HSFEHQ-12-R-0002 A00004.pdf

PDF 277 KB Posted

Attached to
FEMA Temporary Housing Units Federal contract opportunity
Solicitation number
HSFEHQ-12-R-0002
Issued by
Federal Emergency Management Agency Logistics Section

About this file

Amendment A00004

View the file

Other files for this federal contract opportunity

Other files attached to FEMA Temporary Housing Units, newest first.
File Type Posted
HSFEHQ-12-R-0002_Solicitation 20120608 .pdf PDF
HSFEHQ-12-R-0002_Attach2_vAA_June 8 2012.pdf PDF
HSFEHQ-12-R-0002_Attach2_vAA_2012-04-05 _May 15 2012.pdf PDF
HSFEHQ-12-R-0002_A00003.pdf PDF
HSFEHQ-12-R-0002_A00002.pdf PDF
HSFEHQ-12-R-0002_AdditionalGovernmentResponses.pdf PDF
HSFEHQ-12-R-0002_Attach2.pdf PDF
HSFEHQ-12-R-0002_Solicitation.docx DOCX document
HSFEHQ-12-R-0002_A0001.pdf PDF
HSFEHQ-12-R-0002_GovtResponses.pdf PDF
HSFEHQ-12-R-0002_Attach2.pdf PDF
HSFEHQ-12-R-0002_Attach3.pdf PDF
HSFEHQ-12-R-0002_Attach4.docx DOCX document
HSFEHQ-12-R-0002_Attach6.docx DOCX document
HSFEHQ-12-R-0002_Attach8.xlsx XLSX spreadsheet
HSFEHQ-12-R-0002_Attach1.docx DOCX document
HSFEHQ-12-R-0002_Attach7.docx DOCX document
HSFEHQ-12-R-0002_Attach5.docx DOCX document
HSFEHQ-12-R-0002_Attach2.pdf PDF
HSFEHQ-12-R-0002_Solicitation.docx DOCX document
HSFEHQ-12-R-0002 P0001.pdf PDF
HSFEHQ-12-R-0002_Attach4.docx DOCX document
HSFEHQ-12-R-0002_Attach3.xlsx XLSX spreadsheet
HSFEHQ-12-R-0002_Solicitation.docx DOCX document
HSFEHQ-12-R-0002_Attach2.docx DOCX document
HSFEHQ-12-R-002_Attach1.docx DOCX document
PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
HSFEHQ-12-R-0002_Attach5.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NO.

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NO.

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC-

KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 10-83)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY Carolyn M Knight 8 June 2012

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(No., street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(If applicable)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

(X)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

A00004 06-08-2012

Federal Emergency Management Agency

Office of Acquisition Management

500 C Street, S.W., PP 5th Floor

Washington DC 20472

To all Offerors/Bidders HSFEHQ-12-R-0002

X

X X

12:00 PM ET, July 11, 2012

X 1

Please review the attached files and see page 2 for Summary of Changes to Solicitation HSFEHQ-12-R-0002.

Carolyn M. Knight

Contracting Officer

HSFEHQ-12-R-0002 A00004

SUMMARY OF CHANGES:

The following are changes to Solicitation HSFEHQ-12-R-0002:

1. Solicitation due date is changed to 12:00 PM ET, July 11, 2012.

2. Revised Section B.2. MINIMUM AND MAXIMUM ORDERING LIMITATION

3. Revised Section G.5 TASK ORDER PROCEDURES, Paragraph B., Sub-paragraph e)

4. Revised Section G.5 TASK ORDER PROCEDURES, Paragraph B., Sub-paragraph f)

5. Replaced Section G.8 TECHNICAL DIRECTION

6. Revised Section I.5 52.216-18 ORDERING (OCT 1995), Paragraph (a)

7. Revised Section I.8 52.216-19 ORDER LIMITATIONS (OCT 1995), Paragraph (b), Subparagraphs (1) and (2).

The following are the changes to Attachment 2 - Rugged Base Performance Requirements ITMUS:

1. Item 083 – Furnace: This text is added: (This FEMA requirement may need the home manufacturer to request an

Alternative Construction letter from HUD.)

2. Item 084 – Air Conditioning: This text is added: (This FEMA requirement may need the home manufacturer to request an

Alternative Construction letter from HUD.)

3. Item 086 – HVAC Installation: This text is added: (This FEMA requirement may need the home manufacturer to request an Alternative Construction letter from HUD.)

4. Item 155 – Company Commitment: The following text was removed “Within three (3) weeks of award, the manufacturer shall comply with 24 CFR 3282.362 (b) or the contract may be terminated.” and replaced with the following “Within three (3) weeks of a task order award under this solicitation, the manufacturer shall comply with 24

CFR 3282.362 (b) and provide the report to FEMA. Failure to do so may result in FEMA taking corrective action, the result of which may affect the Offerors past performance rating.”

File details come from the government source that posted it. Updated .