Amendment A002.pdf
PDF 432 KB Posted
- Attached to
- AK PRA DENA 10(36), Replace Ghiglione Bridge Federal contract opportunity
- Solicitation number
- 69056725B000009
About this file
This document is an Amendment of Solicitation for the AK PRA DENA 10(36) project to Replace Ghiglione Bridge, issued by the Federal Highway Administration's Western Lands Division. The amendment (A002) extends the bid opening date from 11/18/2025 to 11/25/2025 and revises multiple sections of the special contract requirements. Key modifications include updated requirements for vegetation removal, wildlife protection, contractor housing, and facility services.
Specific changes include new provisions for bird nest surveys, equipment idling restrictions, and vehicle requirements. The contractor must provide two 2016 or newer 4x4 pickup trucks for government use, furnish internet and satellite services at the Toklat Pit, and establish a construction camp/housing facility at the Toklat Road Camp starting July 31st, 2026. The project will take place in Denali National Park, with strict guidelines for environmental protection, wildlife interaction, and operational constraints within the park boundaries.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 11/12/2025 N/A AK PRA DENA 10(36)
Replace Ghiglione Bridge
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056725B000009
9B. DATED (SEE ITEM 11)
10/17/2025
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (11/25/2025 1400 PST)
(_x_ ) is extended, ( ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK PRA DENA 10(36), Replace Ghiglione Bridge
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002, dated 11/12/2025 AK PRA DENA 10(36), Solicitation No. 69056725B000009 Replace Ghiglione Bridge
REVISIONS ARE AS FOLLOWS:
SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)
Page A-3, Block 13A. Revises bid opening date from 11/18/2025 to 11/25/2025.
SPECIAL CONTRACT REQUIREMENTS
Page E-12a, Subsection 105.02 (b), Government-provided material stockpile. Adds language.
Page E-24 and E-24a, Subsection 107.10(e)(3) Other requirements. Revises and adds language.
Page E-25, Subsection 107.12(e)(3) Contractor Housing. Adds language.
Page E-28a, Subsection 108.01(a) Commencement, Prosecution, and Completion of
Work. Adds language.
Page F-29, Subsection 637.039(c) Facilities. Revises and adds language.
ENCLOSURES
Pages:
A-3
E-12a
E-24 and E-24a
E-25
E-28
F-29
New bid opening date: 11/25/2025
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
Federal Highway Administration
FHWA WESTERN FED LANDS DIVISION
610 E FIFTH STREET
Vancouver WA 98661
690567
Federal Highway Adminstration
FHWA WESTERN FED LANDS DIVISION
610 E FIFTH STREET
Vancouver WA 98661 x
10/17/2025
69056725B000009
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
This solicitation is designed AK PRA DENA 10(36), Replace Ghiglione Bridge
IN STRICT ACCORDANCE WITH:
Federal Acquisition Regulation (FAR) and Transportation Acquisition Regulations (TAR)
General Wage Decision
Special Contract Requirements
Standard Specifications for Construction of Roads and Bridges on Federal Highway
Projects, FP-14
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 calendar days and complete it within ________________ ________________ calendar days after receiving
Page A-5
________________________ 11/25/2025
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 8/2014)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
See Blk 10
A-3
360-619-7520See Page A-5
Revised by Amendment A002
E-12a DIVISION 100
Special Contract Requirements
Project: AK PRA DENA 10(36), Replace Ghiglione Bridge
The Government will furnish Steel Pipe Piles for use under Section 551. The material is available at the 5 mile pit located at MP 5 of the Denali Park Road.
E-24 DIVISION 100
Project: AK PRA DENA 10(36), Replace Ghiglione Bridge
Inspect the intake screen for damage (torn screen, crushed screen, screen separated from intake ends, etc.) prior to each deployment. Inspect and repair the structure as needed to ensure the structure always conforms to the original design specifications during use.
(e) Place mats on top of wetlands under access road, remove mats and restore the wetland after construction is complete.
