This document is an email correspondence regarding the LUMA Letter and Construction project related to Solicitation Number 693C73-24-B-000011 for Landslide Repairs in Lares, Puerto Rico.

The email exchange indicates that the project involves repairing landslide and washout damages caused by Hurricanes Irma and Maria on various highways in the Lares, Puerto Rico area. The work includes embankment reconstruction, reinforced soil slope systems, gabion walls, retaining walls, drainage systems, paving, guardrail replacement, signage, and other related work. The project is expected to cost between $5,000,000 and $10,000,000 and is set aside for certified Small Business Concerns. The bid documents are scheduled to be issued on or around May 9, 2024, with the bid due date and location to be specified in the solicitation. The key question in the email exchange is whether the existing electrical infrastructure will be impacted by the proposed construction, and the consultant has confirmed that the electrical lines will not be affected.

View the file

Other files

File Type Posted
Results of Bid Opening - PR ER DOT PRMNT RPR(21).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(21).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(21).pdf PDF
Amendment 0002 - PR ER DOT PRMNT RPR(21).pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR(21).pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
Technical Report - AC-831579_HWY-136.pdf PDF
Hydrologic-Hidraulic Analysis Report - AC-831579.pdf PDF
Lead Report - AC-901579_Hwy-107.pdf PDF
Lead Report - AC-901579_Hwy-107_Certification.pdf PDF
Utility Status Report - AC-901579.pdf PDF
Technical Report - AC-831579_HWY-134.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
Technical Report - AC-831579_HWY-135.pdf PDF
Geotechnical Report - AC-831579_Hwy-137.pdf PDF
Categorical Exclusion Form (NEPA) - Sch A_AC-831579_Hwy-133-140.pdf PDF
Hydrologic-Hidraulic Analysis Report - AC-830579_Hwy-106_Appendix B.pdf PDF
Plans - PR ER DOT PRMNT RPR(21) - Set_Sch B_AC-830579_Hwy-106_108.pdf PDF
Utility Status Report - AC-831579.pdf PDF
Geotechnical Report - AC-830579_Hwy-106.pdf PDF
PRHTAs Standard Specifications for Road and Bridge Construction.pdf PDF
PRHTAs Standard Drawings.pdf PDF
Plans - PR ER DOT PRMNT RPR(21) - Set_Sch A_AC-831579_Hwy-133-140_part 1 of 3.pdf PDF
Geotechnical Report - AC-831579_Hwy-136.pdf PDF
Asbestos Report - AC-901579_Hwy-107.pdf PDF
Hydrologic-Hidraulic Analysis Report - AC-830579_Hwy-108_Appendix C.pdf PDF
Geotechnical Report - AC-831579_Hwy-134.pdf PDF
Lead and Asbestos Report - AC-831579.pdf PDF
Technical Report - AC-830579_HWY-108.pdf PDF
USFWS Conservation Measures.pdf PDF
VETS-4212 Form.pdf PDF
Technical Report - AC-831579_HWY-133.pdf PDF
Asbestos Report - AC-901579_Hwy-107_Certification.pdf PDF
Technical Report - AC-830579_HWY-106.pdf PDF
Hydrologic-Hidraulic Analysis Report - AC-830579.pdf PDF
Geotechnical Report - AC-831579_Hwy-140.pdf PDF
Technical Report - AC-831579_HWY-140.pdf PDF
Utility Status Report - AC-830579.pdf PDF
Plans - PR ER DOT PRMNT RPR(21) - Set_Sch A_AC-831579_Hwy-133-140_part 2 of 3.pdf PDF
Lead and Asbestos Report - AC-830579.pdf PDF
Technical Report - AC-901579_HWY-107.pdf PDF
Geotechnical Report - AC-831579_Hwy-135.pdf PDF
Categorical Exclusion Form (NEPA) - Sch B_AC-830579_Hwy-106_108.pdf PDF
Geotechnical Report - AC-831579_Hwy-133.pdf PDF
IFB Solicitation - PR ER DOT PRMNT RPR(21).pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
PRHTAs Standard Drawings_Revised GABI Drawings_GABI 9-10.pdf PDF
Geotechnical Report - AC-830579_Hwy-108.pdf PDF
Plans - PR ER DOT PRMNT RPR(21) - Set_Sch A_AC-831579_Hwy-133-140_part 3 of 3.pdf PDF
Plans - PR ER DOT PRMNT RPR(21) - Set_Sch B_AC-901579_Hwy-107.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Buenas tardes:

Espero que estés bien.

Favor referirte al correo electrónico de abajo para la respuesta del diseñador.

