IA TAC Bid SheetCLINs and Scenarios 3-13-2009 GW v3.xls
XLS spreadsheet 99 KB Posted
- Solicitation number
- HSFEHQ09R0037
About this file
Updated CLIN table/Bid Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Amend P00009.pdf | ||
| CLIN Table _P00009.pdf | ||
| RFP Amen P00008.pdf | ||
| RFP Amend P00007.pdf | ||
| Latest CLIN Table.pdf | ||
| Final Q and A.pdf | ||
| RFP Amend P00006.pdf | ||
| IA-TAC III Questions 13_Mar 2009.xls | XLS spreadsheet | |
| UPDATED MILESTON FOR THE ACQUISITION CYCLE.doc | DOC document | |
| TACIII RFP Changes 031309.doc | DOC document | |
| SCA.pdf | ||
| DBA.pdf | ||
| PrsntPast_Quest_Attachment_G.doc | DOC document | |
| Updated PRS_Deliverables0313.doc | DOC document | |
| Amend P00005_RFP.doc | DOC document | |
| RFP Amend P00003.pdf | ||
| RFP Amend P00002.pdf | ||
| RFP Amend P00001.pdf | ||
| Q and A 2-24-09.doc | DOC document | |
| PWS Appendix C - Mass Care Staffing.xls | XLS spreadsheet | |
| PWS Appendix B - QASP.doc | DOC document | |
| PRS_Deliverables.doc | DOC document | |
| IATAC III.DOC | DOC document | |
| PWS Appendix A - PerfGuidelines.doc | DOC document | |
| IA TAC Bid Sheet and CLIN 2-18-2009 EC v1.xls | XLS spreadsheet | |
| PWS Appendix D - SOP.doc | DOC document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IA-TAC III - Bid sheet & CLIN
| Index | Applies to Contract (C) , Scenario (S) or both (CS) | CLIN | Sub-CLIN | Short Description | Full Description | PWS References | Type | U/I | Qty | Unit Price | Base Year | Option Year 1 (Include Readiness CLIN 1002) | Option Year 2 (Include Readiness CLIN 2002) | Option Year 3 (Include Readiness CLIN 3002) | Option Year 4 (Include Readiness CLIN 4002) | |
| 1 | C | 0001 | Phase-in (One-time Fee) Base Year | Phase-in (One-time Fee) Base Year | 9 | FFP | One time fee | 1 | N/A | N/A | N/A | N/A | ||||
| 2 | C | 0002 | Readiness for Base Year plus 4 year options | Readiness for Base Year plus 4 year options - Contractors shall propose a monthly readiness cost/price for all readiness activities including, but not limited to, all the following functions. The monthly cost/price shall be fixed. | 9 | FFP | Monthly | 12 | ||||||||
| 3 | C | Playbook - Part of Readiness - Not Separately Priced (NSP) | Playbook - Develop and maintain playbook currency. Identify subcontractors and have contracts and local sources of materials in place. Identify all county and city MH/PM installation requirements (State & Local Codes). Identify Federal, State, Tribal and Lands & Utilities. Identify all Commercial MH Parks in Sector and establish an executable plan for unit installation. Perform Risk Assessment & Analysis, Quality Assurance Standards, and Develop Strategies & Scenarios. | 9.4 | NSP | NSP | ||||||||||
| 4 | C | Training - Part of Readiness - Not Separately Priced (NSP) | Training - Mass Care, Housing, Miscellaneous | 9.5.3 | NSP | NSP | ||||||||||
| 5 | C | Exercise - Part of Readiness - Not Separately Priced (NSP) | Exercise- Mass Care, Housing, Miscellaneous | 9.5.4 | NSP | NSP | ||||||||||
| 6 | C | Monthly Readiness Report - Part of Readiness - Not Separately Priced (NSP) | Reporting -- the Plan shall define a readiness reporting schedule that will include a brief summary of each monthly report’s function and the reasons that warrant the creation of each report. Reporting shall include quantities for labor hours, materials and supplies, travel costs, and the costs associated with any subcontractors. The reporting shall be user-friendly, and incorporate charts, graphs, and any other media the contractor chooses to make the information understandable and relevant. | 9.5.5 | NSP | NSP | ||||||||||
| 7 | C | Quarterly Briefings - Part of Readiness - Not Separately Priced (NSP) | Quarterly Briefing – deliver quarterly briefings at FEMA Headquarters in Wash., D.C. to descriptively clarify readiness measures. the Plan shall name the titles, with accompanying job descriptions and responsibilities, of the personnel that will attend. The initial playbook(s) shall be delivered at this time, and will be part of the first briefing and each subsequent briefing shall include updated playbook(s). | 9.5.6 | NSP | NSP | ||||||||||
