PWS Appendix A - PerfGuidelines.doc
DOC document 101 KB Posted
- Solicitation number
- HSFEHQ09R0037
About this file
Performance Guidelines
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Amend P00009.pdf | ||
| CLIN Table _P00009.pdf | ||
| RFP Amen P00008.pdf | ||
| RFP Amend P00007.pdf | ||
| Latest CLIN Table.pdf | ||
| Final Q and A.pdf | ||
| RFP Amend P00006.pdf | ||
| IA-TAC III Questions 13_Mar 2009.xls | XLS spreadsheet | |
| UPDATED MILESTON FOR THE ACQUISITION CYCLE.doc | DOC document | |
| TACIII RFP Changes 031309.doc | DOC document | |
| SCA.pdf | ||
| DBA.pdf | ||
| PrsntPast_Quest_Attachment_G.doc | DOC document | |
| IA TAC Bid SheetCLINs and Scenarios 3-13-2009 GW v3.xls | XLS spreadsheet | |
| Updated PRS_Deliverables0313.doc | DOC document | |
| Amend P00005_RFP.doc | DOC document | |
| RFP Amend P00003.pdf | ||
| RFP Amend P00002.pdf | ||
| RFP Amend P00001.pdf | ||
| Q and A 2-24-09.doc | DOC document | |
| PWS Appendix C - Mass Care Staffing.xls | XLS spreadsheet | |
| PWS Appendix B - QASP.doc | DOC document | |
| PRS_Deliverables.doc | DOC document | |
| IATAC III.DOC | DOC document | |
| IA TAC Bid Sheet and CLIN 2-18-2009 EC v1.xls | XLS spreadsheet | |
| PWS Appendix D - SOP.doc | DOC document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A to RFP
Appendix A
Performance Guidelines for Group Site Construction, Unit Installation and
Staging Area Construction
For Proposal Purposes these Performance Guidelines have been drawn from historical and trial and error experiences and may be used to calculate costs. Contractors are welcomed to propose using more stringent requirements.
Group Site Construction
Items of Work
The work requires the complete development (construction) of the Group Sites. The work includes but is not limited to: soil testing, surveying, clearing, grubbing, stripping, debris disposal, fill and grading, site utilities design and layout, fencing, installation of all necessary water, sewer, electric, gas (as appropriate), telephone distribution and facilities, cable access, roads and related installations, storm water management, and erosion prevention measures. Also provide safety fencing, signage, unit numbering, street lights, shelter lights and other items to ensure the safety of Group Site occupants as well.
Environmental Support
Support FEMA or designee work on any environmental issues. Obtain bonds and permits and begin development (construction) on time. The Contractor shall assess each potential group site for endangered species, historical concerns and check the Superfund Register. The Contractor shall coordinate with FEMA Regional Environmental Office, to be identified at the kickoff meeting.
Existing Utilities
The Contractor shall coordinate all utility relocation requirements and make payment to the utility companies for all services, fees, and permits required to relocate and re-establish service if applicable. Utility services shall not be interrupted except for brief periods to facilitate cut-ins. The Contractor shall be responsible for all costs related to protecting existing utilities. The Contractor shall coordinate construction activities with telephone and cable utilities. Coordinate utility installations with the local communications companies to include, but not be limited to, the local phone and cable companies, and not to impede completion deadlines.
Protection and Maintenance of Traffic
The Contractor shall coordinate all utility relocation requirements and make payment to the utility companies for all services, fees, and permits required to relocate and re-establish service if applicable. Utility services shall not be interrupted except for brief periods to facilitate cut-ins. The Contractor shall be responsible for all costs related to protecting existing utilities.
Surveys
The Contractor shall layout the work from the established bench marks For each feature of work, field staking shall define area limits such that the COTR can easily determine, without additional surveys, if alignment and/or limit adjustments need to be made.
As-Built
An as-built field survey of all utilities shall be conducted after installation to determine the final locations and elevations of utility manholes and hydrants. Final elevations shall be determined for all sewer inverts and castings. Three sets of drawings showing the locations of all features of the work. The as-built shall be provided to the COTR.
Temporary Construction Facilities
The Contractor shall furnish and install (1) office trailer complete for his own use with all utilities and restroom facility. The trailer will be placed at the location designated by the COTR.
Construct appropriate hard surfaces in all common areas to include but not be limited to dumpster pad, wheelchair accessible van/bus stop, mail kiosk, etc. These areas must be accessible.
Fencing
The Contractor shall provide in the design, recommendations for chain link fencing and signage for safety reasons, including, but not limited to the following areas:
Retention Pond
Substation Area
If there is an additional area of concern identified by FEMA, the Contractor shall provide chain link fencing around that perimeter.
Phasing of Construction
Phasing may be required by FEMA. In that case, all construction areas shall have a perimeter marked by orange safety fencing and adequate signage, with controlled ingress and egress. As each phase of the group site is completed and opens to applicants, the unfinished phases shall be separated from construction areas with orange safety fencing and adequate signage until all construction is completed.