Cordialmente, From: Fernando Alamo <Fernando.Alamo@bha-llc.com> Sent: Thursday, February 15, 2024 4:30 PM To: Gonzalez, Joangelli <jagonzalez@csagroup.com> Subject: Fwd: AC-901579: LUMA Letter and Conctruction

Hola Joangelli:

Abajo encontrarás nuestra respuesta. Cualquier cosa me dejas saber.

Sent from my iPad

Begin forwarded message:

From: Alfredo Soto <Alfredo.Soto@bha-llc.com> Date: February 15, 2024 at 4:25:36 PM AST To: Fernando Alamo <fernando.alamo@bha-llc.com> Subject: RE: AC-901579: LUMA Letter and Conctruction

Saludos, Luego de revisar el plano para el proyecto de referencia, hago la observación que las facilidades eléctricas no se afectan por el proyecto. En las hojas eléctricas se muestra la linea eléctrica como "existing to remain".

A tales efectos y como se muestra en la nota presentada en rojo en la hoja UTE-1, al no haber impacto en la infraestructura eléctrica, el endoso no es necesario.

Ing. Alfredo Soto

BH&A

De: Fernando Alamo <Fernando.Alamo@bha-llc.com> Enviado: jueves, febrero 15, 2024 12:13 PM Para: Alfredo Soto <Alfredo.Soto@bha-llc.com> Asunto: Fw: AC-901579: LUMA Letter and Conctruction

From: Gonzalez, Joangelli <jagonzalez@csagroup.com> Sent: Thursday, February 15, 2024 12:00 PM To: Fernando Alamo <fernando.alamo@bha-llc.com> Cc: Jean C. Perez Cintron <jeperez@acumenian.com> Subject: Fw: AC-901579: LUMA Letter and Conctruction

Buenos días:

CAUTION: This email originated from outside of the Department of Transportation (DOT). Do not click on links or open attachments unless you recognize the sender and know the content is safe.

Joangelli González Compré Project Manager

E-mail jagonzalez@csagroup.com Phone 787.641.6800 Ext.1755 Mobile 787.234.4628

We support all GREEN initiatives, please consider the environment before printing this email. Save a Tree.

CONFIDENTIAL NOTICE: The contents of this message, including any attached files, may contain confidential information. If you have received this message in error, please notify us immediately by reply e-mail and then delete this message form your system.

Please do not copy it or use it for any purpose or disclose its contents to any other person. Thank you for your cooperation.

[EXTERNAL SENDER: Be very cautious with links and attachments. REMITENTE EXTERNO: Tenga mucha cautela con los enlaces y archivos adjuntos. ]

La presente es sobre el asunto del endoso de energía eléctrica para el HWY-107, según conversado en la mañana de hoy.

El documento con fecha 2022, señalaba una línea en el área del deslizamiento. Luego está el documento que dice Permit, dado al comentario en rojo entiendo se interpretó que no se veía afectada. Sin embargo, el plano aparenta no presentar la línea, según comentario.

La interrogante es si la línea se verá impactada por los trabajos propuesta, favor referirte al correo electrónico de abajo.

Agradeceré el esfuerzo que puedan hacer para atender esto con urgencia, ya que el proyecto está para comenzar el proceso de subasta.

De tener alguna pregunta, no dude en dejarme saber.

Cordialmente, From: Gomez-Rosario, Edna (FHWA) <edna.gomez-rosario@dot.gov> Sent: Wednesday, February 14, 2024 3:27 PM To: Gonzalez, Joangelli <jagonzalez@csagroup.com> Cc: Reyes, Ricardo (FHWA) <Ricardo.Reyes@dot.gov>; Rodriguez, Miguel (FHWA) <Miguel.Rodriguez@dot.gov> Subject: AC-901579: LUMA Letter and Conctruction

Hi Joangelli, Can you verify with the consultant regarding this LUMA letter? We would like confirmation from the consultant that the Electric Line will not be impacted during construction.

Joangelli González Compré Project Manager

E-mail jagonzalez@csagroup.com Phone 787.641.6800 Ext.1755 Mobile 787.234.4628

We support all GREEN initiatives, please consider the environment before printing this email. Save a Tree.

CONFIDENTIAL NOTICE: The contents of this message, including any attached files, may contain confidential information. If you have received this message in error, please notify us immediately by reply e-mail and then delete this message form your system.

Please do not copy it or use it for any purpose or disclose its contents to any other person. Thank you for your cooperation.

[EXTERNAL SENDER: Be very cautious with links and attachments. REMITENTE EXTERNO: Tenga mucha cautela con los enlaces y archivos adjuntos. ]

Muchas gracias, Edna N. Gómez-Rosario, MEM, PE Project Management Team Leader U.S. Department of Transportation Federal Highway Administration Eastern Federal Lands Highway Division Desk: (571) 434-1576 Celc.: (571) 541-0901

File details come from the government source that posted it. Updated .