| 8 | C | 0003 | Program & Task Order Management | Program & Task Order Management - Propose loaded fixed labor rates on an hourly basis. | 9.1 | TM/LH | ||||||||||
| 9 | C | Labor Category | List | TM/LH | Hourly | |||||||||||
| 10 | C | Labor Category | List | TM/LH | Hourly | |||||||||||
| 11 | C | Labor Category | List | TM/LH | Hourly | |||||||||||
| 12 | C | Labor Category | List | TM/LH | Hourly | |||||||||||
| 13 | C | Labor Category | List | TM/LH | Hourly | |||||||||||
| 14 | C | Labor Category | List | TM/LH | Hourly | |||||||||||
| 15 | C | Labor Category | List | TM/LH | Hourly | |||||||||||
| 16 | C | ADDITIONAL LABOR CATEGORY | ADD MORE LINES FOR LABOR CATEGORY IF NECESSARY | TM/LH | Hourly | |||||||||||
| 17 | C | 0004 | Pre-Ops Planning | Pre-Ops Planning. This plan incorporates the findings from the Mission Planning Team (MPT) Housing Mission Assessment. | 9.13 | FFP | EA | 1 | ||||||||
| 18 | S | 0005 | Staging Area Support | Staging Area Support | 6 | FFP | ||||||||||
| 19 | S | 0005AA | Staging Area Operations & Support | Staging Area Operations & Support - Develop processes and procedures to manage the housing units in the staging area, minimally addressing unit storage, traffic flow, access for inspections, receiving, reports, and logs. | 6.1 | FFP | EA | 1 | ||||||||
| 20 | S | 0005AB | Staging Area Unit Receiving | Staging Area Unit Receiving - Includes Inspection, repairs, and cleaning to make unit Ready for Installation (RFI). Ready for installation means prior to leaving the staging area, the contractor will make sure that each unit is capable of being transported; and is safe, sanitary and secure in a manner that accomodates occupation. All items within the unit shall be operable according to manfacturer's specifications. | 6.1 | FFP | EA | 1 | ||||||||
| 21 | S | 0005AC | Staging Area Security | Staging Area Security - The level of commitment is based on risk assessment. A minimum of one unarmed guard per staging area 24 hrs/day, 7 days/week. | 6.1.1.2 | FFP | Days | 180 | ||||||||
| 22 | S | 0005AD | Staging Area Design | Staging Area Design | 6.2 | FFP | EA | 1 | ||||||||
| 23 | S | 0005AE | Staging Area Construction | Staging Area Construction. | 6.2 | FFP | EA | 1 | ||||||||
| 24 | C | 0006 | Haul & Install Temporary Housing Units (THU) on Private or Commercial Sites - Construction. | Haul & Install Temporary Housing Units (THU) on Private or Commercial Sites - Construction. | 7 | FFP | ||||||||||
| 25 | C | 0006AA | Private Site Inspections | Perform Private Site Inspections | 7.1.8 | FFP | EA | 175 | ||||||||
| 26 | C | 0006AB | Commercial Site Inspections | Perform Commercial Site Inspections | 7.1.8 | FFP | EA | 150 | ||||||||
| 27 | C | 0006AC | Mileage for Site Inspections | Mileage for Site Inspections - Round trip mileage includes distance between sites if more than one site is being inspected. Route starting and ending point is from staging location or contractor base of operations. (Includes inspector travel time.) | FFP | MI | 6750 | |||||||||
| 28 | C | 0006AD | Commercial Park Feasibility Assessment | Commercial Park Feasibility Assessment - The Contractor shall, at the request of the COTR, perform preliminary investigations of commercial parks. The adequacy of the park’s infrastructure shall be assessed. Areas of consideration shall include number and size of available lots, sewer system, water distribution system, electrical distribution system, environmental concerns, fire prevention, storm shelters, flood plain information, ingress/egress, and UFAS compliancy. The Contractor shall determine the condition of the aforementioned with respect to governing State, Local, and Federal codes. This information will be reported to the COTR in a written format, including photographs, site plan, and layout. Proximity of local schools, mail route information, and other areas of public interest shall be included in the report. The report shall also consider the availability of telephone service, public transportation, waste management service, and other amenities of interest. | 7.1.8.7 | FFP | EA | 2 | ||||||||