Group Site Utilities
Water Distribution System
References: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN WATER WORKS ASSOCIATION (AWWA)
WWA B300 (1992) Hypochlorite
AWWA B301 (1992) Liquid Chlorine
AWWA C500 (1993; C500a) Metal-Sealed Gate Valves for Water Supply Service
AWWA C502 (1994; C502a) Dry-Barrel Fire Hydrants
AWWA C651 (1992) Disinfecting Water Mains
AWWA C900 (1997) Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 Inches through 12 In., For Water Distribution
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 24 (1995) Installation of Private Fire Service Mains and Their Appurtenances
NSF INTERNATIONAL (NSF)
NSF 14 (1998) Plastics Piping Components and Related Materials
NSF 61 (1999) Drinking Water System Components - Health Effects (Sections 1-9)
A connection to the municipal water supply may be required. The Contractor shall coordinate the proper fittings, procedures and meters needed with the local water company.
Service Lines: Piping for water service lines shall have a nominal size of ¾" diameter. Pipe shall be galvanized steel, polyvinyl chloride (PVC) plastic, Oriented PVC plastic polyethylene, or copper tubing. Water pipe riser shall be minimum ¾-inch and compatible with the service line.
Supply and Distribution Lines: Piping for water distribution lines shall be a minimum of 4 inches in diameter and shall be ductile iron, polyvinyl chloride (PVC), Oriented PVC plastic filament-wound or centrifugally cast reinforced thermosetting resin.
Fire Hydrants: Hydrants shall be dry-barrel type conforming to AWWA C502 and must be connected to at a minimum 6 inch diameter line.
Disinfection: Chlorinating materials shall conform to the following: Chlorine, Liquid: AWWA B301 and Hypochlorite, Calcium and Sodium: AWWA B300.
Meters: The Contractor shall install individual electric meters provided by the local electric authority. If the meters are not provided, the Contractor shall provide meters approved by the local electric power company/cooperative and install them.
Utility Separation: The water lines shall be spaced from sewer lines in compliance with all state requirements.
Placing and Laying: PVC pipe shall be installed and backfilled in accordance with ASTM D 2774. Water-line materials shall not be dropped or dumped into the trench. Except where necessary in making connections with other lines, pipe shall be laid with the bells facing in the direction of lying. The full length of each section of pipe shall rest solidly upon the pipe bedding. Pipe shall not be laid in water or when trench conditions are unsuitable for the work. Water shall be kept out of the trench until joints are complete. When work is not in progress, open ends of pipe, fittings, and valves shall be securely closed so that no trench water, earth, or other substance will enter the pipes or fittings. Pipe ends left for future connections shall be valved, plugged, or capped, and anchored. If required, all lines are to be placed 6 inches below local frost lines.
Winterization: When required, winterize individual unit water lines with electric heat tape or other winterization treatment and extend 14” below the surface of the ground.
Thrust Restraint: Plugs, caps, tees and bends deflecting 30 degrees or more, either vertically or horizontally, on waterlines 4 inches in diameter or larger, and fire hydrants shall be provided with thrust restraints.
Hydrostatic test: The hydrostatic test shall meet the requirements of the local Public Service District. Smoke Tests are not acceptable.
Bacterial Disinfection: Before acceptance of potable water operation, each unit of completed waterline shall be disinfected as prescribed by AWWA C651. After pressure tests have been made, the unit to be disinfected shall be thoroughly flushed with water until all entrained dirt and mud have been removed before introducing the chlorinating material. The chlorinating material shall be liquid chlorine, calcium hypochlorite, or sodium hypochlorite, conforming to paragraph ”DISINFECTION”. The chlorinating material shall provide a dosage of not less than 50 PPM. Valves on the lines being disinfected shall be opened and closed several times during the contact period. The line shall then be flushed with clean water until the residual chlorine is reduced to less than 1.0 PPM. During the flushing period, each fire hydrant on the line shall be opened and closed several times. From several points in the unit, the Contractor will take samples of water in proper sterilized containers for bacterial examination. The samples will be taken to a state certified laboratory for examination. The disinfection shall be repeated until tests indicate the absence of pollution for at least 2 full days. The unit will not be accepted until satisfactory bacteriological results have been obtained.
Sanitary Sewers
References: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
American Society for Testing and Materials (ASTM) C 478 (1997) Pre-cast Reinforced Concrete Manhole Sections.
ASTM D 1784 (1999a) Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds.
ASTM D 2321 (1995) Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications.
ASTM D 2680 (1995a) Acrylonitrile-Butadiene-Styrene (ABS) and Poly (Vinyl Chloride) (PVC) Composite Sewer Piping
ASTM D 2751 (1996a) Acrylonitrile-Butadiene-Styrene (ABS) Sewer Pipe and Fittings
ASTM D 3034 (1998) Type PSM Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings.
ASTM D 3212 (1996a) Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals
ABS Pipe and fittings: ASTM D 2751
Laterals shall be 4 inches in size. Trunk lines shall be 6 inches in size. Acrylonitrile-butadiene-styrene (ABS) and polyvinyl chloride (PVC) composite sewer pipe and fittings shall conform to ASTM D 2680. Fittings shall be compatible with the pipe supplied and shall have a strength not less than that of the pipe.
PVC Pipe and fittings: ASTM D 3034, Type PSM with a maximum SDR of 35. PVC shall be certified as meeting the requirements of ASTM D 1784, cell Class 12454B.
