AppendixDDIDCWBS-DI-MGMT-81334A.pdf

Data Item Description Rev. A PDF 252 KB Posted

Attached to
Agile Transportation for the 21st Century (AT21)
Solicitation number
HTC711-07-R-0001
Issued by

About this file

Appendix D - DI-MGMT-81334A

View the file

Other versions and copies of DI-MGMT-81334A

File Revision Posted Attached to
A094_DID_DI-MGMT-81334D_CWBS.pdf Rev. D Bidders Library for Open Skies OC-135 DVIS

Who attaches DI-MGMT-81334A

Other files

File Type Posted
Amend0012.pdf PDF
SF30-Amend0005.pdf PDF
4_CostTemplate12Apr07Amendment0004.xls XLS spreadsheet
5_Amend0004SectionJAttachment11.doc DOC document
5_Amend0004FedBizOppsQandA.doc DOC document
6_Amend0004.doc DOC document
Amend0003FedBizOppsQ A.doc DOC document
Amendment0003.doc DOC document
Attachment8 CostTemplate.xls XLS spreadsheet
GovernmentResponsestoQuestionssubmittedontheAT21RFP_2.doc DOC document
Amendment0002.doc DOC document
Amendment002AT21_SV-6.pdf PDF
Amendment0002AT21_SV-6.xls XLS spreadsheet
QuestionsandAnswersPostedtoFedbizopps032007.doc DOC document
GovernmentResponsestoQuestionssubmittedontheAT21RFP.doc DOC document
Amendment0001.doc DOC document
AppendixGProblemReportForm.doc DOC document
Attachment10DeliverableSchedule.doc DOC document
Attachment2PPTemplate.doc DOC document
AppendixCDIDCPR-DI-MGMT-81466A.pdf PDF
MemorandumforProspectiveOfferors.pdf PDF
Attachment4PPQuestionnaire.doc DOC document
Attachment3PPLog.doc DOC document
AT21RequestforProposal.doc DOC document
AppendixFDICMAN80639CECP.pdf PDF
Attachment6NDABiddersLibrary.doc DOC document
Attachment8CostTemplate4Mar07.xls XLS spreadsheet
Attachment5DD254.doc DOC document
AppendixHAT21-CDD-Revised-21Feb07forPublicRelease.pdf PDF
AppendixEDIDIMS-DI-MGMT-81650.pdf PDF
Attachment9PerformancePlan.doc DOC document
Attachment7BiddersDemonstration.doc DOC document
NewReleaseDateforAT21RFP.doc DOC document
QuestionsandAnswersPostedtoFedbizopps020707.doc DOC document
QuestionsandAnswersPostedtoFedbizopps020607.doc DOC document
QuestionsandAnswersPostedtoFedbizopps013107.doc DOC document
CopyofAT21_SV-6.xls XLS spreadsheet
UpdatedResponsestoQandAposted121506.doc DOC document
QuestionsandAnswersPostedtoFedbizopps011707.doc DOC document
QuestionsandAnswersPostedtoFedbizopps122006.doc DOC document
QuestionsandAnswersPostedtoFedbizopps121506.doc DOC document
1_IndustryDayAttendeesByCompanyName.xls XLS spreadsheet
IndustryDayAttendeesByCompanyName.xls XLS spreadsheet
AT21IndustryDaySlideShow31Oct2006.ppt PPT presentation
A21AwardFeePlan25Oct.pdf PDF
QuestionandAnswersfrom27Oct2006.doc DOC document
DraftRFP10192006.pdf PDF
AT21CDDforRFP19Oct06.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Contract Work Breakdown Structure

Number: DI-MGMT-81334A Approval Date: 20031031

AMSC Number: D7515 Limitation:

DTIC Applicable: GIDEP Applicable:

Office of Primary Responsibility: (D) OSD/PA&E/CAIG

Applicable Forms: Not Applicable; 35 hours

Use/relationship: This documents the Contract Work Breakdown Structure (CWBS) and its extension by the contractor using terminology and definitions, as applicable, in MIL-HDBK-881. The complete Program Work Breakdown Structure (PWBS) will serve as a basis for program and technical planning, scheduling, cost estimating, resource allocations, performance management where appropriate, configuration management, and status reporting.

This DID summarizes the format for the WBS and provides preparation instructions to support the specific data and frequency requirements specified in the contract. This DID is applicable to all contracts that require a WBS and is related to the two Contractor Cost Data Reporting (CCDR) formats: DD Form 1921, “Cost Data Summary Report” (DID number DI-FNCL-81565A), and DD Form 1921-1, “Functional Cost-Hour and Progress Curve Report” (DID number DI-FNCL-81566A). This DID can also be related to the formats contained in DD Forms 2734/1, 2734/2, 2734/3, 2734/4, and 2734/5, “Cost Performance Report” (DID number DI-MGMT-81466); DD Forms 2735, “Cost/Schedule Status Report, (DID number DI-MGMT-81467); and DD Form 1586, “Contract Funds Status Report” (DID number DI-MGMT-81468).