| 29 | S | 0006AE | Commercial Park Expansion | Misc Expenses for Commercial Park Expansion. The contractor shall conduct an assessment prior to installing and/or modify infrastructure required to increase the capacity of a commercial park. This will include, but is not limited to sewer, water, electric, roads and pad construction. | 7.1.8.8 | FFP | EA | 1 | ||||||||
| 30 | C | 0006AF | Haul & Install at Private or Commercial Site (Unit Quantity: 1 - 50) | Haul and Install at Private Site or Commercial Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet (excavation down to 48 inches), steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 1 - 50, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 31 | C | 0006AF1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 32 | C | 0006AF2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 33 | C | 0006AG | Haul & Install at Private or Commercial Site (Unit Quantity: 51 - 150) | Haul and Install at Private Site or Commercial Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet (excavation down to 48 inches), steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 51 - 150, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 34 | C | 0006AG1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 35 | C | 0006AG2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 36 | C | 0006AG3 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 51-100 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 37 | C | 0006AH | Haul & Install at Private or Commercial Site (Unit Quantity: 151 - 300) | Haul and Install at Private Site or Commercial Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet (excavation down to 48 inches), steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 151 - 300, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 38 | C | 0006AH1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 39 | C | 0006AH2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 40 | C | 0006AH3 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 51-100 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 41 | C | 0006AI | Haul & Install at Private or Commercial Site (Unit Quantity: 301 - 600) | Haul and Install at Private Site or Commercial Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet (excavation down to 48 inches), steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 301 - 600, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 42 | C | 0006AI1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 43 | C | 0006AI2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 44 | C | 0006AI3 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 51-100 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 45 | C | 0006AJ | Haul & Install at Private or Commercial Site (Unit Quantity: 601 - 1,200) | Haul and Install at Private Site or Commercial Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet (excavation down to 48 inches), steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 6011 - 1,200, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 46 | C | 0006AJ1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 47 | C | 0006AJ2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 48 | C | 0006AJ3 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 51-100 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 49 | C | 0006AK | Haul & Install at Private or Commercial Site (Unit Quantity: 1,201 - 2,000) | Haul and Install at Private Site or Commercial Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet (excavation down to 48 inches), steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 1,201 - 2,000, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 50 | C | 0006AK1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 51 | C | 0006AK2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 52 | C | 0006AK3 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 51-100 per day. | 7.1.12 | FFP | EA | 1 | ||||||||
