QA_HSCG87-14-B-PJT672_-_Updated_Responses.pdf

PDF 10 KB Posted

Attached to
Construction Services for Building 54 at USCG Base Kodiak, Alaska
Solicitation number
HSCG87-14-B-PJT648
Issued by

View the file

Other files

File Type Posted
Abstract_of_Offerors_HSCG87-14-B-PJT648.pdf PDF
Abstract_of_Offerors_HSCG87-14-B-PJT648.pdf PDF
Amendment_0002_HSCG87-14-B-PJT648.pdf PDF
Amendment_0001_HSCG87-14-B-PJT648_Bldg54.pdf PDF
33-Q5154_(Building_54_Drawings)-06A_MECHANICAL-3.pdf PDF
Bar54final_EHS_Survey_results_full_report1.pdf PDF
Bar54final__EHS_Survey_results_extract.pdf PDF
Bldg_54_NW_ACM_Prelim_Sample_Results.pdf PDF
Building_54_NW_TO_2_ACM_Abatement_Report_March_2013.pdf PDF
Exterior_Felt_Results_SKMBT_42113050111040.pdf PDF
ECH_acm_survey_results.pdf PDF
Final_Building_54_NW_TO_1_ACM..._Report_-with_appendices2.pdf PDF
DD1149_toHWSB.pdf PDF
BR549_Kodiak_Siding_Manual_FINAL_130704.pdf PDF
SOP-ExemptSolidWasteLandfill-28Oct2010.pdf PDF
Contractors_UEG-withChartsandForms-2003.pdf PDF
20131124__BASE_KODIAK_STANDARD__CONSTRUCTION_SPEC_MASTER.pdf PDF
33-Q5154_(Building_54_Drawings)-08_ELECTRICAL-2.pdf PDF
33-Q5154_(Building_54_Drawings)-07_ELECTRICAL-1.pdf PDF
33-Q5154_(Building_54_Drawings)-09_FIRE_PROTECTION.pdf PDF
33-Q5154_(Building_54_Drawings)-03_ARCHITECTURAL-2.pdf PDF
33-Q5154_(Building_54_Drawings)-06_MECHANICAL-2.pdf PDF
33-Q5154_(Building_54_Drawings)-05_MECHANICAL-1.pdf PDF
33-Q5154_(Building_54_Drawings)-02_ARCHITECTURAL-1.pdf PDF
33-Q5154_(Building_54_Drawings)-01_GENERAL-CIVIL.pdf PDF
33-Q5154_(Building_54_Drawings)-04_STRUCTURAL.pdf PDF
HSCG87-14-B-PJT648_1442_ _IFB.pdf PDF
AK140001_02.07.14_AK1.pdf PDF
33Q5154_USCGKodiakBldg54RenovFINALSpecs.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG87-14-B-PJT672 Questions & Answers Lake Louise Housing – Revision 1

Q1. Is it the intent of this project to replace the GLB supports under the decks?

A. Refer to Section 02 05 00, Paragraph 3.1.E for deck demolition requirements, and Deck As-Built plans included in Drawings.

Revised Q1 Answer: In preparation of the plans and specifications, USCG assumed the major structural elements of the decks are re-usable or require minor repairs, including the GLB supports, beam seats and support foundations with little or no repairs required. The demolition is intended for decking, railings, stairs, clips, angles or any structural elements that are not reusable.

Q2. In order to replace beam seats new concrete work will be required. Is this the intent?

A. Refer to Q1 response.

Revised Q2 Answer: In preparation of the plans and specifications, USCG assumed that minimal concrete work would be required since the assumption was the majority of structural elements are reusable or will only require minor repairs and/or replacement.

NOTE: If different conditions are encountered other than the USCG assumptions in the responses to Q1 and Q2, this would likely fall into a ‘Differing Site Condition’ and would be subject to the Changes clause of the contract.

File details come from the government source that posted it. Updated .