(3) Notify the CO 5 days prior to vegetation removal. Do not clear vegetation between May 1 and July 31 (dates inclusive) for the migratory bird nesting season, unless approved by the CO. If active bird nests are discovered within the construction area, suspend operations at the discovery site. See Page E-24a for updated language to this section.
(4) Equipment Idling Restrictions. Do not allow trucks to idle longer than 5 minutes, in the vicinity of populated Park areas such as: the Headquarters Area (MP 0 through MP 4);
Savage River Campground (MP 12.5); Sanctuary River Campground (MP 22); Teklanika Campground (MP 29.1); Teklanika Rest Area (MP 30.3); and the Toklat Road Camp
(MP 53.38).
(5) Equip all trucks and equipment with mufflers operating at decibels levels less than or equal to the OEM-Designed decibel levels. Use noise producing signals for safety warning purposes only. On equipment requiring backup alarms use self-adjusting backup alarms that sense ambient noise and automatically adjust sound output, maintaining a minimum of five dB(A) above noise level, up to maximum rated output.
(6) Compression release braking systems may be used that meet the following requirements:
(a) Vehicle exhaust systems must be unmodified/functional;
(b) Use only when necessary for safety (i.e. steep grades with heavy loads and/or upon failure of service brakes); and
(c) Preference for limiting use with ¼ mile proximity of campgrounds/housing areas.
107.11 Protection of Forests, Parks, and Public Lands. Add the following:
(a) Do not turn around vehicles, equipment or loads longer than 26 feet inside the park boundaries except at locations designated by the CO. Do not drive vehicles or equipment onto tundra, vegetation, campgrounds, bus stops, drainage areas, or undesignated staging areas and pullouts.
(b) While operating on paved and unpaved sections of road, limit vehicle speeds to 35 miles per hour or posted lower speed limits, and the following. Citations may be issued for exceeding speed limits or disturbing wildlife, and these offenders may be removed from the Park.
(1) A 5 miles per hour speed limit is required for the following.
E-24a DIVISION 100
Project: AK PRA DENA 10(36), Replace Ghiglione Bridge
(3) Notify the CO 5 days prior to vegetation removal. Do not clear vegetation between May
1 and July 31 (dates inclusive) for the migratory bird nesting season, unless approved by the CO. If clearing occurs outside this window, contract a biologist to survey and ensure there are no occupied bird nests in the clearing zone. Submit surveys from a qualified biologist with a minimum of 3 years of experience completing bird surveys and allow up to 3 days for approval by the CO. If a survey is approved, clearing operations are allowed up to 7 days after the date the survey was performed. If an active nest is located, suspend operations within 500 feet of the nest and notify the CO within 1 hour. Obtain approval from the CO before restarting operations.
Survey documentation will include the following:
a.) Name and qualifications of the biologist;
b.) Methods used to determine nests presence; and c.) Number of nests, species and presences of eggs or chicks
E-25 DIVISION 100
(a) When passing animals that do not vacate the road. Expect delays whenever tour buses stop at wildlife viewing areas. Do not use horns or any other noise to frighten wildlife from the roadway.
(b) When signaled by a bus to pass. Do not pass buses unless signaled by a bus to pass.
(c) Whenever pedestrians or bicyclists are encountered on gravel portions of park roads, a “no dust speed policy” is in effect.
(2) A 10 mile per hour speed limit is required whenever pedestrians are encountered on paved portions of park roads.
(c) Store food, liquids, pet food, and garbage in bear proof containers or in locked vehicles at all times and dispose of them in the designated trash compactor at Toklat Road Camp. Contain waste construction materials in dumpsters with solid lids or screen lids with openings no larger than 2 inches. Do not dispose of kitchen or other food wastes in construction dumpsters. Keep dumpster lids closed when unattended. Regularly empty construction dumpsters to prevent accumulation of waste and dispose of waste at a permitted landfill outside the Park boundaries.