| 53 | C | 0006AL | Mileage for Long Haul | Mileage - Long Haul - Ground Mileage for Towing of MHZ/PM for installation from the Long Term Storage Facility to either Staging Area or Installation Site. (Includes hook-up charges) (for biding purposes assume 600 miles one way) Assume 2 Haul & Install 100 MHZ units each, 100 Private, 100 Commercial | No Ref | FFP | MI | 120,000 | ||||||||
| 54 | C | MISCELANEOUS ITEMS - Necessary for hauling & installing Temporary Housing Units (THU) on Private or Commercial Sites - Construction | MISCELANEOUS ITEMS - Necessary for hauling & installing Temporary Housing Units (THU) on Private or Commercial Sites - Construction | FFP | ||||||||||||
| 55 | 0006BA | Misc Expense for Additional Site Preparation at Private or Commercial Site | Misc Expenses for additional Private Site or Commercial Site Preparation and/or Basic MH/PM Installation over & above basic installation charges. (COTR approval required and CO approval if >$3,000). Determined and negotiated as needed during Task Orders. | FFP | EA | 0 | Not Priced | Not Priced | Not Priced | Not Priced | Not Priced | |||||
| 56 | C | 0006BB | Additional Ground Mileage for Long Haul | Mileage - Additional - Ground Mileage for Towing of MH/PM over 150 miles. (This CLIN is only for extending the range of hauling units under the installations CLIN) | FFP | MI | 30000 | |||||||||
| 57 | C | 0006BC | Heavy Tow | Heavy Tow - Includes hauling to site, and equipment. | FFP | EA | 15 | |||||||||
| 58 | C | 0006BC1 | Heavy Equipment to spot | Heavy Equipment to spot MH/PM - This includes Heavy Equipment used on the site to spot the MH/PM. | FFP | EA | 15 | |||||||||
| 59 | C | 0006BD | Additional Steps | Additional Steps - Standard Steps for manufactured homes (Price per entrance) | FFP | EA | 12 | |||||||||
| 60 | C | 0006BE | Platform Steps | Platform Steps - Platform steps, walker accessible. All Steps defined as “Platform Steps” shall be constructed of treated outdoor building material. 5/4” decking material shall be used for all steps and platform surfaces. Two inches (2”) treated material is required for support runners. Handrails are required as defined in the SOW. Steps shall have a 36 inch tread depth and a maximum rise of six inches (6”) between steps. Steps shall have a 48” tread width. Sideboards are required along the outer edges of the steps at a four inches (4”) height. Top platform shall be 60”x60” framed with 2”x6” treated lumber (joist spacing of 16” on center). Top surface of all steps and platform shall be painted with a skid resistant paint material (stick on adhesives are NOT permissible). Steps shall be constructed so that water will NOT accumulate on the walking surface. | Appendix A | FFP | EA | 15 | ||||||||
| 61 | C | 0006BF | UFAS Ramp (30 feet) | UFAS Ramp (up to 30 feet of ramp) | Appendix A | FFP | EA | 30 | ||||||||
| 62 | C | 0006BG | Additional UFAS Ramp (more than 30 feet) | UFAS Ramp (more than 30 feet) | FFP | LF | 360 | |||||||||
| 63 | C | 0006BH | Additional Utility Extension for Sewer (above ground) | Additional Utility Extension (Sewer) - 4-Inch Lateral Sewer Line, Above ground (Over 50 Feet) | FFP | LF | 300 | |||||||||
| 64 | C | 0006BI | Additional Utility Extension for Sewer (buried) | Additional Utility Extension (Sewer) - 4-Inch Lateral Sewer Line, Buried (Over 50 Feet). Includes excavation down to 48 inches. | FFP | LF | 600 | |||||||||
| 65 | C | 0006BJ | Additional Utility Extension for Water | Additional Utility Extension (Water) - 3/4 inch Water Line Extension, Buried (Over 50 Feet). Includes excavation down to 48 inches. | FFP | LF | 900 | |||||||||
| 66 | C | 0006BK | Additional Utility Extension for Electrical | Additional Utility Extension (Electrical) - Direct Wiring Extension of 200 AMP Service (Over 50 Feet). Includes excavation down to 48 inches. | FFP | LF | 900 | |||||||||