Flexible plastic pipe (PVC or high density polyethylene pipe) gasketed joints shall conform to ASTM D 3212.
PVC pipe shall be installed and backfilled in accordance with ASTM D 2321.
Manholes shall be prefabricated of pre-cast concrete sections conforming to ASTM C 478. Joints shall be cement mortar, approved mastic, rubber gaskets, a combination of these types; or the use of external preformed rubber joint seals and extruded rolls of rubber with mastic adhesive on one side. A ladder shall be provided where the depth of a manhole exceeds 4 feet. The ladder shall be constructed in accordance with OSHA. Frames and covers shall be cast iron, ductile iron or reinforced concrete. Cast iron frames and covers shall be as indicated or shall be of type suitable for the application, circular, without vent holes. The frames and covers shall have a combined weight of not less than 400 pounds and be seal tight lids. Reinforced concrete frames and covers shall be as indicated or shall conform to ASTM C 478.
Pipe Bedding: Bedding material shall consist of imported sand fill or gravel. Pipe Bedding shall contain not more than 20 percent by weight passing the No. 200 sieve. The maximum allowable aggregate size shall be 1-1/2 inches for gravity flow sewer and 3/4 inches for pressure pipe.
Pipe Laying: The bottoms of trenches shall be accurately graded to provide uniform bearing and support for the bottom quadrant of each section of the pipe. Pipe shall rest on bedding material along its entire length. For trenches in road sub-grades, common backfill above the bedding shall be placed in 12" lifts and compacted with special purpose compaction equipment. Compaction equipment shall be selected to avoid damage to the pipe. After other required tests have been performed and the trench backfill compacted to 2 feet above the top of the pipe, the pipe shall be inspected to determine whether significant displacement has occurred. This inspection shall be conducted in the presence of the COTR. Pipe sizes larger than 36 inches shall be entered and examined, while smaller diameter pipe shall be inspected by shining a light or laser between manholes or manhole locations. If, in the judgment of the COTR, the interior of the pipe shows poor alignment or any other defects that would cause improper functioning of the system, the defects shall be remedied as directed at no additional cost to the Government.
Trenching: Unless otherwise indicated, trench excavation shall be by open cut except that short sections may be jacked or bored if the utility can be safely and properly installed and ground loss can be properly controlled. All excavation shall be constructed in accordance with OSHA Standards (29 CFR 1926). Allowable trench widths, depths, side slopes, sheet and bracing requirements, and other considerations are given in the OSHA Standard.
Sewer Riser: The sewer riser shall be vertical and terminate no more than 4 inches above ground level with a standing wye (preferred method) at the staked location. The cleanout inlet will be plugged with a threaded cap. The vertical inlet shall be plugged or capped until such time as it is connected to the mobile home unit.
Deflection Test. Deflection test shall be made on the entire length of the installed pipeline after completion of all work including the leakage test, backfill, and placement of any fill, grading paving, concrete, or superimposed loads. Deflection shall be determined by use of a deflection device or by use of a spherical ball. A tolerance of plus 0.5 percent will be permitted. Installed pipe showing deflections greater than 7.5 percent of the normal diameter of the pipe shall be retested by a run from the opposite direction. If the retest also fails, the suspect pipe shall be replaced at no cost to the Government.
Roads and Unit Pads
References:
AASHTO - M147 - Materials for Aggregate and Soil-Aggregate
ASTM C136 - Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM D698 - Test Methods for Moisture-Density Relations of Soils and Soil-Aggregate Mixtures, Using 5.5 lb (2.49 Kg) Rammer and 12 inch (304.8mm) Drop.
ASTM D1556 - Test Method for Density of Soil in Place by the Sand Cone Method
ASTM D2487 - Classification of Soils for Engineering Purposes
ASTM D2922 - Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth)
ASTM D3017 - Test Method for Moisture Content of Soil and Soil-Aggregate in Place Nuclear Methods (Shallow Depth)
ASTM D4318 - Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
AASHTO T180 - Moisture-Density Relations of Soils Using a 10-lb (4.54 kg) Rammer and an 18-in. (457mm) Drop
Local and State codes as applicable
Materials
The aggregates for the surface and base course shall meet State or Local Standards but generally shall have no more than 20% fines and no more than 80% passing the 1-3/4 inch sieve. A stabilization fabric or geotextile fabric will be required and this fabric shall be installed in accordance with manufactures recommendation. The Contractor is responsible to place the correct fabric based on the given soil characteristics.
Grading
During construction, the lines and grades, including crown and cross slope indicated for the base course, shall be maintained by means of line and grade stakes placed by the Contractor. Grade stakes shall be in lines parallel to the centerline of the area under construction and suitably spaced for string lining. The Contractor may use a laser system in lieu of a grade stake system. Adequate drainage shall be provided during the entire period of construction to prevent water from collecting or standing on the area to be constructed. The surface of the top layer shall be finished to grade and cross section shown. Finished surface shall be of uniform texture. Light blading during compaction may be necessary for the finished surface to conform to the lines, grades, and cross sections. Should the surface for any reason become rough, corrugated, uneven in texture, or traffic marked prior to completion, such unsatisfactory portion shall be graded.
