- DORM MANAGEMENT SERVICES Federal contract opportunity
- Solicitation number
- HSFLGL-17-R-00001
About this file
technical exhibit 2
View the file
Other files for this federal contract opportunity
Show all 50
DORM MANAGEMENT SERVICES has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP HSFLGL-17-R-00001 Technical Exhibit 2 Dorm Management Services FLETC, Glynco Georgia
TECHNICAL EXHIBIT 2
PERFORMANCE REQUIREMENTS SUMMARY
No.
REQUIRED
SERVICE
SECTION C
PARAGRAPH
NUMBER
STANDARD
AQL
Maximum Allowable Degree of Deviation
Lot Size
METHOD
OF
SURVEILLANCE
T.C.P.
Custodial
Requirements – Secured Doors
5.3 (b) Perform Task as Specified 0% ** Random Sampling 5%
2 Custodial Services
5.3.1 (a) Perform Task as
Specified 1.5% ** Random
Sampling/Customer Complaint
4%
Custodial Services
– Bed/Bath Linen
5.3.1 (b) Perform Task as
Specified 1.5% ** Random
Sampling/Customer Complaint
4%
4 Draperies 5.3.1 (e) Perform Task as Specified 1.5% ** Random Sampling 2%
5 Fabric & Vinyl Covered Furniture 5.3.1 (f) Perform Task as
Specified 2.5% ** Random Sampling 2%
6 Windows, Glass, and Metal Surfaces 5.3.1 (g) Perform Task as
Specified 2.5% ** Random Sampling 2%
7 Spot Cleaning 5.3.1 (h) Perform Task as Specified 2.5% ** Random Sampling 4%
8 Custodial Service
– Public Area 5.3.1 (j) Perform Task as
Specified 2.5%
** Random Sampling 4%
9 Lost or Abandoned Property 5.5 (b) & (c) Perform Task as
Specified 0% ** Random Sampling 5%
10 Track Service Call 5.6.1 (d) Perform Task as Specified 5 Failures ***
Random Sampling/Customer
Complaint
3%
11 SASS 5.7.2 Perform Task as Specified 4 Failures ** Periodic/Customer
Complaint 4%
12 Staffing/Coverage 1.10, 5.2, 5.6, 5.7.1, 5.9, Perform Task as Specified 0% ** Random Sampling/
Customer Complaint 5%
Scheduled PMP –
Main Campus
5.17 Perform Task as
Specified 1.5% ** Random Sampling 4%
Scheduled PMP –
Main Campus
(FCU)
5.17 Perform Task as
Specified 1.5% ** Random Sampling 4%
16 Schedule PMP – Leased-Buildings
5.18
Perform Task as
Specified 1.5%
Random Sampling 4%
Schedule PMP – Leased-Buildings
(PTAC)
5.18
18 Routine Lodging Maintenance 5.19
19 Painting 5.20 Perform Task as Specified 2.5% ** Random Sampling 2%
20 Electrical Systems 5.21 Perform Task as
21 Lighting Systems 5.22 Perform Task as
22 Renovation 5.23 Perform Task as Specified 1.0% ** 100% Sampling 3%
23 Locksmith Services 5.24 Perform Task as
Specified 1.0% ** Random Sampling 4%
RFP HSFLGL-17-R-00001 Technical Exhibit 2 Dorm Management Services FLETC, Glynco Georgia
24 Insect and Rodent Control 5.25 Perform Task as
Specified 1.0%
25 Maintenance Records 5.31 Perform Task as
Specified 2.5%
3%
**Lot size = # of rooms x # of days in month services are performed *** No more than 5 failures will be allowed for the services described