| 67 | C | 0006BL | Power Pole & Meter Loop | Power Pole and Meter Loop | FFP | EA | 50 | |||||||||
| 68 | C | 0006BM | Single Power Pedestal & Meter Loop | Single Power Pedestal & Meter Loop | FFP | EA | 200 | |||||||||
| 69 | C | 0006BN | Electrical Gang (Qty of 2 meters) | Electrical Gang or Rack Distribution System (Quantity of 2 meters). A Gang or Rack System shall be constructed with the same requirements of a 200 AMP Power Pole meter loop, but shall consist of two or more 200 AMP meter loops designed to supply power to the Power Pedestals or directly to the units. | Appendix A | FFP | EA | 50 | ||||||||
| 70 | C | 0006BO | Electrical Gang (Qty of 4 meters) | Electrical Gang or Rack Distribution System. (Quantity of 4 meters) | FFP | EA | 25 | |||||||||
| 71 | C | 0006BP | Electrical Gang (Qty of 6 meters) | Electrical Gang or Rack Distribution System. (Quantity of 6 meters) | FFP | EA | 10 | |||||||||
| 72 | C | 0006BQ | Well Pump Restoration | Restoration of Well Pump & System (Pressure tank, pressure switch, piping), this includes direct wiring of well pump and 30 AMP well pump switch. | Appendix A | FFP | EA | 2 | ||||||||
| 73 | C | 0006BR | Additional Excavation (48 inches) | Additional Excavation up to 48 inches in depth. This is for excavation only (No conduit). | FFP | CY | 960 | |||||||||
| 74 | C | 0006BS | Additional Excavation (120 inches) | Additional Excavation from 48 inches in depth to 120 inches in depth for Unit Installation. This is for excavation only (No conduit). | FFP | CY | 480 | |||||||||
| 75 | C | 0006BT | Additional Excavation (196 inches) | Additional Excavation from 120 inches in depth to 196 inches in depth for Unit Installation. This is for excavation only (No conduit). | FFP | CY | 450 | |||||||||
| 76 | C | 0006BU | LP System Installation | LP System Installation (Includes purchase of 100 pound tank) | Appendix A | FFP | EA | 10 | ||||||||
| 77 | C | 0006BV | Natural Gas System Installation | Natural Gas System Installation (Includes purchase of 100 pound tank) | Appendix A | FFP | EA | 10 | ||||||||
| 78 | C | 0007 | Unit Maintenance Services & Deactivations | Unit Maintenance Services and Deactivations | 6.5 | FFP | ||||||||||
| 79 | C | 0007AA | Maintenance Hotline | Maintenance Hotline - Establish and staff the Maintenance Hotline Services no later than 24 hours from the time of issue of the first installation work order. | 6.8 | FFP | Days | 180 | ||||||||
| 80 | CS | 0007AB | Preventative Monthly Maintenance Inspection and Repairs | MH/PM/THU Monthly Preventative Maintenance Inspection and Repairs (Includes Minor repair materials). Unit of Issue (U/I) "EA"means one MH/PM/THU. | 6.8 | FFP | EA | 300 | ||||||||
| 81 | C | 0007AC | Major Repairs Items | MH/PM/THU Major Repairs Items. | ||||||||||||
| As required by the COTR in writing prior to any work being done. This is defined as a single item (Major Item) including parts, supplies, and materials (individually or collectively) costing more than $250.00 of materials and/or $250.00 of labor per work order or service call. | 6.5.9 | FFP | EA | 75 | ||||||||||||
| 82 | C | 0007AD | Emergency Maintenance Repairs | Emergency Maintenance Repair for MH/PM/THU. | ||||||||||||
| The contractor shall respond and initiate the repair within two hours and continue to make repairs to the extent there is no longer a safety hazard, life or death situation, or emergency issue. (Contractor shall notify the COTR by the next day.) EA mean repaired items. | 6.5.7 | FFP | EA | 45 | ||||||||||||
| 83 | C | 0007AE | Unit Refurbishment | MH/PM/THU Refurbish. |
As required by the COTR in writing prior to any work being done. Unit shall be made Safe, Sanitary, Functional, and Secured. The contractor shall clean and refurbish units for re-occupancy. “Refurbishment” means restoration of the unit to a “like new” condition, with the exception of reasonable wear and tear. Refurbishment may include, but is not limited to: All items covered under the contractor’s maintenance responsibilities, Repair or replacement of broken or faulty equipment, systems or furniture, Repair or replacement of finish materials such as carpet and trim, and