Routine reporting shall be at CWBS level 3 for prime contractors and key subcontractors.

MIL-HDBK-881 serves as the basis for identifying the first three levels of the PWBS and for developing the CWBS. Extensions of the PWBS and CWBS can be tailored to the specific program but will be consistent with MIL-HDBK-881. Detailed reporting of the CWBS (i.e., below level 3) shall be required only for those lower-level elements that address high-risk, high-value, or high-technical-interest areas of a program. Identifying these additional elements is a critical early assignment for the Cost Working Level Integrated Product Team (CWIPT) for inclusion in the PWBS.

The reporting contractor shall prepare and submit the contract dictionary within 60 days of contract award. The reporting contractor shall maintain and update the WBS Dictionary throughout the life of the contract. The dictionary shall not be submitted more frequently than report submissions.

This DID replaces DID number DI-MGMT-81334

DI-MGMT-81334A

Requirements:

1. Reference documents. Detailed instructions for preparing the CWBS can be found in MIL-HDBK-881. WBS guidance is also contained in Chapter 2 of the CCDR Manual, DoD 5000.4-M-1.

2. Formats. The CWBS shall be reflected in an electronic report that consists of two parts as shown in the sample attachments. Part I is for the CWBS Index and Part II is for the CWBS Dictionary. The index lists the individual elements. The dictionary describes the effort and tasks associated with every CWBS element shown in Part I.

Preparation Instructions:

1. Contract Work Breakdown Structure Index:

a. CWBS Code. Enter the code, if applicable.

b. CWBS Element Level. Enter the level of the CWBS element. Level 1 is the total contract. Levels 2, 3, etc., are successively lower levels of the program.

c. CWBS Element Name. Enter the title of the CWBS element using the specific name or nomenclature.

d. Contract Line Item(s). Enter the numbers of the contract line items associated with the CWBS element, if applicable.

2. Contract Work Breakdown Structure Dictionary:

a. CWBS Code.

b. CWBS Element. Enter the title of each CWBS element in the same order as given in Part I.

c. CWBS Definition. Enter a complete description of the technical and cost content of each CWBS element. The statement should be as descriptive as possible about the efforts, tasks, tests, components, etc., that are to be included in the CWBS element by the contractor. The CWBS Dictionary must be updated and maintained throughout the life of the contract. However, the updated dictionary shall be submitted no more frequently than the CCDR report submissions.

-81334) C ontract W ork Breakdow n Structure— D ata Item D escription (D I-M

G M

T

CONTRACT WORK BREAKDOWN

STRUCTURE INDEX

PROGRAM:

Missile X LRIP Surface-to-Air Interceptor

REP NO: XXXXXX

CONTRACT NO: XXXXXX-98-C-XXX

CONTRACT PLAN NO:

XXXXXXXX

DATE:

06/30/02

CWBS ELEMENT

LEVEL

CWBS

CODE 1 2 3 4 5

NAME

CONTRACT LINE ITEM(S)

1.0

1.1

1.1.1

1.1.2

1.1.3

1.1.4

1.1.5

1.1.5.1

1.1.5.1.1

1.1.5.1.2

1.1.5.2

1.1.5.3

1.1.5.4

1.1.6

1.1.7

1.1.8

1.1.9

1.1.10

1.2

1.3

1.4

Missile System

Air Vehicle

Propulsion

Airframe

Warhead

Post Boost System

Guidance And Control Equipment

Guidance Section

Seeker

Guidance Electronics

Control Devices

Structure

Power and Networks

Ordnance Initiation Set

Airborne Test Equipment

Airborne Training Equipment

Auxiliary Equipment

IAT&C

Integration, Assembly, Test, and Checkout

Systems Engineering/Program Management

Systems Test and Evaluation

Contract Work Breakdown Structure—Data Item Description (DI-MGMT-81334)

CONTRACT WORK BREAKDOWN

STRUCTURE DICTIONARY

PROGRAM:

Missile X LRIP Surface-to-Air Interceptor

RFP NO: ________________________

CONTRACT NO: XXXXX-98-C-XXXX

DATE:

11/1/00

CWBS CODE

CWBS DEFINITION

1.0

1.1

1.1.1

1.1.2

1.1.3

1.1.4

1.1.5

1.1.5.1 1.1.5.1.1

1.1.5.1.2

1.1.5.2

1.1.5.3

1.1.5.4

1.1.6

1.1.7

1.1.8

1.1.9

1.1.10

Missile System

Air Vehicle

Propulsion

Airframe

Warhead

Post Boost System

Guidance and Control Equipment

Guidance Section Seeker

Guidance Electronics

Control Devices

Structure

Power and Networks

Ordnance Initiation Set

Airborne Test Equipment

Airborne Training Equipment

Auxiliary Equipment

Integration, Assembly, Test and Checkout

The missile is a cylindrical body with four fixed fins attached to the aft end of the Solid Rocket Motor case. The control surfaces are located behind the fixed fins. The missile angular orientation is zero degrees at top center, with increasing angles positive in a clockwise direction (standing at the aft end looking forward). The outside surface of the missile body is coated for thermal protection of the structure from aerodynamic heating and rain erosion. Electrical interface between the launcher and the missile is provided by an umbilical cable connecting the missile Aft-Section to the Aft-Section of the Canister.