Site grades shall be checked for low spots and depressions. All low spots and depressions shall be filled so the entire site has positive drainage. All material placed as fill or backfill shall consist of mineral soils with no vegetative matter or rocks larger than 3 inches in size. Unsuitable material shall be placed on site at a location directed by the COTR.
Compaction
All plant, equipment, and tools used in the performance of the work will be subject to approval and shall be maintained in satisfactory working condition at all times. The equipment shall meet the requirements of the referenced state standard specification sections. The base course shall be compacted using a steel-wheeled roller, vibratory smooth drum roller, or pneumatic-tired roller, unless other special compaction equipment is approved. During fill placement, each layer shall be spread uniformly in a maximum uncompacted lift thickness of 6 inches and compacted with a vibratory sheepsfoot roller until there is no further evidence of consolidation.
Finishing
The surface of the top layer shall be finished to grade and cross section shown. Finished surface shall be of uniform texture. Light blading during compaction may be necessary for the finished surface to conform to the lines, grades, and cross sections. Should the surface for any reason become rough, corrugated, uneven in texture, or traffic marked prior to completion, such unsatisfactory portion shall be graded.
All topsoil and surface material shall be removed and the sub-grade compacted prior to the placement of the filter or geotextile fabric and aggregate base. There should be no evidence of depressions from site equipment or excess rutting.
Seeding species and rates must be specified that are compatible with local climate and soil conditions.
Electrical Distribution
The Contractor shall ensure that all electrical drawings are stamped by a professional engineer and reviewed and constructed by a licensed electrician.
References: The publications listed below form a part of this scope of work to the extent referenced.
NSI C2 National Electrical Safety Code
NFPA 70 National Electrical Codes
Extent of Service: The Contractor shall provide underground service from the metering pole to a conduit stub-out. The power company will provide and install all aerial distribution, including poles, metering and service disconnect. The Contractor shall coordinate the complete effort with the power company. The Contractor will connect the conduit to the trailer conduit and terminate the service lateral on the terminals of the mobile home interior electric distribution panel or mobile home junction box.
Coordination - The Contractor shall coordinate the installation with the serving utility. Before the system is energized, the Contractor shall be notified to verify all necessary lockouts are in place, appropriate circuit breakers are off, and electric water heaters are full.
Codes for Distribution: The mobile home park electrical power distribution system shall be installed in accordance with all applicable requirements of the latest edition of the National Electrical Code (NFPA 70), including article 550 Part C, and the National Electrical Safety Code.
General Information
Mobile home service equipment shall be installed in accordance with NFPA 70 article 550-23.
There shall be no splices in the wiring between the load side of the trailer service disconnects and the line side lugs on the trailer load center.
All services shall be grounded according to NFPA 70, article 250. A ground shall be carried to each trailer panel.
Conduit shall be securely attached to the electrical boxes in accordance with NFPA 70. Sweeps shall be used at the mobile home junction box and meter loop assembly.
All exposed PVC conduit installed on poles shall be securely fastened with two-hole straps, a minimum of two per 5-foot length or fraction thereof.
Coordinate electric power distribution with electrical codes and configure for metering at each individual pad on the sites. The sites shall also be configured so common areas, including lighting and shelters, shall be metered separately from the individual pads.
The Contractor shall install all electrical items and connections for mobile homes in accordance with Federal, State, and Local Codes, and in accordance with manufactures recommendations.
Unit Installation
Basic Site Preparation
Basic Site Preparation is described as the work of 2 men working 1 hour with hand tools such as lawnmowers, chain saws, shovels, rakes, wheel barrels, etc. necessary to prepare the site for the unit which may include site grading. As necessary the contractor shall clear and remove, to the property boundary line, any debris incident to trailer installation. The cleared area shall provide sufficient area for manufactured home/Park Model installation, provide occupants adequate access to the home and insure occupant safety. Also included are locating, exposing, and connecting water, sewer, and electrical connections whereby they can be hooked up and made serviceable. Site grading is described as the work of one man working one hour with equipment such as a front-end loader, bobcat, or grader, necessary to provide a level surface and proper drainage for a temporary housing unit to be placed on the site.
Blocking and Leveling for Temporary Housing Units All units shall be set-up on concrete block piers. Block piers for all units shall consist of an arrangement of double blocks stacked in an alternating pattern. If the unit is not leveled properly after weight is transferred to the piers, the Contractor will reinstall the unit at no additional cost to the government.
The piers shall be installed in accordance with the manufacturer’s installation instructions and based on the soil bearing capacity. The Contractor is responsible for determining the soil bearing capacity through contacts with local building officials, soils engineers or other methods acceptable to local authorities. The number and location of piers shall be in accordance with the manufacturer’s instructions unless local codes provide for differing specifications that must be met. Note: The Contractor must have a licensed architect or professional engineer approval for manufactured homes and park model piers that are higher than 60 inches high, or in which more than 20 percent of the piers exceed 40 inches high.
The units shall be blocked and leveled to the manufacturer’s specifications to include other appropriate guidance. As a minimum, the units shall have evenly spaced piers on each side and at least two piers shall be located behind the wheels on each side. (Note: the Contractor is responsible for ensuring proper installation of the unit and for verifying the requirements.)