| Cleaning the floors, kitchens, bathrooms, and all appliances. | 6.5.8 | FFP | EA | 6 | ||||||
| 84 | C | 0007AF | Unit Reposition | MH/PM/THU Reposition. Reposition is to move the installed unit to a different position on the same site. Note: The Contractor must utilize the same material used in the original installation to reposition the temporary housing unit, as long as the material is in good sound condition. - In Unit of Issue (U/I) Ea means 1 unit. | 6.7.3 | FFP | EA | 8 | ||
| 85 | C | 0007AG | Unit Relocation | MH/PM/THU Relocation. Relocation is to move the installed unit from one site to another. - In Unit of Issue (U/I) Ea means 1 unit. | 6.7.4 | FFP | EA | 8 | ||
| 86 | C | 0007AH | Unit Deactivation | MH/PM/THU Basic Deactivation. The Contractor has seven (7) days to complete the deactivation of the unit, at which time the unit must be removed from the site, and seven (7) days to haul and deliver the unit. - In Unit of Issue (U/I) Ea means 1 unit. | 6.7.1 | FFP | EA | 75 | ||
| 87 | C | 0007AI | Emergency Unit Deactivation | MH/PM/THU Emergency Deactivation. The Contractor shall initiate emergency deactivation within six (6) hours of receipt (24 hours-a-day, seven (7) days per week) of an emergency deactivation work order and complete the work within 48 hours of the work order being issued. - In Unit of Issue (U/I) Ea means 1 unit. | 6.7.2 | FFP | EA | 8 | ||
| 88 | C | 0007AJ | Mileage for Unit Deactivation & Relocation | Mileage - Deactivation & Relocation mileage. Ground Mileage for Towing of MH/PM/THU. (Less Than 150 miles, to include hook-up charges.) | No Ref | FFP | MI | 7000 | ||
| 89 | C | 0007AK | Additional Mileage for Unit Deactivation & Relocation | Additional Mileage for Deactivation & Relocation mileage. Ground Mileage for Towing of MH/PM/THU, mileage 150 miles or greater. | No Ref | FFP | MI | 15000 | ||
| 90 | S | 0008 | Community Site - Construction | Community Site - Construction. | 7 | FFP | EA | |||
| 91 | S | 0008AA | Community Site Design | Group Site Design (including site assessments for candidate sites and all studies) (DESIGN PHASE) | 7.1 | FFP | EA | 1 | ||
| 92 | S | 0008AB | Community Site Construction | Community Site Construction (BUILD PHASE) | 7.1 | FFP | EA | 1 | ||
| 93 | S | 0008AC | Community Site Maintenance | Community Site Maintenance (Not unit maintenance) | 6.6 | FFP | Monthly | 6 | ||
| 94 | C | 0008AD | Haul & Install at Community Site (Unit Quantity: 1 - 50) | Haul and Install at a Community Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet, steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 1 - 50, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||
| 95 | C | 0008AD1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||
| 96 | C | 0008AD2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||
| 97 | C | 0008AD3 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 51-100 per day. | 7.1.12 | FFP | EA | 1 | ||
| 98 | C | 0008AE | Haul & Install at Community Site (Unit Quantity: 51 - 150) | Haul and Install at a Community Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet, steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 51 - 150, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||
| 99 | C | 0008AE1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||
| 100 | C | 0008AE2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||
| 101 | C | 0008AE3 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 51-100 per day. | 7.1.12 | FFP | EA | 1 | ||
| 102 | C | 0008AF | Haul & Install at Community Site (Unit Quantity: 151 - 300) | Haul and Install at a Community Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet, steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 151 - 300, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||
