Hydrologic-Hidraulic Analysis Report - AC-830579_Hwy-108_Appendix C.pdf
PDF 58 KB Posted
- Attached to
- Landslide Repairs in Lares, Puerto Rico
- Solicitation number
- 693C73-24-B-000011
About this file
This document is a Hydrologic-Hydraulic Analysis Report for a road repair project in Lares, Puerto Rico. The report includes computations and analysis related to the design of drainage structures, including curb and gutter, inlets, and riprap erosion control, for a section of PR-124 highway. The analysis covers peak flow estimates, spread width, inlet capacity, and design criteria for a 25-year and 50-year recurrence interval. The report provides detailed calculations and specifications for the proposed drainage structures. This report appears to be an appendix or supporting document for the federal contract opportunity to repair landslides and washout damages on several sections of highways in the Lares, Puerto Rico area. The contract opportunity has an estimated value between $5,000,000 to $10,000,000 and is set aside for certified Small Business Concerns. Bids are expected to be due around May 9, 2024.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX -C:
HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES
LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,
ROAD PR-124, LARES, PR
Designer: JOSE A BATLLE & ASSOCIATES
Answer to Comments: ER-HWY-108
Discussion of Results:
Included are the computations requested in response to the comments in the case. The computations include estimating peak design flow (25-yr) for the half road of State Road PR-124 (outside lane) using the rational method. In this computation, a drainage area of 0.047 acres was estimated, and a time of concentration of 5.0 minutes was assumed for a rainfall intensity estimate of 9.34 in/hr and a runoff coefficient (C) of 0.90 (pavements). The peak flow estimate was 0.42 cfs. Peak flow estimates for the basin that drains its runoff to the inside lane of PR-124 were presented in the original report.
Computations related to the dimensions of the following drainage structures: curb & gutter, inlet capacity, pavement spread, and Rip-rap are included in this appendix. The estimated spread width is
3.32 feet (1.01 meters) for a lane width of 3.15 meters.
On the other hand, inlet capacity was evaluated to handle runoff from the 25- and 50-year design rainfall events. These structures will have the following dimensions:
Inlet located outside lane PR-124: length 3.0 ft x width 2.0 ft, Inlet located inside lane PR-124: length 6.0 ft x width 2.0 ft.
In summary, the civil design of the drainage structures meets the design criteria. Lastly, erosion control system dimensions are included. This system uses riprap (grouted) with a minimum size of d50 = 1.0 ft (Class III -FHWA) and an estimated apron length of 7.75 meters. These calculations were performed for a peak flow design (100-year).
Hydraulic Analysis Report
Project Data Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES
LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,
ROAD PR-124, LARES, PR
Designer: JOSE A BATLLE & ASSOCIATES
Project Date: Monday, June 7, 2022
Project Units: U.S. Customary Units
Notes: SITE: ER-HWY-108 // RECURRENCE PERIOD 25-YR
Rational Analysis: Rational Method Analysis - ER-HWY-108 - HalfRoad Notes: PRECIPITATION DATA SOURCE: NOAA ATLAS 14
Rational Method Input Parameters Runoff Coefficient: 0.90
Basin Area: 0.0500 acres
Rainfall Intensity: 9.34 in/hr
Time of Concentration: 5.00 minutes
Recurrence Year: 25 year
Rational Method Results Flowrate: 0.4 cfs
IDF Input Parameters User Supplied Data
25 year Recurrence, 5 min duration: 9.73 in/hr
25 year Recurrence, 10 min duration: 6.65 in/hr
25 year Recurrence, 15 min duration: 5.69 in/hr
25 year Recurrence, 30 min duration: 4.55 in/hr
25 year Recurrence, 60 min duration: 3.38 in/hr
IDF Results 25 year IDF equation: i = 16.9602 / (Tc + -0.5)^0.396608
Intensity: 9.3403 in/hr
Time of Concentration Input Parameters Specified Time of Concentration
Time of Concentration: 5.00 min
Hydrograph - Rational Method Analysis - ER-HWY-108 - HalfRoad - Rational Hydrograph Method
25 year recurrence Interval, Peak Discharge: 0.424 cfs, Time to Peak: 5.00 (min), Total Volume:
127.15 ft^3
Time (minutes) Flow cfs
0.00 0.00
1.00 0.08
2.00 0.17
3.00 0.25
4.00 0.34
5.00 0.42
6.00 0.34
7.00 0.25
8.00 0.17
9.00 0.08
10.00 0.00
Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES
LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,
ROAD PR-124, LARES, PR
Designer: JOSE A BATLLE & ASSOCIATES
Project Date: Monday, June 7, 2022