The Contractor shall clean away all grass roots, loose dirt, rocks and debris at the base of the piers. The Contractor also shall provide a base for each pier. The approximate size of the base is 24” x 24” with double blocking. This may be wooden- 3/4 inch plywood or State and local approved ABS type pier pad, unless otherwise specified by state or local code. The piers will have at a minimum two solid cap blocks on the base and two solid cap blocks at the top of the piers
The pier installation must meet the manufacturer specifications and include the following FEMA requirements. FEMA requirements will take precedence when they exceed manufacturer’s specifications.
After the weight of the unit is transferred to the concrete block piers, the piers must be vertically aligned and tightly shimmed with wooden wedges. If the piers are not vertical at the time of final inspection, they shall be removed and reinstalled by the Contractor at no additional cost.
The Contractor is responsible for all necessary re-leveling and re-blocking of the unit for a period of 90 days after final inspection.
Unit Anchoring and Securing
Anchor and Strap (Tie-Downs) MH. Anchoring and strapping for tie-down of manufactured homes shall be based on the HUD Part 3280 Manufactured Home Construction and Safety Standards for the appropriate Wind Zone of the unit and area the unit will be installed, and based on a soil bearing capacity and the local requirement.
NOTE: This is not a waiver of HUD, State, and local requirements. The units will be anchored appropriately to resist floatation, collapse, and lateral movement. The manufacturer’s installation instructions and local requirements will be followed in determining the location and number of unit tie-down connecting points and method of securing the anchors.
The Contractor is responsible for determining the specific type anchors to be used and the method of securing the anchors based on the anchor manufacturer’s instructions for soil bearing capacity of 1000 PSF, or the Contractor can determine local soil conditions pertinent to anchor pullout resistance through contacts with local building officials, soils engineers or other methods acceptable to local authorities Anchors must be capable for allowable loading and wind zone. Anchoring and Straps (TT)The Contractor shall install two (2) anchors per side (total 4).All anchors must be placed, driven, or augured so that the individual anchor will withstand a withdrawal pull with no more than two (2) inch vertical displacements.
The location of the straps shall be two on the tongue of the unit, and two on the back bumper of the unit. Each strap shall extend from one turnbuckle on the anchor head; wrap one time around the tongue or the back bumper, respectively, before being attached to the other turnbuckle on the anchor head.
Note: Alternatives may be used if the Contractor can provide the COTR with a current independent study by an appropriately licensed expert to support the conclusion that the alternative measure is equal to or exceeds requirements. The Contractor is responsible for ensuring it meets the applicable local requirements.
The strap shall be 1.25” X .035” cold rolled galvanized steel, as per Federal Specification QQ-S-781 G for Type 1 Class B, Grade 1 strapping. The anchor straps shall be snug and in a near vertical position.
Electrical Installation
The Contractor shall provide all electric work in compliance with all national, State, and local codes (National Electric Code (NEC)) and regulations from the electrical assembly to the temporary housing unit interior electrical distribution panel or junction box. The Contractor shall also meet the manufactures recommendation for each unit installed.
Electrical Gang or Rack Distribution System. A Gang or Rack System shall be constructed with the same requirements of a 200 AMP Power Pole meter loop, but shall consist of two or more 200 AMP meter loops designed to supply power to the Power Pedestals or directly to the units.
Air Conditioner Installation
The air conditioner hook-up will be in accordance with the manufacturer’s specifications and installed by a certified heating and cooling technician.
The Contractor must obtain appropriate permits and meet all local codes and ordinances pertaining to the installation of the A/C unit.
The Contractor is responsible for supplying all the appropriate materials for this installation, with exception of the A/C unit.
The Contractor may be tasked to provide generators.
Sanitary Line Installation
At sites with sewer riser already installed, the Contractor will make the connection between the connecting point and the riser up to the sewer line. If a sewer riser is not in place, the Contractor will make an appropriate sewer tap on the sewer collection line and install the necessary piping and riser connection.
A clean-out fitting will be installed in an accessible location to facilitate snaking-out a clogged up line from the connection point, through the riser and into the main or service line. The pipefitting that attaches the sewer connection to the drain outlet of the manufactured home shall be threaded and screwed or installed with a removable adapter for the drain outlet. The nominal inside diameter of the unit sewer connection shall not be less than three inches (3”). The slope shall be continuous and at least one-quarter inch (1/4”) per foot and no more than one-half inch (1/2”) per foot. Overhead (hanging) sewer straps shall be placed at four-foot (4’) intervals (maximum) to prevent any deflections. The fitting between the unit sewer line and sewer riser (placed above ground) will be comply with all appropriate plumbing, safety, and health codes and requirements. This includes:
An approved 4” x 3” adapter and the lower end of the unit sewer line shall extend at least four inches (4”) below the rim of the riser with an air tight connection provided by the use of a rubber ring. Pipe shall be an approved and appropriate rigid PVC sewer pipe. Absolutely no flex-hose allowed. The line shall be of the shortest practical length and include a clean-out “Y” that would allow cleaning and/or clearing of the line from and to the unit as well as from and to the connection or sewer drop point.
