About this file

This memorandum from the Western Federal Lands Highway Division (WFLHD) provides hydraulic design guidance for the replacement of the Ghiglione Bridge, located in AK PA DENA 10(36). The document outlines specific construction requirements for water diversions and erosion and sediment control, referencing a Hydraulic Line and Grade Report from April 5, 2019. Key instructions include constructing diversion berms at least 2 feet above the channel bottom, designing diversions to accommodate a 20 cfs flow, and implementing best management practices (BMPs) to protect bridge abutment slopes from runoff and prevent sediment-laden water from entering adjacent waterways.

The memorandum emphasizes that the erosion and sediment control plans represent minimum requirements and must be updated by the contractor throughout the project to reflect construction activities, sequencing, techniques, and site conditions. The contractor may need to remove and reinstall BMPs, and might be required to provide additional erosion control measures beyond the initial plan. The document is addressed to Brandon Stokes, the WFLHD Project Manager, and copies Tyler Yeoman, the WFLHD Highway Design Engineer, indicating an internal communication about critical construction design considerations.

View the file

Other files for this federal contract opportunity

Other files attached to AK PRA DENA 10(36), Replace Ghiglione Bridge, newest first.
File Type Posted
BidTabulation_AK PRA DENA 10(36).pdf PDF
BidSum_AK PRA DENA 10(36).pdf PDF
QA_11_24_2025.pdf PDF
QA_11_21_2025.pdf PDF
QA_11_18_2025.pdf PDF
QA_11_13_2025.pdf PDF
Amendment A002.pdf PDF
QA_11_12_2025.pdf PDF
QA_11_05_2025.pdf PDF
Amendment A001.pdf PDF
Geotech Report No 11-19 Ghiglione Final Foundation Report.pdf PDF
DENA01036_XS.pdf PDF
BHIM Nov 2022.pdf PDF
9830-011P - Ghiglione Bridge As-Built Plans.pdf PDF
Physical Data_AK PRA DENA 10.zip ZIP file
FLH Bridge oversized or overload vehicle permit request form August 2023.pdf PDF
Ghiglione_ControlSheet.xlsx XLSX spreadsheet
Ghiglione_EPA_Compiled SWPPP_Final.pdf PDF
AK PRA DENA 10(36) - Physical Data - GOV Furnished Pipe Pile Info.pdf PDF
DENA01036_SUP.pdf PDF
DENA01036_VA.pdf PDF
DENA01036_HA.pdf PDF
Toklat Pit_Scrape Material Photos.pdf PDF
9830-011P - Ghiglione Bridge Inspection 2024.pdf PDF
WEF Nov. 2022.pdf PDF
DENA01036_EW.pdf PDF
IFB 69056725B000009.pdf PDF
dena01036_plans.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Memorandum

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661-3801

TO: Brandon Stokes, WFLHD Project Manager

FROM: James Neighorn, WFLHD Hydraulic Engineer

DATE: June 2, 2020

SUBJECT: AK PA DENA 10(36) Replace Ghiglione Bridge, Hydraulic Design Narrative for Construction

A Hydraulic Line and Grade Report, dated April 5, 2019, was prepared for this project.

Construction staff should review the report for detailed information regarding the methodology, recommendations, and conclusions made for the bridge waterway design.

Additional guidance for construction of the drainage is provided below:

Water Diversions:

• Diversions may be required for pier and bridge deck construction. Construct diversion berms to a minimum height of 2 feet above the channel bottom.

• Diversions will serve to separate the active flows from the work area, but will not provide a work area free of water.

• Diversions should beginning at the upstream end of the site with a berm tying into a stable overbank area. The diversion should extend downstream with a berm tying into an overbank area downstream of the proposed work.

• Diversion shall be designed to accommodate a flow of 20 cfs.

Erosion and Sediment Control:

• The bridge abutment slopes will need to be protected from runoff from the bridge deck and approaching roadway ditches. It will be important to place and adjust riprap slope protection so that it catches the flows from the ditches and bridge deck to prevent flows from eroding the embankment. Since vegetation is sparse to non-existent in this location, even small amounts of flow can cause significant erosion over time on the steep embankment.

• The erosion and sediment control plans are intended to identify the minimum BMP elements necessary to address construction site runoff. Plans will need to be updated by the contractor throughout the course of the project to reflect contractor construction activities, sequencing, techniques, and site conditions.

• The contractor may need to remove and re-install BMPs to accommodate construction sequencing. Providing additional BMPs over and above the minimum requirements shown on the plans may be necessary to address conditions created by the contractor.

• The BMPs shown on the plans must be constructed prior to or in conjunction with all clearing and grading activities in such a manner as to ensure that sediment-laden water does not enter adjacent waterways.

cc: Tyler Yeoman, WFLHD Highway Design Engineer