Curb and Gutter Analysis: Curb and Gutter Analysis - ER-HWY-108 - HalfRoad Notes: PEAK FLOW DESIGN 25YR
Gutter Input Parameters Longitudinal Slope of Road: 0.0693 ft/ft
Cross-Slope of Pavement: 0.0222 ft/ft
Uniform Gutter Geometry
Manning's n: 0.0150
Gutter Width: 1.0000 ft
Design Flow: 0.4240 cfs
Gutter Result Parameters Width of Spread: 3.3237 ft
Gutter Depression: 0.0000 in
Area of Flow: 0.1226 ft^2
Eo (Gutter Flow to Total Flow): 0.6154
Gutter Depth at Curb: 0.8854 in
Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES
LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,
ROAD PR-124, LARES, PR
Designer: JOSE A BATLLE & ASSOCIATES
Project Date: Monday, June 7, 2022
Median/Ditch Drop-Inlet Analysis: Median/Ditch Drop-Inlet Analysis - ER-HWY-108 -HalfRoad
Notes: Inlet Capacity
Channel Analysis: Channel Analysis Notes: Curb & Gutter Structure
Input Parameters Channel Type: Triangular
Side Slope 1 (Z1): 1.0000 ft/ft
Side Slope 2 (Z2): 4.0000 ft/ft
Longitudinal Slope: 0.0693 ft/ft
Manning's n: 0.0150
Flow: 0.4240 cfs
Result Parameters Depth: 0.1846 ft
Area of Flow: 0.0852 ft^2
Wetted Perimeter: 1.0223 ft
Hydraulic Radius: 0.0833 ft
Average Velocity: 4.9762 ft/s
Top Width: 0.9231 ft
Froude Number: 2.8864
Critical Depth: 0.3084 ft
Critical Velocity: 1.7827 ft/s
Critical Slope: 0.0045 ft/ft
Critical Top Width: 2.41 ft
Calculated Max Shear Stress: 0.7983 lb/ft^2
Calculated Avg Shear Stress: 0.3604 lb/ft^2
Inlet Data:
Grate Width: 2.0000 ft
Grate Length: 3.0000 ft
Computed Data:
Intercepted flow: 0.4240 cfs
Bypass flow: 0.0000 cfs
Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES
LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,
ROAD PR-124, LARES, PR
Designer: JOSE A BATLLE & ASSOCIATES
Project Date: Monday, June 7, 2022
Notes: SITE: ER-HWY-108 // RECURRENCE PERIOD 50-YR
Channel Analysis: Channel Analysis-OutsideBasin-ER-HWY-108 Notes: Trapezoidal Channel // Outside Basin
Input Parameters Channel Type: Trapezoidal
Side Slope 1 (Z1): 1.5000 ft/ft
Side Slope 2 (Z2): 3.0000 ft/ft
Channel Width: 1.0000 ft
Longitudinal Slope: 0.0640 ft/ft
Manning's n: 0.0150
Flow: 16.3000 cfs
Result Parameters Depth: 0.5773 ft
Area of Flow: 1.3270 ft^2
Wetted Perimeter: 3.8661 ft
Hydraulic Radius: 0.3432 ft
Average Velocity: 12.2833 ft/s
Top Width: 3.5976 ft
Froude Number: 3.5642
Critical Depth: 1.0677 ft
Critical Velocity: 4.4874 ft/s
Critical Slope: 0.0043 ft/ft
Critical Top Width: 5.80 ft
Calculated Max Shear Stress: 2.3053 lb/ft^2
Calculated Avg Shear Stress: 1.3708 lb/ft^2
Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES
LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095444, GROUP B,
ROAD PR-124, LARES, PR
Designer: JOSE A BATLLE & ASSOCIATES
Project Date: Monday, June 7, 2022
Notes: SITE: ER-HWY-108 // RECURRENCE PERIOD 50-YR
Median/Ditch Drop-Inlet Analysis: Median/Ditch Drop-Inlet Analysis-OutsideBasin-ER-HWY-108
Notes: Peak Flow Design – 50YR
Using the following channel: Channel Analysis-OutsideBasin-ER-HWY-108
Channel Analysis: Channel Analysis-OutsideBasin-ER-HWY-108 Notes: Trapezoidal Channel
Input Parameters Channel Type: Trapezoidal
Side Slope 1 (Z1): 1.5000 ft/ft
Side Slope 2 (Z2): 3.0000 ft/ft
Channel Width: 1.0000 ft
Longitudinal Slope: 0.0640 ft/ft
Manning's n: 0.0150
Flow: 16.3000 cfs
Result Parameters Depth: 0.5773 ft
Area of Flow: 1.3270 ft^2
Wetted Perimeter: 3.8661 ft
Hydraulic Radius: 0.3432 ft
Average Velocity: 12.2833 ft/s
Top Width: 3.5976 ft
Froude Number: 3.5642
Critical Depth: 1.0677 ft
Critical Velocity: 4.4874 ft/s
Critical Slope: 0.0043 ft/ft
Critical Top Width: 5.80 ft
Calculated Max Shear Stress: 2.3053 lb/ft^2
Calculated Avg Shear Stress: 1.3708 lb/ft^2
Inlet Data:
Grate Width: 2.0000 ft
Grate Length: 6.0000 ft
Computed Data:
Intercepted flow: 15.5934 cfs
Bypass flow: 0.7066 cfs
Project Title: HYDROLOGIC – HYDRAULIC ANALYSIS // MAIN DRAINAGE STRUCTURES
LANDSLIDES AND ROAD DAMAGE PROJECT // AC-8095 444, GROUP B,
ROAD PR-124, LARES, PR
Designer: JOSE A BATLLE & ASSOCIATES Project Date: Monday, June 7, 2022 Project Units: U.S. Customary Units Notes: SITE: ER-HWY-108 // RECURRENCE PERIOD 100-Y R
Calculation: Riprap ( Outlet 30 inch Pipe) Recurrence Period: 100yr
Size of stone:
d 50 = [(0.02/TW)*(Q/D o )^(4/3)] Data: Results:
ft d 50 = median stone size, ft 0.83 Use d50min = 1.0 ft; Grouted Rip-rap Class III (FHWA)
Q = design discharge, cfs 17.40
D o = maximum pipe or culvert width, ft 2.50
TW = tailwater depth, ft 0.32
Length of apron:
Condition:
TW (<) 0.5 Do
L a = [1.8Q/(D o )^(3/2)] + 7D o Data: Results:
ft m
La = apron length, ft 25.42 7.75
Q = design discharge, cfs 17.40
D o = maximum pipe or culvert width, ft 2.50