The Contractor shall test the sewer line for leakage, and any leaks shall be repaired at no additional cost. All sewer piping and installation shall be installed in accordance with local codes and the Uniform Plumbing Code. If the unit has multiple sewer drop points, they will be interconnected to a single unit drop point.
Municipal Sewer Tap-Install sewer tap
The Contractor shall excavate, install the tap, and connect to the sewer line from the unit and backfill, according to local requirements. The sewer tap shall be made in accordance with local regulations regarding sewer tap installations.
In the event the governing entity has a predetermined fee for sewer taps, such fee shall be paid by the Contractor and reimbursed at actual expense (individual receipt required).
Water Line Installation
Water piping and installation shall be installed in accordance with local codes and the Uniform Plumbing Code.
At sites with water service riser already installed, the Contractor will make the connection between the unit connecting point and the riser. If the water service riser is not in place, the Contractor will make an appropriate tap on the water service line and install the necessary piping and riser connection. A cut-off valve and a hose bib with anti-siphon valve shall be located adjacent to the unit connecting point (must be in convenient location to facilitate shut-off of water to unit and make a watering hose connection)..
The Contractor shall test the service line for leakage, and any leaks shall be repaired at no additional cost.
Municipal Water Tap-Install Water Tap
The installation of the water tap (if required) will be accomplished in conjunction with, and according to the regulations of the local Water Company.
Bacterial Disinfection: Before acceptance of potable water operation, each unit of completed waterline shall be disinfected as prescribed by AWWA C651. After pressure tests have been made, the unit to be disinfected shall be thoroughly flushed with water until all entrained dirt and mud have been removed before introducing the chlorinating material. The chlorinating material shall be liquid chlorine, calcium hypochlorite, or sodium hypochlorite, conforming to paragraph ”DISINFECTION”. The chlorinating material shall provide a dosage of not less than fifty (50) PPM. Valves on the lines being disinfected shall be opened and closed several times during the contact period. The line shall then be flushed with clean water until the residual chlorine is reduced to less than one (1.0) PPM. During the flushing period, each fire hydrant on the line shall be opened and closed several times. From several points in the unit, the Contractor will take samples of water in proper sterilized containers for bacterial examination. The samples will be taken to a state certified laboratory for examination. The disinfection shall be repeated until tests indicate the absence of pollution for at least two (2) full days. The unit will not be accepted until satisfactory bacteriological results have been obtained.
Restoration of Well Pump & System (Pressure tank, pressure switch, piping), this includes direct wiring of well pump and 30 AMP well pump switch. Direct Wiring of Well Pump. Must be installed in accordance with all appropriate federal, State, local and manufacturer's codes and requirements to include all safety issues. Direct wiring to well pump, buried. The cable shall be the appropriate conductor with ground, as well as appropriately encased, direct burial, and installed at least 24" below grade. All cable less than 24” below grade shall be encased in approved metal conduit; all sweeps shall used at the points where the buried cable makes a 90-degree turn toward the meter loop assembly and well pump. Includes the installation of a 30 Amp weatherproof overcurrent protective and disconnect device for the well pump at the electric service entrance.
AMP Well Pump Switch. A 30 Amp weatherproof overcurrent protective and disconnect device for the well pump shall be installed at the electric service entrance.
Water Line Winterization
When specified, the Contractor shall install freeze protection heating tapes and insulation to water supply piping and shut-off valves to prevent freeze-up of the system. The heat cable shall be installed in compliance with the cable manufacturer’s instructions
Gas Installation
Install Complete Petroleum (LP) Gas System. The Contractor shall install a complete LP gas system. The installation must be made so that convenient recovery of the tank(s) is possible. The installation shall be in accordance with State and local codes. This line item shall be used for travel trailers, manufactured homes, park models, and other types of recovery activities as defined by the FEMA DHOPS Manager or designee. The entire system must be checked for leaks and repaired if any are found. The furnace orifice shall be converted to LP gas if necessary, pilot lit, unit cycled, and adjustments made.
Refill Propane Tanks. At the approval of the COTR, refill tanks and inspect connections. This must be issued and approved by the COTR and coordinated with the FEMA DHOPS Manager or designee.
Natural Gas Connections
The connection shall be from the natural gas inlet on the manufactured home to the natural gas riser and/or extension (underground) from gas meter terminating with a riser in accordance with these specifications, State and local regulations. The supply connection shall completed be as required by Federal, State, and local codes.
Entrance and Exit Ways
All ramps, landings, and stair traffic surfaces shall be constructed of treated 5/4” X 6” or 2” X 6” lumber. No plywood shall be used for ramps, landings, or stairs.
The Contractor shall furnish and install steps at each unit entrance/exit. As a minimum, steps will be constructed of treated exterior grade framing lumber forty-eight inches (48”) wide between two (2) sanded and painted with one coat of white paint handrails. Riser height shall not exceed 7-3/4 inches and treads shall be not less than 9 inches. Treads less than 10 inches wide shall have a nosing or effective projection of approximately 1 inch over the level immediately below.