(d) Any mishandling of garbage, trash, food, and other potential bear attractants described above will result in the responsible person, or Contractor, receiving a citation subject to a fine and/or court appearance before the U.S. Magistrate.
(e) Do not disturb, feed, or approach any wildlife species found nesting, hibernating, or otherwise living in, or immediately nearby, worksites.
(f) Do not use toilets designated for public use.
(g) Do not access park Headquarters area or the Flagpole Parking Lot for construction operations.
(h) NPS will place nest deterrent materials on the existing Ghiglione bridge prior to the start of the project. Allow NPS access to modify or replace the deterrents as needed during construction to effectively deter nesting. Notify the CO 14 days before demolishing the existing bridge.
(i) When sheep are attempting to cross the road, vehicles must stop at least 100 yards away and wait until they cross or retreat.
107.12 Contractor Housing. (Added Subsection).
A construction camp/housing facility may be established at the Toklat Road Camp (MP
53.38) starting July 31st, 2026 or earlier if approved by CO subject to the following restrictions.
Submit a housing plan detailing the exact number of housing units, truck tractor sleeper cabs, occupancy, and configuration, at the preconstruction conference; and allow 5 days for approval. Before establishing the camp/housing facility, conduct a joint inspection of the facility with the CO to document existing conditions.
Special Contract Requirements Revised by Amendment A002 Project: AK PRA DENA 10(36), Replace Ghiglione Bridge
E-28a DIVISION 100
Project: AK PRA DENA 10(36), Replace Ghiglione Bridge
(4) Access to the Toklat road camp and facility is not available until July 31st, 2026 or earlier if approved by the CO.
F-29 DIVISION 600
Project: AK PRA DENA 10(36), Replace Ghiglione Bridge
Section 637. — FACILITIES AND SERVICES
08/01/14–FP14
Description
637.01 Add the following:
This work also includes furnishing internet, portable satellite telephone internet services, and clean vehicles in good condition, weather tight and fully usable for the exclusive use of Government personnel and Governmental representatives.
Construction Requirements
637.03 Facilities. Add the following:
(c) Vehicles. Provide two 2016 or newer ½ ton, 4x4 wheel drive, fourtwo-door pickup trucks, manufactured within 5-years of the Award date. Deliver the vehicles to the park headquarters maintenance parking area on the day of the Notice to Proceed date30 days prior to the pre-construction meeting 5 days prior to start of onsite construction activity. Furnish the vehicles with no visible Contractor’s company name or logo. Equip the vehicles with a
Citizen Band (CB) radio and portable internet device. Maintain the vehicles in such a manner to provide safety and reasonable comfort for the operator with all factory equipment in working order. Provide all fuels, maintenance, and collision and comprehensive insurance. Insurance is for the Contractor’s protection. The Government will be responsible for all Government caused damage to the vehicle beyond normal wear and tear. The
Government will not indemnify the Contractor for Government caused damage to third parties. Damage due to no fault of the Government will be the responsibility of the
Contractor. Secure vehicle insurance according to Alaska state standards.
The Government will not operate the vehicles during winter shutdown(s) (see
Subsection 108.01), and will leave the vehicles at the park headquarters maintenance parking area for the Contractor to acquire.
637.04 Services. Delete paragraph (b) and substitute the following:
(b) Communications. Provide internet service and satellite television service for two existing government buildings at Toklat Pit (the first houses a field office and residential unit; and the second is a residential unit approximately 100 feet away). Provide an unlimited data plan, a minimum download speed of 1005 Mbps and a minimum upload speed of 253 Mbps. The existing government buildings have electricity and do not require supplemental power for the communications to be provided. Provide two3 portable satellite internet devices for vehicles that haveallow sending and receiving an unlimited number of text messages to other mobile phonesan unlimited data plan. The device may directly send and receive text messages or work with a mobile phone capable of communications throughout Denali National Park. Pay bills from the service provider by the payment due.
Revised by Amendment A001
Revised by Amendment A002 marino.chea Cross-Out