| 103 | C | 0008AF1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||
| 104 | C | 0008AF2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||
| 105 | C | 0008AF3 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 51-100 per day. | 7.1.12 | FFP | EA | 1 | ||
| 106 | C | 0008AG | Haul & Install at Community Site (Unit Quantity: 301 - 600) | Haul and Install at a Community Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet, steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 301 - 600, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||
| 107 | C | 0008AG1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||
| 108 | C | 0008AG2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||
| 109 | C | 0008AG3 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 51-100 per day. | 7.1.12 | FFP | EA | 1 | ||
| 110 | C | 0008AH | Haul & Install at Community Site (Unit Quantity: 601 - 1,200) | Haul and Install at a Community Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet, steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 601 - 1,200, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||
| 111 | C | 0008AH1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||
| 112 | C | 0008AH2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||
| 113 | C | 0008AH3 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 51-100 per day. | 7.1.12 | FFP | EA | 1 | ||
| 114 | C | 0008AI | Haul & Install at Community Site (Unit Quantity: 1,201 - 2,000) | Haul and Install at a Community Site - Mobile Home/Park Model/THU Complete Installation. Includes all utilities connections up to 50 feet, steps and basic site preparation. Also Included are ground mileage for the Short Haul towing from Staging Area (less than 150 miles, to include hook-up charges). Unit Quantity: 1,201 - 2,000, Unit Installation Rate: 1-10 per day. | 7.1.12 | FFP | EA | 1 | ||
| 115 | C | 0008AI1 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 11-20 per day. | 7.1.12 | FFP | EA | 1 | ||
| 116 | C | 0008AI2 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 21-50 per day. | 7.1.12 | FFP | EA | 1 | ||
| 117 | C | 0008AI3 | Same as the above CLIN | Same as the above CLIN except - Unit Installation Rate: 51-100 per day. | 7.1.12 | FFP | EA | 1 | ||
| 118 | S | 0009 | Mass Care Support Mission | Mass Care Support | 8 | TM/LH | Hourly | |||
| 119 | S | 0010 | DRC Support | DRC Support | 9.6 | TM/LH | Hourly |
&CIA-TAC III Task Order (TO) CLIN Table and Bid Sheet&R3-12-2009 &C&P of &N Cut and Paste in the PWS 7.1.7.2 Notes:
Individual CLINs are marked on the CLIN Table/Bid Sheet with an “S”, “C”, or “CS”.
The CLIN items marked with an “S” indicate that the CLIN is to be used for pricing the below scenarios, and will be used for bid evaluation purposes only. Prices will not be included in the contract, or on subsequent task orders.
The CLIN items marked with a “C” indicate that the CLIN applies to the contract only.The unit price will become a part of the contract for all subsequent task orders.
The CLIN items marked with “CS” indicate that the CLIN is to be used for both scenario and contract. The unit price will become a part of the contract for all subsequent task orders.
Scenarios:
The following Staging Area Support, Commercial Park Expansion, Community Site (formerly Group Site) Construction, Mass Care Support, and DRC Support scenarios are provided for the development of the offeror’s bid.
The development of these sites will occur concurrently within the localities within the four (4) sectors. This is provided to facilitate the bids within the four sectors.
The installation and construction scenarios will be based on current market price assumptions for total installation of three-hundred (300) Temporary Housing Units (THUs):
Community Site = 100 Units Commercial Park / Sites = 100 Units Private Sites = 100 Units
Construction and installation scenarios assume duration of 180 Days, and all construction shall be suitable for all four seasons in the identified locales.