Entrance and Exit Components:
Furnish and Install Steps
The top step shall be constructed with a level platform such that the platform is centered on the door of principal entry into the unit and flush with the doorsill. The platform shall be 60" wide by 60" deep (long).Both handrails shall be constructed with 2” x 4” safety edge lumber, routed for gripping purposes, and shall be provided on all steps. All material requirements shall be in accordance with the applicable guidelines. Steps shall have a stable foundation, be level in both directions and anchored. The platform shall have a non-skid surface using materials that are State and Industrial approved (sand added to paint is unacceptable). The handrails shall surround the platform on all sides. Other materials for steps that are approved by the state and local code enforcement jurisdiction may be substituted with the COTR’s approval. The Contractor is responsible for providing the supporting documentation of the State and local approval. However this does not waive any safety requirements. If the steps present a safety hazard the Contractor shall build steps and platform appropriately.
Furnish and Install Platform Steps
Platform steps, walker accessible. All Steps defined as “Platform Steps” shall be constructed of treated outdoor building material. 5/4” decking material shall be used for all steps and platform surfaces. Two inches (2”) treated material is required for support runners. Handrails are required as defined in the SOW. Steps shall have a 36 inch tread depth and a maximum rise of six inches (6”) between steps. Steps shall have a 48” tread width. Sideboards are required along the outer edges of the steps at a four inches (4”) height. Top platform shall be 60”x60” framed with 2”x6” treated lumber (joist spacing of 16” on center). Top surface of all steps and platform shall be painted with a skid resistant paint material (stick on adhesives are NOT permissible). Steps shall be constructed so that water will NOT accumulate on the walking surface.
Furnish and install ramp
The Contractor shall ensure the ramp is built and installed in accordance with the current Uniform Federal Accessibility Standards are available on the following website: http://www.access-board.gov/ufas/ufas-html/ufas.htm. The contract shall prepare the grade and construct a wooden ramp with level platform, such that the platform provides a level area to the latch side of the door of principal entry into the unit and flush with the doorsill. Contractor shall coordinate ramp design with local authorities to ensure compliance with the current Federal accessibility requirements, State and local requirements as well as the safety of the occupant. The Contractor is responsible for researching the appropriate requirements and incorporating that requirement into the installation time lines.
The Contractor shall provide all supplies and materials. All wood shall be treated, exterior grade framing lumber and shall be used throughout, except for the platform and runway surface, which shall be 2” x 6” treated, exterior lumber. The handrail shall meet UFAS requirements. Nails shall be coated and sized consistent with industry standards. The overall length of the ramp and platform shall be fixed by the height above the grade of the unit sill and the distance to a suitable, firm surface, approach to the ramp. Suitable, firm surfaces shall be firm, stable, and slip resistant and appropriate for use by persons in wheelchairs (All types of wheelchair). For sites lasting up to six months, acceptable initial surface materials, when properly engineered, are asphalt, concrete, soil with stabilizer, crushed rock with mixed aggregate not exceeding 3/4" in size with stabilizer, and boardwalks. For sites lasting longer than 6 months, suitable surface materials are asphalt, concrete, or engineered boardwalks.
The ramp pitch shall be 1:12 maximum, which represents one inch (1”) of height maximum for each twelve inches (12”) in length and shall have landings at the top, bottom, and every 30 feet in length. Platforms must be 60-inch by 60-inch square. The Contractor may supply modular aluminum ramps that are compliant with applicable Federal accessibility standards in lieu of wood ramps provided they are acceptable the local authorities and comply with the foregoing requirements relating. The ramp shall be firmly supported on grade, with mud seals added where necessary because of soil conditions. The ramp and the platform shall have a non-skid surface using materials that are Industrial approved (sand added to paint is unacceptable).
Suitable site approach surfaces shall be firm, stable, and slip resistant and appropriate for use by persons in wheelchairs (All types of wheelchair). For sites lasting up to six months, acceptable initial surface materials, when properly engineered, are asphalt, concrete, soil with stabilizer, crushed rock with mixed aggregate not exceeding 3/4" in size with stabilizer, and boardwalks. For sites lasting longer than 6 months, suitable surface materials are asphalt, concrete, or engineered boardwalks.
Make Unit Ready for Occupancy
Clean and Make Unit Ready for Occupancy. Assemble Accessories and Arrange for Use:
Arrange all furniture for occupancy.
Clean and mount storm window panels.
Install drawers.
Remove window clips; travel blocking and protective taping.
Hang fire extinguisher (report low charge to FEMA inspector).
Mount exterior light fixtures, and install bulbs.
Install interior light globes and covers.
Install un-mounted screens.
Re-install any fallen curtains.
Install cabinet door panels and other knockout panels.
Install commode tank lid and repair, if necessary, cabinet/door/drawer hardware.
The Contractor shall clean and test all appliances, components, and systems associated with the units to include but not be limited to plumbing, electrical, HVAC, exhaust fans, etc.
Activate Utility Systems and Make Minor Repairs (All parts changed must be of same quality.).Test water system and make minor repairs (i.e., tighten, adjust, or replace fittings, flare nuts, faucet washers, ball cocks, shower diverters, faucet sets, etc.); Verify hot/cold water lines, reverse if required.
Tighten or replace loose drain line connections (traps, strainer assemblies, etc.)/.Replace commode wax ring and tank gaskets, as needed.
