Velocity: 4.4874 ft/s

Critical Slope: 0.0043 ft/ft

Critical Top Width: 5.80 ft

Calculated Max Shear Stress: 2.3053 lb/ft^2

Calculated Avg Shear Stress: 1.3708 lb/ft^2

Inlet Data:

Grate Width: 2.0000 ft

Grate Length: 6.0000 ft

Computed Data:

Intercepted flow: 15.5934 cfs

Bypass flow: 0.7066 cfs

Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES

LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095 444, GROUP B,

ROAD PR-124, LARES, PR

Designer: JOSE A BATLLE & ASSOCIATES Project Date: Monday, June 7, 2022 Project Units: U.S. Customary Units Notes: SITE: ER-HWY-108 // RECURRENCE PERIOD 100-Y R

Calculation: Riprap ( Outlet 30 inch Pipe) Recurrence Period: 100yr

Size of stone:

d 50 = [(0.02/TW)*(Q/D o )^(4/3)] Data: Results:

ft d 50 = median stone size, ft 0.83 Use d50min = 1.0 ft; Grouted Rip-rap Class III (FHWA)

Q = design discharge, cfs 17.40

D o = maximum pipe or culvert width, ft 2.50

TW = tailwater depth, ft 0.32

Length of apron:

Condition:

TW (<) 0.5 Do

L a = [1.8Q/(D o )^(3/2)] + 7D o Data: Results:

ft m

La = apron length, ft 25.42 7.75

Q = design discharge, cfs 17.40

D o = maximum pipe or culvert width, ft 2.50