This element refers to the means for delivering the destructive effect to the target, including the capability to generate or receive intelligence to navigate and penetrate to the target area and to detonate the warhead. This element includes the design, development, and production of complete units (prototype and operationally configured units, which satisfy the requirement of their applicable specifications(s)) regardless of their use.

The propulsion system consists of the booster and the interstage. A single-stage, solid propellant rocket motor provides all of the boost impulse for the missile. The deployable flares and aft rate gyro package (RGP) are positioned at the aft end of the booster in the BUG configuration.

This element refers to the structural framework that provides the aerodynamic shape, mounting surfaces and environmental protection for the missile components. It includes the wings, fins, and structural body assemblies.

Warhead includes the assembly containing the kill mechanism of the round and its associated high explosives, chemicals, biological agents, nuclear devices, and pyrotechnics.

This element provides the roll rate control and the final velocity to adjust and deploy the payload as well as the external protection material, velocity control system, and deployment group.

This element refers to the missile’s ability to acquire and track targets, receive guidance data from various sensors and execute the necessary flight path to intercept the target.

This element refers to the missile’s ability to receive guidance data from various sensors.

The seeker assembly is attached to the kill vehicle via the forward ring of the forecone. The assembly consists of four elements; a seeker basecone, an IR sensor, a gimbal set, and a Seeker Electronics Assembly (SEA).

The seeker basecone is a conical assembly cast from magnesium. It is used as the main structure to mount the IR sensor and gimbals to the KV, and to dampen structural resonances.

This element includes all the electronic components and their structural items needed to perform all the seeker tracking functions.

This element includes all the electronic components and support structure needed to perform the electronic processing done outside, but near the detector assembly. This may include detector biasing electronics, preamplification, gain control processing, A/D conversion and multiplexing of the detector outputs when many detector outputs are present.

This element refers to the metal or composite materials that provide external housing, bulkheads, attach points and connectors for guidance and control equipment.

This element refers to the subsystem that starts the missile and maintains electrical power prior to launch, upon release from the launch platform, and during flight. Additionally, it consists of power supply devices and power converters.

The ordnance initiation set initiates all ordnance events throughout the missile and ground system (except reentry system components). Upon receipt of an electrical signal from the missile guidance and control system, the ordnance initiation set firing units convert the signal into ordnance outputs to the detonating cords. Among these ordnance events are stage separation, motor ignition, gas generator ignition, shroud separation, etc.

Includes through bulkhead initiators, ordnance test harnesses, and firing units/exploding bridge wires.

The airborne test equipment element refers to an exercise warhead that is interchangeable with the live warhead and suitable for developmental firing. This element includes destruct systems, recovery systems, special instrumentation, and telemetry equipment.

The airborne training equipment element refers to an exercise warhead that is interchangeable with the live warhead and suitable for training firing. This element includes destruct systems, recovery systems, special instrumentation, and telemetry equipment associated with the training mission.

The auxiliary equipment element refers to that additional equipment generally excluded from other specific elements. This element includes the environmental control, safety and protective subsystems, and destruct system. It also includes equipment of a single purpose and function that is necessary for accomplishing the assigned mission.

The IAT&CO of the hardware will be conducted at the contractor’s assembly facility. Subsystem components will be assembled and tested, then shipped to company YYYY for final assembly and testing.

Contract Work Breakdown Structure—Data Item Description (DI-MGMT-81334)

CONTRACT WORK BREAKDOWN

STRUCTURE DICTIONARY

PROGRAM:

Missile X LRIP Surface-to-Air Interceptor

RFP NO: ________________________

CONTRACT NO: XXXXXX-98-C-XXXX

DATE:

11/1/00

CWBS CODE

CWBS DEFINITION

1.2

1.3

1.4

Integration, Assembly, Test, and Checkout

Systems Engineering/Program Management

Systems Test and Evaluation

The IAT&CO of the missile will be conducted at a Company YYYY assembly facility. For flight vehicles, the guidance and control unit is tested and installed, the units are fueled, and the ordinance is installed. The missile is then installed in the canister and shipped to the testing range.

The system engineering and technical control as well as the business management of the project. System Engineering/Project Management effort that can be associated specifically with the hardware element is excluded, unless this management effort is of special contractual or engineering significance (e.g., associated contractor).

Four prototypes of the missile will be tested at WWWW testing range over a period of 3 months. The testing facility will evaluate both missile performance and accuracy, along with the launching platform capabilities.

End of DI-MGMT-81334A

File details come from the government source that posted it. Updated .