Tighten loose connections in electrical system.
Test electrical circuits and replace bulbs, breakers, switches, or receptacles, as needed.
Test Appliances and Appurtenances
Activate, test and make any necessary minor repairs to the refrigerator, range, furnace, air conditioner, and water heater for proper operations.
Adjust pilots and burners, change orifices, water heater elements, etc., as needed
Test smoke detectors and replace if faulty. Smoke detector provided by FEMA upon receipt of damaged one
Test exhaust fans for proper operation, repair as needed.
Inspect the unit exterior.
Steps/ramps properly installed and secured with no safety hazard.
The unit is not under any electrical wires.
UFAS requirements incorporated.
The unit is not missing any siding.
The unit has no broken windows and/or doors.
The unit is properly blocked, anchored, and leveled.
The roof has been checked for leaking and/or damage.
There are no exterior water or sewer leaks.
There are no holes, trenches, or other safety hazards around the unit.
All piping has been properly secured and sloped.
Final Clean-Up and Readiness:
Units will be cleaned and inspected by the Contractor to ensure the unit is safe, sanitary and functional to the extent that the units are RFO. As part of this activity to make the units RFO, all furniture, appliances, shelves, and cabinets shall be unpacked, cleaned, assembled, and made ready for use. The Contractor shall install two (2) FEMA-provided “living kits” in each MH. Prior to RFO, the Contractor shall operate AC unit for a minimum of two (2) hours and for as long as possible, up to twenty-four (24) hours to ensure proper function and reliability. Any system failures shall be reported to the COTR.
Modification of Units for Persons with Disabilities
The UFAS Units shall be installed in accordance with UFAS, and shall include ramps.
All improvements within the boundary of the site shall comply with UFAS whether or not it is expressly stated in this outline.
Provide at least one accessible route complying with UFAS from public transportation stops, accessible parking spaces, passenger loading zones and public streets or sidewalks to each accessible and visit-able dwelling unit and to each public and common use facility and element within the boundary of the site (UFAS 4.3).
Place accessible dwelling units nearest public transportation and accessible parking and nearest any public and common use amenities within the boundaries of the site.
Do not cluster all accessible dwelling units into one area. (UFAS 4.1.1) Similarly, do not house persons with disabilities in clusters; provide housing in a setting that integrates households having persons with disabilities with households that do not have persons with disabilities.
Provide sufficient vehicular access ways for Para-transit vehicles (typically, lift-equipped vans) to stop within 200 feet of every accessible dwelling unit entrance.
All retail stores or other privately-operated businesses located on the site must be accessible in accordance with the requirements of Title III of the Americans with Disabilities Act., 42 U.S.C. 12182 and 12183.
Accessible routes shall be firm, stable, and slip resistant. (UFAS 4.5.1)
Acceptable initial surface materials, when properly engineered, are:
Asphalt
Concrete
Soil with stabilizer
Crushed rock with mixed aggregate not exceeding 3/4" in size with stabilizer
Boardwalks
For developments lasting longer than 6 months, replace the initial surface materials with asphalt, concrete, or engineered boardwalks as needed and directed by the COTR at no additional costs to the government.
Accessible routes must slope no more than 8.33%. Any portion of the accessible route that slopes more than 5% shall be constructed as a ramp, with handrails on sides, edge protection, and other ramp features (UFAS 4.3.7).
Accessible routes must cross slope no more than 2% (UFAS 4.3.7).
Accessible routes shall be at lest 3'-0" wide and have 5'-0" x 5'-0" passing areas every 200' (UFAS 4.3.4).
Skirting of Manufactured Homes
The Contractor shall furnish and install vinyl skirting on the entire perimeter of a manufactured home or other type of pre-fabricated housing or structure in accordance with manufacturer’s recommendations and all Federal, State, and Local Codes. The Contractor must supply all materials. All sewer, water, and electric feeds shall enter the MH from under the unit inside the skirting.
Staging Area Design & Construction
The Contractor shall construct all items in this section in accordance with Federal, State, and local regulations or codes. The Contractor shall also follow all applicable engineering design guidelines to ensure that all maintenance issues for the staging area a kept at a bare minimum. All items in this section shall be approved and accepted by FEMA DHOPS.
Before construction of the staging commences the Contractor may be required to complete all environmental documentation required by Federal, State, and Local Authorities. This may require but not be limited too NEPA, FONSI, NPDES, etc.
No construction activities can begin prior to acceptance of all environmental documentation unless waivers are obtained from the appropriate regulating agency.
The Contractor shall grade the site to prevent any standing water. The site shall be compacted to support the load of several mobile homes without sinking. The roads throughout the staging area shall be construction with filter fabric and a durable gravel to adequately meet the soil characteristics.
The Contractor will typically be required to install 8’ chain link fencing around the perimeter of the staging area with appropriate entrance and exit gates as directed by FEMA. These gates are typically 16’ in length each. The Contractor shall also provide lighting for the site by means of portable light plants or by connecting to existing service.
Other items that may be required include guard shacks, utilities for FEMA trailers, etc.
All items completed as mentioned above shall be in accordance with all Federal, State, Tribal and Local regulations or codes.