Locations:
Los Angeles/ Los Angeles County,California (Alpha Sector) Johnstown/ Cambria County,Pennsylvania (Bravo Sector) Waco/ McLennan County,Texas (Charlie Sector) Savanna/ Chatham County, Georgia (Delta Sector)
Only the below bulleted items should considered when pricing the scenario in an effort to ensure all proposals are comparable:
Scenario - Staging Area Support:
6.1 Staging Area Design, Development and Management
6.2 Staging Area Design and Construction
• Site is a vacant paved truck depot, with capacity for 100 Temporary Housing Units
• One (1) Staging Area
• Capacity to accommodate 100 Temporary Housing Units
• Security fencing
• Lighting
• Sewer
• Water
• Electric service
• Office space
• Site layout
• Traffic flow
• Guard houses
• Issuing, receiving and maintenance of units will be performed at the staging area.
Scenario - Commerial Park Expansion:
• Extension of Commercial park to accommodate 40 THU’s (size of 40’x70’)
• Lot area is undeveloped and has been leveled.
• 40 vehicle parking pads for Temporary Housing Units.
• Layout is two rows of 20 pads (in-line) .
• Utilities are within 100 feet of the proposed extension.
• Utilities conduit and trenching need to be extended.
• Utilities have the capacity to service the 40 additional THUs.
• The construction of a road is necessary.
Scenario – Community Housing Park Development:
6.4 Community Site Land Assessment and Design
Appendix A
• Undeveloped parcel sufficient to accommodate all 100 THUs
• Group site design and construction to accommodate 100 Temporary Housing Units (14’x70’)
• All utilities are located within 300 ft., with capacity to support the completed site.
• 1000 ft of access road construction.
• 6 months of site/ pad maintenance.
• Applicable construction standards.
• Environmental concerns.
• Consideration of UFAS Accessibility standards; Ref. PWS 6.2.4.7.
Scenario - Mass Care Support:
Synopsis: Ten thousand individuals are in need of extensive mass care services in the aftermath of a no-warning event, such as an earthquake. Federal, State, and Local governments are unable to provide this level of mass care support. Non-governmental Organizations (NGOs) have been stretched beyond capacity. Each shelter is required to accommodate 1,000 people. Shelters will need to be open for 30 days. Assume that existing facilities are available for sheltering.
Define each of the following both as functions and in dollar value. Include the breakdown of labor rates and travel expenses necessary to perform.
• Other Direct Costs (ODCs) expected to be used during task orders, such as additional travel, labor rates, materials, equipment, supplies, and permits;
• Concept of Operations and Mobilization Plan (COMP), quality control, reports, work plan, milestones, record keeping, all program delivery support;
• Mobilization within 48 hours to affected area;
• Logistical support;
• Shelter operations, to include internal shelter communications;
• Feeding operations;
• Security support;
• Health services support;
• Social services support;
• Pet services support; and,
• Facility deactivation.
Scenarios - DRC Support
Synopsis: Two scenarios, one of which will describe a Fixed Disaster Recovery Center (DRC) . The second scenario will address a Mobile DRC. Each DRC will handle 1,000 applicants per day, 12 hours-a-day, for a period of 30 days. Assume facilities are available to provide power and other utilities. 48 hours is allowed to set up the facilities.
Consider applicants with variety of physical, emotional and psychological exigencies; physical impediments to access (ingress, egress, parking and public transportation); and, government and non-governmental stake holders needing inclusion. For each scenario, define the following in function and in dollar values -- include the breakdown of labor rates and travel expenses necessary to perform.
• Other Direct Costs (ODCs) expected to be used during task orders, such as additional travel, labor rates, materials, equipment, supplies, and permits;
• DRC Plan;
• Procedure to locate and evaluate the feasibility of DRC sites in a coordinated effort with FEMA designees;
• DRC staffing support;
• Security support during operating and non-operating hours;
• Equipment, materials, utilities, transportation supply and coordination (logistical support);
• Communication support for phones, computers and office machines (internal and external); and,
• Plan for deactivating DRC.
File details come from the government source that posted it. Updated .