Ghiglione_ControlSheet.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
AK PRA DENA 10(36), Replace Ghiglione Bridge
Solicitation number
69056725B000009
Issued by

About this file

This Excel file is a Survey Control Point List for the Ghiglione Bridge Replacement project located in Alaska. The document provides detailed geospatial survey data for three surveying points (2997, 2998, and GHIG1) with precise state plane coordinates, geographical coordinates, elevations, and combined factors. The survey was conducted in June 2009 using US Survey Foot units and the Alaska zone 4 SPCS NAD83 (CORS96) coordinate system, with orthometric elevations based on the NAVD88 GEOID06a vertical datum. The control sheet includes spatial information such as latitude, longitude, ellipsoid height, and point descriptions, which are likely critical for the bridge replacement project's engineering and construction planning.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Information

Information
1.This file transfers the Survey Control point list (in Excel format) to an Excel plan sheet. Open the point list files in Excel. Select the tab at the bottom of the worksheet and drag it to this spreadsheet. It will become a new tab. Place the name of this tab in the "Data Location" block below. The Survey Control point list will appear.
2.If extra sheets are needed, copy the original plan sheet by holding the left mouse button on the worksheet's tab (below) and hold the <CTRL>key. A mini sheet with a plus sign should appear. Drag this and drop it to the desired location.
Common Sheet Information
Insert the following values. They will appear on every sheet.
State:AKNote: If there is more than one project number, use <ALT><ENTER> to insert page break for additional lines.
Project:PRA DENA 10(36)
NPS PMIS /

Drawing No:

Designed by:WFLHD_Survey
Date:1/1904
Checked by:WFLHD Survey
Date:1/1904
First sheet #:D.41.0
Title block text:SURVEY CONTROL
Show Totals?TRUE
Data location:Page 1Worksheet found
Data begins in col:A
Min. rows/table33.0
Base sheet name:Sheet3rows w/dataOK - no spaces in data
Max. row/table403data rowsWarnings:
40rows/table
PROJECT :Ghiglione Bridge Replacement

DATE OF FIELD WORK : June 2009 DATE OF FINAL ADJUSTMENT : June 2009

PROJECT UNITS : US Survey Foot COORDINATE SYSTEM : Alaska zone 4 SPCS NAD83 (CORS96)

EPOCH DATE : 2008.000

VERTICAL DATUM : Orthometric Elevations based on the NAVD88 GEOID06a

Sheet Names
Input the names of the worksheets in the order you would like the sheets numbered.
Worksheet NameSheetHeader rowSheet NumberNotes
SheetD.434OK
Sheet (2)UndefinedFALSE4
Sheet (3)UndefinedFALSE4
Sheet (4)UndefinedFALSE4
Sheet (5)UndefinedFALSE4
Sheet (6)UndefinedFALSE4
Sheet (7)UndefinedFALSE4
Sheet (8)UndefinedFALSE4
Sheet (9)UndefinedFALSE4
Sheet (10)UndefinedFALSE4
Sheet (11)UndefinedFALSE4
Sheet (12)UndefinedFALSE4
Sheet (13)UndefinedFALSE4
Sheet (14)UndefinedFALSE4
Sheet (15)UndefinedFALSE4
Sheet (16)UndefinedFALSE4
Sheet (17)UndefinedFALSE4
Sheet (18)UndefinedFALSE4
Sheet (19)UndefinedFALSE4
Sheet (20)UndefinedFALSE4
Total Sheets:10sheets missing

Revised: 15 June 2015

Sheet

Sheet Information
Sheet num:D.4Filename0
Sheet name:SheetC:\MyFiles\Projects\Alaska\Denali\control\[Ghiglione_ControlSheet.xlsx]Sheet
Reference:Time
30-Apr-2019 2:07 PM
Begin Column:ABCDEFGHI

PROJECT :Ghiglione Bridge Replacement DATE OF FIELD WORK : June 2009 DATE OF FINAL ADJUSTMENT : June 2009 PROJECT UNITS : US Survey Foot COORDINATE SYSTEM : Alaska zone 4 SPCS NAD83 (CORS96)

STATE PLANE COORDINATESGEO COORDINATES
3.0POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTIONNOTE:
29973492192.0431680732.9283435.33363°33'23.579940"N149°45'09.904860"W3482.25160.999735855/8" IR w/RPC1.To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
29983492323.7841680225.7313421.87663°33'24.896049"N149°45'21.091444"W3468.78740.999736445/8" IR w/RPC
GHIG13492065.0101680271.6583373.36463°33'22.346796"N149°45'20.099296"W3420.28230.999738765/8" IR w/FHWA Alum Cap
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000

PROJECT :Ghiglione Bridge Replacement DATE OF FIELD WORK : June 2009 DATE OF FINAL ADJUSTMENT : June 2009

PROJECT UNITS : US Survey Foot COORDINATE SYSTEM : Alaska zone 4 SPCS NAD83 (CORS96)

STATE PLANE COORDINATESGEO COORDINATES
POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTION
29973492192.0431680732.9283435.33363°33'23.579940"N149°45'09.904860"W3482.2520.999735855/8" IR w/RPC
29983492323.7841680225.7313421.87663°33'24.896049"N149°45'21.091444"W3468.7870.999736445/8" IR w/RPC
GHIG13492065.0101680271.6583373.36463°33'22.346796"N149°45'20.099296"W3420.2820.999738765/8" IR w/FHWA Alum Cap

File details come from the government source that posted it. Updated .